Loading...
HomeMy WebLinkAbout20180029 Ver 1_Stormwater Info_20180306Transmittal 601 North Trade St Suite 200, Winston Salem, NC 27101 Page 1 of 2 PROJECT:EGGER - DAVIDSON COUNTY 17-212 DATE:2/6/2018 SUBJECT:Stormwater Management Submittal TRANSMITTAL ID:00018 PURPOSE:For your approval VIA:Info Exchange FROM NAME COMPANY EMAIL PHONE Neal Tucker 601 North Trade St Suite 200 Winston Salem NC 27101 United States Stimmel Associates, P.A.NTucker@stimmelpa.com 336-723-1067 TO NAME COMPANY EMAIL PHONE Chonticha McDaniel 1617 Mail Service Center Raleigh, NC 27699-1617 United States of America NC Division of Water Resources, 401 & Buffer Permitting Branch chonticha.mcdaniel@ ncdenr.gov (919) 870-6379 REMARKS: Chonticha, The stormwater documents for the Egger project are too large to e-mail, so I am transmitting a link for you to download them from our Information Exchange server. Stormwater plans, calculations, stormwater permit application and re-treatment exhibit are included. Click the link in this transmittal to download the files. Let me know if you have any questions. Thanks. Neal Tucker Transmittal DATE:2/6/2018 TRANSMITTAL ID:00018 Page 2 of 2 DESCRIPTION OF CONTENTS QTY DATED TITLE NOTES 1 2/6/2018 Egger PRE-TREATMENT EXHIBIT.pdf 1 2/5/2018 Egger SWM Application.pdf 1 2/6/2018 Egger SWM Calculations.pdf 1 2/6/2018 Egger SWM Plans Full Set_2-1-18.pdf COPIES: Sue Homewood (NCDENR W-S Regional Office) Brad Luckey (Pilot Environmental, Inc) Wilbur Christmas (Stimmel Associates, P.A.) GI107GI106GI105GI104GI102GI101OUTLET100GI201OUTLET200GI202GI203GI204GI205GI206GI207GI209GI103GI208PERMANENTDIVERSIONCHANNELINSTALLEDDURINGSTAGE1EROSIONCONTROL.GI210GI211CHECKEDBY:DRAWNBY:ISSUEDATE:DESIGNMANAGER:DESIGNCOORDINATOR:ARCHITECT:CIVIL/STRUCTURAL:MECHANICAL/ELECTRICAL/PLUMBING:REVISIONS:17-21212/04/2017WECJNTNo.DescriptionDatePHASE1ABUILDINGS04/05/06(OFFICE/TRAININGCENTER)LEXINGTON,NORTHCAROLINASHEETNAME:SHEETNUMBER:PROJECTNO:DESIGNCONSULTANTS:ANEWMANUFACTURINGFACILITYAIssuedforReview12/04/2017WoodsProductsLLCEGGERBIssuedforReview12/22/2017CIssuedforReview12/28/2017DIssuedforReview01/11/2018EIssuedforReview01/15/2018FIssuedforBid01/23/2018GIssuedforPermitting01/31/2018HBidRevision02/01/2018EXHIBITNorth0SCALE:1"=120'120120240360RETAININGWALLRETAININGWALLACCESSROADEGGERPARKWAYBYOTHERSDUKEENERGYACCESSROADTOR/W.DUKEENERGYSUBSTATIONPAD.WETDETENTIONPOND.SEESW-401.RELOCATEDDUKEENERGYTRANSMISSIONLINE.FUTUREPHASE3HATCHAREAREPRESENTTHEAREADESIGNATEDBYEGGERWOODPRODUCTSASPRODUCINGCATEGORY2STORMRUNOFFREQUIRINGPRE-TREATMENTPRIORTODISCHARGINGTOTHESTORMWATERMANAGEMENTPOND.RETAININGWALLEGGERPARKWAYSTORMOUTFALLBYOTHERSMASSGRADINGCONTOURS.SEEPHASEPLANSBYOTHERSFORFINALGRADING.PONDDRAINAGEAREA(TYP)EGGERENTRANCEN35°44'43.0788"W80°20'23.4852"PROPERTYLINE(TYP)PROPERTYLINE(TYP)PROPERTYLINE(TYP)PROPERTYLINE(TYP)S O U T H P O T T S C R .WETLANDS(TYP).ALLWETLANDSHAVEBEENDELINEATEDBYPILOTENVIRONMENTAL.WETLANDS(TYP).ALLWETLANDSHAVEBEENDELINEATEDBYPILOTENVIRONMENTAL. STORMWATER MANAGEMENT CALCULATIONS AND SUPPORTING INFORMATION EGGER WOOD PRODUCTS, LLC Linwood Davidson County, N.C. Project # 17-212 Owner: Egger Wood Products, LLC 300 Egger Parkway Linwood, NC 27299 By: 2/06/2018 Hydrologic Soil Group—Davidson County, North Carolina (Egger Wood Products) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/16/2018 Page 1 of 3395460039549003955200395550039558003956100395460039549003955200395550039558003956100558100558400558700559000559300559600559900560200560500560800 