HomeMy WebLinkAbout20160012 Ver 1_Certification of Completion_20180124Water Resources
ENVIRONMENTAL QUALITY
Governor
DONALD R. VAN DER VAART
WR Project No.: DWR# 16-0012 County: Buncombe
Applicant: Leslie Carreiro, City of Asheville
Project Name:
Bee Tree Creek Slope Stabilization
Date of Issuance of 401 Water Quality Certification: Z! i 0 j "Zo 1
Certificate of Completion
Secretary
S. JAY ZIMMERMAN
Director
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and
Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh,
NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
1, Leslie Carreiro , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, Kyle Seaman , as a duly registered Professional Engineer (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically,vvecidy, ffilfti=) the construction of the project, for the Permitee hereby state that, to
the best of my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules the approved plans and specifications, and other supporting materials.
Signature:2Z Registration No. 042470
Date o
State of North Carolina I Environmental Quality I Water Resources
1611 Mail service Center I Raleigh, North Carolina 27699-1611
919 707 9000