HomeMy WebLinkAbout20180285 Ver 1_PCN Form Submission_20180226Action History (UTC-05:00) Eastern Time (US & Canada)
�brrrit by Anonymous User 2/26/2018 10:14:04 AM (Start Event)
Accept by Carpenter,Kristi 2/26/2018 4:37:58 PM (DOT Initial Review)
• The task was assigned to Carpenter,Kristi . The due date is: March 1, 2018 5:00 PM
2/26/2018 10:14 AM
E-PCN Submittal
���
�lulslaa af Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
January 31, 2018 Ver 2.3
*
Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red.
Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf
A. Processing Information
County(or Counties) where the project is located:*
Caldwe II
Is this project a public transportation project? *(')
C�' Yes C' No
Is this a NCDOT Project?*
r Yes C' No
(NCDOT only) T.I.P. or state project number:
WBS #
44594
(for NCDOT use only)
1a. Type(s) of approval sought from the Corps:*
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
Nationwide Permit (NWP) Number: 14 - Linear transportation
NWP Number Other:
List all MNnurrbers you are applying for not on the drop down list.
1c. Type(s) of approval sought from the DWR:*
check all that apply
ri 401 Water Quality Certification - Regular r 401 Water Quality Certification - E�ress
r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
*
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
�' Yes C•' No
C' Yes �' No
1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
If so, attach the acceptance letter from rritigation bank or in-lieu fee program
C� Yes l" No
Acceptance Letter Attachment
Gick the upload button or drag and drop files here to attach docurrent
Mitigation - SR 2003 Division 11 - STR - CT 01 (Warm).pdf 64.05KB
FlLE TYFE MJST BE FflF
1f. Is the project located in anyof NC's twentycoastal counties?*
C' Yes �' No
1h. Is the project located in a designated trout watershed?*
C' Yes C' No
Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-PrograrrUAgency-Coordination/Trout.aspx
B. Applicant Information
B. Applicant Information
1a. Who is the Primary Contact?*
Heath Slaughter
1b. Primary Contact Email:*
hslaughter@ncdot.gov
1c. PrimaryContact Phone:*
(xxx)xxx-xxxx
(336)903-9202
1d. Who is applying for the permit?
fJ Owner r Applicant (other than owner) r Agent/Consultant
(Check all that apply)
2. Owner I nformation
2a. Name(s) on recorded deed:
NCDOT
2b. Deed book and page no.:
2c. Responsible party:
(for Corporations)
2d.Address
Street Address
801 Statesville Road
Address Line 2
��
North Wilkesboro
Fbstal / Zip Code
28659
2e. Telephone Number:
(xxx)xxx-xxxx
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
hslaughter@ncdot.gov
State / Rovince / f�gion
NC
Country
USA
C. Project Information and Prior Project History
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
SR 2003, Washboard Lane
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/town:*
Lenoir
1d. Driving directions*
IF it is a new project and can not easily be found in a C�5 rrapping system Rease provide directions.
See attached Map
2. Project Identification
i 2a. Property Identification Number:
(tax RN or parcel ID)
2b. Propertysize:
(in acres)
2c. Project Address
Street Address
Address Line 2
�Y
Fbstal / Zip Code
State / R-ovince / Region
Cauntry
2d. Site coordinates in decimal degrees
I Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as
appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude: *
35.90496
ex:34208504
3. Surface Waters
Longitude:*
-81.39667
-77.796371
3a. Name of the nearest body of water to proposed project:*
UTs to Morris Creek
3b. Water Resources Classification of nearest receiving water:*
C
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Catawba
3c. What river basin(s) is your project located in?*
RiverBasin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Secondary Road in rural area.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
Gick the upload button or drag and drop files here to attach docurrent
Washboard Lane Topo.pdf 134.87KB
Fle type rrust be pdF
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
Gick the upload button or drag and drop files here to attach docurrent
Fle type rrust be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
0
4e. List the total estimated linear feet of all existing streams on the property:
(interrrittent and perennial)
150
4f. Explain the purpose of the proposed project:*
Secondary Road Improvement
4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:*
See attached cover letter
4h. Please upload project drawings for the proposed project.
aick the upload button or drag and drop files here to attach docurrent
Washboard_PermitPacket.pdf 3.2MB
Fle type rrust be pdF
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
�' Yes C' No [' Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
C' Preliminary C' Approved C' Unknown �' fWA
Corps AID Number:
6carrple: SAV�2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Othe r:
Heath Slaughter
NCDOT
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
i 5d1. Jurisdictional determination upload
Gick the upload button or drag and drop files here to attach docurrent
Fle type rrust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
C' Yes C' No �' Unknown
� 7. Future Project Plans
7a. Is this a phased project?*
C•' Yes C' No
7b. If yes, explain.
