HomeMy WebLinkAbout20081784 Ver 1_Certification of Completion_20090302Certification of Completion
DWQ Project No.: d8- /?g f?l County:
Applicant: 0.''k? ?evy ,(j/D'??,? zflw C'
Project Name: 9264WICA lfw-10 1j/.?.??g 2
Date of Issuance of Certification or Authorization:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Date: ? ti?
M
uld
1-,11AR ? 2009
Agent's Certification DENR _ WATER QL1A11TY
WETLANDS AND STORMOATER gRgNGN
I, 'Aaf/?? , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: Date: e?Z'Z O?
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
, hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Registration No.
Date
W t`, r&
r
> QWa)
Beverly Eaves Perdue, Governor
Dee Freeman, Secretary
North Carolina Department of Environment and Natural Resources
January 13, 2009
Edward and Diana Hoffer
PO Box 266
Glenville, NC 28736
Subject Property: Edward and Diana Hoffer Property
1840 Woods Mtn Trail Point
Thorpe Lake (Glenville Lake)
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. and Mrs. Hoffer:
Coleen H, Sullins, Director
Division of Water Quality
DWQ Project # 08-1784
Jackson County
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 312.5 square feet (0.0071 acres) of open waters below normal pool lake level,
and 312.5 square feet (0.0071 acres) above normal pool lake level for the purpose of shoreline
stabilization along 125 linear feet of shoreline at the subject property, as described within your application
dated November 24, 2008 and received by the N.C. Division of Water Quality (DWQ) on December 3,
2008. After reviewing your application, we have decided that the impacts are covered by General Water
Quality Certification Number(s) 3693 (CC3693).. The Certification(s) allows you to use Regional
Permit(s) 30 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain
or otherwise comply with any other required federal, state or local permits before you go ahead with your
project including (but not limited to) Erosion and Sediment Control, Non-discharge, and Stormwater
regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as
depicted in your application shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total tilts for this project (now or in the fitture) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2I-1.0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
? Amount Approved (Units) Plan Location or Reference
W'atet s_
' 0 0071 (acres) 312.5 sg ft. below lake level ^
Waters 0.0071 (acres) _ 312.5 scLft_above lake level
N6rthCarolina
;Alatttrn!!y
North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service
lntemet: www.,ncwaterqualny.org FAX (828) 299-7043 1-877-623-6748
GAWPDATAIDEMWQ1Jackson\401 s108-1784HofferAPPROVAL.doc
An Equal OoportunityfAffirmative Action Emnlover - 50% Recvcled110% Post Consumer Pacer
Mr.&.Mrs. Hoffer
Wage 2 of 2
January 13, 2009
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone lan McMillan or Gy dMarolyin t e Ceniia] Office i
Raleigh at 919-733-1786 or Linda Wiggs in the DWQ Asheville Regional Office at 828-296-4500.
Sincerely,
a t Coleen H. Sullins, Director
Enclosures: GC 3693
Certificate of Completion
cc: 401/Wettand Unit
USACE Asheville Regulatory Field Office
DWQ Asheville Regional Office
Central Files
Duke Energy-Lake Services-Lisa Leatherman
ttscs Boh Iatin ; -
PO Box 304
t
Certification of Completion 1 ` @ ??q ca,
MAR 6 2oQ9
DWQ Project No.: eg- /7 County: ?,r
TLANDSANDSTOryR?
Applicant: ,? ¢n? !1/?!'???d,
Project Name: o92b "f vo hl~ f/QF 1'?•?df' T.?
Date of Issuance of Certification or Authorization:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Agent's Certification
Date:
I, xgd? -, hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: Date: ??'Z ? d7
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
, hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Signature: Registration No. Date