Loading...
HomeMy WebLinkAbout20160825 Ver 1_ R-5745 Silt Deposit_20180227Carpenter,Kristi From: John Prater <jfprater@Vaughnmelton.com> Sent: Tuesday, February 27, 2018 8:19 AM To: Slaughter, Johnathan H Cr. Eller, Douglas W; Johnson, Aaron; Wanucha, Dave Subject: [External] Re: R-5745 Silt Deposit Thanks Heath we will do that. John From: Slaughter, Johnathan H <hslaughter@ncdot.gov> Sent: Tuesday, February 27, 2018 8:16:54 AM To: John Prater Cc: Eller, Douglas W; Johnson, Aaron; Wanucha, Dave Subject: R-5745 Silt Deposit Th�y hav� 24 hours to cl�an it up. I vvill b� out th�r� today. Mak� sur� this is not�d in your NPDES r�cords. From: John Prater [mailto:jfprater@Vaughnmelton.com] Sent: Monday, February 26, 2018 4:41 PM To: Slaughter, Johnathan H <hslaughter@ncdot.gov> Cc: Eller, Douglas W<dweller@ncdot.gov>; Johnson, Aaron <ajohnsonl@ncdot.gov> Subject: [External] DK00232 Silt Deposit Heath, On the Taylorsville Road project in Lenoir we had silt that left the project site and was deposited in the creek. I believe this occurred due to an 8 inch waterline tap that was completed on Friday 2-23-2018. It was found this morning that the tap had leaked over the weekend. I have directed them to remove the deposited sediment from the creek and contain it. They want to remove the sediment tomorrow as they begin construction of the waterline crossing the creek in this same area. They have to build a diversion around the deposit to complete the waterline installation. I have attached a picture for you to review. John Prater Boone Construction I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,