February 5, 2018
COUNTY:
MEMO TO:
FROM:
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Caldwell County
Heath Slaughter
Division Environmental Officer
Doug Eller '�A..-�. £,G�-- '3sc
District Engineer
SUBJECT: Erosion and Sedimentation Control Submittal Packet
SR 2003 (Washboard Ln.)
Township: Little River
WBS - 44594
JAMES H. TROGDON, III
SECRETARY
We are proposing to replace two (2) wet crossline pipes (located on Washboard Ln. in Caldwell
County) when the necessary permits are obtained.
The wet crossline pipes are at the following locations:
Station Descri tion
7+02 Old 40'x48" CSP New 60'x48" CMP
32+63 Old 40'x18" CSP New 88'x48" CMP
De-watering will be required for the wet pipe replacements.
Morris Creek and unnamed tributaries to Morris Creek are within the Catawba River Basin and
are classified as Class "C". We are requesting the necessary permits to proceed with this work.
Attached is the E&SC Plan packet, which includes the proposed erosion control and wet pipe
drawings. The Minimum Criteria Checklist is also included.
If you have any questions or need additional information, please let us know.
DWE/bsg/jc
Attachments
cc: C.C. Reinhardt, PE, Division Maintenance Engineer (Letter Only)
Kenny Heavner, PE, County Maintenance Engineer (Letter Only)
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
BOONE DISTffiCT OFFICE
P.O. BOX 1460
BOONE, NC 28607
Te(ephone: (828) 268-6022
Fax:(828) 265-5414
CustomerService.• 1-877-368-4968
Website: www.ncdot.eov
Location:
1829 HWY. 194 NORTH
BOONE, NC 28607
Mercatar Projection 0.1 0.2 0.3 0.4 0.5 km
WG584 � . F � MN �
115NG Zone 175MV _g°
0.1 O.Z 0.3 mi ,
°..��II ����i�0�,���0�m�i"� S�ale 1:4699 1 inch = 392 feet ❑� ��
� �
�
V
o�
�
�
C
�
�
r
�
U
W
J
m
�
�
�
0
�
U
W
N
C
O
�
L
O
0
m
�
0
�
�
3
�
0
U
T
0
�
c
0
0
�
�
i�
��
r+�
0
o �LL
� o�
m
w
VICINITY MAP
Porous Baffle Spacing
'"Baffles in Silt Basins at drainage
turnouts and all other temporary
rock sediment dams-Type B;
-If basin Iength=l0' or less;l baffle
-If basin length=ll' ta 20';2 baffles
-If basin Iength=20' ar more;3 baffles
eaually spaced in basin
NOTE:
PERIMETER EROSION CONTftOI MEASURES SHALL BE
INSTALLED DURING CLEARING AND GRUBBING PHASE.
Level III Cert # 3474
GRAPHIC SCALE
2 51�8�
PLANS
5�
PROFILE (HORIZONTAL)
5�
PROFILE (VERTICAL)
ROADSIDS SNVIRONM6NTAL UN]T
DIVISION OF HIGXWAYS
STATS OF NORTH CAAOLINA
� � i � -� � i � i : ��> � � :���: c�� ��� � � � �—� � �� ��� c�� � . ► �, ��
II)I` I�f(�)\ (�)l I-II��I-I\\ .'�1 �
I'' I•� I(�) I'� I'' I'� (�� I'' (�> � I II�
I-I � � I-I �` '� � I . I'� (�) � I C�) \ � (�) \ I 1'� C�) I .
CALD WE�L C� U1\tTY
LOCATION: SR 2003 WASHBOARD LN.
FROM NC 90 TAYLORSVILLE RD.
STA 7+ 02 AND STA 32 + 63
TYPE OF WORK: PIPE REPLACEMENT
TXSSS BItOSlON AND SSD]MSNT CONTROL PLANS COMPLY
WITX THB RSGULATIONS SST AORTX BY TXB
NCG-010000 GET78RAL CONSTRUCTTON PERMIT 6FFBCTIVE AUGUST 3, 2011
ISSUBD BY TXS NORTX CAROLINA DSPARTMSNT OF BNVIRONMENT AND
NATURAL RESOURC6S DIVISION OF WATER QUALITY.
