Loading...
HomeMy WebLinkAbout20180285 Ver 1_SR 2003, Letter_201802261�OY COC�PER GovEtznox STATE OF NORTI� C,AIZOLINA DEPAR`�'MENT OF TI�ANSPORTATI4N February 26, 2Q�8 Mr. Eric Alsrneyer U. �. Arrny Corps of �ngineers Raleigh Re�ulatory ri��d Office 3331 Heritage Trade IDrive, Suite 145 Wake Forest, NC 27�$7 Subject: Nationwide Permit #�14 SR 2003, Washbaard Lane Caldwell Count_y, Nort% Caralina Project Nu�ber: 44594 (QWR Permit Fe�: $240} Dear Mr. Als�neyer: J.4MEs H. TROGDON, III SECRGTARY �lie NC Department of Transportation has accepted the subj�ct route as a road additiotl. We currently have right-of-way to up�rade the rt�ad to current standarcis a11d pave i� but the ro�te is nat on the current pavin�; priority y�t. Flowever, the twc, wet pipes on the road are in very poor conditi�n and need to be replac�d. The road rs mar�•ow at th� crossing locations as weli. As a result, we are prc�paspng to replace/�engthen the wet pipes and widen the road at the two st�eam crosszngs only. The i•emainder of the widenang will occur when tl7e project hits the priorzty list. i'otal project length wi�l eventually be 0.75 miles. �mpervious surface area will increase by abaut 0.55 acres w�en paved. '�'his project will req�aire the r�placement of twa wet pipes as shown below: Stre�m Iiat, �cts: St�9io�a Existi�ag Fr���)s�ecd Nt�atetaer Pipe Siz� �'B�� S��e 7+p2 4$"x 40' 48"x 6(�' 32+61 18"�. �0' 4$"x $8' Permanent Stream�bed Fill � 6$' "I'emporar,y Dewaterin� = GO' Ri�ra� T�tal Inipacts D�waieri�g Imr�ac.� 10 30 60 10 �0 88 Bank Stabilizatian = 2�' Total Pro.ject Impacts =148' These wet pipes carry different UTs to Morris Creek (Class: Cj in the Catawba River Bastn. Tlvs act�v�ry will require temporary dewatering. Ar� impervious sandbag dike will be construc_ted ups�ream of t�e proposed pipes to create a small pool. Clean water will MaiPing.4r/dress: Telephone: (33h} 6b7-'�11 I Locutioro: NC DI:YARTMCAP"1' OF TR�.NSPOF�TATIOIvt F'2z: (33G) CG7-45�9 fi.DDRCSS �' D1V�SION 1I Custon:erS�ri=ice: 1-877-368-�1968 C`I'T5', NCZTI' 8U1 S"TATESVIL!„EROAB NORTH W1LKL;SB(JRd, NC'8659 ii'e6site: vnstiv.ncslot_gov Mr. Eric Alsmeyer SR 2003, Washboard Lane February 26, 201$ temporarily be pumped around the conshuction area and will be ctischarged dovvnstream. .Any diriy vvater located inside of the constniction area will be pumped into a silt bag if necessary. Once the work is complete, the impervious dikes will be removed and preconstruction s#reambed eievations wi.11 be restored. This project was re�iewed for the presence of threatened and endangered species in the field an�d I have also included a query of the NCNHP database. Sased on �the project area mapped with my request, the da.�tabase search indicates tha.t there are no recoarcis of federal�y listed T/E species, importan# natural comrr�uaiities, naturai axeas, or conservatio�a/managed areas within the praposed project boundary {see attached}. There will be approximately 1.1 acres of iree cutting when the full typical s�ction width is built. The NLEB is listed as a protected species in this county but the project does nat fall within 0.25 miles of any red H[TC identified in the SLOPES spelled out in the Na�ionwide Permit Regional Conditions. We dfl not anticipate any impact ta any other federally listed speci�s. T,his project is not located within a trout watershed. Cultural resource work has been compieted. No surveys were required (see attached}. The project impacts are not signifcant in nature and should not xemvve or degrade existing water quality uses. By utilizing appropriat� BMPs, downstream water quality standards vvill be protected. Overall water qual�Ey in the area will be impraved by paving the gravel surface. Attached is a Preconstruction Notification Form, a plan sheet, a rnarked county map a�d a marked. topogz�aphy map. By copy of this electronic letter, it i� requested that the Division of Water Resources, 401/Wetlands Unit, issue the appropriate permit for construction of this project. It is requested that any conn►ments related to the 441 certaf cation be electronically farwarded directIy to rne wzth a capy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible_ If fiuther inforn�ation is required, please let me know. Your early review and cpnsideration vvi11 be appreciated. Sincerely, �� / Heath Slaughter Divisio� Environmental Officer Enclosures cc: Kenny Heavner, PE, Caunty Maintenance Engineer Branaon Greer, Assistant District Engineer Zack Souther, Roadside Environmenta.l Fie�d Operatioz�s Technician