Loading...
HomeMy WebLinkAboutSW3171205 - Braeburn (7)A. Wet Pond 1 Pre -Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Wet Pond 1 Pre-Dev TOC 1: SHEET FLOW - SEGMENT ID A 1 Surface description (table 3-1) Woods -Li ht 2. Manning's roughness coefficient, n (table 3-1) 04 3 Flow length, L (total 1_5 300 ft) ft 100 4 Two-year 24-hour rainfall, P ........ ....in 312 5. Land slope, s ................. ..ft/ft 00360 6 Tt = 0 007 (nL)^0.8 Compute Tt ........ hr 0.29 + 0.29 P2"0 5 s"0.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID B C 7. Surface description (paved or unpaved) ......... Unpaved Unpaved 8. Flow length, L ft 367 361 9 Watercourse slope, s ft/ft 00400 0.0166 10 Average velocity, V (figure 3-1) ...... ....... 3 227 2.08 11. Tt = L Compute Tt hrI 003 + 005 0.08 3600 V 3, CHANNEL FLOW SEGMENT ID 12 Channel type (Pipe or Open Channel) 13 Cross sectional flow area, a. ftZ 14 Wetted perimeter, pw ft 15 Hydraulic radius r = a/pw Compute r ...... A 16 Channel slope, s ft/ft 17 Manning's roughness coefficient, n 18 V = [1 49 r"(2/3) s"(1/2)] / n Compute V ..ft/s 19 Flow length, L ...ft 20 Tt = L Compute Tt ..hr + 1 0001 3600 V 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Hr = 0.37 Min = 22 2 Reference. Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 1 Pre-Dev TOC Braeburn - Pond 1 - TOC Calcs Pre-Dev 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: ciiesent Developed Pond 1 CN Pre -Development 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. I Fig. of Group and hydrologic condition) 2-2 2-312-4 Acres CN x area B Woods, Good condition _ 55 1 696 9327 (TaB) B Open space, Good condition (grass cover > 75%) 61 0 000 000 (TaB) B Dirt Roads_(including right-of-way) 82 0.236 1939 (TaB) C Woods, Good condition _ 70 9 226 64580 (ScA) C Open space, Good condition (grass cover> 75%) 74 0 592 4378 (ScA) C Dirt Roads (including right-of-way) 87 0 610 5305 (ScA) C Paved areas, streets, roofs, driveways, etc (excl ROW) _ 98 0 099 970 (ScA) D Woods, -Good condition 77 0.786 6054 (CmB) D Open space, Good condition (grass cover> 75%) 80 0.000 000 (CmB) D Dirt Roads (rncluding right-of-way) 89 0.000 000 (CmB) D Paved areas, streets, roofs, driveways, etc (excl ROW) - 98 0.041 401 (CmB) " Use only one CN source per line Totals = 13 286 92954 CN (weighted) total product = 929 542 = 700 Use CN= 70 total area 132855 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall , P (24-hour) in 420 650 1030 Runoff, Q in 146 3 21 650 (Use P and CN with table 3-11, fig 2-1, and equation 3-14) Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service US Department of Agriculture, June 1986 ESP Assocates, PA PoBox703O Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007i i Pond 1 CN Pre -Development Braeburn - Pond 1 - CN Calcs Pre-Dev 12/14/2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc v10 4 Tuesday, 12 112 / 2017 Hyd. No. 1 POND 1 PRE -DEV Hydrograph type = SCS Runoff Peak discharge = 5.507 cfs Storm frequency = 1 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 24,256 cuft Drainage area = 13.290 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 600 5.00 400 300 200 1.00 POND 1 PRE -DEV Hyd No 1 -- 1 Year Q (cfs) 6.00 500 400 300 200 1.00 000 - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 1 POND 1 PRE -DEV Hydrograph type = SCS Runoff Peak discharge = 9.806 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 38,396 cuft Drainage area = 13.290 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1000 MEMM-1110 400 200 000 POND 1 PRE -DEV Hyd No 1 -- 2 Year Q (cfs) 1000 400 200 111 l 0 2 4 6 8 10 12 14 16 18 20 22 24 26 I Hyd No 1 Time (hrs) Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@) 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 1 POND 1 PRE -DEV Hydrograph type = SCS Runoff Peak discharge = 26.15 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 92,772 cuft Drainage area = 13.290 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2800 2400 20.00 16.00 12.00 M 400 �� POND 1 PRE -DEV Hyd No. 1 -- 10 Year Q (cfs) 2800 24.00 2000 16.00 1200 IM 400 ! I0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 1 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 13.290 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.76 in Storm duration = 24 hrs Q (cfs) 40.00 2000 - 10.00 rfivaTil Tuesday, 12/12/2017 Peak discharge = 36.72 cfs Time to peak = 12.10 hrs Hyd. volume = 128,460 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 22.20 min Distribution = Type II Shape factor = 484 POND 1 PRE -DEV Hyd. No. 1 -- 25 Year I --ijl I I Q (cfs) 40.00 3000 2000 1000 -M 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2015 by Autodesk, Inc v10 Hyd. No. 1 Time to peak POND 1 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 13.290 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.48 in Storm duration = 24 hrs Q (cfs) 50.00 4000 3000 20.00 1000 Tuesday, 12/12/2017 Peak discharge = 45.10 cfs Time to peak = 12.10 hrs Hyd. volume = 156,683 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 22.20 min Distribution = Type II Shape factor = 484 POND 1 PRE -DEV Hyd No. 1 -- 50 Year Q (cfs) 50.00 40.00 3000 20.00 1000 Rn 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 1 POND 1 PRE -DEV Hydrograph type = SCS Runoff Peak discharge = 50.82 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 176,047 cuft Drainage area = 13.290 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 5000 40.00 3000 2000 10.00 POND 1 PRE -DEV Hyd No 1 -- 100 Year Q (cfs) 6000 50.00 4000 30.00 20.00 1000 0 00 10.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) B. Wet Pond 1 Post -Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 1 Post-Dev TOC Braeburn - Pond 1 - TOC Calcs Post-Dev 12/14/2017 Time of Concentration (Tc) or Travel Time (Tt) Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Wet Pond 1 Post-Dev TOC 1. SHEET FLOW SEGMENT ID A B 1. Surface description (table 3-1) Grass -Short Woods -Light 2 Manning's roughness coefficient, n (table 3-1) ........ 0.15 04 3. Flow length, L (total L:5 300 ft) ft 60 40 4 Two-year 24-hour rainfall, P ..in 3 12 1 3.12 5 Land slope, s ....... ....... ft/ft 0.0100 1 0.095 6 Tt = 0.007 (nL)^0.8 Compute Tt ... hr 0.15 + 009 024 P2"0.5 s^0 4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID B C 7 Surface description (paved or unpaved) Unpaved Unpaved 8 Flow length, L ...ft 115 32 9 Watercourse slope, s ..ft/ft 0.0608 0.0140 10. Average velocity, V (figure 3-1) 3.978 1.91 11. Tt = L Compute Tt ....hr 0.01 + 0.00 001 3600 V I CHANNEL FLOW SEGMENT ID D 12 Channel type (Pipe or Open Channel) Pipe 13 Cross sectional flow area, a... .. .. ........... ftZ 3.14 14 Wetted perimeter, pw ..ft 6.28 15. Hydraulic radius r = a/pw Compute r ft 0.50 16 Channel slope, s ......... ft/ft 0.005 17 Manning's roughness coefficient, n 0.012 18. V = [1 49 r^(2/3) s^(1/2)] / n Compute V ft/s 5.53 19 Flow length, L ft 558 20. Tt = L Compute Tt hr 0.03 + 1 0031 3600 V 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Hr= 0 28 Min = 1678 Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 1 Post-Dev TOC Braeburn - Pond 1 - TOC Calcs Post-Dev 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Develope Pond 1 Post -Development CN 1. 1 RunoffCurve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment of Tbl. Fig. Fig. Group and hydrologic condition) 2-2 2-3 2-4 Acres CN x area B Residential, 1/8 acre or less (town houses) 85 1 932 16425 (TaB) C Residential, 1/8 acre or less (town houses) 90 10 526 94734 (ScA) D Residential, 1/8 acre or less (town houses) — -- - - 92 0 827 7610 (CmB) * Use only one CN source per line Totals = 13 286 118769 CN (weighted) total product = 1187 69 = 894 Use CN= 89 total area 132856 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall , P (24-hour) in 420 650 1030 Runoff, Q in 3 01 522 895 (Use P and CN with table 3-11, fig 2-1, and equation 3-14) Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service US Department of Agnculture, June 1986 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 ESP Assocates, PA Pond 1 Post -Development CN PoBox 7030 Braeburn - Pond 1 - CN Calcs Post-Dev Charlotte NC 28241 12/14/2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2015 by Autodesk, Inc v10 4 Hyd. No. 2 Time to peak POND 1 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 13.290 ac Basin Slope = 0.0% Tc method = User Total precip. = 2.58 in Storm duration = 24 hrs Tuesday, 12 / 12 / 2017 Peak discharge = 23.52 cfs Time to peak = 12.07 hrs Hyd. volume = 73,565 cuft Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 16.80 min Distribution = Type II Shape factor = 484 POND 1 POST -DEV Q (cfs) Hyd No. 2 -- 1 Year Q (cfs) 2400 2400 2000 20.00 1600 16 00 12.00 1200 8 00 800 400 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@) Civil 3DO 2015 by Autodesk, Inc v10 z Hyd. No. 2 Time to peak POND 1 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 13.290 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.12 in Storm duration = 24 hrs Tuesday, 12 112 / 2017 Peak discharge = 30.85 cfs Time to peak = 12.07 hrs Hyd. volume = 96,902 cuft Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 16.80 min Distribution = Type II Shape factor = 484 90111sl; W.3I a 11-: LVA Q (Cfs) Hyd. No. 2 -- 2 Year Q (cfs) 35.00 3500 3000 30.00 2500 2500 20 00 20.00 1500 15.00 10.00 1000 500 500 0.00 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 2 Time to peak POND 1 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 13.290 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.80 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 4000 30.00 2000 1000 fiYATAIIIII Tuesday, 12/12/2017 Peak discharge = 53.95 cfs Time to peak = 12.07 hrs Hyd. volume = 172,745 cuft Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 16.80 min Distribution = Type II Shape factor = 484 POND 1 POST -DEV Hyd No 2 -- 10 Year -- Q (cfs) 60.00 50.00 4000 30.00 2000 1000 MWaTa1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@) Civil 3D@) 2015 by Autodesk, Inc v10 4 Hyd. No. 2 POND 1 POST -DEV Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 13.290 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.76 in Storm duration = 24 hrs Tuesday, 12/12/2017 Peak discharge = 67.13 cfs Time to peak = 12.07 hrs Hyd. volume = 217,247 cuft Curve number = 89 Hydraulic length = 0 ft Time of conic. (Tc) = 16.80 min Distribution = Type II Shape factor = 484 POND 1 POST -DEV Q (cfs) Hyd. No 2 -- 25 Year 7000 60.00 5000 40.00 30.00 20.00 1000 Q (cfs) 7000 5000 4000 30.00 2000 10.00 000 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD® Civil MID 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 1 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 76.97 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 250,929 cuft Drainage area = 13.290 ac Curve number = 89 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.80 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POND 1 POST -DEV Q (cfs) Hyd No 2 -- 50 Year 8000 7000 6000 5000 40.00 - -- ---- - — - - --- - -- - - -_ ---- --_ - 3000 2000 1000 Q (cfs) 80.00 7000 5000 4000 3000 2000 1000 000 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 1 POST -DEV _ Hydrograph type = SCS Runoff Peak discharge = 83.51 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 273,489 cuft Drainage area = 13.290 ac Curve number = 89 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conic. (Tc) = 16.80 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POND 1 POST -DEV Q (cfs) Hyd No 2 -- 100 Year Q (cfs) 90.00 90.00 8000 8000 7000 70.00 - 6000 60.00 - 50.00 5000 4000 4000 3000 3000 2000 20 00 -_ -� — — - _ —� -- 1000 10.00 000 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Wet Detention Basin Worksheet Basin ID Wet Pond #1 Required Designer Input= Project Name Braebum Project # FM26 420 Designer C Ludwig Date 12/08/17 Rev 1 J Basin Drainage Area Summary Total Impervious Area 5 57 ac 242,545.66 sf Total Pervious Area 7 72 ac 336,169.94 sf Total Future Impervious Area 0 00 ac Total Area: 13.29 ac 578 715.60 sf Perform Water Balance Calcs. Percent BUA 41.91% Calculate The Design Volume Design Rainfall 1 00 -in Determine the Runoff Coefficient (Rv) for the 1 -in rainfall R„=005+09x(1) 1 = 41 91% Rv = 0.43 Determine the Water Quality Volume (WQv) WQ„ = Design Rainfall x Rv x Onsite Drainage Area Design Rainfall is 1 Inch Rvis043 Drainage Area is 13 29 Acres WQv = (1 x 0 43 x 16 88)/12 V(design) = 0.47 -ac -ft 20,602.24-cf Calculate The Required Main Pool Volume Equation osVolume, VIYP VMP = 0.87 * H RT * DV S Where: 0.87 = Factor to adjust for the volume in the forebay VMP = Main pool volume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) TS = Average time between storm events (5 days) DV = Design volume (cubic feet) Vmp = 50,187.06-cf Calculate The Required Forebay Volume V(forebay) = 20% of Vmp =F 10 037.41-cf Calculate the Permanent Pool Elevation from Proposed Contours with Forebay Assumed Elev Of Permanent Pool 611.00 -ft Elevation at Bottom of Littoral Shelf 610.50 -ft Required Permanent Pool Volume 60,224.47-cf Forebay Crest Elevation = 609.50 -ft % Forebay = 1 18.64%1 Required PPE = 607.43 -ft Proposed PPE = F 611.00 -ft Basin Detention Stage/Storage Above Permanent Pool Elevation Elev Contour Area Basin Permanent Pool Stage/Storage Accumul Vol 611 00 44,195 71 sf Elev Forebay Area Main Bay Area Total Area Forebay Incr Vol Forebay Accumulated Vol Main Bay Incr Vol Main Bay Accumulated Vol Total Accumulated Vol 60500 2,438 06 sf 19,321 74 sf 21,759 80 sf 0 00-cf 0 00-cf 0 00-cf 0 00-cf 0 00-cf 60600 3,247 64 sf 21,418 06 sf 24,665 70 sf 2,842 85-cf 2,842 85-cf 20,369 90-cf 20,369 90-cf 23,212 75-cf 60700 4,164 37 sf 23,577 81 sf 27,742 18 sf 3,706 01-cf 6,548 86-cf 22,497 94-cf 42,867 84-cf 49,416 69-cf 60800 5,186 94 sf 25,797 50 sf 30,984 44 sf 4,675 66-cf 11,224 51-cf 24,687 66-cf 67,555 49-cf 78,780 00-cf 60900 6,315 36 sf 28,077 13 sf 34,392 49 sf 5,751 15-cf 16,975 66-cf 26,937 32-cf 94,492 81-cf 111,468 47-cf 60950 6,919 27 sf 29,239 57 sf 36,158 84 sf 3,308 66-cf 20,284 32-cf 14,329 18-cf 108,821 98-cf 129,106 30-cf 61000 00 sf 36,305 46 sf 36,305 46 sf 0 00-cf 20,264 32-cf 16,886 26-cf 125,708 24-cf 145,992 56-cf 61050 00 sf 39,641 35 sf 39,641 35 sf 0 00-cf 20,284 32-cf 19,486 70-cf 145,194 94-cf 165,479 26-cf 611 00 00 sf 44,195 71 sf 44,195 71 sf 1 00-cf 20,285 32-cf 20,959 27-cf 166,154 21-cf 186,439 52-cf % Forebay = 1 18.64%1 Required PPE = 607.43 -ft Proposed PPE = F 611.00 -ft Basin Detention Stage/Storage Above Permanent Pool Elevation Elev Contour Area Incr Vol Accumul Vol 611 00 44,195 71 sf 0 00 cf 186,439 52 cf 611 50 48,907 00 sf 23,275 68 cf 209,715 20 c 61200 50,351 00 sf 24,814 50 cf 234,529 70 cf 61300 53,281 00 sf 51,816 00 cf 286,345 70 cf 61400 56,268 00 sf 54,774 50 cf 341,120 20 c 61500 59,311 00 sf 57,789 50 cf 398,909 70 c 616.00 62,411 00 sf 60,861 00 cf 459,770 70 c 61650 63,984.00 sf 31,598 75 cf 491,369 45 cf 61700 65,567 74 sf 32,387 94 cfj 523,757 39 c 61800 68,782 66 sf 1 67,175 20 cfj 590,932 59­cf Calculate the Average Depth of the Pond Equation 2. Average depth when the shelf is not submerged or the shelf is being included in the average depth calculation VPP Div° = APP Where: Da,,g = Average depth in feet VPP = Volume of permanent pool (feet3) APP = Area of permanent pool (feet) Equation 3. Average depth when the shelf is submerged and the shelf is being excluded from the average depth calculation VPP—Vshel f Davg = Abottomofshelf Where: Dag = Average depth in feet VPP = Total volume of permanent pool (feet3) Vsheff = Volume over the shelf only (feet3) — see below Abottom of shelf = Area of wet pond at the bottom of the shelf (feet2) Vshelf - 0.5 * Depthmax over shelf Perimeterperrn pool * Wfdthsubmerged part ofshelf Where: Dmax over shelf = Depth of water at the deep side of the shelf as measured at permanent pool (feet) Perimeterpermane,t pool = Perimeter of permanent pool at the bottom of the shelf (feet) Widths„bmerged part ofshelf = Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) PPE =E6150.7520-fftt P P Penmeter= Vpp = App = Bottom of Shelf Elev = A(bottom of