Loading...
HomeMy WebLinkAbout20180234 Ver 1_CAMA Application_20180213Coastal Management ENVIRONMENTAL QUALITY February 5, 2018 C) v/� 0�3� TO: Karen Higgins 401 & Buffer Permitting Unit DWR/Water Quality Permitting ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(cD.ncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Samuel Cross Project Location: 50 Raeford St., adjacent to a man-made canal in Ocean Isle Beach, Brunswick County Proposed Project: installation of a new boat lift and relocation of existing floating dock Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by March 1, 2018. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: Samuel Cross c/o Rick West 2. LOCATION OF PROJECT SITE: 50 Raeford St. adjacent to a manmade canal in Ocean Isle Beach, Brunswick County Photo Index - 2006: 1-6156, J-11 Lat:33.916471°N Long: 78.372918°W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 12/01/2017 Was Applicant Present -No 5. PROCESSING PROCEDURE: Application Received - 01/08/2018, Complete 02/01/2018 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Town of Ocean Isle Beach Land Classification from LUP - Residential (B) AEC(s) Involved: EW, PTA (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - Municipal sewer Planned - None (F) Type of Structures: Existing - Single Family Residence, private docking facility Planned - Installation of new boatlift. Waterward extension of existing dock. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands 193 sq. ft. Open Water (incorporated) (C) Other Uplands (D) Total Area Disturbed: - 193 sq. ft. (E) Primary Nursery Area: NO (F) Water Classification: SA; HQW Open: No 8. PROJECT SUMMARY: The applicant proposes to install a new boatlift and relocate an existing floating dock 4' waterward. Samuel Cross c/o Rick West Page Two 9. PROJECT DESCRIPTION The applicant's property is located at 50 Raeford Street, adjacent a man-made canal contiguous with the Atlantic Intracoastal Waterway (AIWW) in the Town of Ocean Isle Beach, Brunswick County. Directions from Highway 17 south of Shallotte: Turn Left onto Ocean Isle Beach Rd. and travel approximately 3.6 miles and continue straight onto Causeway Dr./ NC -904 for approximately 1.12 miles. Turn left onto E. 2nd St. and travel approximately 0.8 miles. Turn left onto Raeford St. and travel approximately 0.3 miles. The project site will be located on the right side of the street. The project site is a corner lot measuring approximately 0.2 acres in area with canal shoreline frontage on two sides totaling approximately 204' in length. The shoreline is void of Coastal Wetland vegetation and is stabilized by an existing concrete bulkhead. High ground vegetation consists primarily of lawn grass and ornamental landscaping. Existing upland development includes a single-family home, gravel driveway, and pool which abuts the existing concrete bulkhead. The property maintains separate docking facilities on the north and east sides of shoreline. The east side docking facility consists of a pier measuring approximately 4' in width by 8' in length and ramp measuring approximately 4' in width by 16' in length which leads to a floating dock measuring approximately 8' in width by 16' in length. The existing floating dock is aligned parallel to the channel approximately 20' waterward of NHW and in alignment with the established pier head line. An existing jet dock measuring approximately 5' in width by 10' in length is connected to the north side of the existing floating dock. The docking facility on the north side shoreline consists of an existing ramp measuring approximately 4' in width by 16' in length which leads to an existing floating dock measuring approximately 6' in width by 30' in length. The floating dock is aligned parallel to the canal and has an existing ramp landing measuring approximately 44 sq. ft. in area. Existing water depths at the waterward end of the existing floating platform measure approximately -2' to -3' @ Normal Low Water (NLW). The waters of the manmade canals and adjacent AIWW are classified SA; HQW by the Division of Water Resources and are NOT designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries. They are CLOSED