Loading...
HomeMy WebLinkAbout20070812 Ver 2_Stacey Adkins - The El Group, Inc_20090225[Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project] Subject: [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project] From: Mike Templeton <Mike.Templeton@ncmail.net> Date: Wed, 25 Feb 2009 11:08:51 -0500 To: Coleen Sullins <Coleen. Sul lins@ncmail.net> CC: Michael Parker <Michael.Parker@ncmail.net>, John Dorney <John.Dorney@ncmail.net>, Deborah Gore <deborah.gore@ncmail.net> Coleen - Here is a 2007 email thread regarding a discharge to Stanly County from an Alcoa 'abatement' project at the Badin site. I am forwarding it because it mentions the presence of PCBs in the discharge, which I didn't remember until I read it again. I've left a message with Deborah Gore to see if she knows more about it. - Mike T ------- Original Message -------- Subject: [Fwd: [Fwd: [Fwd: [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project]]]] Date: Tue, 27 Nov 2007 15:42:21 -0400 From: Mike Templeton <Mike.Templeton a,ncmail.net> To: Deborah Gore <deborah.gore(ancmail.net> CC: Michael Parker <Michael.Parker(&ncmail.net>, ROBERT MCDANIEL <ROBERT.MCDANIEL(&,ncmai1.net> Deborah - This may just be an FYI for now, but I thought Pretreatment should know about it and you can decide if PERCS needs to follow up on it. It appears from this email thread that a contractor is doing some cleanup work inside the Alcoa Badin Works and wants to discharge filtered water to the Stanly County WWTP. The 11/8 email below from Stacy Atkins (contractor) to Donna Davis (Stanly County) says the materials "contain asbestos, lead-based paint, and trace levels of PCBs (far below NC & EPA regulatory levels)." Potentially haz waste, though it doesn't say one way or the other. No data, no HW characterization. If this discharge does include haz waste and the County agrees to take it, the wastewater is no longer subject to RCRA requirements. If that's acceptable We're in the middle of negotiating a permit settlement with Alcoa. Let me know if you want to know more. - Mike T •------- Original Message -------- Subject: [Fwd: [Fwd: [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project]]] Date: Tue, 27 Nov 2007 13:00:03 -0500 From: Bob Sledge <Bob.Sled,ge(iDncmail.net> To: Mike Templeton <Mike.Templeton(&ncmail.net> Mike, Here's that e-mail I just mentioned. Most of the discussion flies right over my head, but it doesn't sound good.... Bob S. 1 of 4 2/27/2009 11:20 AM [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project] Michael E. Templeton, P.E. Point Source Branch/ NPDES Surface Water Protection Section NCDENR • DWQ Raleigh, NC Tel: 919.807.6402 Fax: 919.807.6495 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. *********** Subject: [Fwd: [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project]] From: Marcia Allocco <marcia.allocco@ncmail.net> Date: Mon, 26 Nov 2007 15:46:08 -0500 To: Michael Parker <Michael.Parker@ncmail.net>, Samar Bou-Ghazale <Samar.Bou-Ghazale@ncmail.net>, John Lesley <John.Lesley@ncmai l.net> CC: Bob Sledge <bob.sledge@ncmail.net> Any answers gentlemen??? My first inclination would be that the discharge would not be covered under their permit. Marcia Marcia Allocco - Marcia.AlloccoCncmail.net Environmental Chemist North Carolina Department o Division of Water Quality - 610 East Center Ave., Suite Mooresville, NC 28115 Environment & Natural Resources Surface Water Protection Group 301 Ph: (704) 663-1699 Fax: (704) 663-6040 Subject: [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project] From: Barbara Sifford <barbara.sifford@ncmail.net> Date: Mon, 26 Nov 2007 14:59:09 -0500 To: Marcia Allocco <Marcia.Allocco@ncmail.net> Discharge to Badin WWTP ? Barbara Sifford - Barbara.Sifford(oncmail.net Environmental Technician v North Carolina Dept. of Environment & Natural Resources Div. of Water Quality 610 E. Center Ave., Suite 301 Mooresville, NC 28115 Ph: 704.663.1699 Fax: 704.663.6040 Subject: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project From: "David Gill" <dgill@co.stanly.nc.us> 2 of 4 2/27/2009 11:20 AM [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project] Date: Mon, 26 Nov 2007 14:37:43 -0500 To: <Barbara.Sifford@ncmail.net> Barbara, Can you please take a look at the email below from Stacey Adkins of The EI Group in Charlotte, to Donna