she = 39,641.35-sf V(sheif) = 1,156.23-cf Davg = 4.67 -ft A(bottom of she = 39,641.35-sf V(sheif) = 1,156.23-cf Davg = 4.67 -ft Determine The Orifice Size of the Riser Structure 1 -year, 24-hour Storm Pre -Development Runoff Volume = 24,256.00-cf (See Hydraflow Hydrographs) 1 -year, 24-hour Storm Post -Development Runoff Volume = 73,565.00-cf (See Hydraflow Hydrogrephs) Difference = 49,309.00-cf Vpp = 186,439.52-cf 1 -year, 24-hour Storm Volume in Wet Pond #1= 235,748.52-cf 1 -year, 24-hour Storm Elevation in Wet Pond 4 1 = 612.02 -ft CA(2gH)0s = Q C = 0.6 A = 7.07 int 9 = 32.2 ft/sec H = 0.51 ft Orifice Diameter = 3 in Qout = 0.17 cfs Drawdown Time = 3.38 days Pond No. 2 - Wet Pond 1 Start at PPE Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 800 Top of pond Elev 618 00 —700 —600 16 00 ft Riser WeirA - Elev 615 00 20 00 ft Cipoletti weir WeirB - Elev 616 00 500 6 0 x 36 0 in orifice —400 CulvC -Inv 614 00 300 —200 3 00 in orifice CulvA - 58 5 LF of 36 0 in @ 1.71 % Gu lvB --Inv-644-00 1 00 0 00 7 Stage (ft)�fF-' Bottom of pond Elev 611 00 Section 25 -yr NTS 10 -yr 100 -yr 2 -yr 50 -yr 1 -yr Inflow hydrograph = 2 SCS Runoff- POND 1 POST -DEV Project Braeburn Pond 1.gpw Thursday, 12 / 14 / 2017 Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Pond No. 2 - Wet Pond 1 Start at PPE Pond Data Contours -User-defined contour areas Conic method used for volume calculation Begining Elevation = 611 00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 000 611 00 44,196 0 0 050 61150 48,907 23,263 23,263 100 61200 50,351 24,811 48,075 200 61300 53,281 51,804 99,879 300 61400 53,268 53,269 153,148 400 61500 59,311 56,257 209,405 500 61600 62,411 60,848 270,253 550 61650 63,984 31,595 301,848 600 61700 65,568 32,384 334,232 700 61800 68,783 67,162 401,394 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 3600 300 600 000 Crest Len (ft) = 1600 2000 000 000 Span (in) = 3600 3.00 3600 000 Crest EI. (ft) = 61500 61600 000 000 No. Barrels = 1 1 3 0 Weir Coeff. = 333 333 333 333 Invert El. (ft) = 611 00 611 00 61400 000 Weir Type = 1 Clpltl --- --- Length (ft) = 5850 050 050 000 Multi -Stage = Yes No No No Slope (%) = 171 000 000 n/a N -Value = .013 013 013 n/a Orifice Coeff. = 060 060 060 060 Exfil.(in/hr) = 0 000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 000 Note Culvert/Onfice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for onfice conditions (ic) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 000 0 611 00 000 000 000 - - 000 000 --- --- --- --- 0 000 050 23,263 611 50 0 15 ic 0.14 is 000 --- 000 000 --- --- --- --- 0 143 1 00 48,075 61200 0 23 is 0 22 ic 000 --- 000 000 --- --- --- --- 0 216 200 99,879 61300 0 33 is 0 32 ic 000 -- 000 000 --- --- --- --- 0 317 300 153,148 61400 0 41 is 0 39 is 000 --- 000 000 --- --- --- --- 0 394 400 209,405 61500 19 30 ic 0 36 ic 18 76 is --- 000 000 --- --- --- --- 1912 500 270,253 61600 59 23 is 0 16 ic 14 87 is --- 44 19 s 000 --- --- --- --- 5923 5.50 301,848 616.50 66 01 ic 0 12 is 10 55 is --- 55 34 s 2355 --- --- --- --- 8955 600 334,232 61700 71 06 ic 0 09 is 8 11 ic --- 62 85 s 6660 --- --- --- --- 13765 700 401,394 61800 79 34 ic 0 06 is 5 51 ic --- 73 72 s 18837 --- --- --- --- 26767 Starmount Cove CONCRETE ANCHOR BUOYANCY CALCULATIONS Unit wt. of concrete (pcf) _ Unit wt. of H2O = TOP OF RISER ELEV. _ INV. OUT OF RISER ELEV. _ INT WIDTH OF RISER= INT LENGTH OF RISER= WALL THICK. OF RISER = BASE THICK. OF RISER = VOL OF RISER= BUOYANT FORCE = VOL. CONC. IN RISER = SINKING FORCE OF RISER = CONC. PAD THICKNESS = CONC. PAD WIDTH/LENGTH = VOL. OF CONC. PAD = SINKING FORCE OF PAD = TOTAL SINKING FORCE = WET POND #1 CS #1 150 Ib/ft3 62.4 Ib/ft3 615.00 ft 605.00 ft 48 in 48 in 6 in 6 in 262.5 ft3 16380.0 lbs Vol. of Riser x Unit wt. of H2O 102.5 ft3 8979 lbs 24 in 8 ft 128.00 ft3 11212.8 lbs 20191.8 lbs Factor of safety = SINKING FORCE BUOYANT FORCE F.S. = 1.23 Vol. of Conc. x (Unit wt. of Conc. - Unit wt. of H20) L x W x H/ Pad Thickness Vol. of Pad x (Unit wt. of Conc. - Unit wt. of HZO) OK F.S. MUST BE GREATER THAN 1.10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - POND 1 POST -DEV Max. Elevation Reservoir name = Wet Pond 1 Start at PPE Max. Storage Storage Indication method used Q (cfs) 24.00 2000 1600 12.00 M 4.00 0 10 Hyd No 3 WET POND 1 PPV Hyd. No 3 -- 1 Year 20 30 40 Hyd No 2 Tuesday, 12/12/2017 = 0.249 cfs = 24.13 hrs = 57,439 cult = 612.29 ft = 62,983 cuft Q (cfs) 24.00 20.00 1600 12.00 M 4.00 000 50 60 70 80 90 100 =El Total storage used = 62,983 cuft Time (hrs) Hyrdrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D0 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge = 0.291 cfs Storm frequency = 2 yrs Time to peak = 24.17 hrs Time interval = 2 min Hyd. volume = 70,128 cuft Inflow hyd. No. = 2 - POND 1 POST -DEV Max. Elevation = 612.70 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 84,411 cuft Storage Indication method used WET POND 1 PPV Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 3500 3500 3000 30.00 25.00 2500 2000 20.00 15.00 15.00 10.00 1000 500 500 L0 00 - 000 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No 3 Hyd No 2 [L-LTL1 Total storage used = 84,411 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10.4 Tuesday, 12 / 12 / 2017 Hyd. No. 3 WET POND 1 PPV Hydrograph type Storm frequency = Reservoir = 10 yrs Peak discharge Time to peak = 0.590 cfs = 24.10 hrs Time interval = 2 min Hyd. volume = 103,579 cuft Inflow hyd. No. = 2 - POND 1 POST -DEV Max. Elevation = 614.02 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 154,292 cult Storage Indication method used WET POND 1 PPV Q (cfs) Hyd No 3 -- 10 Year 60.00 50.00 40.00 2000 1000 a�111111 Q (cfs) 6000 5000 4000 30.00 2000 10.00 0.00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No 3 Hyd No 2 ffTFM(-1 Total storage used = 154,292 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge = 2.332 cfs Storm frequency = 25 yrs Time to peak = 15.00 hrs Time interval = 2 min Hyd. volume = 147,462 cuft Inflow hyd. No. = 2 - POND 1 POST -DEV Max. Elevation = 614.16 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 161,888 cuft Storage Indication method used Q (cfs 70.00 :1 11 50.00 40.00 30.00 2000 10.00 WET POND 1 PPV Hyd No 3 -- 25 Year Q (cfs) 7000 • 1 11, 5000 4000 30.00 2000 1000 000 000 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No. 3 Hyd No 2 [L F111' Total storage used = 161,888 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - POND 1 POST -DEV Max. Elevation Reservoir name = Wet Pond 1 Start at PPE Max. Storage Tuesday, 12 / 12 / 2017 = 4.919 cfs = 13.30 hrs = 180,959 cuft = 614.28 ft = 168,833 cuft Storage Indication method used Q (cfs) WET POND 1 PPV Hyd No. 3 -- 50 Year Q (cfs) 8000 8000 70.00 7000 60.00 60.00 - __ -- - -- - - - ---- - - - -- ----- ---- 50.00 -------- --- - 5001 4000 4000 3000 30.00 --- 2000 -- --- ----- - - --- - — -- — — 20.00 � 1000 10.00 0.00 0 10 20 30 40 50 60 70 80 90 _ Hyd No 3 Hyd No 2 TILT_1� D Total storage used = 168,833 cult 000 100 Time (hrs) 11 Hydrograph Report Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Storage Indication method used I WET POND 1 PPV Q (cfs) Hyd. No 3 -- 100 Year Tuesday, 12/12/2017 = 7.778 cfs = 12.80 hrs = 203,410 cuft = 614.39 ft = 174,963 cuft Q (cfs) Iyu uu Hydraflow Hydrographs Extension for AutoCAD(D Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - POND 1 POST -DEV Reservoir name = Wet Pond 1 Start at PPE Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Storage Indication method used I WET POND 1 PPV Q (cfs) Hyd. No 3 -- 100 Year Tuesday, 12/12/2017 = 7.778 cfs = 12.80 hrs = 203,410 cuft = 614.39 ft = 174,963 cuft Q (cfs) Iyu uu 90.00 8000 8000 7000 7000 60.00 60.00 — - - 5000 50.00 4000 4000 30.00 -- --� ----- _ ----. �— 30.00 i 20.00 2000 10 00 10.00 n nn 000 0 10 20 30 40 50 60 70 80 90 Hyd No 3 Hyd No 2 1 ITI-ITII Total storage used = 174,963 cuft 100 Time (hrs) C. Wet Pond 2 Pre -Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 2 TOC PRE -DEV Braeburn - Pond 2 - TOC Calcs Pre -Development 12/14/2017 Time of Concentration (Tc) or Travel Time (Tt) Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Wet Pond 2 TOC PRE -DEV 1. SHEET FLOW SEGMENT ID A 1 Surface description (table 3-1) Woods -Light 2 Manning's roughness coefficient, n (table 3-1) . 