Loading...
HomeMy WebLinkAbout20170127 Ver 2_PCN Form Submission_20180228Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 2/27/2018 10:28:52 PM (Start Event) Accept by Carpenter,Kristi 2/28/2018 11:12:41 AM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: March 2, 2018 5:00 PM 2/27/2018 10:29 PM E-PCN Submittal ��� �lulslaa af Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf A. Processing Information County(or Counties) where the project is located:* Guilford Is this project a public transportation project? *(') C�' Yes C' No Is this a NCDOT Project?* C' Yes C•' No 1a. Type(s) of approval sought from the Corps:* fJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* r% Nationwide Permit (NWP) � Regional General Permit (RGP) Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply fJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non-404 Jurisdictional General Permit �J Riparian Buffer Authorization * 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: C' Yes C•' No * 1d. Is this notification solelyfor the record because written approval is not required? � For the record only for Corps Permit: �' Yes C�' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? IF so, attach the acceptance letter from rritigation bank or in-lieu fee program r Yes l" No Acceptance Letter Attachment Gick the upload button or drag and drop files here to attach docurrent I CMRTF_Horse Pen Creek Road Widening.pdf 212.35KB FlLE 7YFE MJST BE f�F 1f. Is the project located in anyof NC's twentycoastal counties?* C' Yes C•' No 1h. Is the project located in a designated trout watershed?* C' Yes C� No Link to trout information: http://w�nn�v.saw.usace.army.mil/Missions/Regulatory-Permit-PrograrrUAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* John Jamison 1b. Primary Contact Email:* john.jamison@hdrinc.com 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (919)232-6625 1d. Who is applying for the permit? r Owner r Applicant (other than owner) �7 AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: City of Greensboro 2b. Deed book and page no.: e�asting rights-of-way and easements- recently acquired for the project 2c. Responsible party: (for Corporations) Guy Ingle, Construction Projects Coordinator 2d.Address Street Address PO Box 3136 Address Line 2 �� Greensboro Fbstal / Zip Code 27402-3136 2e. Telephone Number: State / R-ovince / Region NC Country Guilford (xxx)x�c-xxxx (336)373-2627 2f. Fax Number: (336)373-2338 I (xxx)xxx-xxxx 2g. Email Address:* Guy.ingle@greensboro-nc.gov 4. Agent/Consultant (if applicable) 4a. Name: Michelle Podeszwa, PE 4b. Business Name: (if applicable) HDR Engineering 4c. Address Street Address 440 S. Church St. Suite 1000 Address Line 2 �� Charlotte Fbstal / Zip Code 28202 4d. Telephone Number: (704)338-6700 (xxx)xxx-xxxx 4e. Fax Number: (xxx)xxx-xxxx 4f. Email Address:* Michelle.Podeszwa@hdrinc.com State / R-ovince / F�gion NC Country Mecklenburg AgentAuthorization Letter* Rease provide the Agent Authorization Letter if you are subrritting this docurrent. Horse Pen Creek Road PCN signature page.pdf 74.89K6 FlLE TYFE MJST BE FDF C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Horse Pen Creek Road Improvements 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Greensboro 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. the project is along Horse Pen Creek Road between New Garden Road and Battleground Avenue (US 220) in northwest Greensboro 2. Project Identification 2a. Property Identification Number: (t�vc RN or parcel ID) Existing ROW - see attached plansheets 2b. Propertysize: (in acres) 47 2c. Project Address Street Address Address Line 2 �� F�stal / Zip Code 2d. Site coordinates in decimal degrees State / Rovince / F�gion Country Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) I Latitude:* Longitude:* 36.13408 -79.88683 ex:34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Horsepen Creek 3b. Water Resources Classification of nearest receiving water:* WS III; NSW ( Horsepen Creek) Surface Water Lookup 3c. What river basin(s) is your project located in?* Cape Fear RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The site is the e�asting Horse Pen Creek Road alignment, a 2- lane suburban roadway maintained by the City of Greensboro through a residential district in the northwest portion of the City. Land uses along the corridor are primarily residential, with areas of limited commercial/ institutional development and recreation lands. A number of public and private schools and park facilities are located along the corridor. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) qick the upload button or drag and drop files here to attach docurrent Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 ezcerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 2 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 1000 4f. Explain the purpose of the proposed project:* To serve future volumes, relieve congestion, address past/current growth in the area, improve safety, and improve pedestrian and bicycle mobility. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* i Horse Pen Creek Road is 3.2 miles long with 25 intersections ( 5 signalized). It is a minor thoroughfare with current daily traffic volumes up to 18,700. 