Loading...
HomeMy WebLinkAboutNCG551273_Compliance Evaluation Inspection_20180112Water Resources ENVIRONMENTAL QUALITY Nathan Marshall 106 Fairntosh Place Durham, NC 27712 Dear Mr Marshall: January 12, 2018 Govei not MICHAEL S REGAN Seci etag LINDA CULPEPPER Into un Du ectof RECEIVED/DENR/DWR ,IAN 16 2018 Water Resources Subject- Compliance Evaluation Inspection Permitting Section Single Family Wastewater Treatment System Permit No. NCG551273 Durham County On January 9, 2018, Andy Neal from the Raleigh Regional Office visited your single-family residence (SFR) wastewater treatment system to evaluate compliance with the above pen -nit to discharge wastewater The checked boxes below show what conditions were noted at your facility- F-1 acility ❑ In compliance: You are reminded to regularly maintain the chlorine disinfection and dechlorination systems, have the effluent sampled once a year, and have the septic tank pumped out every 3 to 5 years. Your good record of operation and meeting the permit requirements is highly commended ❑ Disinfection: Your system is lacking disinfection, either chlorine tablets or a UV light system New miles put into place on August 1, 2007 require all SFR systems to have a means of disinfection (and dechlonnation when chlorine tablets are used to disinfect, if the system was installed since that date). Since your system had no disinfection, the installation is to include a chlorine tablet dispenser, a contact chamber capable of providing a minimum 30 minute contact time, and another tablet dispenser that will hold dechlonnation tablets. Please submit a schedule to this office within 20 calendar days of receipt of this letter that states your plan for correcting this deficiency ® 'Treatment tablets missing or are wrong kind: You are responsible for always having chlorine tablets and dechlonnation tablets (if a required part of your system) in place They must be the kind for wastewater treatment and riot for swimming pools. ❑ Dechlorination: Your system was installed after August 1, 2007, so must have a means of dechlonnation located downstream of the chlorinator and its contact chamber. See Disinfection paragraph above. Please submit a schedule to this office within 20 calendar days of receipt of this letter stating your plan for correcting this deficiency ® Pumping the septic tank: The septic tank should be pumped out every 3 to 5 years A pumping company can check the status periodically and detennine when pumping is required. Division of Nater Resources, Raleigh Regional. Office, Watei Quality Operations Section littp //portal ncdcni oig'web/wq/aps 1628 Mail Service Center, Raleigh NC 27699-1628 Phone (919) 791-4200 Location 3800 Barrett Drive, Raleigh, NC 27609 Fax (919) 788-7159 X Failure to analyze the effluent: The effluent that is discharged from your system must be analyzed once each year See Part I(A) of your permit about his requirement A list of NC certified laboratories that provide this service was left at your residence during the inspection Make arrangements for sampling to be carried out within the next 3 months, and submit results to this office within 3 weeks after the sampling has been done ] Locations of treatment units are unknown: Determine this and report to this office within 30 days of receipt of this letter with a_sketch_or map ❑ Other: An ownership change form is included with this letter Please complete this form and return it to the address listed at the bottom of the form within 45 days of receipt of this letter. If you have questions or comments about this inspection, please contact Andy Neal or me at 919- 791-4200 Licensed plumbers should be used to make plumbing changes within your home Sincerely S. Daniel Smith, Supervisor Water Quality Regional Supervisor Raleigh Regional Office Attachments- Inspection Report cc RRO/SWP Files Charles Weaver, NPDES Permitting Unit