HomeMy WebLinkAbout20180199 Ver 1_Site Meeting Notes-February 21 2018_20180221Meeting Notes
Date: February 21, 2018
Type of Site: NCDMS Stream and Wetland Site
Prepared By: Mac Haupt
Sponsor/Provider: Water Land Solutions
Meeting Type: Field Site Review
NCDMS ID Number:
Project Name: Buffalo Creek Tribs
County: Johnston
USACE Action ID Number:
HUC and Basin: Neuse - 03020201
NCDWR Project Number: 20180199
Coordinates: 35.7241 `N -78.3433 `W
Attendees:
WLS-Scott Hunt, Kayne Van Stell, Kathryn
DMS -Jeff S
COE- Henry W, Ross Sullivan
WRC -Travis
DWR- Katie
Notes, Sketch, etc.:
R4- dry now, because storm water diversion, ok to divert water back into this channel. Stormwater work behind school
changed the path of the flow to the adjacent tributary.
R3-pres proposed 10:1, ok, goes into headcut proposed for Rest, ok
MSR1-R approach ok, channel incised, upper half, active mass wasting, good Bedform material
Did see a channel from upper SW pond, should be RSC, channel probably jurisdictional, however RSC justified.
A few cores showed hydric soils and potential for wetland rehab. in the wetland areas marked on the map.
R5- a few areas of headcuts/incision, would warrant some work
MSR2-not as incised, some areas of bank erosion, moving or raising channel bed would help hydrology of wetlands.
Was really undecided on this reach until the end of the walk. Decided that the added benefit of the wetland rehydration
would justify the work. Also, would be ok if they considered slope from top to bottom of project, may have to adjust
culvert (Travis's comment).
R6 -intermittent half way up, if R could lose hydrology, question about whether they take the pond out. I would be in
favor of taking pond out and restoring "valley", however, I do not think they are going to pursue this since the ephemeral
call was halfway up the tributary.
Action Items:
Page 1
Notes, Sketch, etc.:
Page 2