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be pdF 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* �' Yes �' No �' Unknown Comments: See attached correspondence from Amy Euliss, DWQ 5b. If the Corps made a jurisdictional determination, what type of determination was made? * r Preliminary l" Approved f Unknown C' N/A Corps AID Number: 6carrple: SAV�2017-99999 SAW-2013-01953 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other HDR Engineering 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. February 8, 2012 verification site visit with Thomas Brown (USACE) and Amy Euliss (NCDWQ); July 15, 2016 site visit with David Bailey (USACE) (Brian Wrenn (NCDWR) reviewed on his own on July 12, 2016) 5d1. Jurisdictional determination upload Gick the upload button or drag and drop files here to attach docurrent Fig3_JurisdictionalFeatures_Horsepen_NRTR_11x17P.pdf 3.81 MB Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* �' Yes C' No f" Unknown 6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). A prior NWP 14 (SAW-2013-01953) and GC 3886 (project # 20170127) was issued under the old program that e�ired in March 2017. This is a request for a re-issuance of the permit/GC. I Project History Upload Gick the upload button or drag and drop files here to attach docurrent Fle type rrust be f�F 7. Future Project Plans 7a. Is this a phased project?* C' Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): fJ Wetlands rJ Streams-tributaries rJ Buffers r Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site #- Reason for impact* 2b. Impact type * 2c. Type of wetland* W1- Land Clearing N�p label (e.g. f�ad Qossing 1- Qalvert, dewatering, etc) W2- Fill N�p label (e.g. F�ad Qassing 1- Qalvert, dewatering, etc) W3- Land Clearing N�p label (e.g. Fd�ad Qossing 1- QiNert, dewatering, etc) W4- Excavation N�p label (e.g. I�ad Qossing 1- Qalvert, dewatering, etc) T F2rrranent (P� or Terrporary (� P F2rrranent (P'j or Terrporary (� T F2rrrenent (P� or Terrporary (� P F2rrranent (P� or Terrporary (� 2g. Total Temporary Wetland Impact 0.070 i 2g. Total Permanent Wetland Impact 0.120 2g. Total Wetland Impact 0.190 2h. Comments: Bottomland Hardwood Forest Bottomland Hardwood Forest Bottomland Hardwood Forest Bottomland Hardwood Forest 2d. Wetland name *Ze. 2f. Type of 2g. Impact Forested* Jurisdicition* area* W1 Yes Corps 0.050 (404, 10) or C7�NR(401, (acres) other) W2 Yes Corps 0.100 (404, 10) or GNF2(401, (acres) other) W3 Yes Corps 0.020 (404, 10) or CMR(401, (acres) other) W4 Yes Corps 0.020 (404, 10) or C7�NR(401, (acres) other) 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Site #- Reason for 3b.lmpact 3c. Type of impact* 3d. Stream name * 3e. Stream 3f. Type of impact* type* Type* Jurisdiction* S1- Culvert removal T Culvert Horse Pen Creek Perennial Corps N�p label (e.g. Fd�ad Q-ossing 1) F2rrranent (P� or F2rennial (F�2) or Terrporary (� interrrittent (IfV� S2 P Relocation Stream 4 Intermittent Corps N�p label (e.g. I�ad Qossing 1) F2rrrenent (P'j or F2rennial (�) or Terrporary (� interrrittent (If� S3 T Stabilization Stream 4 Intermittent Corps N�p label (e.g. f�ad Qossing 1) F2rrranent (Fj or F�rennial (�2) or Terrporary (� interrrittent (IfVn S4 T Other Stream 5 Intermittent Corps N�p label (e.g. Fd�ad Q-ossing 1) F2rrranent (Fj or F2rennial (F�2) or Terrporary (� irderrrittent (IfV� S5 P Culvert Stream 6 Perennial Corps N�p label (e.g. Id�ad Qossing 1) F2rrrenent (Pj or F2rennial (FB�) or Terrporary (� interrrittent (If� S6 T Stabilization Stream 6 Perennial Corps fv�ip label (e.g. R�ad Qossing 1) F2rrranent (Fj or F�rennial (FH�) or Terrporary (� interrrittent (If� '" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 91 3i. Total temporarystream impacts: 69 3i. Total stream and tributary impacts: 160 3j. Comments: Horse Pen Creek culvert is being removed and replaced with a bridge; Stream 4 is being relocated; Stream 5 is temp impacts for stormwater outlet tie-in, per Corps request to minimize erosion; Stream 6 is fill/ pipe in erosional gulley beginning at E/ P stream origin point. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. r Neuse r Tar-Pamlico r Catawba r Randleman � Goose Creek �J Jordan Lake � Other 6b. Impact Type * 6c. Per or Temp* B1 P Location and 6cerrpt, Allowable, allowable w/ F�rrranent (P� or rritigation Terrporary (� 62 T Location and 5cerrpt, Allowable, allowable w/ F�rrranerrt (P� or rritigation Terrporary (� 6d. Stream name * Horse Pen Creek Horse Pen Creek 6e. Buffer mitigation required? * No No 3g. Stream 3h. Impact width* length* 30 41 Average (feet) (linear feet) 3 50 Average(feet) (linearfeet) 3 10 Average (feet) (linear feet) 3 8 Average (feet) (linear feet) 5 41 Average (feet) (linear feet) 5 10 Average(feet) (linearfeet) 6f. Zone 1 impact* 5,529 (square feet) 1,702 (square feet) 6g. Zone 2 impact* 3,958 (square feet) 789 (squarefeet) 6b. Impact Type * 63 I Location and Exerrpt, Allowable, allowable w/ rritigation B4 Location and C errpt, Allowable, allowable w/ rritigation 6h. Total buffer impacts: i Temporary impacts Permanent impacts: Total buffer impacts 6c. Per or 6d. Stream name * Temp* P Stream 5 F�rrranerd (P� or Terrporary (� P Stream 6 F2rrranerd (P) or Terrporary (� Zone 1 1,702.00 Zone 1 10,477.00 Zone 1 12,179.00 Zone 2 789.00 Zone 2 7,576.00 Zone 2 8,365.00 6e. Buffer mitigation required?* No No 6i. Comments: I B1 and 62 impacts are on either side of the existing culvert/ proposed bridge location; B5 and B6 are at other locations along the project Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Gick the upload button or drag and drop files here to attach docurrent Fig 1_Vicin ity_Horsepen_NRTR. pdf 1.55M6 Fig2_ProjectStudyArea_Horsepen_NRTR_11 x17P. pdf 2.68M6 174268_HORSEPEN_EC_ALL_092115.pdf 47.4M6 I HORSEPEN_Permit_Set_24x36_091916.pdf 13.92MB Fle rrust be FDF E. Impact Justification and Mitigation 1. Avoidance and Minimization 6f. Zone 1 6g. Zone 2 impact* impact* 745 409 (square feet) (square feet) 4,203 3,209 (squarefeet) (squarefeet) 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The Horse Pen Creek crossing could have been a culvert extension, but to minimize impacts and increase floodplain capacity a bridge was chosen to replace the exsting culvert. The widening was shifted away from streams where feasible to minimize the required fills and piping. Wetland A, a much higher quality v�tland downgradient of the road widening, was avoided entirely. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* As described above, the primary avoidance measure is the bridge construction in lieu of a culvert extension. Fill slopes were reviewed to minimize the overall footprint as well. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C� Yes �' No 2c. If yes, mitigation is required by (check all that apply): r DWR N,7 Corps 2d. If yes, which mitigation option(s) will be used for this project? fJ Mitigation bank r Payment to in-lieu fee program r Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Cripple Creek 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland 0.38 Attach Receipt and/or letter aick the upload button or drag and drop files here to attach docurrent CMRTF_Horse Pen Creek Road Widening.pdf 212.35KB FlLE TYFE MJST BE FDF 3c. Comments The bank has confirmed these credits are available. Payment is pending. F. Stormwater Management and Diffuse Flow Plan (required by DWR) �"� Recent changes to the stormwater rules have required updates to this section .*'� 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C� Yes C' No 1b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SI-NVf) � Wetland Swale (higher SHWT) r Other SCM that removes minimum 30% nitrogen (check all that apply) For a list of options to meet the diffuse flow requirements, click here. Diffus Flow Documentation Gick the upload button or drag and drop files here to attach docurrent Fle type rrust be FOF 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* �' Yes �' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* C� Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C•' No Comments:* locally funded project; received written concurrence from DWQ's SEPA coordinator (Hannah Headrick at the time) that no SEPA document was required 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes C•' No 2b. Is this an after-the-fact permit application?* !' Yes C•' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact � nearby downstream water quality?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. � Please see cover letter. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * C' Yes C•' No C' rUA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * C' Yes C•' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes l" No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* C' Yes C' No 5e. Is this a DOT project located within Division's 1-8?* C' Yes C•' No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* C' Yes C' No 5g. Does this project involve bridge maintenance or removal?* C' Yes r No c' Unknown Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEBSLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?** �' Yes �' No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* C� Yes C' No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the prope rty. C7ick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* on-site habitat review, including a small whorled pogonia survey in areas of potential habitat during the optimal survey window, as well as Natural Heritage Program NHEO database 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes �' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC SHPO website at http://gis.ncdcr.gov/hpoweb/ 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* �' Yes C' No 8b. If yes, explain how project meets FEMA requirements: The one FEMA crossing is being converted from a box culvert to a bridge crossing. The analysis of the design concluded it would be a no-rise, with local floodplain administrator coordination for a post-construction LOMR. 8c. What source(s) did you use to make the floodplain determination?* local floodplain administrator coordination Miscellaneous Miscellaneous attachments not previously requested. C7ick the upload button or drag and drop files here to attach docurrent Horsepen PCN signature 2018.pdf 1002.47K6 Fle rrust be FDF Signature Page Signature rJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name:* John Jamison Signature [��ld�6i [�/llh7Gif�l6/ Initial Review Is this project a public transportation project? *(?) C� Yes C' No Change only if needed. Has this project met the requirements for acceptance in to the review process?* C� Yes C' No BIMS # Assigned* 20170127 Version#* 2 Reviewing Office* Central Office - (919) 707-9000 Select Project Reviewer* April Norton:eads\arnorton Is a payment required for this project?* C' No payment required �' Fee received C' Fee needed - send electronic notification