558100 558400 558700 559000 559300 559600 559900 560200 560500 560800 35° 44' 54'' N 80° 21' 30'' W35° 44' 54'' N80° 19' 38'' W35° 43' 55'' N 80° 21' 30'' W35° 43' 55'' N 80° 19' 38'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 500 1000 2000 3000 Feet 0 150 300 600 900 Meters Map Scale: 1:12,800 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Davidson County, North Carolina Survey Area Data: Version 18, Sep 26, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2015—Mar 15, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Davidson County, North Carolina (Egger Wood Products) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/16/2018 Page 2 of 3 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ArA Armenia loam, 0 to 2 percent slopes, frequently flooded C/D 6.8 2.3% CcB Cecil sandy loam, 2 to 8 percent slopes B 4.6 1.6% CcD Cecil sandy loam, 8 to 15 percent slopes A 10.8 3.7% ChA Chewacla loam, 0 to 2 percent slopes, frequently flooded B/D 32.7 11.2% DdB Davidson loam, 2 to 8 percent slopes B 115.4 39.3% DdD Davidson loam, 8 to 15 percent slopes B 5.1 1.7% MeB Mecklenburg loam, 2 to 8 percent slopes C 7.7 2.6% MeD Mecklenburg loam, 8 to 15 percent slopes C 4.9 1.7% PaE Pacolet sandy loam, 15 to 25 percent slopes B 13.2 4.5% Ud Udorthents, loamy C 64.5 22.0% Ur Urban land 20.1 6.8% W Water 7.6 2.6% Totals for Area of Interest 293.4 100.0% Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Davidson County, North Carolina Egger Wood Products Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/16/2018 Page 3 of 3 Project :Egger Wood Products Sheet : 1 Project No.:17-212 Date : 2/5/2018 Designed by:WC Revised: Checked by: SCS RUNOFF CURVE NUMBERS- SITE DRAINAGE AREA PRE-DEVELOPED CONDITIONS BASIN LAND USE SOIL HYDROL. AREA AREA CURVE NO CN x NAME GROUP (AC.) ( % ) (CN)AREA N/A N/A 6.37 4.36%98 624 N/A N/A 1.98 1.36%98 194 * C 1.05 0.72%70 74 Woods-Good DdB B 0.38 0.26%55 21 Ud C 5.31 3.63%65 345 DdB B 0.28 0.19%48 13 ArA D 4.27 2.92%73 312 * C 47.60 32.58%71 3380 ArA D 6.92 4.74%78 540 Meadow-Good ** B 71.93 49.24%58 4172 *Ud,MeB,MeD **DdB,PaE,DdD TOTALS 146.09 46.0% 9674 WEIGHTED CN (PRE-DEVELOPED) = 66 POST-DEVELOPED CONDITIONS BASIN LAND USE SOIL HYDROL. AREA AREA CURVE NO CN x NAME GROUP (AC.) ( % ) (CN)AREA N/A N/A 137.63 94.21%98 13488 N/A N/A 3.32 2.27%98 325 Ud C 5.14 3.52%74 380 *NaB,TdC,CoA TOTALS 146.09 100.0% 14193 WEIGHTED CN (DEVELOPED) = 97 Water-Pond Open Space Good Brush-Good Brush-Good Meadow-Good Meadow-Good Impervious Water Woods-Good Brush-Good Impervious NOAA Atlas 14, Volume 2, Version 3 Location name: Linwood, North Carolina, USA* Latitude: 35.7417°, Longitude: -80.3437° Elevation: 692.37 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular |PF_graphical |Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.385 (0.354-0.418) 0.456 (0.420-0.497) 0.531 (0.488-0.578) 0.582 (0.534-0.631) 0.637 (0.582-0.691) 0.672 (0.612-0.729) 0.703 (0.635-0.762) 0.727 (0.654-0.790) 0.751 (0.670-0.817) 0.765 (0.677-0.834) 10-min 0.615 (0.566-0.668) 0.729 (0.672-0.795) 0.851 (0.782-0.926) 0.931 (0.854-1.01) 1.01 (0.927-1.10) 1.07 (0.974-1.16) 1.12 (1.01-1.21) 1.15 (1.04-1.25) 1.19 (1.06-1.29) 1.21 (1.07-1.31) 15-min 0.769 (0.707-0.835) 0.917 (0.845-0.999) 1.08 (0.989-1.17) 1.18 (1.08-1.28) 1.29 (1.18-1.40) 1.36 (1.23-1.47) 1.41 (1.28-1.53) 1.45 (1.31-1.58) 1.50 (1.33-1.63) 1.51 (1.34-1.65) 30-min 1.05 (0.970-1.15) 1.27 (1.17-1.38) 1.53 (1.41-1.66) 1.71 (1.56-1.85) 1.91 (1.74-2.07) 2.04 (1.86-2.22) 2.16 (1.95-2.35) 2.26 (2.04-2.46) 2.38 (2.12-2.59) 2.45 (2.17-2.67) 60-min 1.31 (1.21-1.43) 1.59 (1.46-1.73) 1.96 (1.80-2.13) 2.22 (2.04-2.41) 2.54 (2.32-2.75) 2.77 (2.52-3.00) 2.98 (2.69-3.23) 3.17 (2.86-3.45) 3.41 (3.04-3.71) 3.58 (3.16-3.90) 2-hr 1.52 (1.40-1.65) 1.84 (1.69-2.00) 2.28 (2.10-2.48) 2.61 (2.39-2.83) 3.02 (2.76-3.27) 3.33 (3.02-3.60) 3.62 (3.27-3.93) 3.90 (3.49-4.24) 4.26 (3.77-4.63) 4.51 (3.95-4.90) 3-hr 1.62 (1.49-1.76) 1.95 (1.80-2.13) 2.44 (2.24-2.65) 2.79 (2.56-3.03) 3.25 (2.97-3.52) 3.60 (3.27-3.90) 3.94 (3.55-4.26) 4.27 (3.82-4.62) 4.70 (4.15-5.09) 5.01 (4.37-5.44) 6-hr 1.96 (1.80-2.13) 2.36 (2.18-2.57) 2.94 (2.70-3.20) 3.38 (3.10-3.67) 3.96 (3.61-4.30) 4.42 (4.00-4.78) 4.87 (4.37-5.26) 5.32 (4.72-5.74) 5.91 (5.18-6.39) 6.36 (5.50-6.88) 12-hr 2.30 (2.12-2.51) 2.77 (2.56-3.04) 3.47 (3.19-3.79) 4.02 (3.68-4.38) 4.76 (4.32-5.17) 5.34 (4.81-5.78) 5.94 (5.30-6.41) 6.55 (5.78-7.07) 7.37 (6.40-7.95) 8.00 (6.84-8.63) 24-hr 2.76 (2.57-2.98) 3.34 (3.11-3.59) 4.17 (3.88-4.49) 4.83 (4.49-5.20) 5.71 (5.29-6.15) 6.41 (5.93-6.90) 7.13 (6.57-7.67) 7.86 (7.22-8.46) 8.85 (8.09-9.55) 9.62 (8.76-10.4) 2-day 3.21 (2.99-3.44) 3.86 (3.60-4.14) 4.79 (4.47-5.13) 5.51 (5.13-5.90) 6.47 (6.01-6.93) 7.23 (6.70-7.75) 7.99 (7.39-8.57) 8.78 (8.09-9.42) 9.83 (9.01-10.6) 10.6 (9.73-11.5) 3-day 3.41 (3.19-3.65) 4.09 (3.83-4.38) 5.05 (4.73-5.41) 5.81 (5.42-6.21) 6.82 (6.34-7.29) 7.61 (7.06-8.15) 8.42 (7.79-9.03) 9.24 (8.53-9.92) 10.4 (9.51-11.1) 11.2 (10.3-12.1) 4-day 3.61 (3.39-3.86) 4.33 (4.06-4.63) 5.32 (4.99-5.69) 6.11 (5.71-6.52) 7.16 (6.67-7.66) 8.00 (7.43-8.56) 8.85 (8.20-9.48) 9.71 (8.97-10.4) 10.9 (10.0-11.7) 11.8 (10.8-12.7) 7-day 4.16 (3.92-4.43) 4.96 (4.67-5.29) 6.03 (5.66-6.42) 6.87 (6.44-7.31) 8.01 (7.50-8.53) 8.92 (8.32-9.50) 9.84 (9.15-10.5) 10.8 (9.99-11.5) 12.1 (11.1-12.9) 13.0 (12.0-14.0) 10-day 4.74 (4.49-5.02) 5.63 (5.33-5.97) 6.76 (6.39-7.16) 7.64 (7.22-8.10) 8.83 (8.31-9.35) 9.76 (9.17-10.3) 10.7 (10.0-11.4) 11.6 (10.9-12.4) 12.9 (12.0-13.8) 13.9 (12.9-14.9) 20-day 6.38 (6.06-6.71) 7.52 (7.14-7.91) 8.88 (8.42-9.34) 9.95 (9.43-10.5) 11.4 (10.8-12.0) 12.6 (11.8-13.2) 13.7 (12.9-14.5) 14.9 (13.9-15.7) 16.5 (15.3-17.5) 17.7 (16.4-18.8) 30-day 7.89 (7.53-8.27) 9.27 (8.85-9.71) 10.8 (10.3-11.3) 11.9 (11.4-12.5) 13.5 (12.8-14.1) 14.6 (13.9-15.3) 15.8 (14.9-16.5) 16.9 (16.0-17.8) 18.5 (17.3-19.4) 19.6 (18.4-20.7) 45-day 9.92 (9.52-10.4) 11.6 (11.1-12.1) 13.3 (12.7-13.8) 14.6 (13.9-15.2) 16.2 (15.5-16.9) 17.5 (16.7-18.3) 18.7 (17.8-19.6) 20.0 (18.9-20.9) 21.6 (20.4-22.6) 22.8 (21.4-23.9) 60-day 11.8 (11.4-12.3) 13.8 (13.3-14.3) 15.5 (15.0-16.2) 16.9 (16.2-17.6) 18.6 (17.9-19.4) 20.0 (19.1-20.8) 21.2 (20.3-22.1) 22.4 (21.4-23.4) 24.0 (22.8-25.1) 25.2 (23.9-26.4) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Back to Top Maps & aerials Small scale terrain Large scale terrain Large scale map + – 3km 2mi + – 100km 60mi + – 100km 60mi Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer + – 100km 60mi Project:Egger Wood Products Project No.:17-212 Date:2/5/2018 Designed By:WC Revised: Checked By: POND NAME: Egger Wood Products DA: 146.09 Ac 146.09 AC % Imp: 96.48 %140.95 AC Imp. Rd: 1 in Rv: 0.92 Volume Required: 486999 cf Calculation from NCDEQ Stormwater Design Manual Water Quality Simple Method Project:Egger Wood Products Project No.:17-212 Date:2/5/2018 Designed By:WC Revised: Checked By: WET DETENTION BASIN AVERAGE DEPTH Calculation from NCDEQ Stormwater Design Manual VPP(cf)= 985,916 Main Pool