0.4 3 Flow length, L (total L5 300 ft) ft 100 4 Two-year 24-hour rainfall, P ....in 312 5. Land slope, s ......... ..ft/ftl 00190 6 Tt = 0 007 (nL)^0 8 Compute Tt ......... hrl 0.37 + I 0.37 P2^05s"04 2. SHALLOW CONCENTRATED FLOW SEGMENT ID B C 7 Surface description (paved or unpaved) Unpaved Unpaved 8 Flow length, L ft 510 902 9 Watercourse slope, s ....ft/ft 00217 0.0180 10 Average velocity, V (figure 3-1) 2.377 216 11. Tt = L Compute Tt ........ .. .. hrl 0.06 + 012 018 3600 V 3. CHANNEL FLOW ------------- SEGMENT ID 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a. ftZ 14 Wetted perimeter, pw ft 15 Hydraulic radius r = a/pw Computer... .. A 16 Channel slope, s .............. ft/ft 17. Manning's roughness coefficient, n . 18 V = [1 49 r^(2/3) s^(1/2)] / n Compute V ...... ft/s 19. Flow length, L .............. ft 20. Tt = L Compute Tt ........hr + 0.00 3600 V 21 Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Hr= 0.55 Min = 330, Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 2 TOC PRE -DEV Braeburn - Pond 2 - TOC Calcs Pre -Development 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Pond 2 CN Pre -Development 1. Runoff Curve -Number _ Soil Cover Description CN* Area Product Hydrologic (cover type, treatment of Tbl. Fig. Fig. Group and hydrologic condition) 2-2 2-3 2-4 Acres CN x area B Woods, Good condition (TaB) 55 0.658 3619 B Open space, Good_ condition (grass cover > 75%) --- (TaB) 61 0.000 000 B Dirt Roads (Including right-of-way) -— (TaB) 82 0.052 423 C Woods, Good condition (ScA) 70 17 446 1221 22 C Open space, Good condition (grass cover > 75%) -74 (ScA) 0 037 274 C Dirt Roads (Including right-of-way) (ScA) _ 87 0.000 000 C Paved_ areas, streets, roofs, driveways, etc (excl.ROW) (ScA) 98 0 000 000 D Woods, Good condition (CMB) 77 1 514 11654 D space, Good condition (grass cover > 75%) _Open - (CmB) 80 0 000 000 D Dirt Roads (including right-of-way) (CmB) 89 0 000 000 D Paved areas, streets, roofs, driveways, etc (excl ROW) _ (CmB) 98 0 000 000 * Use only one CN source per line Totals = 19 706 138093 CN (weighted) total product = 1380 93 = 70 1 Use CN= 70 total area 197062 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall , P (24-hour) in 420 650 1030 Runoff, Q In 146 3 21 6.50 (Use P and CN with table 3-11, fig 2-1, and equation 3-14) Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service US Department of Agriculture, June 1986 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 ESP Assocates, PA Pond 2 CN Pre -Development PoBox 7030 Braeburn - Pond 2 - CN Calcs Pre -Development Charlotte NC 28241 12/14/2017 Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2015 by Autodesk, Inc v10 4 Hyd. Pio. 1 Time to peak POND 2 PRE -DEV Hyd. volume - Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 2.58 in Storm duration = 24 hrs Q (cfs) 700 5.00 4.00 200 1.00 000 -1 0 2 4 Hyd No 1 0 Tuesday, 12/12/2017 Peak discharge = 6.331 cfs Time to peak = 12.27 hrs Hyd. volume = 35,785 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 33.00 min Distribution = Type II Shape factor = 484 POND 2 PRE -DEV Hyd No 1 -- 1 Year Q (cfs) 700 500 4.00 3.00 200 1 00 I I C 1 1 1 1 1 1 1 w 1 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2015 by Autodesk, Inc v10 4 _ Hyd. N®. 1 Time to peak POND 2 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.12 in Storm duration = 24 hrs Q (cfs) 12.00 1000 800 600 200 000 Tuesday, 12 / 12 / 2017 Peak discharge = 11.30 cfs Time to peak = 12.23 hrs Hyd. volume = 56,644 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 33.00 min Distribution = Type II Shape factor = 484 POND 2 PRE -DEV Hyd No 1 -- 2 Year Q (cfs) 12.00 1000 4.00 200 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 2 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.80 in Storm duration = 24 hrs Q (cfs) 3500 30.00 2500 2000 1500 1000 500 Tuesday, 12/12/2017 Peak discharge = 30.67 cfs Time to peak = 12.23 hrs Hyd. volume = 136,863 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 33.00 min Distribution = Type II Shape factor = 484 POND 2 PRE -DEV Hyd No 1 -- 10 Year Q (cfs) 35.00 3000 2500 2000 1500 1000 500 Now 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 31DO 2015 by Autodesk, Inc v10 4 _ Hyd. No. 1 Time to peak POND 2 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.76 in Storm duration = 24 hrs Q (cfs) 5000 40.00 3000 2000 1000 Tuesday, 12 / 12 / 2017 Peak discharge = 43.23 cfs Time to peak = 12.23 hrs Hyd. volume = 189,513 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 33.00 min Distribution = Type II Shape factor = 484 POND 2 PRE -DEV Hyd No. 1 -- 25 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 000 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D0 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 2 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.48 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 40.00 30.00 2000 1000 0 00 Tuesday, 12/12/2017 Peak discharge = 53.07 cfs Time to peak = 12.23 hrs Hyd. volume = 231,149 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 33.00 min Distribution = Type II Shape factor = 484 POND 2 PRE -DEV Hyd No 1 -- 50 Year Q (cfs) 6000 5000 40.00 3000 2000 1000 OWIT11 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@) 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 1 POND 2 PRE -DEV Hydrograph type = SCS Runoff Peak discharge = 59.78 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 259,716 cuft Drainage area = 19.710 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 33.00 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6000 50.00 4000 3000 20.00 10.00 0 00 POND 2 PRE -DEV Hyd. No 1 -- 100 Year Q (cfs) 6000 5000 40.00 3000 2000 1000 EMIT21 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) D. Wet Pond 2 Post -Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 2 TOC Post-Dev Braeburn - Pond 2 - TOC Calcs Post -Development 12/14/2017 Time of Concentration (Tc) or Travel Time (Tt) Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Wet Pond 2 TOC Post-Dev 1. SHEET FLOW . SEGMENT ID A B 1 Surface description (table 3-1) Grass -Short Pavement 2. Manning's roughness coefficient, n (table 3-1).. 0.15 0 011 3. Flow length, L (total L:5 300 ft) ....ft 75 25 4. Two-year 24-hour rainfall, P ...in 312 3.12 5. Land slope, sft/ft 0.0306 0.02 6. Tt = 0 007 (nL)^0.8 Compute Tt ...............hr 0.11 + 0.01 0.12 P2^05s'04 2. SHALLOW CONCENTRATED FLOW. . SEGMENT ID C 7. Surface description (paved or unpaved) Paved 8 Flow length, L ...ft 10 9 Watercourse slope, s ... ............... ft/ft 0.0075 10. Average velocity, V (figure 3-1) ......... 1 760 11 Tt = L Compute Tt hrl 000 + 0.00 3600 V 3. CHANNEL FLOW SEGMENT ID D 12 Channel type (Pipe or Open Channel) Pipe 13. Cross sectional flow area, a ............ .......... ft2 3.14 14. Wetted perimeter, pw ft 6.28 15. Hydraulic radius r = a/pw Compute r. ....... . ft 050 16 Channel slope, s . ............. ..ft/ft 0 005 17 Manning's roughness coefficient, n ....... 