HomeMy WebLinkAbout20160825 Ver 1_ R-5745 Silt Deposit_20180227Carpenter,Kristi
From: John Prater <jfprater@Vaughnmelton.com>
Sent: Tuesday, February 27, 2018 8:19 AM
To: Slaughter, Johnathan H
Cr. Eller, Douglas W; Johnson, Aaron; Wanucha, Dave
Subject: [External] Re: R-5745 Silt Deposit
Thanks Heath we will do that.
John
From: Slaughter, Johnathan H <hslaughter@ncdot.gov>
Sent: Tuesday, February 27, 2018 8:16:54 AM
To: John Prater
Cc: Eller, Douglas W; Johnson, Aaron; Wanucha, Dave
Subject: R-5745 Silt Deposit
Th�y hav� 24 hours to cl�an it up. I vvill b� out th�r� today. Mak� sur� this is not�d in
your NPDES r�cords.
From: John Prater [mailto:jfprater@Vaughnmelton.com]
Sent: Monday, February 26, 2018 4:41 PM
To: Slaughter, Johnathan H <hslaughter@ncdot.gov>
Cc: Eller, Douglas W<dweller@ncdot.gov>; Johnson, Aaron <ajohnsonl@ncdot.gov>
Subject: [External] DK00232 Silt Deposit
Heath,
On the Taylorsville Road project in Lenoir we had silt that left the project site and
was deposited in the creek. I believe this occurred due to an 8 inch waterline tap
that was completed on Friday 2-23-2018. It was found this morning that the tap
had leaked over the weekend.
I have directed them to remove the deposited sediment from the creek and
contain it. They want to remove the sediment tomorrow as they begin
construction of the waterline crossing the creek in this same area. They have to
build a diversion around the deposit to complete the waterline installation.
I have attached a picture for you to review.
John Prater
Boone Construction