Prepored In the O(fIce ofr
DIVISION OF HIGHWAYS
DIVISION 11, DISTRICT 2 BOONS
P.O. BOX 1960, 800NS, N.C. 28607
2018 STANDARD SPECIFICATIONS
iTA'iL S[w'IE V4010LT �BPER[!�(8 tA 'IOTnL
SIBB1'9
.�� ��SQ� EC-1 ��
arnn aao1.Nn r.�.r4a.xn nxw�m�+
ER05ION AND SEDIMENT CONTROL MEASURE�
� � �
1�.� °remporery SiIE IDiEch _ _ �
l�i�.d� Temparary IDivercion _ _ _ _ _ _ _ _ _ _ _ _ _ � .� �
1605.01 Temporary S�lt Feuce _ _ _ _ _ _ _ _ _ _ NI IN il{
16�ii,Q1 3pecial �edimeet CanErol Fence _ _ _ _ �D�T
1(12�,81 �empornry Berms nnA S�ope Dreinc _ _ _ _ _ _ _ _ _ T� ~
l�.�i Si�tBasin Type�__'____________ � i
1633.�1 Temporxry Aock Silt Ch��k T7P�-A_ _ _ _ _ _ _ _ �
Temporary Rack 3ilt Check T7p� A with O
Mait�ng and Polsacr�lamide (PAMZ _ _ _ _ _ _ _ _ �
l�.�i °remporary Ra�k S�It CLe�k TyPa-B_ ____'
ii,nEt�e � Coir Fsbar Vlyntt�e_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ �
Natt]e� Coir F'ibee iVatt�e O
witL Polyecry�nmiAe (PAM)----------------
163�1.01 Temparary Rock 5ediment Dam Type'.�_ ____.
1�.� °rempornry IZock SedimenE IDam Type-B_ _�
l�i�.dl �ock pipe In�eE Scdiment Trnp Type-A_ _____.�
16�.� Rock Pipe In1eE 5ediment Trap Type'B_ __� ]
�� �1�.� �ti��ing Basin________________________
1�.� Specia� SEi��ing Baein_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ �
Rack In]eE SedimenE Trap:
1�4.�1 TYPe f�l________________________A�
i6d�.VL Type B ��
1�1.Q� Type C � �
3kimme: Baain �
Tiexed 5]cimmer Baein �
Infiltratioo Baai� �
THIS PROJECT CONTAINS
EROSION CON'I`ROL PLANS
FOR CLEARZNG AND
GRU33L�G PHA3E OF
CONSTRUCTION.
Roadauu� 8tandard D�ewi�We
The follmr{nA raadwey a�n�l�ieh etaadarde ee oppear in "Roadwoy 8rnadud Drawluge"- Roadway Dai'n
Untt - N. C� Deputmenc o�'lran�portadan - Roleigh, �I. C., dated donuuy 2018 and tbe luen
revleon thueto ere appllceble to this proJeet and by eefveace Lereby ue com3dered a pert of
theso pluu�
1604A1 Railrond Eraeian Cantrol Demil 1632�01 Aook Idet 8ediment TraD Type A
160'.Ol Temporary 9ilc Fatoe 1632.02 Rode Idet 8odiment TraD Typo 3
1606.01 9yeoial 9edimenc Control Fenoo 1632A3 RooL Inlet 8odimmt Tray Type C
1607.01 Gr9vel Comwadon Fatraooe 1633A1 Temyorery Aook Bilt Cheok Tyye A
1622.01 Temporery 3erm� md 91ope Dreia 1633�U2 Temporuy Roak 8ilt Chcak Type 3
1630A1 Ri�er 3eeia 1634�01 Tempora�y Rock 9edlment Dam Tme A
1630.0] Silt 3eein Type 3 1634.02 Temporuy Roek 9edimeut Dam Type J
1630�03 TemD�1' BLIt Dlwh 1635A1 Aook Pipe Inlet 9edlment Trep Type A
1630�04 8dlllnA .3aein 163SA2 Roolc Piye Inlet 9ediment Trep Type 3
1G30.05 Tempowy Dlveretoa 1640�01 Coir Fba 3e�le
1630.06 8peoial9dlling �uin 1646A1 Temporory 9veam Gl�oesing
i�i.ai H4�a ���i�os
Erosion Control Schedule and Notes
EROSION CONTROL & PIPE INSTALLATION
TROUT BUFFER ZONE SEQUENCE
GENERAL E&SC NOTES
GR�UND STABILIZATION CHART
1. Generally, the order of installation of the
erosion control measures will be as follows:
A. Temporary silt basins shall be installed
before clearing and grubbing begins.