0 012 18 V = [1 49 r^(2/3) s^(1/2)] / n Compute V ............ft/s 553 19 Flow length, L ft 944 20. Tt = L Compute Tt hr 005 + 0 05 3600 V 21 Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Hr = 0.17 Min = 1021 Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 2 TOC Post-Dev Braeburn - Pond 2 - TOC Calcs Post -Development 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present evelope Pond 2 Post -Development CIV 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment of Tbl. IFig. I Fig. Group and hydrologic condition) 2-2 12-312-41 Acres CN x area B Residential, 1/8 acre or less (town houses) (TaB) 85 0 710 6032 C Residential, 1/8 acre or less (town houses) (SCA) 90 17 483 157347 D _Residential, 1/8 acre or less (town houses) (CmB) _ 92 1 514 13925 * Use only one CN source per line Totals = 19 706 177304 CN (weighted) total product = 1773 04 = 900 Use CN= 90 total area 197062 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall, P (24-hour) in 420 650 1030 Runoff, Q in 311 533 908 (Use P and CN with table 3-11, fig 2-1, and equation 3-14) Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service US Department of Agriculture, June 1986 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 ESP Assocates, PA Pond 2 Post -Development CN PoBox 7030 Braeburn - Pond 2 - CN Calcs Post -Development Charlotte NC 28241 12/14/2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 2 Time to peak POND 2 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min _ Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 2.58 in Storm duration = 24 hrs Q (cfs) 5000 40.00 30.00 1000 MIM Tuesday, 12/12/2017 Peak discharge = 45.36 cfs Time to peak = 12.00 hrs Hyd. volume = 118,242 cuft Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.20 min Distribution = Type II Shape factor = 484 POND 2 POST -DEV Hyd. No. 2 -- 1 Year Q (cfs) 5000 40.00 3000 20.00 10.00 row 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2015 by Autodesk, Inc v10 4 Hyd. No. 2 POND 2 POST -DEV Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 19.710 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.12 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 12 / 2017 = 58.83 cfs = 12.00 hrs = 154,548 cuft = 90 = 0 ft = 10.20 min = Type II = 484 Q (cfs) POND 2 POST -DEV Hyd. No 2 -- 2 Year Q (cfs) 6000 6000 50.00 5000 40.00 40.00 3000 3000 20.00 20.00 1000 1000 000 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2015 by Autodesk, Inc v10 4 Hyd. N®. 2 Time to peak POND 2 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.80 in Storm duration = 24 hrs Q (cfs) 12000 10000 8000 60.00 40.00 2000 Tuesday, 12/12/2017 Peak discharge = 100.87 cfs Time to peak = 12.00 hrs Hyd. volume = 271,794 cuft Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.20 min Distribution = Type II Shape factor = 484 POND 2 POST -DEV Hyd No 2 -- 10 Year IL 0.00 - 0 Q (cfs) 120.00 10000 4000 2000 r7i7i1 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 2 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 124.75 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 340,314 cuft Drainage area = 19.710 ac Curve number = 90 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.20 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POND 2 POST -DEV Q (cfs) Hyd No 2 -- 25 Year 140.00 120.00 10000 8000 6000 4000 2000 Q (cfs) 14000 120.00 10000 4000 2000 0 00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 2 Time to peak POND 2 POST -DEV Hyd. volume -- Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.48 in Storm duration = 24 hrs Tuesday, 12 / 12 / 2017 Peak discharge = 142.57 cfs Time to peak = 12.00 hrs Hyd. volume = 392,099 cuft Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.20 min Distribution = Type II Shape factor = 484 POND 2 POST -DEV Q (cfs) Hyd. No 2 -- 50 Year Q (cfs) 160.00 160.00 14000 14000 -- 12000 _-- _ _.-- _w_._ --- _ --__ _._� �_-_-. �_-� _--• --_- � __-- 120.00 10000 10000 8000 8000 6000 60.00 _ 4000 4000 20.00 2000 000 _ - -- -- ---- - - - _— 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 2 Time to peak POND 2 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 19.710 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.96 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 10000 :1 11 6000 4000 20.00 Tuesday, 12 / 12 / 2017 Peak discharge = 154.40 cfs Time to peak = 12.00 hrs Hyd. volume = 426,759 cuft Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.20 min Distribution = Type II Shape factor = 484 POND 2 POST -DEV Hyd No 2 -- 100 Year Q (cfs) 16000 14000 12000 100.00 40.00 20.00 000 - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Wet Detention Basin Worksheet Basin ID Wet Pond #2 Required Designer Input= Project Name Braebum Project # FM26 420 Designer C Ludwg Date 12/08/17 Rev 1 Basin Drainage Area Summary Total Impervious Area 8 97 ac 406,248.36 sf Total Pervious Area 7 91 ac 452,155.41 sf Total Future Impervious Area 0 00 ac Total Area, 19.71 ac 858,403.77 sf Perform Water Balance Calcs. Percent BUA:l 4552% Calculate The Design Volume Design Rainfall 1 00 -in Determine the Runoff Coefficient (Rv) for the 1 -in rainfall R„=005+09x(1) 1 = 4552% Rv = 0.46 Determine the Water Quality Volume (WQv) WQ„ = Design Rainfall x Rv x Onsite Drainage Area Design Rainfall is 1 Inch Rv is 0.46 Drainage Area is 19 71 Acres V(design) = 0 75 -ac -ft 32.881.67-cf Calculate The Required Main Pool Volume Equation 9e Main Pool Volume, V mp VMP = 0.87 * HRT * DV TS Where: 0.87 = Factor to adjust for the volume In the forebay VMP = Main pool volume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) TS = Average time between storm events (5 days) DV = Design volume (cubic feet) Vmp = 80,099.75-cf Calculate The Required Forebay Volume V(forebay) = 20% of Vmp = 16,019.95-cf Calculate the Permanent Pool Elevation from Proposed Contours with Forebay Assumed Elev Of Permanent Pool 600.00 -ft Elevation at Bottom of Littoral Shelf 599.00 -ft Required Permanent Pool Volume 96,119 70-cf Forebay Crest Elevation = 598.50 -ft % Forebay = 16.62 Required PPE = 598.90 -ft Proposed PPE = 600.00 -ft Basin Detention Stage/Storage Above Permanent Pool Elevation Elev Contour Area Basin Permanent Pool Stage/Storage Accumul Vol 60000 41,721 87 sf Elev Forebay Area 1 Forebay Area 2 Main Bay Area Total Area Forebay Incr Vol Forebay Accumulated Vol Main Bay Incr Vol Main Bay Accumulated Vol Total Accumulated Vol 59400 26127 83154 sf 15,414 18 sf 16,506 99 sf 0 00-cf 0 00-cf 0 OD-cf 0 00-cf 0 00-cf 59500 68684 1,217 53 sf 17,232 44 sf 19,136 81 sf 1,498 59-cf 1,498 59-cf 16,323 31-cf 16,323 31-cf 17,821 90-cf 59600 119836 1,666 03 sf 19,120 03 sf 21,986 42 sf 2,385 38-cf 3,883 97-cf 18,176 24-cf 34,499 55-cf 38,383 52-cf 59700 179763 2,183 03 sf 21,077 04 sf 25,057,70 sf 3,423 53-cf 7,307 50-cf 20,098 54-cf 54,598 08-cf 61,905 58 -Cf 59800 247763 2,762 52 sf 23,103 44 sf 28,343 59 sf 4,610 41-cf 11,917 90-cf 22,090 24-cf 76,688 32-cf 88,606 22-cf 59850 284288 3,076 46 sf 24,142 69 sf 30,062 03 sf 2,789 87-cf 14,707 77-cf 11,811 53-cf 88,499 85-cf 103,207 63-cf 59900 32,104 74 sf 32,104 74 sf 0 00.cf 222-21 14,061 86-cf 102,561 71-cf 102,561 71-cf 599 50 36,834 82 sf 36,834 82 sf 0 00-cf 0 00-cf 17,234 89-cf 119,796 60-cf 119,796 60-cf 60000 41,721 87 sf 41,721.87 sf 0 00-cf 0 00-cf 19,639 17-cf 139,435 77-cf 139,435 77-cf % Forebay = 16.62 Required PPE = 598.90 -ft Proposed PPE = 600.00 -ft Basin Detention Stage/Storage Above Permanent Pool Elevation Elev Contour Area Incr Vol Accumul Vol 60000 41,721 87 sf 0 00 cf 119,796 60 c 601 00 44,729 54 sf 43,225 71 cf 163,022 31 c 60200 47,793 77 sf 46,261 66 cf 209,283 96 c 60300 50,914 53 sf 49,354 15 cf 258,63811 Cf 60400 54,091 84 sf 52,503 19 cf 311,141 30 c 60500 57,325 68 sf 55,708 76 cf 366,850 06 cf 6060 60,616 07 sf 58,970 88 cf 425,820 93 c 606 50 62,282 67 sf 30,724 69 cf 456,545 62 cf Calculate the Average Depth of the Pond Equation 2. Average depth when the shelf is not submerged or the shelf is being included in the average depth calculation VPP Davg = A P P Where: Davg = Average depth in feet VPP = Volume of permanent pool (feet3) APP = Area of permanent pool (feet') Equation 3. Average depth when the shelf is submerged and the shelf is being excluded Froin the average depth calculation VPP—Vshelf Davg = Abottomofshelf Where: Davg = Average depth in feet VPP = Total volUrne of permanent pool (feet3) Vshelf = Volume over the shelf only (feet3) — see below Abottom of shelf = Area of wet pond at the bottom of the shelf (feet') Vshelf = 0.5 * Depth,ax over shelf Perimeterperm pool * Widthsubmerged part ofshelf Where: Dmax over shelf = Depth of water at the deep side of the shelf as measured at permanent pool (feet) Perimeterpermanent pool = Perimeter of permanent pool at tete bottom of the shelf (feet) Widthst,bmerged part of shelf = Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) PPE =A599.00-ft P P Perimeter = Vpp = App = Bottom of Shelf Elev = A(bottom