HomeMy WebLinkAbout20180265 Ver 1_PCN Form Submission_20180223Action History (UTC-05:00) Eastern Time (US & Canada)
�brrrit by Anonymous User 2/22/2018 3:45:07 PM (Start Event)
Accept by Carpenter,Kristi 2/23/2018 11:30:53 AM (DOT Initial Review)
• The task was assigned to Carpenter,Kristi . The due date is: February 27, 2018 5:00 PM
2/22/2018 3:45 PM
E-PCN Submittal
���
�lulslaa af Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
January 31, 2018 Ver 2.3
*
Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red.
Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf
A. Processing Information
County(or Counties) where the project is located:*
Scotland
Bladen
Is this project a public transportation project? *(')
C�' Yes C' No
Is this a NCDOT Project?*
r Yes C' No
(NCDOT only) T.I.P. or state project number:
G5600BA
WBS #
� 50061.1.3
(for NCDOT use only)
1a. Type(s) of approval sought from the Corps:*
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
Nationwide Permit (NWP) Number: 23 - Categorical Exclusions
NWP Number Other:
List all MNnurrbers you are applying for not on the drop down list.
1c. Type(s) of approval sought from the DWR:*
check all that apply
ri 401 Water Quality Certification - Regular r 401 Water Quality Certification - E�ress
r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
*
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
�' Yes C•' No
C' Yes �' No
1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
If so, attach the acceptance letter from rritigation bank or in-lieu fee program
C� Yes l" No
Acceptance Letter Attachment
Gick the upload button or drag and drop files here to attach docurrent
C-5600BA - RW - LU 04.pdf 65.97KB
FlLE TYFE MJST BE FflF
1f. Is the project located in anyof NC's twentycoastal counties?*
C' Yes �' No
1h. Is the project located in a designated trout watershed?*
C' Yes C' No
Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-PrograrrUAgency-Coordination/Trout.aspx
B. Applicant Information
B. Applicant Information
1a. Who is the Primary Contact?*
Anamika Laad
1b. Primary Contact Email:*
alaad@ncdot.gov
1c. PrimaryContact Phone:*
(xxx)xxx-xxxx
(919)707-4705
1d. Who is applying for the permit?
r Owner rJ Applicant (other than owner) r Agent/Consultant
(Check all that apply)
2. Owner I nformation
2a. Name(s) on recorded deed:
2b. Deed book and page no.:
2c. Responsible party:
(for Corporations)
2d.Address
Street Address
Address Line 2
�Y
Fbstal / Zip Code
2e. Telephone Number:
(xxx)xxx-xxxx
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
bsmythe@ncdot.gov
3. Applicant Information (if different from owner)
3a. Applicant is:
�' Agent
C�' Other JCDOT
If other please specify.
3b. Name:
Anamika Laad
3c. Business Name:
(if applicable)
NCDOT
3d.Address
State / FYovince / F�gion
Country
Street Address
1 South Wilmington Street
Address Line 2
1553 Mail Service Center
a�
Raleigh
Fbstal / Zip Code
27699-1553
3e. Telephone Number:
(919)707-4705
(xxx)xxx-xxxx
3f. Fax Number:
i (919)715-6580
(xxx)xxx-xxxx
3g. Email Address:*
alaad@ncdot.gov
State / Rovince / f�gion
NC
Country
C. Project Information and Prior Project History
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Dixie Storage Siding Track, Bladenboro Siding Track and East Arcadia
Siding Track
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/town:*
� Laurinburg, Bladenboro and East Arcadia
1d. Driving directions*
If it is a new project and can not easily be found in a G� rrapping system Rease provide directions.
To Dibe Storage Siding Track - Head east on Business 74 from East Laurinburg, CSX Railroad tracks should be on the left.
Bladenboro and East Arcadia sites have no jurisdictional resources impacted so directions are not provided.