to the harvest of shellfish. PROPOSED PROJECT: The applicant proposes to install a new boatlift and relocate an existing floating dock 4' waterward. As proposed, the relocation of the existing floating dock located on the north side would require an addition to the floating ramp landing measuring approximately 6' in width by 4' in length. The existing pilings located on either side of the floating dock are proposed to be relocated to the landward side of the floating dock, where no dockage is proposed. The proposed relocation of the existing floating dock located on the north side of the property's shoreline would align the waterward edge of the structure approximately 26' from the NHW mark on the existing concrete bulkhead. This distance would not exceed the 1/a width distance of the waterbody, which measures approximately 120' and would not encroach into the Town of Ocean Isle Beach's dredge channel, which is located approximately 36' waterward of the NHW mark. As proposed, a boatlift measuring approximately 12' in width by 12' in length would be installed approximately 10' east of the proposed relocated floating dock. The proposed boatlift would also be aligned approximately 26' waterward of the NHW mark, in line with the proposed relocated floating dock. There are no existing or proposed encroachments into either adjacent 15' riparian corridor setback. Samuel Cross c/o Rick West Page Two 10. ANTICIPATED IMPACTS: The proposed 6' in width by 4' in length addition to the existing floating ramp landing and the proposed installation of a new boatlift both on the north side of the property, would incorporate approximately 193 sq. ft. of Estuarine Waters and Public Trust Area. The proposed new boatlift would increase the slip count to a total of three (3) for the property in waters that measure approximately -3' in depth @ NLW. Minor increases in turbidity should be expected during the proposed construction. Submitted by: Sean Farrell Date: February 05, 2018 Office: Wilmington 1-8-2018 To whom it may concern: Project location and owner Samuel Cross SO Raeford OIB NC 28469 Scope of work Install a new boat lift running in series with existing dock. (see diagram) Due to the concrete seawall -location we are moving the boat lift out approx. 4 feet toward center of canal so we can install 2 inside pilings without hitting the concrete wall. We are installing 4 pilings for the boat lift. We are moving the floating dock out approx. 4 feet to get our dock and outside pilings of boat lift in line. We are relocating 2 piles on old floating dock and removing an old mooring piling to accept the new location of the floating dock. Also we will be adding to floating extension (4'x6') extension on back so the ramp will still land on the floating dock. Thank You Rick West of AMW docks 704-363-0668 I tEC IVED D(.1M WILMINGTON, NC IAN 0 -12018 J' ' APPLICATION for Major Development Permit (last - V , yrtosl North Carolina DMSION OF COASTAL MANAGEMENT t. Primary Applicant/ Landowner information Business Name AgenU Conor 1: First Name 1 71 Project Name (it applicable) Applicant 1: First Name Mi Last Name AgenU Contractor 2: First Name Ml Applicant 2: First Name Ml Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address TUr-14 c q �r� PO Box City State AIC- ,fir- c�,Ihf>�� �.'0,�� ,�/C ZIP �7 Country 71 Phone No. K FAX No. No. 2 ext. FAX( Street Address (tf different from above) City State ZIP Email '�Se— r i � , 2. AgentlContractor information Business Name AgenU Conor 1: First Name 1 71 MI Last Name 1.61 es cx- AgenU Contractor 2: First Name Ml Last Name Mailing Address) 4 jN PO Box City © "` State ZIP I �� '(NNjo. Phone �}�_�Phone V�V xt No. 2 ext. FAX( Contractor # Street Address (if different from above) City State ZIP Email Y Cd j ",e L, <Form continues on back> u�'lvi WILMINGTON, NC Form DCM MP -1 (Page 2 of 4) 3. project Location CouD,ty (can be multiple) � " Z,.> t Subdivision Name Phone No. _ _ /t, / Pr ext. a. In which NC river basin is the project located? �( UIE c. 1s the water body identified in (b) above, natural or manmade? ! fANatural []Manmade ❑Unknown I e Is proposed work within city limits or planning jurisdiction? j�YeOyes❑No 4. 