Loading...
HomeMy WebLinkAbout20070402 Ver 1_Application_20090304 STATE OF NORTH CAROLINA 0 DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PURDUE GOVERNOR March 2, 2009 U. S. Army Corps of Engineers Regulatory Field Office Post Office Box 1000 Washington, NC 27889-1000 Attention: Mr. William Wescott NCDOT Coordinator Dear Sir: EUGENE A. CONTI, JR. SECRETARY O7 u`/UD--"' 2 Subject: Request for a Section 404 General Permit 31 Application, Section 401 Water Quality Certification, and Neuse River Riparian Buffer Authorization for the Replacement of Bridge No. 46 on SR 1091 over Wheat Swamp Creek in Greene County. Federal Project No. BRZ- 1091[1], TIP No. B-4125. Debit $240 from WBS Element No. 33478. 1.1 References: USACE GP 31 Action ID SAW 2007-1105-140 issued 3/21/07. NCDWQ WQC No. 20070402 and Neuse River Riparian Buffer Authorization issued 3/23/07. NCDOT Permit Application dated March 8, 2006 Due to the expiration of the permits referenced above, the North Carolina Department of Transportation (NCDOT) is re-applying for the permits necessary for project construction. Neither the design nor proposed impacts have changed from those provided in the original application for this project. Please find enclosed the Pre-Construction Notification form (PCN), permit drawings, and half-size plan sheets for the above referenced project. The NCDOT proposes to replace existing Bridge No. 46 on SR 1091 over the Wheat Swamp Creek in Greene County. A Categorical Exclusion (CE) was signed on December 18, 2003 and distributed shortly there after. Additional copies are available upon request. The project involves replacement of the existing structure with a 105-foot bridge at approximately the same location using top-down construction. The approach roadway will consist of two 12-foot travel lanes with shoulder widths of 6 feet. Permanent impacts will consist of 0.08 acre to riparian wetlands adjacent to Wheat Swamp Creek, and 2,275 ft2 of riparian buffer. Traffic will be detoured off-site, along surrounding roads, during construction. The project schedule calls for a July 21, 2009 Let date with a review date of June 2, 2009. MAILING ADDRESS: TELEPHONE: 919-431-2000 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919-431-2002 NATURAL ENVIRONMENT UNIT PDEA-ENVIRONMENTAL RESOURCES CENTER PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 4701Ave. -116 Atlantic 1598 MAIL SERVICE CENTER WEBSITE: WWWNCOOT.ORG Raaleeighigh,, N NC 2 27604 RALEIGH NC 27699-1598 Nioratoriurh c: ,The NC Division of Marine Fisheries (NCDMF) recommended a moratorium for anadromous fish in a letter dated June 12, 2002. However in an email (attached) dated July 31, 2006, Sean McKenna with NCDMF deferred the anadromous fish call to NC Wildlife Resources Commission (NCWRC). According to a letter from the NCWRC, dated June 12, 2002, no in- stream moratoria were requested for this project. Therefore, NCDOT will not adhere to an in- stream work moratorium for this project. Regulatory Approvals Section 404 Permit: All aspects of this project are being processed by the Federal Highway Administration as a "Categorical Exclusion". The NCDOT requests that these activities be authorized by a General Permit 31. Section 401 Permit: We anticipate 401 General Certification number 3704 will apply to this project. In accordance with 15A NCAC 2H, Section.0500(a) and 15A NCAC 2B.0200 we are providing 5 copies of this application to the NCDWQ, for their approval. We are also providing authorization to debit $240 from WBS 33478. 