Loading...
HomeMy WebLinkAbout20160825 Ver 1_Feb 22, 2018 inspections_20180226Wetland Inspection Report Project Num: 20160825 Version Project Name: NCDOT - US 64/NC 90 Improvements (R-5745) County: Caldwell Location: NCDOT - US 64/NC 90 Improvements (R-5745) Latitude: +35° 55' 27" SW Plan Location Site Owner Name NC DOT Division 11 Inspection Date: 2�22�2018 Reason for Inspection Routine Inspection Type: Records/File Review (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: � Operation and Maintenance Inspection Summary: 1 Status: Issued Project Type: Road maintenance/repair/improvemen Region: �sheville Title: ❑ Not Compliant Longitude: -81 ° 30' 15" Phone: Phone: 336-776-9703 page: 1 Site Number: 20160825 Inspection Date: 2/22/2018 Owner: Pettyjohn, Michael A. Inspection Type: Records/File Review (DOT) Reason for Visit: Routine Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? �❑❑❑ Are the inspection and maintenance records complete and available for review? �❑❑❑ Comment: Records were reviewed and determined to be properly completed and accuratelv reflected condtions of outfalls and erosion control measures. A rain gaqe is on site. page: 2