2. Project Identification
2a. Propertyldentification Number:
(t�vc RN or parcel ID)
2b. Propertysize:
(in acres)
2c. Project Address
Street Address
Address Line 2
Qty
Fbstal / Zip Code
State / Rovince / F�gion
Country
2d. Site coordinates in decimal degrees
I Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as
appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
� Latitude:*
34.763146
ex:34.208504
3. Surface Waters
Longitude:*
-79.420997
-77.796371
3a. Name of the nearest body of water to proposed project:*
I Little Creek (Leith Creek - Johns Pond)
3b. Water Resources Classification of nearest receiving water:*
C; Sw (NCDWR Stream Index No. 14-33a)
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Lumbe r
RiverBasin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
I Development in the area is industrial and wooded with swamp.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
� DWR)
Gick the upload button or drag and drop files here to attach docurrent
C-5600BA- Dipe Storage Siding Track.pdf 1.68M6
Fle type rrust be pdF
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
Gick the upload button or drag and drop files here to attach docurrent
Fle type rrust be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
6.0
4e. List the total estimated linear feet of all existing streams on the property:
(interrrittent and perennial)
1000
4f. Explain the purpose of the proposed project:*
I Rehabilitate and upgrade existing side tracks and construct two new rail bridges to reduce bottlenecks on CSX SE-
line. Reduce congestion in the state's rail network between the Port of Wilmington and Charlotte and reduce
amount of cargo on highways by increasing rail efficiency and transporting via rail.
4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:*
Rehabilitate and upgrade e�sting siding tracks from MP 270.5 to MP 271.9. Extend E�sting Dipe Siding Track #1
(located closest to the mainline) approbmately 4,600 feet to just v�st of the I-74 overpass at MP 271.93. Extend
Existing Dibe Siding Track #2 (next to Siding Track #1) appro�amately 1,800 feet, to east of the Highland Road at-
grade rail crossing at MP 271.32. Construct two new rail bridges to carry both the main track and Siding Track #1
over Little Creek at MP 271.48. Equipment includes typical construction equipment such as backhoes, dump
trucks, dozers, excavators and cranes.
4h. Please upload project drawings for the proposed project.
qick the upload button or drag and drop files here to attach docurrent
DWG_20170531_NC_Di�ae_Storage_Siding_Extension_Level 1.pdf 2.05MB
C5600B Redline Drainage Plans.pdf 5.1MB
C56006_Permit Drawings_2018.02.12.pdf 2.48M6
Fle type rrust be pdf
5. Jurisdictional Determinations
Sa. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
C� Yes C' No C' Unknown
Comments:
RK&K Engineers conducted field work and attended a field visit to confirm
their jurisdictional determinations. Documentation of this jurisdictional
determination has not been received.
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
C�' Preliminary C' Approved C' Unknown C' N/A
Corps AID Number:
6carrple: SAN�2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Othe r:
Hal Bain and John Merritt
RK&K Engineers
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
RK&K Engineers conducted field work and attended a field visit to confirm their jurisdictional determinations. Documentation of this
jurisdictional determination has not been received.
5d1. Jurisdictional determination upload
aick the upload button or drag and drop files here to attach docurrent
Fle type rrust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
f Yes
7. Future Project Plans
7a. Is this a phased project?*
C' Yes G No
C•' No
f" Unknown
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre-construction notification.
f�UA
� D. Proposed Impacts Inventory
D. Proposed I m pacts I nventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
N7 Wetlands r Streams-tributaries r Buffers
r Open Waters r Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. Site #- Reason for impact* 2b. Impact type * 2c. Type of wetland*
Site 1 - Fill Slope
N�p label (e.g. F�ad Qassing 1- Qalvert,
dewatering, etc)
Site 1 - Mechanized Clearing
N�p label (e.g. Road Qossing 1- Qalvert,
dewatering, etc)
Site 2 - Fill Slope
N�p label (e.g. I�ad CXossing 1- CLlvert,
dewffiering, etc)
Site 2 - Mechanized Clearing
N�p label (e.g. F�ad Qassing 1- Qalvert,
dewatering, etc)
P Riverine Swamp
F�rrrenerd (P� or Forest
Terrporary (�
P Riverine Swamp
F2rrrnnent (P� or Forest
Terrporary (�
P Riverine Swamp
F2rrranent (P� or Forest
Terrporary (�
P Riverine Swamp
F�rrranerd (P� or Forest
Terrporary (�
2g. Total Temporary Wetland Impact
0.000
2g. Total Permanent Wetland Impact
0.790
2g. Total Wetland Impact
0.790
2h. Comments:
2d. Wetland name *2e. 2f. Type of 2g. Impact
Forested* Jurisdicition* area*
WA Yes Corps 0.380
(404, 10) or d�NR(401, (acres)
other)
WA Yes Corps 0.210
(404, 10) or CMR(401, (acres)
other)
WA Yes Corps 0.130
(404, 10) or CMR(401, (acres)
other)
WA Yes Corps 0.070
(404, 10) or CMR(401, (acres)
other)
E. Impact Justification and Mitigation
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
Storage improvements were considered on the opposite side of the main track from the existing storage siding.
i However, if the existing siding track was not utilized for the improvements, construction on the other side of the
mainline tracks v�rould result in more impacts to the natural environment, including an increase in the length of
stream channel impacts and the acreage of wetland impacts.