B. Silt fences and tem orary silt ditches
shall be installed a�er clearing and before grading.
C. Temp orary stone ditch checks with PAM or
wattIes with PAM shall be installed in all disturbed
areas as soon as the disturbance begins.
D. Final stone ditch checks or wattles shall be
installed as soon as ditch line is established.
E. Pipe outlet and inlet protection will be done
as soon as the pipe is mstalled.
F. Other permanent erosion control measures are to
be imp�lemented as soon as practical.
2. Temporary rock silt checks?typ e B will be spaced
by percent grade as shown in-the erosion control plan.
3. No. S stone, or equivalent� will be used in conjunction
with the temporary rock silt checks in locations where
water is leaving the project or entering a pipe.
4. All devices are to be cleaned out when half full.
5. Establish permanent vegetation per ground stabilization
chart.
SCHEDULE
Wet Pipe Installation Schedule and Notes
1, Prior to installing any E&SC measures identify
permit conditions and impact area limits.
2. Install erosion control devices.
3. Manage the water course. The pipe must be
placed in the dry. Install dewatering measures.
4. Remove material and existing pipe while limiting,
material and sediment from entering stream and
escaping the project.
5. Excavation of stream channel shall not exceed 10' on
either side of new pipe or culvert unless indicated on permit.
6. Per permit conditions for Corps of. Engineers
and the Wildlife Resources Commission, all pipes
in streams 48"or �reater must be buried 12" below
streambed elevation, Pipes less than 48"must be buried
with 20% of the diameter below streambed elevation.
7. Place the new pipe and compact backfill.
8. Install slope protection on the outlet and inlet ends
of the pipe. A1so complete installation of erosion
control measures and perform maintenance as needed
on existing measures.
9. Establish permanent vegetation per ground stabilization
chart.
Notes;
10. More infortnation on wet pipe installation can be found
For silt basin size see the attached erosion control plans. in the BMP manual section 4.2 "Pipe & Culvert
installation"
PAM is to be placed on all Typ e A checks and wattles in the erosion
control chain except for the final device in HWQ and Trout projects.
GROUND STABILIZATION CHART
Site Area Descrlption Stablllzatlon Tlme Frame Stablllzatlon Tlme Frame Exceptions
Perimeter dikes, swales, ditches 7 days None
and slopes
High Quality Water Zones 7 days None
Slopes steeper than 3:1 7 days If slopes are 10 ft. or less in length and are
not steeper than 2:1, 14 days are allowed
Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in lenght
All other areas flatter than 4:1 14 days None
(except for perimeters and HQW zones)
General Erosion Control Sequence & Notes for NC DOT
Projects in Trout Buffer Zones
1. Prior to installing any E&SC measures identify
permit conditions and impact area limits. Review
trout buffer variance approval conditions for
any special provisions.
2. All materials should be on the hand before work
is commenced.
3. Install EC devices
4. Work within the buffer zone should be sequenced
to minimize the length of time that disturbed areas
are exposed. Stream bank stabilization, which includes
the area from the edge of water to the top of bank, should
be phased so that each day's work is a completed work,
including provision of adequate ground cover.
5. Graded slopes and fills within the trout buffer zone will
within 7 calendar days of completion of any phase of
grading be planted or otherwise �rovided with temporary
or permanent ground cover, devices, or structures sufficient
to restrain erosion.
6. Graded slopes and fills within the trout buffer zone (excluding
road shoulders) shall be protected with rolled erosion control
product, bonded fiber matrix, or flexible growth medium after
seeding.
Notes:
Silt fence backed by woven wire, with a post spacing of 6 feet,
shall be used instead of standard silt fence in trout buffer zone.
Special sediment control fence shall be used in areas where
bedrock is encountered which�rohibits the proper anchoring
of fabric, and in low points o the silt fence in 3-foot sections
to allow for concentrated flows.