Volume APP(sf)= 116,538 Main Pool Area davg(ft)= 8.46 Use (ft) 8 FORBAY SIZE CHECK ELEVATION POND AREA (SF) POND VOL. (CF) N-FORBAY AREA (SF) N-FORBAY VOL. (CF) S-FORBAY AREA (SF) S-FORBAY VOL. (CF) 641.5 90,122 0 1,414 0 2,061 0 642 91,574 45,424 2,686 1,025 3,828 1,472 643 94,502 93,038 6,201 4,444 9,130 6,479 644 97,464 95,983 6,865 6,533 10,010 9,570 645 100,460 98,962 7,560 7,213 10,931 10,471 646 103,490 101,975 8,286 7,923 11,893 11,412 647 106,554 105,022 9,044 8,665 12,895 12,394 648 109,652 108,103 9,831 9,438 13,935 13,415 649 112,786 111,219 10,650 10,241 15,013 14,474 650 116,538 226,190 11,786 21,617 16,357 30,292 985,916 77,097 109,979 Pond Vol.: 985,916 cf Forbay Vol.: 187,076 cf Forbay %: 18.97 OK Project:Egger Wood Products Project No.:17-212 Date:2/5/2018 Designed By:WC Revised: Checked By: Average Depth: 8.00 ft Drainage Area: 146.09 AC Impervious Cover: 96.48 % NCDEQ STORMWATER DESIGN MANUAL TABLE 1: PIEDMONT AND MOUNTAINS SA/DA PERCENT Permanent Pool Average Depth (ft) IMPERVIOUS COVER 3.0 4.0 5.0 6.0 7.0 8.0 10 0.51 0.43 0.37 0.30 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.40 30 1.17 0.94 0.84 0.72 0.61 0.56 40 1.51 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 70 2.51 2.09 1.80 1.56 1.34 1.17 80 2.92 2.41 2.07 1.82 1.62 1.40 90 3.25 2.64 2.31 2.04 1.84 1.59 100 3.55 2.79 2.52 2.34 2.04 1.75 96.48 1.69 SA/DA= 1.69 Surface Area Required: 107,782 sf Surface Area Provided: 116,538 sf Project :Egger Wood Products Sheet : 1 Project No.:17-212 Date : 2/5/2018 Designed by:WC Revised: Checked by: Temporary WQ Pool Drawdown From NCDEQ Stormwater Design Manual Orifice Size:10 in 0.83 ft Orifice Area: 0.545 ft^2 Orifice Invert:650.00 Permanent Pool Area at Elev. 650.00= 144,681 sf Orifice Centroid: 650.42 Top Temp. Pool: 653.37 Driving Head: 2.95 ft Ho: 0.983 ft Q= 2.604 CFS t = V / Q t :Drawdown Time {sec} V :emp. Pool Volum {CF} = 486,999 Q: Flow {CF/S}= 2.604 t = 187026.78 sec 2.16 day Project: Egger Wood Products Project No.: 17-212 Sheet: 1 Designed By: WC Date: 2/5/2018 Checked By: WC Structure Location / Identifier: 8'x8' Riser with 54" TC 50 DI Barrel RECTANGULAR PRECAST CONCRETE STRUCTURE FLOATATION CALCULATIONS UNIT WEIGHT OF WATER = 62.4 PCF UNIT WEIGHT OF CONCRETE (In Air) = 145.0 PCF ANTI-BOUYANCY FACTOR OF SAFETY = 1.15 Note: Excludes weigth of trash rack UNIT WEIGHT OF PIPE MATERIAL = 351 # / LF 54" DI TC 50 RECTANGULAR STRUCTURE OUTSIDE OUTSIDE WALL WALL BASE LEN (FT) WID (FT) THK (IN) HT (FT) THK (IN) WALLS: 9.33 9.33 8.00 12.40 BASE: 13.33 13.33 34.00 DISPLACED VOLUME / WEIGHT ADDS: (COLLARS) HT (FT) WID (FT) THK (IN) # DISPL. BOUYANT ADD 1: 7.14 9.33 12 1 VOLUME WEIGHT FORCE ADD 2:0000 (CF)(LBS)(LBS) WALLS 1079.41 41,538 67,355 WEIGHT DEDUCTS:BASE 503.45 73,001 31,415 CORES:DIA (IN) THK (IN) #STRUCTURE: 1582.86 114,538 98,770 CORE 1: 57.56 8 1 CORE 2: 12 8 1 BARREL 72.28 1,404 4,510 CORE 3: 0 0 0 COLLAR 1 66.62 9659 4,157 NOTCH:WID (IN) HT (IN) # COLLAR 2 0.00 0 0 NOTCH 1 0 0 0 NOTCH 1 -N/A- 0 -N/A- NOTCH 2 0 0 0 NOTCH 2 -N/A- 0 -N/A- CORE 1 -N/A- -1,747 -N/A- EXPOSED BARREL CORE 2 -N/A- -76 -N/A- LEN (FT) DIA (IN) CORE 3 -N/A- 0 -N/A- 4.00 57.56 INSTALLED TOTALS 1721.76 123,779 107,438 BOUYANT FORCE = 107,438 LBS ACTING UPWARD STRUCTURE WEIGHT = 123,779 LBS ACTING DOWNWARD NET FORCE = 16,341 ACTING DOWNWARD F.S. = 1.152 BALLAST REQUIREMENTS :NO BALLAST REQUIRED FACTOR LENGTH WIDTH THICKNESS VOLUME WEIGHT OF ACTUAL BALLAST :(FT) (FT) (FT) (CF) (LBS) SAFETY 00 0 0.0 - 1.15 BASE SECTION WEIGHT :BASE HEIGHT (FT) = 0 GROSS BASE WEIGHT (LBS) = 73,001 BASE SECTION BLOCK OUTS :DIA # OF WEIGHT (SHIPPING CONDITION) (IN) BLOCK OUTS (LBS) 10NET BASE SECTION 20SHIPPING WEIGHT : 3 0 73,001 LBS. Appendices Rev. 12/93 8.06.3 1 - PRE-DEVELOPMENT 2 - POST-DEVELOPMENT 3 - POND ROUTING Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Project: Egger.gpw Monday, 02 / 5 / 2018 Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Pond No. 1 - EGGER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 641.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft)Total storage (cuft) 0.00 641.00 90,121 0 0 1.00 642.00 98,088 94,105 94,105 2.00 643.00 109,833 103,961 198,065 3.00 644.00 114,339 112,086 310,151 4.00 645.00 118,951 116,645 426,796 5.00 646.00 123,669 121,310 548,106 6.00 647.00 128,493 126,081 674,187 7.00 648.00 133,418 130,956 805,143 8.00 649.00 138,449 135,934 941,076 9.00 650.00 144,681 141,565 1,082,641 10.00 651.00 156,542 150,612 1,233,253 11.00 652.00 161,912 159,227 1,392,480 12.00 653.00 167,832 164,872 1,557,352 12.50 653.50 170,826 84,664 1,642,016 13.00 654.00 173,842 86,167 1,728,183 14.00 655.00 179,941 176,892 1,905,075 14.50 655.50 183,024 90,741 1,995,816 15.00 656.00 186,130 92,288 2,088,104 16.00 657.00 192,409 189,270 2,277,374 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 54.00 10.00 0.00 0.00 Span (in)= 54.00 10.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft)= 641.00 650.00 0.00 0.00 Length (ft)= 169.00 0.50 0.00 0.00 Slope (%)= 5.47 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 32.00 34.00 0.00 0.00 Crest El. (ft)= 653.40 655.50 0.00 0.00 Weir Coeff.= 3.00 3.37 3.33 3.33 Weir Type = 1 Ciplti --- --- Multi-Stage = Yes No No No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 Stage (ft) 0.00 641.00 3.00 644.00 6.00 647.00 9.00 650.00 12.00 653.00 15.00 656.00 18.00 659.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 1 PRE-DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 6.069 cfs Storm frequency = 1 yrs Time to peak = 3.73 hrs Time interval = 2 min Hyd. volume = 74,189 cuft Drainage area = 146.090 ac Curve number = 66 Basin Slope = 1.6 % Hydraulic length = 4384 ft Tc method = KIRPICH Time of conc. (Tc) = 24.57 min Total precip. = 1.96 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 1 PRE-DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 14.55 cfs Storm frequency = 2 yrs Time to peak = 2.90 hrs Time interval = 2 min Hyd. volume = 142,354 cuft Drainage area = 146.090 ac Curve number = 66 Basin Slope = 1.6 % Hydraulic length = 4384 ft Tc method = KIRPICH Time of conc. (Tc) = 24.57 min Total precip. = 2.36 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 2 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 1 PRE-DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 59.42 cfs Storm frequency = 10 yrs Time to peak = 2.73 hrs Time interval = 2 min Hyd. volume = 384,193 cuft Drainage area = 146.090 ac Curve number = 66 Basin Slope = 1.6 % Hydraulic length = 4384 ft Tc method = KIRPICH Time of conc. (Tc) = 24.57 min Total precip. = 3.38 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 3 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 1 PRE-DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 157.93 cfs Storm frequency = 100 yrs Time to peak = 2.67 hrs Time interval = 2 min Hyd. volume = 855,977 cuft Drainage area = 146.090 ac Curve number = 66 Basin Slope = 1.6 % Hydraulic length = 4384 ft Tc method = KIRPICH Time of conc. (Tc) = 24.57 min Total precip. = 4.87 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 4 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 2 POST-DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 181.13 cfs Storm frequency = 1 yrs Time to peak = 2.57 hrs Time interval = 2 min Hyd. volume = 852,038 cuft Drainage area = 146.090 ac Curve number = 97 Basin Slope = 1.6 % Hydraulic length = 4384 ft Tc method = KIRPICH Time of conc. (Tc) = 24.57 min Total precip. = 1.96 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) POST-DEVELOPMENT Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 2 POST-DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 223.48 cfs Storm frequency = 2 yrs Time to peak = 2.57 hrs Time interval = 2 min Hyd. volume = 1,057,367 cuft Drainage area = 146.090 ac Curve number = 97 Basin Slope = 1.6 % Hydraulic length = 4384 ft Tc method = KIRPICH Time of conc. (Tc) = 24.57 min Total precip. = 2.36 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 2 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) POST-DEVELOPMENT Hyd. No. 2 -- 2 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 2 POST-DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 330.45 cfs Storm frequency = 10 yrs Time to peak = 2.57 hrs Time interval = 2 min Hyd. volume = 1,584,455 cuft Drainage area = 146.090 ac Curve number = 97 Basin Slope = 1.6 % Hydraulic length = 4384 ft Tc method = KIRPICH Time of conc. (Tc) = 24.57 min Total precip. = 3.38 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 3 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (hrs) POST-DEVELOPMENT Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 2 POST-DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 484.98 cfs Storm frequency = 100 yrs Time to peak = 2.57 hrs Time interval = 2 min Hyd. volume = 2,358,236 cuft Drainage area = 146.090 ac Curve number = 97 Basin Slope = 1.6 % Hydraulic length = 4384 ft Tc method = KIRPICH Time of conc. (Tc) = 24.57 min Total precip. = 4.87 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 4 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 70.00 70.00 140.00 140.00 210.00 210.00 280.00 280.00 350.00 350.00 420.00 420.00 490.00 490.00 Q (cfs) Time (hrs) POST-DEVELOPMENT Hyd. No. 2 -- 100 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 27.38 cfs Storm frequency = 1 yrs Time to peak = 4.53 hrs Time interval = 2 min Hyd. volume = 825,210 cuft Inflow hyd. No. = 2 - POST-DEVELOPMENT Max. Elevation = 653.78 ft Reservoir name = EGGER Max. Storage = 1,690,378 cuft Storage Indication method used. Wet pond routing start elevation = 650.00 ft. 1 0 8 16 24 32 40 48 56 64 72 80 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) POND ROUTING Hyd. No. 3 -- 1 Year Hyd No. 3 Hyd No. 2 Total storage used = 1,690,378 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 48.23 cfs Storm frequency = 2 yrs Time to peak = 3.57 hrs Time interval = 2 min Hyd. volume = 1,030,490 cuft Inflow hyd. No. = 2 - POST-DEVELOPMENT Max. Elevation = 653.99 ft Reservoir name = EGGER Max. Storage = 1,726,061 cuft Storage Indication method used. Wet pond routing start elevation = 650.00 ft. 2 0 6 12 18 24 30 36 42 48 54 60 66 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) POND ROUTING Hyd. No. 3 -- 2 Year Hyd No. 3 Hyd No. 2 Total storage used = 1,726,061 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 154.13 cfs Storm frequency = 10 yrs Time to peak = 2.93 hrs Time interval = 2 min Hyd. volume = 1,557,488 cuft Inflow hyd. No. = 2 - POST-DEVELOPMENT Max. Elevation = 654.74 ft Reservoir name = EGGER Max. Storage = 1,858,786 cuft Storage Indication method used. Wet pond routing start elevation = 650.00 ft. 3 0 4 8 12 16 20 24 28 32 36 40 44 48 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (hrs) POND ROUTING Hyd. No. 3 -- 10 Year Hyd No. 3 Hyd No. 2 Total storage used = 1,858,786 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 02 / 5 / 2018 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 284.96 cfs Storm frequency = 100 yrs Time to peak = 2.87 hrs Time interval = 2 min Hyd. volume = 2,331,185 cuft Inflow hyd. No. = 2 - POST-DEVELOPMENT Max. Elevation = 655.83 ft Reservoir name = EGGER Max. Storage = 2,056,460 cuft Storage Indication method used. Wet pond routing start elevation = 650.00 ft. 4 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 70.00 70.00 140.00 140.00 210.00 210.00 280.00 280.00 350.00 350.00 420.00 420.00 490.00 490.00 Q (cfs) Time (hrs) POND ROUTING Hyd. No. 3 -- 100 Year Hyd No. 3 Hyd No. 2 Total storage used = 2,056,460 cuft DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules:  Coastal SW – 1995  Coastal SW – 2008  Ph II - Post Construction (select all that apply)  Non-Coastal SW- HQW/ORW Waters  Universal Stormwater Management Plan  Other WQ Mgmt Plan: Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Egger Wood Products, LLC 2. Location of Project (street address): 300 Egger Parkway City:Linwood County:Davidson Zip:27299 3. Directions to project (from nearest major intersection): From the intersection of I-85 and Belmont Rd. (Hwy 47) Travel East on Belmont approximately 1 mile to the Intersection of Belmont Rd. (Hwy 47) and Clyde Fitzgerald Rd. (SR 1287) and Egger Parkway (under construction). Turn right on Egger Parkway and travel approximately 0.2 miles to entrance on right. 4. Latitude:35° 44’ 43.0788” N Longitude:80° 20’ 23.4852” W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): New Modification Renewal w/ Modification† †Renewals with modifications also requires SWU-102 – Renewal Application Form b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: Not Started Partially Completed* Completed* *provide a designer’s certification 2. Specify the type of project (check one): Low Density High Density Drains to an Offsite Stormwater System Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, . 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): CAMA Major Sedimentation/Erosion Control: 181 ac of Disturbed Area NPDES Industrial Stormwater 404/401 Permit: Proposed Impacts 0.24 wetland,1.0 pond,49 lf stream b. If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? No Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official’s name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Egger Wood Products, LLC Signing Official & Title:Bernhard Vorreiter, Manager b. Contact information for person listed in item 1a above: Street Address:300 Egger Parkway City:Linwood State:NC Zip:27299 Mailing Address (if applicable):PO Box 907 City:Lexington State:NC Zip:27293 Phone: (980 ) 267-7050 Fax: ( ) Email:bernhard.vorreiter@egger.com c. Please check the appropriate box. The applicant listed above is: The property owner (Skip to Contact Information, item 3a) Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner’s name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Davidson County Signing Official & Title:Zeb Hanner, County Manager