1.1 as payment for processing the 401 Water Quality Certification. Neuse River Riparian Buffer Authorization: NCDOT requests that the NCDWQ review this application and issue a written approval for a Neuse River Riparian Buffer Authorization. A copy of this permit will be posted on the NCDOT web site http://www.nedot.org/doh/preconstruct/pe/neu/pennit.html Thank you for your time and assistance with this project. Please contact John Merritt at jsmerritt@ncdot.gov or (919) 431-6749 if you have any questions or need any additional information. Sincerely, N? c Gregory J. Thorpe, Ph.D. Environmental Management Director, PDEA W/attachment Mr. Brian Wrenn, NCDWQ (5 Copies) W/o attachment (see website for attachments) Dr. David Chang, P.E., Hydraulics Mr. Greg Perfetti, P.E., Structure Design Mr. Victor Barbour, P.E., Project Services Unit Mr. Mark Staley, Roadside Environmental Mr. Richard E. Greene, P.E. Div. 4 Engineer Mr. Chad Coggins, Div. 4 Environmental Officer Mr. Scott McLendon, USACE, Wilmington Mr. Gary Jordan, USFWS Mr. Travis Wilson, NCWRC Mr. Ron Sechler, NMFS Ms. Anne Deaton, NCDMF Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P.E., Programming & TIP Mr. Art McMillan, P.E., Highway Design Mr. John Williams, P.E., Planning Engineer A'CDOT TIP B-4125 Page 2 of 3 o?OF?W A?TEg 0 Y Office Use Only:. Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: ®Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NW P) number: or General Permit (GP) number: 198200031 1c. Has the NW P or GP number been verified by the Corps? ® Yes ? No Id. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ®No For the record only for Corps Permit: ? Yes ® No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Replacement of Bridge No. 46 on SR 1091 over Wheat Swamp Creek 2b. County: Greene 2c. Nearest municipality / town: Hookerton 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state project no: B4125 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if applicable): not applicable 3d. Street address: PDEA-NEU, 4701-116 Atlantic Ave 3e. City, state, zip: Raleigh, NC 27604 3f. Telephone no.: (919) 431-6749 3g. Fax no.: (919) 431-2002 3h. Email address: jsmerritt@ncdot.gov Page 1 of 10 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: -4 b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): NCDOT Right-of-Way .4096 Longitude: - 77.5590 Latitude: 35 1 b. Site coordinates (in decimal degrees): (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: approximately 0.43 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Wheat Swamp Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C Sw NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Rural with forested areas, scattered residential and farms 3b. List the total estimated acreage of all existing wetlands on the property: 0.10 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 120 3d. Explain the purpose of the proposed project: To replace a structurally deficient and/ or functionally obsolete bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: Replacement of the existing bridge structure with a 105-foot bridge at approximately the same location and roadway elevation of the existing structure using top-down construction. Typical road construction equipment such as but not limited to: cranes, bulldozers, and track hoes. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ? No ? Unknown project (including all prior phases) in the past? Comments: SAW-2006-32604-140 issued 6/30/06 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Landmark Design Group Name (if known): Ryan Smith, Com Faquin, Jamie Shern Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. March 21, 2007 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. USACE ORM ID SAW 2007-1105-140 on 3/21/07, NCDWQ Project No. 20070402 v.1 on 3/23/07 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December,10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ? Streams - tributaries ® Buffers ? Open waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ®P ? T fill herbaceous ? Yes ® No ® Corps ® DWQ 0.01 W2 ®P ? T mech. clearing herbaceous ? Yes ® No ® Corps ® DWQ 0.02 W3 ®P ? T fill bottomland ® Yes ® Corps 0 02 hardwood ? No ®DWQ . W4 ®P ? T mech. clearing bottomland hardwood ® Yes ? No ® Corps ®DWQ 0.01 W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.08 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction' Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P F1 T ? PER El Corps ? INT ? DWQ ? PER ? Corps S5 ? P ? T ? INT ? DWQ ? PER ? Corps S6 ? P ? T ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem ora T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ®No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 51k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ® P ? T Bridge Wheat Swamp Creek ® Nos 628 113 B2 ®P ? T Road Wheat Swamp Creek s ® 460 1074 Fill No ?Yes B3 ?P?T ? No 6h. Total buffer impacts 1088 1187 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Longer spans with fewer bents than the existing bridge, 3:1 slopes in jurisdictional areas 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Bridge No. 46 will be replaced in place with an offsite detour. Design Standards in Sensitive Watersheds will be implemented, 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this pro project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 . PCN Form -Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan - 1 a . Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1b . If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? % 2b . Does this project require a Storm water Management Plan? ? Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ' ? Phase II 31b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HOW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 41b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a . Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 51b . Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b . If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered 'yes' to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ® Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a . Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H.1 300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered 'yes' to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a . Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b . If you answered 'yes' to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes No impacts? E3 Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Actual surveys conducted at the site by NCDOT staff as well as the NCNHP Inventory 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County List 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Investigations by NCDOT staff and review from the NCSHPO. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Ph s. NG?r,? Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 NORTH CAROLINA HOOKERTON GR EIENIE COUNTY NEUSE RIVER BASIN PROJECT LOCATION VICINITY MAP WETLAND PERMIT 1V `l DO ll DIVISION OF HIGHWAYS GREENE COUNTY PROJECT: 33478.1.1 (B-4125) REPLACE BRIDGE a46 OVER WHEAT SWAMP CREEK ON SR 1091 permit Draw;hg SHEET OF Sheet l? of NCDOT LOCATION MAP DIVISION OF HIGHWAYS GREENE COUNTY PROJECT: 33478.1.1 (B-4125) REPLACE BRIDGE U46 OVER WHEAT SWAMP CREEK ON SR 1091 Permit Drawing SHEET OF Sheet Z of 6 o z1 D N O ? r N 0 0 U m m m T [n 0 m m O d ' N O J + W J + 0 ? ? J W O O J W r N .Z1 r ,Z1 A 0 d d N N .. L L N n 4 C T T 1 O N (D < N 0 0 0 ? ? _! 3 0 0 o n m- m d fD N 7 G ? m =_ 3 N m ? m a 0 -0 D cL C) M O O O < (U S r O O O n^ d j Z Ut W N , ... N ? N J O O N V N O m D v n m 3 ? m N 3 3 D G n m v " ? 3Sx D m ? » ? 3 T o i . (D j? N t0 _ ? 3 g M 3 ° ^ " cn p n > > ?(na m 0 3 v PROPERTY OWNERS NAMES AND ADDRESSES PARCEL NO. NAMES ADDRESSES 3 James A. Fields, e( ua 6899 Hugo Road Hookerion, NC 28538 4 Ely J. Derry P.O. ]Egos 1475 Kinston, NC 28503 NCDOT DIVISION OF HIGHWAYS GREENE COUNTY PROJECT: 33178.1.1 (B-1125) REPLACE BRIDGE '16 OVER WHEAT SWAMP CREEK ON SR 1091 Permit Drawing 6 of Sheet SHEET OF NORTH CAROLINA HOOKERTON GR ElENIE COUNTY NEUSE RIVER BASIN PROJECT LOCA VICINITY MAP BUFFER PERMIT NCDOT DIVISION OF HIGHWAYS GREENE COUNTY PROJECT: 33478.1.1 (B-4125) REPLACE BRIDGE 1$46 OVER WHEAT SWAMP CREEK O&ff&AWing Sheet _ I of LOCATION MAP NCDOT DIVISION OF HIGHWAYS GREENE COUNTY PROJECT: 33478.1.1 (B-4125) REPLACE BRIDGE '46 OVER WHEAT 3$SWAMP CREEK ONBSRef Ufewin9 Sheet -Z_. Of SHEET OF L , I nd i C QI I ° ? g+ I I I J I'I I AI ' ?3 ?y °' I . ? I 1 K r ,?g? d ? I 1 „I g G ? N S? Q I 1? I III E m ?? W I ? I III N III lid ql III ? O rF I c LL,? 'aw J ? II III - Q d ' V Z I I I N r u O I o LLJ >w Zo°N I III ? I R ? LL V "? lil lu W 99 a ? II I em Z I 0 ? 