of shelf) = I 32,104.74-sf Vshelf) = 4,965.65-cf Davg = 4.19 -ft Determine The Orifice Size of the Riser Structure 1 -year, 24-hour Storm Pre -Development Runoff Volume =1 35,785.00-cf (See Hydraflow Hydrographs) 1 -year, 24-hour Storm Post -Development Runoff Volume = 118,242.00-cf (See Hydraflow Hydrographs) Difference = 82,457.00-cf Vpp = 139,435.77-cf 1 -year, 24-hour Storm Volume in Wet Pond 41 = 221,892.77-cf 1 -year, 24-hour Storm Elevation in Wet Pond #1 = 602 26 -ft CA(29H)os = Q C= 0.6 A= 7.07 in' g = 32.2 ft/sec H = 1.13 ft Orifice Diameter = 3 in Qout = 0.25 cfs Drawdown Time = 3.80 days OK Pond NO. 1 - WET POND 2 ABOVE PPE Top of pond -700 Elev. 606 50 -600 -500 -400 -300 WX1141 Sim Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 0 00 ' ' Stage (ft) •°�i-`�' '* `•� ` '-` ' `�` Bottom of pond Elev 600 00 Section 25 -yr NTS 10 -yr 100 -yr 2 -yr 50 -yr 1 -yr Inflow hydrograph = 2 SCS Runoff - POND 2 POST -DEV Project. Braeburn Pond 2.gpw Friday, 12 / 15 / 2017 Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Friday, 12 / 15 / 2017 Pond No. 1 - WET POND 2 ABOVE PPE Pond Data Contours -User-defined contour areas Conic method used for volume calculation Begining Elevation = 600.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 000 60000 41,722 0 0 1 50 601 00 44,730 64,819 64,819 250 60200 47,794 46,249 111,068 350 60300 50,915 49,341 160,409 450 60400 54,092 52,490 212,899 550 60500 57,326 55,695 268,594 650 60600 60,616 58,957 327,551 700 60650 62,283 30,721 358,272 Culvert / Orifice Structures Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for onfice conditions (ic) and submergence (s) Weir Structures Storage / Discharge Table [A] [Bl [C] [PrfRsr] Elevation [A] [Bl [C] [D] Rise (in) = 2700 300 1200 000 Crest Len (ft) = 2000 2000 000 000 Span (in) = 4200 300 36.00 000 Crest EI. (ft) = 60350 60450 000 000 No. Barrels = 1 1 3 0 Weir Coeff. = 333 333 333 333 Invert EI. (ft) = 60000 60000 60250 000 Weir Type = 1 Cipltl --- --- Length (ft) = 9300 050 050 000 Multi -Stage = Yes No No No Slope (%) = 050 000 000 n/a --- --- --- 5486 550 268,594 60500 73 28 Ic N -Value = 013 013 013 n/a 650 327,551 60600 83 21 is 0 06 Ic Orifice Coeff. = 060 060 060 060 Exfil.(inlhr) = 0 000 (by Wet area) 0 05 is 8 95 Ic --- Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 000 Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for onfice conditions (ic) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 000 0 60000 000 000 000 --- 000 000 --- --- --- - 0 000 1 50 64,819 601 00 0 22 is 0 22 is 000 --- 000 000 --- --- --- --- 0 221 250 111,068 60200 0 32 is 0 32 is 000 --- 000 000 --- --- --- --- 0 324 350 160,409 60300 11 17 Ic 0 34 Ic 10 83 Ic --- 000 000 --- --- --- --- 11 17 450 212,899 60400 54 86 oc 0 17 Ic 31 14 Ic --- 2355 000 --- --- --- --- 5486 550 268,594 60500 73 28 Ic 0.09 Ic 16 24 Ic --- 56 94 s 2355 --- --- --- --- 96 82 650 327,551 60600 83 21 is 0 06 Ic 10 53 Ic --- 72 57 s 12235 --- --- --- --- 20551 700 358,272 60650 87 56 is 0 05 is 8 95 Ic --- 78 55 s 18837 --- --- --- --- 27592 Starmount Cove CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND #2 CS ##2 Unit wt of concrete (pcf) = 150 Ib/ft3 Unit wt of H2O = 62.4 Ib/ft3 TOP OF RISER ELEV = 603.50 ft INV. OUT OF RISER ELEV. = 594.00 ft INT. WIDTH OF RISER = 60 in INT LENGTH OF RISER= 60 in WALL THICK OF RISER= 6 in BASE THICK. OF RISER = 6 in VOL OF RISER= 3600 ft3 BUOYANT FORCE = 22464.0 lbs Vol. of Riser x Unit wt of H2O VOL. CONC. IN RISER = 122.5 ft3 SINKING FORCE OF RISER = 10731 lbs CONC. PAD THICKNESS = 36 in CONC. PAD WIDTH/LENGTH = 8 ft VOL OF CONC. PAD = 192.00 ft3 SINKING FORCE OF PAD = 16819.2 lbs TOTAL SINKING FORCE = 27550.2 lbs Factor of safety = SINKING FORCE BUOYANT FORCE F.S. = 1.23 OK Vol. of Conc. x (Unit wt. of Conc. - Unit wt. of H2O) L x W x H/ Pad Thickness Vol. of Pad x (Unit wt. of Conc. - Unit wt. of H2O) F.S. MUST BE GREATER THAN 1.10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2015 by Autodesk, Inc v10 4 Friday, 12 / 15 / 2017 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 0.312 cfs Storm frequency = 1 yrs Time to peak = 24.13 hrs Time interval = 2 min Hyd. volume = 78,938 cuft Inflow hyd. No. = 2 - POND 2 POST -DEV Max. Elevation = 601.87 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 104,996 cuft Q (cfs) 5000 4000 30.00 20.00 1000 WET POND 2 ROUTED Hyd No. 3 -- 1 Year 10 20 30 40 Hyd No 3 Hyd No 2 50 60 70 80 90 =L --LSI Total storage used = 104,996 cuft Q (cfs) 50.00 4000 30.00 2000 1000 1 0.00 100 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Friday, 12 / 15 / 2017 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 0.620 cfs Storm frequency = 2 yrs Time to peak = 24.03 hrs Time interval = 2 min Hyd. volume = 93,056 cuft Inflow hyd. No. = 2 - POND 2 POST -DEV Max. Elevation = 602.53 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 137,042 cuft Storage Indication method used WET POND 2 ROUTED Q (cfs) Hyd No 3 -- 2 Year Q (cfs) 6000 6000 5000 5000 4000 40.00 3000 30.00 20.00 2000 10.00 10.00 000 - 000 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No 3 Hyd No 2 ILL=Total storage used = 137,042 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCADS Civil 3D@ 2015 by Autodesk, Inc v10 4 Friday, 12 115 / 2017 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 11.86 cfs Storm frequency = 10 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 209,593 cuft Inflow hyd. No. = 2 - POND 2 POST -DEV Max. Elevation = 603.02 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 161,468 cuft Storage Indication method used Q (cfs) 120.00 100.00 80.00 6000 4000 2000 0 00 WET POND 2 ROUTED Hyd. No 3 -- 10 Year Q (cfs) 120.00 10000 :1 1I .I II 4000 2000 WWI 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No. 3 Hyd No. 2 EMTT_f Total storage used = 161,468 cult Hyrdrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Friday, 12 / 15 / 2017 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 32.07 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 277,908 cuft Inflow hyd. No. = 2 - POND 2 POST -DEV Max. Elevation = 603.53 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 187,884 cuft Q (cfs) 140.00 120.00 100.00 01 10 40.00 WET POND 2 ROUTED Hyd. No 3 -- 25 Year 0 00 0 Q (cfs) 14000 12000 10000 40.00 20.00 MAIN 4 8 12 16 20 24 28 32 36 40 44 48 Time (hrs) Hyd No. 3 Hyd No. 2 =LI_Lli Total storage used = 187,884 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2015 by Autodesk, Inc v10 4 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - POND 2 POST -DEV Max. Elevation Reservoir name = WET POND 2 ABOVE PPE Max. Storage Storage Indication method used Friday, 12 / 15 / 2017 = 50.31 cfs = 12.20 hrs = 329,610 cuft = 603.87 ft = 206,077 cuft WET POND 2 ROUTED Q (cfs) Hyd. No 3 -- 50 Year 160.00 14000 12000 - - ^- --�� -- - - — 100.00 80.00 6000 _-...__..._ _..-,......_ .. _Pry _ ..... �. 4000 2000 Q (cfs) 16000 14000 120.00 10000 4000 20.00 000 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No 3 Hyd No. 2 TZ1T(-(�I Total storage used = 206,077 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Friday, 12 / 15 / 2017 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 57.92 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 364,221 cuft Inflow hyd. No. = 2 - POND 2 POST -DEV Max. Elevation = 604.11 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 218,858 cuft Storage Indication method used WET POND 2 ROUTED Q (cfs) Hyd. No 3 -- 100 Year Q (cfs) 16000 16000 - 140 00 14000 ' 12000 120.00 100.00 10000 8000 80.00 60 00 6000 4000 40.00 2000 2000 000 - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No 3 Hyd No 2 !1111=1_-1-11 Total storage used = 218,858 cult E. Wet Pond 3 Pre -Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Reference Urban Hydrology for Small Watersheds Technical Release 55, Sod Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 3 TOC Pre-Dev Braeburn - Pond 3 - TOC Calcs Pre -Development 12/14/2017 Time of Concentration (Tc) or Travel Time (Tt) Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Wet Pond 3 TOC Pre-Dev 1. SHEET FLOW SEGMENT ID A B 1 Surface description (table 3-1) ... Woods -Light Grass -Short 2 Manning's roughness coefficient, n (table 3-1)...... 