Loading...
HomeMy WebLinkAbout20180027 Ver 1_SAW-2018-00058 NCDOT R5716 Perquimans_New Hope Road_20180223Carpenter,Kristi From: Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> Sent: Friday, February 23, 2018 11:08 AM To: Willis, Thomas C Cc: Ward, Garcy Subject: [External] SAW-2018-00058 NC R5716 New Hope Rd Attachments: SAW-2018-00058 NCDOT R5716 Perquimans_New Hope Road.pdf CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Clay, It was pointed out to me that you had requested a NWP14 for this project and I issued it under a NWP 3. Attached is the amended version of your request. Please replace the previously issued verification with the attached one. If you have any questions please let me know. Kyle Barnes Regulatory Project Manager US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 <http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0> Thank you for taking the time to visit this site and complete the survey. U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2018-00058 County: Perquimans Countv U.S.G.S. Quad: Hertford GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Clav Willis NC Department of Transportation Address: 113 Airport Drive Edenton, NC, 27932 Telephone Number: (252) 482-1876 Size (acres) 0_4 Nearest Town Hertford Nearest Waterway Perquimans River River Basin Albemarle-Chowan USGS HUC 03010205 Coordinates Latitude: 36.1916 Longitude: -76.3916 Location description: The proiect area begins approximately 2.6 miles east of the intersection of US 17 and New Hope Road near the town of Hertford in Perquimans Countv, North Carolina Description of projects area and activity: The proiect will involve the widening of New Hope Road between SR1302 and SR 1300 from 18ft to 22ft. There are two locations within the proiect area that contain Waters and Wetlands of the US that will be impacted bv fill. Applicable Law: � Section 404 (Clean Water Act, 33 USC 1344) ❑ Sections 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: 14 SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated Januarv 8, 2018. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Elizabeth City, NC, at (252) 264-3901. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Kvle Barnes at (910) 251-4584 or Kv1e.W.Barnes(a�usace.armv.mil. BARNES.KYLE.WILLIA � ,� �393u Corps Regulatory Official: M.� 388035397 �a�e.=�,a���=,,a=� �_� °' Date: Januarv 24, 2018 Expiration Date of Veriiication: March 18, 2022 SAW-2018-00058 Determination of Jurisdiction: A. � There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary deternunation is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any wark that could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters, including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law ar our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID: SAW- . Basis For Determination: The waters within the uroiect area are a tributarv of the Perpuimans River which is a TNW and the wetlands within the uroiect area flow unimpeded to that TNW. Remarks: E. Attention USDA Program Participants T'his delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. AppCa15 InfOPmatlOn (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by N/A **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Digitally signed by BARNES.KYLE.WILLIAM.138803539] 7 rr BARNES.KYLE.WILLIAM.1388035397 DN:c=US,o=U.S.Government,ou=DoD,ou=PKl,ou=USA CO�S Re�la+0� 011lCla�. rn=BARNES.KVLE.WILLIAM.138803539] � Date:2018.021311:04:11 -OS'00' Kyle Barnes Date of JD: Januarv 24, 2018 Expiration Date of JD: N/A SAW-2018-00058 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Copy furnished: Agent: Clav Willis NC Department of Transportation Address: 113 Airport Drive Edenton, NC, 27932 Telephone Number: (252) 482-1876 SAW-2018-00058 Action ID Number: SAW-2018-00058 County: Perquimans County Permittee: Clav Willis, NC Department of Transportation Project Name: NCDOT R5716 PERQUIMANS NEW HOPE ROAD Date Verification Issued: January 24, 2018 Project Manager: Kvle Barnes Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Kyle Barnes Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: NC Department of Transportation File Number: SAW-2018-00058 Date: Januarv 24, 2018 Clay Willis Attached is: INITIAL PROFFERED PERMIT (Standard Permit or Letter of p PROFFERED PERMIT (Standard Pern�it or Letter of permission PERMIT DENIAL APPROVED JURISDICTIONAL DETERMINATION PRELIMINARY JURISDICTIONAL DETERMINATION See Section below ssion) A B C D E SECTION I- The following identifies your rights a»d options regarding a» administrative appeal of the above decision. Additional i�ifonnation may be found at http://www.usace.arm_y.mil/inet/functions/cw/cecwo/reg or Coros re�ulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You inay accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final autl�orization. lf you received a Letter of Permission (LOP), you may accept the LOP and your work is aLrtharized. Yotiir signat�ire on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. OB7ECT: If you object to the perinit (Standard or LOP) because of certain terms and conditions therein, you may request that the perniit be modified accordingly. You must complete Scction II of this form and return the forni to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the pennit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) ii�odify the permit to address all of your concerns, (b) modify tbe permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: Ifyou received a Standard Perrnit, you may sign the pennit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and condirions, and approved jurisdictional determinarions associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You inay appeal the denial of a permit under the Coips of Engineers Administrative Appeal Process by completing Section II of this fonn and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new infonr�ation for further consideration by the Corps to reevaluate the JD. SECTION II - REQLTEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decisioii or your objections to an initial proffered permit in clear concise statements. You inay attach additional information to t11is form to clarify where your reasons or objections are addressed in the ad�ninistrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental infonnation that the review officer has determined is needed to clarify the adininistrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this d�cision and/or the If you only have questions regarding the appeal process you inay appeal process you may contact: also contact: Mr. Jason Steele, Administrative Appeal Review Officer District Engineer, Wilmington Regulatory Division, CESAD-PDO Attn: Kyle Barnes U.S. Anny Corps of Engineers, South Atlantic Division 2407 West St" Street, Washington, NC 27889 60 Forsyth Street, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Per�nits send tliis form to: District Engineer, Wilmington Regulatory Division, Attn: Kyle Barnes, 2407 West 5th Street, Washington, NC 27889 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this for�n to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137