5(lalt'OlW 19...0' 4I J I IE+ ° 'L z I a u IL u wL 3roo N III J = b ? ?,?. i II ?" LL w III III ? ? + ' I I I u.I c N N W'W N'N W W W W N N 2 b w ? Ix it I ?''? s I . III I al +n O y I + I I II \\ 1. " I ;, 'Hal r\ ?4 x \ B al N Su M [ N? IL .. Ix I :? tn, -MV I s?m`:? / ,-tom r - I L1% • N n s ?, y I r ?? II W r / I s? .E9'1i .ZL905 I I • ? •. .. ?= / i III e y ? ' g /gM1 {? f'! I' ? nsxs arvss .six ao rnw "" u" ? i I w ?r I m 1 i a? . S3oo ? O mT , u T ya ? Q 3 zz e O? Z g yu I R. Q. _,-= II o I m ? I I I $. I I I a Z W ? ? I I I ml : y y I I ? y?? zE L sL _sar ceve_ O ? ' ' ? II III I I ? E 211.10 x0a15 JS i II 2 III II ° N III / / GIn a ? ?I tl „ I I + I ? tll I - 91,. I I F N II @ IC jl I S Z ? ? III' }I I ' l9 .I I { W a I ?I =r m saw's r as. e' a' xr III (» 0/ € I ? o bb/LI'8 ` - u6P'op 4sd-y pn4 5211G <? Ifi M {? t I_ 1 IIII II' / I I z ' C) ' . ' / \ Ii y 3 I \ I / 1 1 ?j f I 1 ?\\\ ? / / I x F 13 1 I /q b / 1 11 N a N 3 IG J O LL aw a J ? 1 ? K 1- O.K ?w W W W W W W N N \ I I ' I / ' , . ' / n ? / I' 1111 1 / l11 0 : I 1 ' ?"Mt. `_\ ? " 11 \ \ ? \ \ \ ` \ w I \ // / I ' \AA\ \11 111 `\ \ ` IiZi??q'>//?'"? " I? ill ??1'«1- i??'vului?'i?ilAr?ll A vvv `vvv \ -e5? %/UI!/ \ III I a \\\ / 'l/lull, 1 ll/ a C '%'4 //??yvll/-I ? I. I 11111 '1 ?* ,I\b\\\\- _ ?_ J4 ? ?` ?? ?? \ \I\\1//'? ?r 11 \r?1?'11l\\ '^? - ? Irll : / °/?He \ ? \\\? . 5sy?Ts v/ `M r - ii `?/f v uo. vssn / ?V Iv I v ?` - 'b rs Ili r Y I 1 c s ? \ _ _ , - _ 9 7Egg ? - _ 1 I / / I I 1\ -r. " \ Q WI 3ceo I. _I /Al 1 '/I ,? ?\\\?\\\\\ ,/?/,_7?:W -__ \ I -I IIII eg ` ` \\ \ l =K;U - / ._ \ ` 1 I /l I I' / , d Z / \ \ 1 I \011 \\ \\ 1\- amdr?394• 41 ?.I\ el III 11 u -I r' Z tee/ •- 1: '.\ / 1 \\\\ o\\\\ \\\ \\??\?I? ° - ?'`I III - ' '?? {V?_\ 5 07. \ 1 ?? i I \.\ .\ `'? \?`' \.' \ Ill I \" . \ \ II L/ N \. V \.. \.. .\A ? \\\\\\\A\ :f+ls'el oa_ C-111\y?, .' ? 1?/L./ \\ \ \\(/ \\ \\\\\\111` /?« I I `ir \ \:i Alf u\vvv.AIvv r e,?? 1vv?++ v ` ' ?/ /,'. ,I , I I III?IIIII111 \ r J I 1 - \` `_ \\\??\ III \\? \,-____ WIN N \ 0 Is ( a v _ _ 1 1\ ??? 1 • i I OM o x Zw $ 15 ^ ? f n ? p i? I I I/ 0/ m. ? ?Lv f. O? r f 1 ml I \ ' I I \ q' l /\ i l \ // I , \ \I - _ - ` \ j1 I I \ B , _ / _ \ sl c _bu av+F _ - 1 I I v 1 ? I I / 1 I Xa.?O ? I xon l \ N . ` ' ? 1 A 1 A 1 I ?A l I O ? ! ? I I _ W IIIIIIIII / ? ._\: i I m/ Il I 1 ? I 1 rp II VI \ ' rN I 1 I -\ ' - w 11r ?? 8 1 \IrT \\ \`? / I II 4 I/ I I I I /' I 1 111 -m so?a• ?r . e' a•}r / :I , II I ' } I ' ? ? mot' yWr II I _ _ I V X11 \1 1 1 11 I //' Il `\I4 u5P'e0 / 1 I 1, /1 ?1? / , 1 ' ? l, I I 1 1 'l I 1 -- II 1 /S wi M = , '' ? \ l\\ - I '? Ali \ p 1` I' ,'4r I I ' Ili I l 111 `/ II \ I / I I I l 1 1 II l l ? V/ \ -.' 1 1 1/ I I 1111 1 1 // 1 I ? I / + II I ? 1 1 / I ? / ? {{ 'Ill./! l ' I ? I \ I IIII 1 ' v ( I I I 1 1 I - ' ' ! I I v ? 1 ' I I I A 111111 vI I ?_ & l ? V 1 v / I \ ? I I I I ' I111 JI 111\ ? A I J I 1 I IIII ? / I I I \ / 1 / ?? \ a IIII I 11 I . 11111 ?1 Its -- - - ?/ 1 /. - dTYS Ir3Xr JO IdWIdW r \ \. X65'- _ ? `- / i i ? •I 1?u ° 1 ?N?' _-. /,1111 /fllll?) 11 ?r4- ' ' /4111` . li° Ir a%? ?lll'nly / ?