Davis, director of Stanly County Utilities. They are doing some abatement work at Alcoa Badin Works and Stanly County needs to know if our permit covers this type of work? I'm not sure if you are the one who actually wrote our permit or not, and if you are not the person that this needs to go to, could you please forward this to them and let me know. They are also in a hurry to get this done, so I would appreciate a reply as soon as you can get back to me. Thanks for your time and attention in this matter. David Gill Utilities Project Compliance Coordinator 704-986-3872 Office 704-964-2703 Cell dgill@co.stanlv.nc.us -----Original Message----- From: acowley@eil.com [mailto:acowley@eil.com) Sent: Monday, November 26, 2007 1:09 PM To: David Gill Subject: FW: Stacey Adkins - The EI Group, Inc. - Alcoa Badin Project Original Message: From: Stacey Adkins sadkins@eil.com Date: Mon, 26 Nov 2007 10:54:48 -0500 To: dbrummitt@eil.com, acowley@eil.com Subject: FW: Stacey Adkins - The EI Group, Inc. - Alcoa Badin Project Stacey A. Adkins Senior Industrial Hygiene Technician The EI Group, Inc. 8604 Cliff Cameron Drive, Suite 152 Charlotte, NC 28269 Cell (704) 622-7052 Tel (704) 593-1640 Fax (704) 593-1650 web site: www.eii.com e-mail: sadkins@eil.com <mailto:sadkins@eil.com> "Your Single-Source Environmental, Health & Safety Solution" This e-mail, including attachments, may include confidential and/or proprietary information, and may be used only by the person or entity to which it is addressed. If the reader of this e-mail is not the intended recipient or his or her authorized agent, the reader is hereby notified that any dissemination, distribution, or copying of this e-mail is prohibited. If you have received this e-mail in error, please notify the sender by replying to this message and delete this e-mail immediately. From: Stacey Adkins Sent: Thu 11/8/2007 5:19 PM To: ddavis@co.stanly.nc.us Subject: Stacey Adkins - The EI Group, Inc. - Alcoa Badin Project Donna, we will be performing an abatement project of materials associated with inactive reactor units located in the pot room courtyards at Alcoa Badin works. Abatement includes materials that contain asbestos, lead-based paint, and trace levels of PCBs (far below NC & EPA regulatory levels). Water will be filtered once through an 20-micron filter, then through a 5-micron filter prior to discharge into the sanitary sewer system. The majority of the water filtered and discharged will be from the decontamination shower units. Gross waste and water associated with the abatement will be properly bagged and sealed following abatement 3 of 4 2/27/2009 11:20 AM [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project] regulations satisfying the state of North Carolina and the Federal EPA regulations. The gross waste and associated water will be properly disposed of and will not enter the sanitary sewer system. The estimated time of abatement project will be approximately 2 months. Confidentiality Notice: This electronic mail transmission, and any attachment to it, contains privileged and confidential information intended only for the personal and confidential use of recipient(s) designated above. If you are not the intended recipient of this communication, or the employee or agent responsible for delivering it to the intended recipient, you are hereby notified that any review, disclosure, copying, distribution or use of the contents of this information is strictly prohibited. If you have received this communication in error, please immediately notify the sender and please destroy the original message and all copies. Thank you. -------------------------------------------------------------------- mail2web.com - Microsoft(r) Exchange solutions from a leading provider - http://link.mail2web.com/Business/Exchange E-mail correspondence to and from this address may be subject to the North Carolina Public Records Laws and may be disclosed to third parties ' (Fwd: JFwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project)J.eml Content-Type: message/rfc822 Content-Encoding: 7bit [Fwd: FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin ProjectJ.eml Content-Type: message/rfc822 Content-Encoding: 7bit FW: Stacey Adkins - The El Group, Inc. - Alcoa Badin Project Content-Type: message/rfc822 Content-Encoding: 7bit 4 of 4 2/27/2009 11:20 AM