Jurisdictional work must be completed nowdue to pipe condition. Most of the road widening will occur later.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre-construction notification.
D. Proposed Impacts Inventory
D. Proposed I m pacts I nventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
� Wetlands r Streams-tributaries r Buffers
r Open Waters r Pond Construction
E. Impact Justification and Mitigation
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
Pipe lengths will be the minimum necessary to accommodate the newtypical section.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
All appropriate BMPs will be used during construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C•' Yes �' No
2c. If yes, mitigation is required by (check all that apply):
r DWR �,7 Corps
2d. If yes, which mitigation option(s) will be used for this project?
r Mitigation bank rJ Payment to in-lieu fee program r Permittee Responsible Mitigation
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached.
fJ Yes
4b. Stream mitigation requested:
(linear feet)
136
4c. If using stream mitigation, what is the stream temperature:
warm
4d. Buffer mitigation requested (DWR only):
(squarefeet)
4e. Riparian wetland mitigation requested:
(acres)
4f. Non-riparian wetland mitigation requested:
(acres)
4g. Coastal (tidal) wetland mitigation requested:
(acres)
4h. Comments
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
""` Recent changes to the stormwater rules have required updates to this section .*'�
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
f Yes C•' No
For a list of options to meet the diffuse flow requirements, click here.
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes C' No
G. Supplementary Information
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
C�' Yes C' No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?*
C' Yes �' No
Comments:*
MCC
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
C' Yes �' No
2b. Is this an after-the-fact permit application?*
C' Yes �' No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
C' Yes C•' No
3b. If you answered "no," provide a short narrative description.
Water quality will be improved by paving the road.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project? *
C' Yes r No C' f�/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
C•' Yes �' No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
f Yes C•' No
5d. Is another Federal agency involved?*
C' Yes C•' No
5e. Is this a DOT project located within Division's 1-8?*
C' Yes C•' No
Sf. Will you cut anytrees in order to conduct the work in waters of the U.S.?*
C' Yes C' No
[' Unknown
5g. Does this project involve bridge maintenance or removal?*
C' Yes C•' No
Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf
5h. Does this project involve the construction/installation of a wind turbine(s)?**
C' Yes �' No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers,
mechanized pile drivers, etc.?*
C' Yes C•' No
Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*
NHP and visual observation.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
C' Yes C•' No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?*
C' Yes C•' No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
I Project was reviewed by HEU.
7c. Historic or Prehistoric Information Upload
Qick the upload button or drag and drop files here to attach docurrent
18-01-0023 NoSu rveyReq. pdf 2.21 MB
SR 2003 (Caldwell) No Survey form.pdf 541.64KB
Fle rrust be Ft7F
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
C' Yes �' No
8c. What source(s) did you use to make the floodplain determination?*
Above Link
Miscellaneous
Miscellaneous attachments not previously requested.
C7ick the upload button or drag and drop files here to attach docurrent
NHP project_report_sr_2003_washboard_lane.pdf 773.04KB
SR 2003, Letter.pdf 767.98KB
VICINITY MAP - WASHBOARD LN.pdf 133.46KB
Fle rrust be FDF
Signature Page
Signature
rJ By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
. I intend to electronically sign and submit the PCN form.
Full Name:*
Heath Slaughter
Signature
�%t� Q Sl��.r��t� �
Initial Review
Is this project a public transportation project? *(?)
C� Yes C' No
Change only if needed.
Has this project met the requirements for acceptance in to the review process?*
C� Yes
C' No
BIMS # Assigned*
20180285
Version#*
1
Reviewing Office*
Winston-Salem Regional Office - (336) 776-9800
Select Project Reviewer*
I Dave Wanucha:eads\djwanucha
Is a payment required for this project?*
C' No payment required
�' Fee received
C' Fee needed - send electronic notification