Loading...
HomeMy WebLinkAbout20061893 Ver 1_Inspection_20090303NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Coleen H. Sullins Director March 3, 2009 Mr. David Clark, et al P.O. Box 9 Lincolnton, NC 28212 Dear Mr. Clark: Subject: 401 Certification Compliance Optimist Club Road Site DWQ #: 06-1893 Lincoln County, NC Dee Freeman Secretary On February 24, 2009, staff of this office conducted a 401 Certification compliance inspection at the subject site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). Based on our inspection, the construction appeared to be compliant. However there were some areas of concern: ¦ Impact #2, there is sloughing of the bank on the upstream end of the culvert, which as allowed sediment to enter the stream. The ponds constructed for the storm water management plan required maintenance. Sediment that has entered the pond needs to be removed prior to occupying any future facility that is to be constructed. If you have any questions, please do not hesitate to contact me at (704) 663-1699. Sincerely, Zater Alan D.Surface otection Environmental Sr. Specialist cc: John Hennessy - Compliance/Enforcement David Ledford - Lincoln County Ian McMillan File Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwaterguality.orq NorthCarolina ,Xaturallrf An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper