Loading...
HomeMy WebLinkAbout20090139 Ver 1_Staff Comments_2009031009-0139 EPCOR USA North Carolina - Roxboro Plant AML Comments March 10, 2009 Please re-submit your site plans on full plan sheets at a scale of no smaller than 1"=50' with topographic contours shown. 2. Please show the entire stormwater drainage system for the site, including all stormwater inlets, pipes, swales and outlets, on the plan sheets. 3. Please provide an inventory of imperviousness surfaces in each drainage area. The inventory should include all proposed building footprints, roads, driveways, sidewalks, gravel-surfaced areas, amenity areas, etc. A Stormwater Management Plan (SMP) must be provided for any drainage areas that exceed 24 percent imperviousness. For each BMP, provide a completed BMP Supplement Form with all the required items (see http://l12o.enl-.state.nc.uslsu/bnlp forms.htm). Per NCAC 2B 15A: 02H.1000, a "drainage area" is defined as "the entire area contributing surface runoff to a single point."