The disturbed areas within the stream buffer shall be restored
to native vegetation characteristic of an undisturbed buffer to
the extent practical upon completion of construction.
Flyrock protection such as blast mats should be provided for
blasting in close proximity to streams.
PAM is to be placed on all Type A checks and wattles in the
erosion control chain except for the final device in HWQ and
Trout projects.
°� PROJECi AEFERlNC! NO. SIIEET NO.
m
----- � --.__. _.__.. __. __ _ .__.. ._--. -__. ___....------.._.--- _._. .. . . . .. . . . . . .
� 44594 2
m MY SMEET N0.
E X I S T i N� TY P I C A L ROADWAY DlSIGN �����s
ENGINElR lNGINlER
�
i
I
I
-2.3' -0.20 i +0.15 �� ��
4.3' , 5.13'-
12.5' _.,_._L_---- --
_ -- �
� I
I
I
� I
�
NOT TO SCALE
P RO PQ S E D TYP I CAL NOT TO SCALE
�
� �
� .
� ,
m
W .
� GRADE �
r POINT ,
a
� 6� � � 4� 4� ,� y.�
�
J
m
3
� 0,02 FTiFT 0.02 FT/FT
` 0.0 FT 0 08 FTiFT
m �, 3:l
0
�
�
o �
J I
9 �
O
m '
h
0
3 ^ ,1
Y
m
a
U
O
U
L
O
U
C
m
N
�
OU
_ m
mo
�
N �
I�
0] O
Wp
�
ar
���I���N �]F ]H�GIE�WA��
S7CAl7C7E �]F N�1�7CH CA�B.�]L�NA
SO�L STABILIZATl011t S UMMARY S.H�EET
MATTI11lG FOR EROSI011t C011lTROL
CONST ��NE FROM TO SIDE ESTIMATE lSY)
SHEET N0. STATION STATION
5U 'f OTAL 0
M 15GBI•I•AN DU5 MA11 I NG 10 0ti I N5T I•1•E0 Ay 0 I R G1 E0 6Y 'f NE tiNG I N�tiR
'fOTAI. 0
5AY 0
PERMA11lE11tT SOIL REIIITFORCEME11tT MAT
CONST LINE FROM TO SIDE ESTIMATE (SYJ
SHEET N0. STATiON STATION
5u TOTA� a
M15GEI.�ANEDUS MATIING 10 6ti INSTA I•ti0 A5 OIR� 1ti0 6Y 'fNti NbINEtiR
TOTAI. 0
5AY 0
���VI���I�T �]F ]H�GI[�WA��
S7CA7C7E �]F N�I$7CH �AtI�.�IL�NAt
S()l� S TAB.��IZA �'I �111 TIMEFRAI VlES
SlT E DESCRIPT lON ST ABILIZAT l0/V T lME T IMEFRAME EXCEPT IONS
PERIMETER DIKES, SWALES. DITCHES AND SLOPES � DAYS NONE
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3al 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWEDa
SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN
LENGTH,
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE,EXCEPT FOR PERIMETERS AND HQW ZONES.
. � � � . � � .
... . .
� • • '
-, � �
� i i � , � � i i , � , � �
� •
,. .
�• .- -
' � ��������■ �������� • • -
' ' ' ----------------- • : - -
' o�a�����������a�������� -
�����������������������
� o����������������������
������������������e����
o���������������������� ...
�����������������������
���o�����������e�����e���� -
������������������0����
=� o����������������������
������������������0����
= '- o���������������������� � .,
������������������e����
' = o���e�������������e���� ...
������������������0����
.. o�����������������e���a ...
������������������e����
,.. o���������������������� -
��������������������e����
o����������������������
������������������e����
- o���������������������� ...
�����������������������
- o���e������������������ ...
�����������������������
������������������e����
�����������������������
�����������������������
������������������e����
������������������e����
�����������������������
������������������e����
������������������e����
������������������e����
�����������������������
�����������������������
�����������������������
�����������������������
�����������������������
������������������e����
�����������������������
�����������������������
������������������e����
������������������e����
������������������e����
������������������e����
�����������������s�����
�����������������������
������������������e����
������������������e����
�����������������������
�����������������������
�� �����������������������