Loading...
HomeMy WebLinkAbout20180269 Ver 1_401 Application_20180218E -PCN Submittal DWR 133W$lon of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20F ile°/x202018-1-30. pdf ...... ...... ..... ...... ...... ..... ...... ...... ..... ...... ...... ...... ...... ..... ...... ..... ..... ....... A. Processing Information County (or Counties) where the project is located: Lee Is this project a public transportation project? * (? r Yes r No 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* 17 Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number: 39 - Commercial/Institutional Developments NWP Number Other: List all NN nunbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply V 401 Water Quality Certification - Regular r- Non -404 Jurisdictional General Permit r- 401 Water Quality Certification - Express r- Riparian Buffer Authorization * 1d. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: r Yes r No 1d. Is this notification solely for the record because written approval is not required? For the record only for Corps Permit: r Yes r No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from aitigation bank or in -lieu fee program f Yes r No 1f. Is the project located in anyof NC's twenty coastal counties?* r Yes r No 1h. Is the project located in a designated trout watershed?* r Yes r No Link to trout information: http://wuwv.saw.usace.army.miI/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information B. Applicant Information 1a. Who is the Primary Contact?* Wyatt Brown 1b. Primary Contact Email:* brownenvgrp@gmail.com 1c. Primary Contact Phone:* (919)524-5956 1d. Who is applying for the permit? W Owner r- Applicant (other than owner) r- Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: Little River, LLC 2b. Deed book and page no.: Dd 1376 Pg 0369, Dd 1376 Pg 0372, Dd 1376 Pg 375, Dd 1376 Pg 726, Dd 1376 Pg 863 2c. Responsible party: (for Corporations) Ray Covington 2d. Address Street Address PO Box 1320 Address Line 2 City Sanford Postal / Zip Code 27331 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: 2g. Email Address:* covington2@me.com State / Province / Pegion North Carolina Country Lee C. Project Information and Prior Project History C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Little River Quarry 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Sanford 1d. Driving directions* If it is a new project and can not easily be found in a GPS napping system Rease provide directions. 537 Fred Stone Road, Sanford, NC 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 9569 -29-3664-00,9660-10-6469-00,9569-38-4774-00,9569-38-7123-00, 9660 -11-6185-00,9569-19-2568-00,9569-27-1993-00,9569-09-4643-00, 9660-12-6034-00 2b. Property size: (in acres) —376 2c. Project Address Street Address 537 Fred Stone Road Address Line 2 City State / Province / Pegion Sanford NC Postal/Zip Code Country 27331 Lee 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.398448 -79.127919 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Upper Little River 3b. Water Resources Classification of nearest receiving water:* Class B Surface Water Lookup 3c. What river basin(s) is your project located in?* Cape Fear River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Existing conditions are a cow pasture for the proposed project and a pine forest for the entrance road from NC 87. General land use is agriculture. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) dick the upload button or drag and drop files here to attach docurrent Quad.pdf 552.28KB File type rust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Click the upload button or drag and drop files hereto attach docurent Soil Map.pdf 1.24MB File type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: —0.32 4e. List the total estimated linear feet of all existing streams on the property: (internfttent and perennial) —4560 4f. Explain the purpose of the proposed project:* Project is to be a rock quarry, it will mostly be in an existing open pasture. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used: The project was designed to avoid wetland impacts, we are only impacting 0.035 square feet of wetlands, We have 5 stream crossing and are bridging 4 of them to avoid stream impact. Track hoe will be used to set the bridging and culverts for the Little River impact. 4h. Please upload project drawings for the proposed project. (lick the upload button or drag and drop files hereto attach document LTTLRVRW sh 1 preliminary (2).pdf 246.93KB LTTLRVRW sh 2 preliminary.pdf 296.01 KB LTTLRVRW sh 3 preliminary.pdf 95KB File type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? F Preliminary r Approved r Unknown r N/A Corps AID Number: Exarrple: SAW2017-99999 SAW -2015-02582 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Wyatt Brown Brown's Environmental Group, Inc 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. COE, Andy Williams, March 21, 2017 5d1. Jurisdictional determination upload nick the upload button or drag and drop files here to attach docurrent JD approved tear sheet.pdf File type rrust be FDF 6. Project History 4.17MB 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 7. Future Project Plans 7a. Is this a phased project?