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:*
The NCDOT "Best Management Practices for Protection of Surface Waters" will be implemented where practicable
� to control stormwater runoff and minimize wetland impacts.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C� Yes �' No
2c. If yes, mitigation is required by (check all that apply):
rJ DWR �J Corps
2d. If yes, which mitigation option(s) will be used for this project?
I r Mitigation bank N7 Payment to in-lieu fee program r Permittee Responsible Mitigation
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached.
fJ Yes
4b. Stream mitigation requested:
(linear feet)
4c. If using stream mitigation, what is the stream temperature:
4d. Buffer mitigation requested (DWR only):
(squarefeet)
4e. Riparian wetland mitigation requested:
(acres)
0.79 acres
4f. Non-riparian wetland mitigation requested:
(acres)
4g. Coastal (tidal) wetland mitigation requested:
(acres)
4h. Comments
6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR
6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire
form - please contact DWR for more information.
r Yes r No
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
""` Recent changes to the stormwater rules have required updates to this section .*'�
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
C' Yes r No
For a list of options to meet the diffuse flow requirements, click here.
If no, explain why:
Not located withing a river basin that has protected riparian buffers.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
C� Yes C' No
G. Supplementary Information
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
C�' Yes C' No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?*
r Yes c" No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the
NEPAor SEPAfinal approval letter.)*
C� Yes l" No
NEPA or SEPA Final Approval Letter
C7ick the upload button or drag and drop files here to attach docurrent
C56006A_CE Type IA_Nov 2017signed.pdf 9.32M6
FlLE TYFE MJST BE FDF
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
C' Yes �' No
2b. Is this an after-the-fact permit application?*
C' Yes �' No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
C' Yes C•' No
3b. If you answered "no," provide a short narrative description.
No, proposed project is extending e�sting track sidings. This is not e�ected to produce additional development,
rather, alleviate bottlenecks on the CSX SE-Line.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project? *
C' Yes G No C' f�UA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
C' Yes �' No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
C� Yes �' No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
C� Yes C' No
What Federal Agency is involved?
FHWA
5e. Is this a DOT project located within Division's 1-8?*
�' Yes C' No
f Unknown
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*
US Fish and Wildlife Endangered Species Website and National Marine Fisheries Service Critical Habitat website.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
C' Yes C•' No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
National Marine Fisheries Service website.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
I Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?*
C' Yes C•' No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCDOT Cultural Resources office performed a review.
7c. Historic or Prehistoric Information Upload
aick the upload button or drag and drop files here to attach docurrent
I G5600BA_Cultural Resources.pdf
Fle rrust be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
C•' Yes �' No
2.41 MB
8b. If yes, explain how project meets FEMA requirements:
The Hydraulics Unit will coordinate with the NC Floodplain Mapping Program to determine status of project with
regard to applicability of NCDOT's Memorandum of Agreement or approval of a Conditional Letter of Map
Revisions (CLOMR) and subsequent final Letter of Map Revisions (LOMR).
8c. What source(s) did you use to make the floodplain determination?*
NC Floodplain Mapping website - DFIRM Panel 8376
Miscellaneous
Miscellaneous attachments not previously requested.
C7ick the upload button or drag and drop files here to attach docurrent
DFIRM_NC_3710837600K(2).pdf 2.83M6
C56006_HYD_SMP_20180212.pdf 24.94KB
Fle rrust be F�F
Signature Page
Signature
rJ By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
. I intend to electronically sign and submit the PCN form.
Full Name:*
ANAMIKA LAAD
Signature
�� .
Initial Review
Is this project a public transportation project? *(?)
C� Yes C' No
Change only if needed.
Has this project met the requirements for acceptance in to the review process?*
C� Yes
C' No
BIMS # Assigned*
20180265
Version#*
Reviewing Office*
Central Office - (919) 707-9000
Select Project Reviewer*
April Norton:eads\arnorton
Is a payment required for this project?*
C' No payment required
�' Fee received
C' Fee needed - send electronic notification