b. Contact information for person listed in item 2a above: Street Address:913 Greensboro Street City:Leington State:NC Zip:27292 Mailing Address (if applicable):PO Box 1067 City:Lexington State:NC Zip:27293 Phone: (336 ) 242-2200 Fax: ( ) Email:zeb.hanner@davidsoncountync.gov 3. a. (Optional) Print the name and title of another contact such as the project’s construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits: Davidson County Point of Contact:Todd Hancock, Director Phone #: (336 ) 242-2807 Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be conveyed to a wet detention pond designed to remove 85% of TSS. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: Approval of a Site Specific Development Plan or PUD Approval Date: Valid Building Permit Issued Date: Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: Coastal SW – 1995 Ph II – Post Construction 3. Stormwater runoff from this project drains to the Yadkin Pee-Dee River basin. 4. Total Property Area: 167.044 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) – Total Coastal Wetlands Area (5) – Total Surface Water Area (6) = Total Project Area+: acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 84.38 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area Drainage Area Drainage Area Receiving Stream Name South Potts Cr. Stream Class * C Stream Index Number * 12-111 Total Drainage Area (sf) 6,363,680 On-site Drainage Area (sf) Off-site Drainage Area (sf) Proposed Impervious Area** (sf) 6,139,782 % Impervious Area** (total) 96.48 Impervious** Surface Area Drainage Area Drainage Area Drainage Area Drainage Area On-site Buildings/Lots (sf) 5,915,884 On-site Streets (sf) On-site Parking (sf) On-site Sidewalks (sf) Other on-site (sf) 223,898 Future (sf) Off-site (sf) Existing BUA*** (sf) Total (sf): 6,139,782 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off-site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within ½ mile of the site boundary, include the ½ mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5” x 14” (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. l. Details of roads, drainage features, collection systems, and stormwater control measures. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5”x11” copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state-stormwater-forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Wilbur Christmas, PE Consulting Firm: Stimmel Associates, PA Mailing Address:601 N. Trade St. Suite 200 City:Winston-Salem State:NC Zip:27101 Phone: (336 ) 723-1067 Fax: (336 ) 723-1069 Email:wchristmas@stimmelpa.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, _____________________________________, a Notary Public for the State of ____________________, County of ____________________, do hereby certify that ______________________________________ personally appeared before me this day of _________________, _______, and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, _________________________________________________ SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature: Date: I, _____________________________________, a Notary Public for the State of ____________________, County of ____________________, do hereby certify that ______________________________________ personally appeared before me this day of _________________, _______, and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, _________________________________________________ SEAL My commission expires