* r Yes F No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): rJ Wetlands rJ Streams -tributaries F Buffers F- Open Waters r- Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site # - Reason for impact* 2b. Impact type * 2c. Type of wetland * 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* Sheet 2, road fill.wetland P Seep Sheet 2 No Both 0.031 K/hp label (e.g. Poad Crossing 1 - Oalvert, Permanent (P) or (404, 10) or D✓VR(401, (acres) dewatering, etc) Temporary (T) other) Sheet 3, edge of road fill P Seep Sheet 3 No Both 0.004 Ivbp label (e.g. Road Crossing 1 - Culvert, Permanent (P) or (404, 10) or DV\R(401, (acres) dewatering, etc) Temporary (T) other) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.035 2g. Total Wetland Impact 0.035 2h. Comments: impact area was moved as much as possible to avoid vvetland impact 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Site # - Reason for 3b.lmpact 3c. Type of impact* 3d. Stream name* 3e. Stream 3f. Type of 3g. Stream 3h. Impact impact* type * Type * Jurisdiction * width * length* road crossing, sheet P Culvert Little River Perennial Both 50 135 7 Fern -anent (F) or Perennial (PEP) or Average (feet) (linear feet) Ivbp label (e.g. Finad Crossing 1) Temporary M internittent (INT) — All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 135 3i. Total temporary stream impacts: 0 31. Total stream and tributary impacts: 135 3j. Comments: Little River is the only culvert -ed road crossing with stream impact. E. Impact Justification and Mitigation E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The wetlands were delineated first, the quarry roads were designed to avoid and minimize impacts, 4 of the 5 stream crossing are by bridges to avoid stream impact. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* All impacts were due to roads, the width of roads were narrowed as much as possible to minimize impacts and still be safe for large trucks. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Cape Fear is not a buffered basin in this area. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No To look up low density requirement click here 15A NCAC 02H .1003(2). 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state - approved local government stormwater program?* r Yes r No Hnt: projects that have vested rights, exerrptions, or grandfathering from state or locally irrplerrented storrrwater programs or projects that satisfy state or locally-inplerrented storrrwater programs through use of cornTunity in -lieu programs should answer no to this question. 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters. r Stormwater Management Plan r Antidegradation Calculations 3b. Stormwater Management Plan: If submitting a SMP for review and approval, it shall comply with the high-density development requirements set forth in 15A NCAC 02H .1003. Include all appropriate stormwater control measure supplemental forms and associated items. dick the upload button or drag and drop files here to attach docurrent 11-23-2016 Stormwater & Erosion Control Calculations.pdf 36.35MB HLE TYPE MUST BE FDF 3c. Antidegradation Calculations: If submitting calculations to document the project will not cause degradation of downstream surface waters, the documentation shall include a detailed analysis of the hydrological impacts from stormwater runoff when considering the volume and velocity of stormwater runoff from the project built upon area and the size and existing condition of the receiving waterbody(ies). nick the upload button or drag and drop files hereto attach docurrent HLE TYPE MUST BE PDF G. Supplementary Information G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? r Yes r No 2b. Is this an after -the -fact permit application?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The rock quarry should not generate additional development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? f Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No f Unknown 5e. Is this a DOT project located within Division's 1-8?* r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* r Yes r No 5g. Does this project involve bridge maintenance or removal?* r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?"* r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* Natural Heritage site 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* http://wm.habitat.noaa.gov/protection/efh/habitatmapper.htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpovveb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Dept. Cultural Resources, Historic Preservation Office 7c. Historic or Prehistoric Information Upload Cick the upload button or drag and drop files here to attach docurrent File rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: the Little River Crossing is inside the 100 year floodplain, Becky Ward, PE has designed the crossing and has calculated a LOMAR 8c. What source(s) did you use to make the floodplain determination?* FEMA maps Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files hereto attach docurrent File rrust be FDF Signature Page Signature m By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Wyatt Brown Signature Initial Review Is this project a public transportation project?*(?) r Yes r No Change only ff needed. Has this project met the requirements for acceptance in to the review process?* r Yes r No BIMS # Assigned * 20180269 Version#* Reviewing Office* Raleigh Regional Office - (919) 791-4200 Select Project Reviewer* Stephanie Goss:eads\szgoss Is a payment required for this project?* r No payment required f Fee received G Fee needed - send electronic notification What amout is owed? * $240.00 r $570.00