9 to Description a. Total Ieyrgth of shoreline on the tract (ft.) c. Size of individual lot(s) (V- (0 � 4 1 � LCI ATV r. 0�- (if many lot sizes, please attach additional page with a list) e. Vegetation on tract ,L R S,) � r p,• s 5 APPUCATION for Major Development Permit State Rd. # r o� StateC ZAP , ��� Lot No.(s) (if many, attach additional page with list) Of water nearest to proposed project b.-�Name ` of body cL ^JitN S L' —4 d. Name the closest major water body to the/ proposed project site. f. If applicable, list the planning jurisdiction or city limit the proposed 1 work falls within. b. Size of entire tract (Sq• d. Approximate elevation of tract above NHW (normal high Water) or NWL (normal water level) '%NHW or []NWL I. Man-made features and uses now on tract g. Identify and describe the existing land uses adiacent to the proposed project site. (-I,— _�.'�ST P c,, S L') ;-' eo- & l 5 h. How does local government zone the tract? fR i. 1s the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if app e ) NYes oNo j]NA j. Is the propos P ed activi art of an urban waterfront redevelopment proposal? tY k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy If.yes, by whom? 1. Is the proposed pro leCt located in a National Registered Historic District or does it involve a National Register listed or eligible property? <Form continues on next page> Oyes ®No QYes %No ❑NA Oyes %No ONA ^r`ri C Form DCM,MP-1 (Page 3 of 4) m. (i) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? (iii) If yes to either (i) or (ii) above, has a delineation been conducted? (Attach documentation, if available) n. Describe existing wastewater treatment facilities. 0'1 o. Describe existing drinking water supply source. UAp0-7- p. . Describe existing storm water management or treatment systems. /J A 5, Acitvitfes andnts a. Will the project be for commercial, public; or private use? Ncw lrasa---i- )- ) b. Give a brief description of Durooslf, use, and daily operations of the project when complete. Major Development Permit []Yes []Yes kNo []Yes J`No ❑Commercial []Public/Govemment .Private/Community c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored.Cl€ -!�'44 e-, d. List all development activities you p pose. rv� exLrS, dr -S e. Are the proposed activitie7 maintenance of an existing project, new work, or bpth?�j f. What is the approximate total isturbed land area resulting from the proposed project? 12 f X /.9' ?gq-k 4- Aiz-C A- g. Will the proposed project encroach on any public easement, public accessway or other area that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. I. Will wastewater or stormwater be discharged into a wetland? If yes, will this discharged water be of the same salinity as the receiving water? j. Is there any mitigation proposed? If yes, attach a mitigation proposal. <Form continues on back> Ft or []Acres []Yes [XNo [-INA flYes [ No [JNA *; na A- < t` �VJ1LMING .'ON. NIC; 0 N v Form DCM MP -1 (Page 4 of 4) AFFLIUA i wn wr Major Development Permit 6: Additional lntormaiion In addixoii !o ihJs ► ted pAlkaaar for, {MP die ip/Mw g 'blow. appucavre, r►�usrve se�r►irried toordee ror� t�!► ckage ro be bomplete r:ins (a) - (tib arb d+a�ys spabf�t �+"Y iv°P'"er't applktl°". Please consult#W a fnstruction briofdet o+► Itory to ptopeNj! w�pa►s the r�rjrhed item§ eetow. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. v , d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to N� f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Nethegrr u� C 6` f -� Phone No. Address i Q 3 � O.c� nt� E a ri � .� r C' i (t: L L C' Ar" us; A"' Name Phone No. Address ' . �` ov fG $cit /4 /u C^ /,,A r 5Z,-c/_fg 1 �r %I>Y aC�cA-� 1✓ 01 1 v 2 l f� � a— Phone No. Name Address g. A list of previous state or federal permits issued for work on the project tract. /Include permit numbers, permittee, and issuing dates. �v V1. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. luj} / j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) A k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. CertMeelon and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify th t theJnforr�mation provided in this applicati is truthful ,to the best f my knowledge. Date IC I f( Print Name i �-� v Jlc 5 Signature' Please indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information pDCM MP -5 Bridges and Culverts QDCM MP -3 Upland Development )§DCM MP -4 Structures Information .