„ I I 8- E 8 W/ 1 II 1 _ lu / VIII B \ Iti'l IN. yal? e $ n 'u o ° ? ? N O 1 u t V di I l n u l ?? o o(, d ,i l?,i \ ' ( ? - \ \ I GC J Q N TJ va 1 II a \ ` 7 Z t 5 g µ D i 0 "y ' a , . N _ ' O Ir 1 ? I ? Z - F _ -w -45 V s N S a 6 6 6 O N a O N 0 0 I l u It l 0 ° 0 0 0 ?'a w ? 0 0 0 0 ^_ 0 m o, II 0. 5 d Z G ? ° S F o „" 6 0 z Z n ? ? w 0 1 _ II J ? d Z \ / I _/ - - - ' 11 I Yp 11 II 11 ' \ ` 1 \\ ? \\ 1\ _?y?gtr-??m?,4?iDG ,.Il l\I III \ 1 I ..\ / I1 a \\ ` \`\ \\\ \_{ yr II 1111 m \ \ :I ''i \ \\? (r \\?`\\\\\I`1\I? ?I- _ _ CI illfl\II\T/ -\ 1, \ /-IEy-\\\\ \ _ A \ 1??\. \ I / \ \\` \\\\\II II / /, Ifi - ,III pl( `\ `\?` W. All ? `e\ \\`\.? \\? it /' / ! 111' IIII ° \ ` ,O11\.? \? `v i I v 1 "i 1 vvvAvvv`?vvv 11v / i'IW ' 14 v N` ?v v?'?s' - \J ) of X11 \1j111 j1 tll l('IjIJ . C/I - \. ??. _?`.? \\\?\\\`,1?? - fl / d' II 1 lI v ?: A A\ V A ? II I I I I ? ???vv?3 ? v ?? V 1? e' / A, l1 II ??'//11111 111 I ?" ` Ilrl \ \\ 11\\ \\\\ \\ 'J\ \., m ? \ 11 1 / ? ?,i /n ? I I 1/l Jl? 11: I ?1 / ylb ?.? \? 111\\ \ \ \ \ \ \ i o I///r 'rS/ ? I 111 ?I. /. ?,. \\11\? \' ? llf \ \ \ _ q ? -a5• _ b ? rr??lll#^ \ 1111 I 111 I/I/ „ \\??\ - / / _ +?-? I 0000) u, / / w" I I I I^N J \\ --\\ T N N 00, N Z s F? ? I N y m d W0 mrn J IL m. 0? K d J I ? K H g o ?11 N N W w w IA N W W o° /W N N 8 6 0 q It ` ??? \\ / 3 ` \ \ / _ ? - \ \ d ? II / Z E r\\\ \ 9€-,\ l?j`\`'? nluo em.s Irw, io Nw "?`1 I, `a a v / 1 ° ggn Z7 P o do { 3 9W' ME g , l5 ?? ^ £ o¢ ? 9° 1 * 1 I 3? 11 li _ v v 1 3 4 1 m? 1 vs v v` v`? 1 \ 1 W / 1 I I . \ \ ? / 1 \ o? A 8 e -/ I, I ` \ 1 \ - _ _ ? \ 1 \ _ O r \ I I _ ?_ ?_? ? \ \ \ / \ ?"ra,rr \ ` 1 \ ` ` I I I I r ' II I ? ` - 1 - - ? \ I I `;sl r ' W II C-4? O - d l v / / ? d \ I 1 1 ryl I I - ? 1 I? ` I ? ? 1 Q ? l 1 I I tI I I / v / _ ? ? ? \ - ? I II I v 1 f Q N I C I I I 1 11 1 I ' - W l I \ \ in r/ % 1 1 IN III/ \NN it N 1 ' l i \ \ \ II im sans' w' . e'?').r_ I ? I II II I 1 0/ t 1 I 1 Y i f I 1 \ \\ - /! Il III I _ u5P'b0 4sd-1^9-wjd-p 4 1 l I I / \ \ - ? / _r I II / \p If% \ /I (` X11 - ?r 1 1 III 1 1 ' II / II ? 1 ?r ? I ` 111 11 ' 11 II I I ? V/ \ ?\ 1 1 I I 111 , / I 1 I l I I , 11 \ I - I I I / l / 1 ' 1 1 1 I a . I 11\ nll1ll ' l 1 ? \ ? I I A 1 ? ' I \ / Id ` I I ullfl ,1 \ . 11111 I /\? _ -- ? I /.. J / 7 03-aUG-2406 16.01 \h ..?nye.neu \ 25-h?Iyp _bu!_psh 04-Ceteil.dgn .InnnnA MV JI 4RC D I r r ? nn Z ? ? I ? n ? I I rO F- ) I m N o W /V I Z - m I m IF J I I N N O ` \ I ?? D ? I I I I O ? N Z -9 I I .D r r ? O . ? X r ? - \I 00 . CID 0 z D m A` v I I\ I N O WMI - Z8 c? r ? r 7r- N L 0) CD IS DA IL Or co m f? Zr N N > r 'a INo? N m ? m Z 2 rn Z M. g so :°g z £ M ? a $ o ro I I I SI2 a or CF/ I 1 ? _ ? ? '?? . m a o b $Y . 