Loading...
HomeMy WebLinkAbout20051225 Ver 2_Certification of Completion_20090306Certification of Completion DWQ Project No.: 0'5-12.`5, \J e.- _ z.. County:. VAK-C7 600 PzT`( Applicant: . C P-U 7- - T4YYE-z 1-1 Project Name: C ITS( b-F PAt-EZC-r -Fm- Date of Issuance of Wetland Permit:Ny? 23, Zcz?g Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to -DWQ by the applicant, the applicant's authorized agent, or the project engineer. I n w7i'!?\ tM- . L certificates from all of these. .-? Applicant's Certification kilAR 6 2 ?`3 JENR - WATER QUALITY I, jzL T- o41 ?'Q--• , hereby-state that, to the best of my abilities, dW! TM%*W 1 used in the observation of the construction such that the construction was observed to be built within substantial compliance and inten/te e. Ol Ater Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting V S ignature: Agent's Certification I; used in. the observation of the compliance and intent of the 401 and other supporting materials. S ignature: Date: If this project was designed by _a Certified Professional I, 1>J[?a CKI. as a duly registered Professional Landscape Architect, Surveyor, etc.) in t e State of North Carolina, having been authorized to observe eriodically, weekly, full time) the construction of the project; for the Permiee hereby state that, to the best of my abilities, e and diligence was used in the observation of the construction `such that the construction was observed to be built within substantial. compiiance .and intent of the 401 Water Quality Certificatiow and Buffer Rules, the approved plans and. specifications, andot??@ot? ®?aterials. Signature: .??? `?' FF-3360 ?''. stration No. ®Z? Date f n • Date: 2?//J /0? hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within. substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, 6 , March 3, 2009 Ms. Cyndi Karoly 401 Oversight/Express Permitting Unit Division of Water Quality 1650 Mail Service Center Raleigh, NC, 27699-1650 Dear Ms. Karoly: Nil The City of Raleigh is pleased to submit the Certificate of Completion for the project titled Fred Fletcher Park Extended Detention Wetland. This nearly 0.6 acre constructed wetland serves as a restored wetland in Raleigh's Fred Fletcher Park was completed in winter 2008 and now treats stormwater runoff draining from the approximate 60-acre watershed. This project was conceived by the City of Raleigh to address non-point source pollution in the Pigeon House Branch watershed, which is subject to a recent Total Maximum Daily Load (TMDL) allocation and to the Neuse River Nutrient Sensitive Waters Management Strategy. As this project is part of a watershed-wide initiative that has been undertaken by the City to improve water quality in Pigeon House Branch, we are pleased to have your support for these efforts. If you have any questions or would like to visit the site, please feel free to call me at (919) 996-4009 or email me at amy.hathaway@ci.raleigh.nc.us. Sincerely, Amy Hathaway Stormwater Project Engineer City of Raleigh Stormwater Management Division OFFICES • 222 WEST HARGETT STREET • POST OFFICE BOX 590 • RALEIGH, NORTH CAROLINA 27602 RECYCLED PAPER