% 8 ..2 -1y 3 -� R rJ 1 5 "V n t i i ;SyT� �� nd i, NC V Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS []This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Govemmentrivate/Community ❑Yes PJo C. (i) Dock(s) and/or pier(s)iU d. (i) Are Finger Piers included? []Yes %No (ii) Number I If yes: (iii) Length (ii) Number (iv) Width (iii) Length (v) Floating []Yes ❑No (iv) Width (v) Floating ❑Yes []No e. (i) Are Platforms included? []Yes []No If yes: �(�31,Y� f. (i) Are Boatlifts included? pl'1'es []No If yes:�Gd (ii) Number 22� i 1' i (iii) Length J lo (ii) Number (iii) Length (iv) Width 5 (iv) Width (v) Floating 9kes ❑No Al� 'FL -0 AT k A) b Note: Roofed areas are calculated from dnpline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing Z maintenance service ❑�,�Dockage, fuel, and marine supplies L/ Dockage ("wet slips") only, number of slips: L� VDry storage; number of boats: I ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: I. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). 7i �kmc-,b0 0" []Open water, dredging for basin and/or channel []Open water, no dredging required []Other; please describe: 7 I k. Typical boat length: U I. (i) Will the facility, be open to the general public? ❑Yes o `.. Vr E D m. (i) Will the facility have tie pilings? / r, N ❑Yes I No _.. i i 1, v! i NCC (ii) If yes number of tie pilings? 2�?-808-2808 , 1-8834RCOA8T revised. 121-27 06 Form DCM MP -4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RFi EIVED C Form DCM MP -4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? Oyes "Plo n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? QYes VNo o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. OCW �OB SAV OS OWL IpNone p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? QYes )jNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. / 3. BOATHOUSE (including covered lifts) 'This section not applicable a. (i) Is the boathouse structure(s): OCommeroial OPublic/Govemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) `I This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS This section not applicable a. Is the structure(s): OCommercial OPublic/Govemment ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED DEW,.,1, Y111YV t E) YY)L,l VI,"J, NC r�?•5ed: 12;2'r 06 Form DCM MP -4 ( Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian properly lines Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body ,o Vd, l` 0Y- /.SCI ,I -Pe- a SLE', e. (i) Will navigational aids be required as a result of the project? []Yes []No 'PkQA (ii) if yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. d. Water depth at waterward end of structure at NLW or NWL `8. OTHER []This section not applicable a. Give complete description: ice) �L 6G`��`c Date ime f ame �i Signature 252-808-2808:. a A� -:,'ii C`vi ,,Z) _�J+fq. TO 1. .0 ORIVINO DIS IANci 5 its cx:t %x ISI.I., Ht:;uar rrtctst: VyL ¢h Red? wV ­ VACATIONS ..!.J.c rrw.,ux w:, r revs - a�. 1+ rr,-^ter rr.- � r�r,"� � • � �� a a o. v y % 1�" PK�PN c11 z w w U w oc•cart We 13cac•h is c ollvelile tly iocawd to ntik-s scnuh of tln• I ILSlork• Port of Wibnington. North Carollm and 25 Ittiles north of world fattxxts Myrtle Beach. Proximity to z airlxvis atxl nrtjor inter -4,111V highways 1.40 mid 1-95 make octad Isk, Reach very acc•essiblt• to year-round visitors. 147 Sit°/U 1z' 8t0t 7 9 Nb(' ON 'NO jJNIN IIM +^''fin 41 r f` .A � FY -4-1-q 16-1 Tuq(j -' jz4 4�Irl Vt S -`1�d /00-� "I'Y,.O /►'CJS �M I tw S rn-Ao '3 `,� Ow r''aNt`"s —zBSo - 0)49 - 414b vev � 0 t;,W4 �y I"s p F 4 r L ---------- - 4%p ciZ - 7 .4, L ---------- - 4%p brunswICK tounty uata viewer IP 4g, 43 42 October 15, 20171:851 54 0 0.005 0.01 0.02 mi 0 Addresses — US Hwy Minor Parcel C L,) 0.02 0.04 km Roads — NC Hwy Parcels Wicicco�4ym�— Interstate Condo 4 D G f-01 W I I tV111 N( i — State Road ) 2018 Brurmwlck JAN 2 , Brurawick C Id,1S PAHAI o '09 yN)l x�M� ,OL =1 11 �9h$LP��✓ Oiv SS��?� ��•w�r3 47 1 of i --rd i ly re z dv dAI 1 -�35- ��N TWIN A.