3z z ?? z i T .,. ,R ? Al i ?a i ' o C7 G o ? -., r?? C Al. Z P It H Q• Q ? Fr ° Fal Ky o z? k 'J R. rn N CO) ^7 Csl '9 d ?i ? ? ? . Cdl P-3 ? ? '+1 z m n :? Gj1 z a M c "?' e N rTi ' p t-I Z y c? ? x o" ? '0 C4 C? f sh_oaozie.am, CONTRACT. TIP PROJECT: B-4125 0 0 0 T = 5 n O Z N u N O O O y r (q 0 0 ??? b bbd ti ? ?n n n n ?oZ a nb x . o aY N o 0 x C) n 'C °?ro ro 0 11? n II 00 K y° N? ? ea K y V ? y O Y O N .ro O y ? p?an ? K 'i N x ? sOx T A n H Q m? ?x$ b e @ Y e _! y O ° a °x b H 2 IN W CT o ? to IA m y IN w 'o ? OD 2 ? l,, X m y p J=a Im A I -? m a 0 tv W O R1 x C0,° a c? Sa y 1 !?rrC? n O Z "C n h u a w m lma1 , ? tl V V V O m m in i.N a a J m m 0 _a a \8-acv-2 l1Oe l`l ?'a`aizs_.a o eaezu.a is s B- YP 9^ ° °L' s E ° ?CC Q C ° ° 1 1 1 ? m I1 1 1 ti ti I OR n N II _ y p 4? ?? II fs 4 D f B o r N N V N m m m f _? --- A o z I z a? Z II ° a? 5- Z to z =O r m ?s z m 49 Z m to O y Z N H O C ? O N A O X O 7 W N p C A y 0 10 MEN* 2 I = °° J C ° J 10 c b 0 O / O Pa` OD v / o o TL o o / DD 14 CA IL ° err c 'p £ Ntj 2 44 Oy ' H 01 m o irom PPc = y V l m 515n O O? N W M AO DD f/INIt n ZO'? UIO °1 a °O- ym ++ > (.100 y prN 00 OO 6ij, m ' °o ?_ ?YQ OOm °Z oo Q nOO O --o,O Q Zm v m O+Z r1-O Dm °? Z z i I Z "Z y-I4Z w Z y?yy Q rin0 C?Z F1D fJ ? o z° ?°? O N Q VI N N n° °7° ?• O m ma A r N+ Da C N ?G Z+O NZ m p0 ym 1 ?i10p + 00 rm-m O - yyOOp C; Z o m 0 <? fA p ?m m S_ m 0 Z° m mo 1 y3 1 a 1 O ^i c ? 1 0 ° ` m f m m 1 °> pO - y 1 m y z M ?? f g m 1 :4 > '? m rn m S C y 110 d - / C yC m I m A m / p p A / Z .0 A ?oN 4 o O O y O O O O O ? ? N b O O O A O O O 0 s ? b g a < O O f O O J O ? o II s_ II 9 O 10 I O G? O G? f < c ? m N m N T X Ty H9 Ty r S;' y 9 a ? 9p ? ' a•• i ' ° ' z s z z z ° s• x =oma v voma v .. y ? ? ? am ? ? 9 m z y ' my 'mu m ? O w0 < r o o 111 ? p m g pmn mn m o '? ya 9 p ? s ?mm m?~il mm m n p a m Om O? C* 0 Q p vp 00 OA r j p A ? m a S"o° m i z¢ m aa`a io 9 Y m ? < y Ina p d a a m O p O ?m p y O i 18-AUG-2006 II:19 \roadra?.\ pro \$4125-rdy-pb_040216.dgn 8/17/99 &£. I }}} I I t3 ?,F 10 iii g'g IIII RM.M .8 5R Y .9LY05 m 088 - 4 > v Y IIII ? I i ? o A , gmm >7 ?o I'F 111 FF o o e + ++x v ^?n += g n Im IIII IP ?., I -i 1 888 gg,?P °$ °c. II I N_ oN n >?,4 :? Y W k.r I 11 1-v o s Za $IC 0 m p z° lea ?°e >i 1 O 1 Z' g pp 993 H5? I I 8?;. p L $i A x 8 III 1 N Zz } . ?? V III ? 'i N ° ' 07 ??, $ Y IIA ? ? a .or9zz szcaso" o0o m'?' 688 ^ Frtrt, Am +Y?gO? II iN 8 W=N? I I ? ?Q "g AO e 4 'ao I ?.6 8 Ao I °z +°?? I $o: $:: I m zy u ?i A } } m ?°,° ??8, uNg x 1 O r?r Z p2 dm P , E-'i y? m w c 6 D G) _7^ III ..'?.1_ -„ D J ? I o,Z g6°. _ 11 x +m €.a knx or riser skeuv cn51x \ N s 11 I 1r/ o m 'g n I '? / \ I _ 'I I o r6.a9. m \ \ ? Q I I li / soszzzrx - easy ' . '" /g s \ 1 \ Si 9.\ (f ?i ? b q? \ 4 I I m ? ^ ' ?a SZ°?"e, ti RAM P S k ? Q kkk I ?F k kl 4y Ji+° P k , k = k k i m i 8g ?N[ , k p k /k k / - rr? $ ?p ?µ Ik s ?k k k _ A$ F k _ `N kkk kk ? k k *wZ k `k k I \ kv'f ?'.k k ?? k k ?} a? k (M µ k k/ ? I »? kkkk;k T?k c I I I \T k kl kk/ T °va 88F h* e µk µ kk 1 1 k kk k^9 + ?- i&& W k i" k ? ? E ??' 6O? ? kk .k k// ,111 kk?kkk P 4? BRO }} m kk gal 1 ?, BGge d^ k C ` ? I I i I\k?* II ? ? >a? ? ?Q kkk ? ^Ir j1 I 'a Ik \ Y }}?' 4 M vs jl III ?? k\ .i /? K 111, r k .. a / 1 o paw _ / / ^?? 11111 I w I? \\ \.=`/ ( 20 ? o g 5?'SL ^I I - I , I+1 .OY"Y6[ Y.LO.LLY05 it Asu_ n m m A. my I III A Y, ?, III I ? x ? .0 11 48 O 17° I III i _ C I ^ III k y III yy I I i' w ? yl I °' u e m - + 41 iII T S 3 I Z o II 1 I $t 9 y z+i C: V rn mw 1 I I j + O z 0 1 ill ia' I m z I,I c? or £ Job a z_ N o i N