0.4 0.15 3 Flow length, L (total L <_ 300 ft) ft 34 66 4 Two-year 24-hour rainfall, P In 3 12 3.12 5 Land slope, s ........... . ......ft/ft 0.0300 1 0.018 6 Tt = 0.007 (nQA0 8 Compute Tt hr 0.13 + 012 0.25 P2^0 5s'04 2'. SHALLOW CONCENTRATED FLOW SEGMENT ID C 7. Surface description (paved or unpaved) .... ....... Unpaved 8 Flow length, L ft 361 9. Watercourse slope, s ..ft/ft 00200 10 Average velocity, V (figure 3-1) 2.282 11 Tt = L Compute Tt hrl 004 + 0.04 3600 V 3. CHANNEL FLOW � SEGMENT ID 12 Channel type (Pipe or Open Channel) 13 Cross sectional flow area, a ....ft2 14 Wetted perimeter, pw ft 15 Hydraulic radius r = a/pw Computer... .. ft 16. Channel slope, s ft/ft 17. Manning's roughness coefficient, n . 18. V = [1 49 r"(2/3) s^(1/2)] / n Compute V .. ... ...ft/s 19 Flow length, L .ft 20 Tt = L Compute Tt ... hr + 0.00 3600 V 21 Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Hr = 0 29 Min = 17.4 Reference Urban Hydrology for Small Watersheds Technical Release 55, Sod Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 3 TOC Pre-Dev Braeburn - Pond 3 - TOC Calcs Pre -Development 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd Fort Mill, SC 29708 Pltone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project Braebum By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Pond 3 CN Pre -Development 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment of Tbl. Fig. Fig. Group and hydrologic condition) 2-2 2-3 2-4 Acres CN x area B Woods, Good condition 55 0 000 000 (TaB) B Open space, Good condition (grass cover > 75%) 61 0.000 000 (TaB) B Dirt Roads (including right-of-way) _ 82 0 000 000 (TaB) C _ Woods, Good condition _ 70 3 188 22315 (ScA) C Open space, Good condition (grass cover> 75%) 74 9 108 67399 (ScA) C Dirt Road_ s (including right-of-way) 87 0 000 000 (ScA) C Paved areas, streets, roofs, driveways, etc (excl ROW) 98 0.000 000 (ScA) D _ _ Woods, Good condition - - - 77 0 000 000 (CmB) D Open space, Good condition (grass cover> 75%) - -(CmB) 80 0.000 0.00 D Dirt Roads (including right-of-way) 89 0 000 000 (CmB) D Paved areas, streets, roofs, driveways, etc (excl.R_OW) 98 0 000 000 (CmB) * Use only one CN source per line Totals = 12 296 89714 CN (weighted) total product = 897 143 = 730 Use CN= 73 total area 122959 2. Runoff - Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall , P (24-hour) in 420 6.50 1030 Runoff, Q in 1 67 351 6.89 (Use P and CN with table 3-11, fig 2-1, and equation 3-14) Reference Urban Hydrology for Small Watersheds Technical Release 55, Sod Conservation Service US Department of Agriculture, June 1986 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 ESP Assocates, PA Pond 3 CN Pre -Development PoBox 7030 Braeburn - Pond 3 - CN Calcs Pre-Dev Charlotte NC 28241 12/14/2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 3 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 12.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 2 58 in Storm duration = 24 hrs Q (cfs) 8.00 400 200 Tuesday, 12/12/2017 Peak discharge = 7.670 cfs Time to peak = 12.10 hrs Hyd. volume = 27,299 cuft Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 17.40 min Distribution = Type II Shape factor = 484 POND 3 PRE -DEV Hyd. No 1 -- 1 Year Q (cfs) 800 4.00 2.00 NOW 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 3 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 12.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.12 in Storm duration = 24 hrs Tuesday, 12 / 12 12017 Peak discharge = 12.45 cfs Time to peak = 12.10 hrs Hyd. volume = 41,614 cuft Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 17.40 min Distribution = Type II Shape factor = 484 POND 3 PRE -DEV Q (cfs) Hyd. No 1 -- 2 Year Q (cfs) 14 00 1200 1000 8.00 6.00 400 2.00 0 00 14 00 1200 10.00 8.00 600 4.00 2.00 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hy►drograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 3 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 12.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.80 in Storm duration = 24 hrs Q (cfs) 30.00 25.00 20.00 15.00 1000 500 Tuesday, 12 / 12 / 2017 Peak discharge = 29.98 cfs Time to peak = 12.07 hrs Hyd. volume = 94,868 cuft Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 17.40 min Distribution = Type II Shape factor = 484 POND 3 PRE -DEV Hyd. No 1 -- 10 Year Q (cfs) 30.00 25.00 2000 1500 10.00 5.00 000 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 3 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 12.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.76 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 1000 0 00 Tuesday, 12/12/2017 Peak discharge = 41.16 cfs Time to peak = 12.07 hrs Hyd. volume = 129,064 cuft Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 17.40 min Distribution = Type II Shape factor = 484 POND 3 PRE -DEV Hyd. No 1 -- 25 Year Q (cfs) 50.00 4000 3000 2000 1000 KI MI 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADG Civil 3D@ 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 1 POND 3 PRE -DEV Hydrograph type = SCS Runoff Peak discharge = 49.83 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 155,867 cuft Drainage area = 12.300 ac Curve number = 73 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.40 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POND 3 PRE -DEV Q (cfs) Hyd. No 1 -- 50 Year Q (cfs) 50.00 50.00 40.00 4000 - 30.00 30.00 2000 20.00 1000 1000 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 POND 3 PRE -DEV Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 12.300 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.96 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 12 / 2017 = 55.71 cfs = 12.07 hrs = 174,168 cuft = 73 = 0 ft = 17.40 min = Type II = 484 Q (cfs) POND 3 PRE -DEV Hyd. No 1 -- 100 Year Q (cfs) 60.00 6000 5000 50.00 4000 40.00 3000 3000 2000 20.00 1000 10.00 000 - 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) F. Wet Pond 3 Post -Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Reference. Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from 'NCDENR BMP Design Manual, July 2007 Wet Pond 3 TOC Post-Dev Braeburn - Pond 3 - TOC Calcs Post -Development 12/14/2017 Time of Concentration (Tc) or Travel Time (Tt) Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Wet Pond 3 TOC Post-Dev 1. SHEET. FLOW w SEGMENT ID A B 1 Surface description (table 3-1) Grass -Short Pavement 2 Manning's roughness coefficient, n (table 3-1) . ........ 0.15 0.011 3. Flow length, L (total L:5 300 ft) . ............. .. ft 80 20 4 Two-year 24-hour rainfall, P .in 3.12 3.12 5 Land slope, s ......... .. ..ft/ftl 0.0200 1 0.01 6. Tt = 0 007 (nL)^0.8 Compute Tt hrI 0.14 + 0.01 015 P2^0.5 s^0 4 2. SHALLOW,CONCENTRATED FLOW SEGMENT ID B 7. Surface description (paved or unpaved) Paved 8 Flow length, L .. ..... ............. ..ft 74 9. Watercourse slope, s ft/ft 00200 10 Average velocity, V (figure 3-1) ... 1 2.875 11 Tt = L Compute Tt hrl 0 01 1 + 0.01 3600 V 3. CHANNEL -FLOW -` SEGMENT ID C 12 Channel type (Pipe or Open Channel) Pipe 13 Cross sectional flow area, a. . ft2 3 14 14. Wetted perimeter, pw ....... ... .... ft 628 15 Hydraulic radius r= a/pw Compute r ft 050 16. Channel slope, s ..ft/ft 0 005 17. Manning's roughness coefficient, n .... ... ....... . 0 012 18. V= [1.49 r^(2/3) s^(1/2)] / n Compute V ...ft/s 553 19. Flow length, L ...ft 514 20 Tt = L Compute Tt hr 003 + 1 0031 3600 V 21 Watershed or subarea Tc or Tt (add Tt In steps 6, 11, and 19) Hr= Min = 11.4 Reference. Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from 'NCDENR BMP Design Manual, July 2007 Wet Pond 3 TOC Post-Dev Braeburn - Pond 3 - TOC Calcs Post -Development 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Develope Pond 3 Post -Development CN 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition) 2-2 2-3 2-4 Acres CN x area B Residential, 1/8 acre or less (town houses) 85 0 000 000 (TaB) C - Residential, 1/8 acre or less (town_ houses) 90 12 296 110663 (SCA) D Residential, 1/8 acre or less (town houses) - - 92 0.000 000 (CmB) * Use only one CN source per line Totals = 12 296 110663 CN (weighted) total product = 1106 63 = 900 Use CN= 90 total area 122959 2. Runoff f Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall , P (24-hour) in 420 650 1030 Runoff, Q in 311 533 9.08 (Use P and CN with table 3-11, fig 2-1, and equation 3-14) Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service US Department of Agriculture, June 1986 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 ESP Assocates, PA Pond 3 Post -Development CN PoBox 7030 Braeburn - Pond 3 - CN Calcs Post-Dev Charlotte NC 28241 12/14/2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 3 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 28.31 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 73,789 cuft Drainage area = 12.300 ac Curve number = 90 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 3000 25.00 2000 15.00 1000 5.00 an 11=11 POND 3 POST -DEV Hyd. No. 2 -- 1 Year Q (cfs) 3000 2500 20.00 1500 10.00 5.00 W I1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 3 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 36.71 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 96,446 cuft Drainage area = 12.300 ac Curve number = 90 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POND 3 POST -DEV Q (cfs) Hyd. No 2 -- 2 Year Q (cfs) 4000 4000 3000 3000 20 00 20.00 10.00 1000 000 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 3 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 62.95 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 169,613 cuft Drainage area = 12.300 ac Curve number = 90 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POND 3 POST -DEV Q (cfs) Hyd No 2 --10 Year 7000 60.00 5000 4000 30.00 20.00 1000 0 00 - 0 2 4 6 Hyd No 2 Q (cfs) 7000 5000 4000 3000 20.00 1000 rain 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 3 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 77.85 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time Interval = 2 min Hyd. volume = 212,373 cuft Drainage area = 12.300 ac Curve number = 90 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs, Shape factor = 484 POND 3 POST -DEV Q (cfs) Hyd No 2 -- 25 Year 80.00 70.00 6000 - 50.00 4000 3000 20.00 100071�1- Q (cfs) 8000 7000 5000 4000 3000 20.00 10.00 000 _— 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 2 POND 3 POST -DEV _ Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 12.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.48 in Storm duration = 24 hrs Tuesday, 12 / 12 / 2017 Peak discharge = 88.97 cfs Time to peak = 12.00 hrs Hyd. volume = 244,689 cuft Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 11.40 min Distribution = Type II Shape factor = 484 POND 3 POST -DEV Q (cfs) Hyd No. 2 -- 50 Year Q (cfs) 90 00 8000 7000 60.00 50.00 4000 30.00 20.00 1000 0 00 90 00 8000 70.00 60.00 50.00 40.00 3000 20.00 1000 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc 00 4 Hyd. No. 2 Time to peak POND 3 POST -DEV Hyd. volume _ Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 12.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.96 in Storm duration = 24 hrs Q (Cfs) Tuesday, 12 / 12 / 2017 Peak discharge = 96.36 cfs Time to peak = 12.00 hrs Hyd. volume = 266,318 cuft Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 11.40 min Distribution = Type II Shape factor = 484 POND 3 POST -DEV Hyd. No 2 --100 Year Q (cfs) 100 00 i uu.uu 90.00 90.00 - 8000 _ _ 8000 -_ — _ _ _—--__-._ W 7000 7000 60.00 6000 - 50.00 50.00 4000 ---- - -- ----- -------- - — --- -- - -----_-- 40.00 _--- — - - - ---- 3000 - L 3000 20.00 ---- -------------- ---------------- 2000 - - — - - ----- 1000 1000 0 2 4 Hyd No. 2 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Wet Detention Basin Worksheet Basin ID Wet Pond #3 Required Designer Input=_ Project Name Braebum Project # iFM26 420 Designer C Ludwg Date 12/08/17 Rev 1 Basin Drainage Area Summary Total Impervious Area 5.04 ac 1 219,698.98 sf Total Pervious Area 7.25 ac 315,909.41 sf Total Future Impervious Area 0 00 ac Total Area 12 30 ac 535,608.39 sf Perform Water Balance Calcs. Percent BUA:J 41.02% Calculate The Design Volume Design Rainfall 1 00 -in Determine the Runoff Coefficient (Rv) for the 1 -in rainfall Rv = 0 05 + 0 9 x (1) 1 = 4102% Rv = 042 Determine the Water Quality Volume (WQv) WQ v = Design Rainfall x Rv x Onsite Drainage Area Design Rainfall is 1 Inch Rv is 0 42 Drainage Area is 12 3 Acres WQv = (1 x 0 42 x 12 30)/12 V(design) = 0.43-ac-ff 18,709.13-cf Calculate The Required Main Pool Volume =rPool Volume, Vmp VMP = 0.87 HRT DV T, Where 087 = Factor to adjust for the volume in the forebay VrnP = Main pool volume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) TS = Average time betvdeen storm events (5 days) DV = Design volume (cubic feet) Vmp = 45,575.43-cf Calculate The Required Forebay Volume V(forebay) = 20% of Vmp = 9,115.09-cf Calculate the Permanent Pool Elevation from Proposed Contours with Forebay Assumed Elev Of Permanent Pool 598.00 -ft Elevation at Bottom of Littoral Shelf 597 50 -ft Required Permanent Pool Volume 54,690.51-cf Forebay Crest Elevation = 597.00 -ft % Forebay = 17.73 Required PPE = 593.09 -ft Proposed PPE = 598.00 -ft Basin Detention 5tagelstorage Above Permanent PoolElevation Basin Permanent Pool Stage/Storage Elev Contour Area Incr Vol Elev Forebay Area Main Bay Area Total Area Forebay Incr Vol Forebay Accumulated Vol Main Bay Incr Vol Main Bay Total Accumulated Vol Accumulated Vol 591 50 3,868 88 sf 29,882 93 sf 33,751 81 sf 0 00-cf 0 00-cf 0 00-cf 0 00-cf 0 00-cf 59200 4,27191 sf 30,948 45 sf 35,220 36 sf 2,035 20-cf 2,035 20-cf 15,207 85-cf 15,207 85-cf 17,243 04-cf 59300 5,129 87 sf 33,130 42 sf 38,260 29 sf 4,700 89-cf 6,736 09-cf 32,039 44-cf 47,247 28-cf 53,983.37-cf 59400 6,056 90 sf 35,380 50 sf 41,437 40 sf 5,593 39-cf 12,329 47-cf 34,255 46-cf 81,502 74-cf 93,832 21-cf 59500 1 7,053 01 sfl 37,698 69 sf 1 44,751 70 sfj 6,554 96-cf 18,884 43-cf 36,539 60-cf 1 118,042 34-cf 136,926 76-cf 59600 8,118 19 sf 40,084 98 sf 48,203 17 sf 7,585 60-cf 26,470 03-cf 38,891 84-cf 156,934 17-cf 183,404 20-cf 59700 9,252 46 sf 42,539 38 sf 51,791 84 sf 8,685 33-cf 35,155 35-cf 41,312 18-cf 198,246 35-cf 233,401 70-cf 59750 00 sf 53,908 56 sf 53,908 56 sfj 0 00-cf 1 35,155 35-cf 24,111 99-cf 222,358 34-cf 257,513 69-cf 59800 .00 sfj 58,760 76 sf 58,760 76 sf 0 00-cf 1 35,155 35-cf 28,167 33-cf 250,525 67-cf 285,681 02 -cf % Forebay = 17.73 Required PPE = 593.09 -ft Proposed PPE = 598.00 -ft Basin Detention 5tagelstorage Above Permanent PoolElevation Elev Contour Area Incr Vol Accumul Vol 59800 58,760 76 sf 0 00 cf 285,681 02 cf 59850 63,770 18 sf 30,632.74 cf 316,313 75 cf 59900 65,303 51 sf 32,268 42 cf 348,582 18 cf 60000 68,412 80 sf 66,858 16 cf 415,440 33 cf 601 00 71,578 62 sf 69,995 71 cf 485,436 04 cf 602.00 74,800 98 sf 73,189 80 cf 558,625 84 cf 603.00 78,079 88 sf 76,440 43 cf 635,066 27 cf 604 00 81,415 35 sf 79,747 62 cf 714,813 89 cf 60500 84,807 35 sf 83,111 35 cf 797,925 24 cf Calculate the Average Depth of the Pond Equation 2. Average depth when the shelf is not submerged or the shelf is being included in the average depth calculation VPP Davg = App Where. Davg = Average depth In feet VPP = Volume of permanent pool (feet3) APP = Area of permanent pool (feet2) Equation 3. Average depth when the shelf is submerged and the shelf is being excluded from the average depth calculation VPP—Vshel f Davg = Ahottomofshelf Where- Davg = Average depth in feet VPP = Total volume of permanent pool (feet3) Vshelf = Volume over the shelf only (feet3) — see below Abottom of shelf = Area of wet pond at the bottom of the shelf (feet2) Vsheif - 0.5 * Depthn,axover shelf " Perimeterpermpool * Widthsubmergedpart ofshelf Where: Dmax over shelf = Depth of water at the deep side of the shelf as measured at permanent pool (feet) Perimeterpermanent pool = Perimeter of permanent pool at the bottom of the shelf (feet) Widthsubmergedpart ofshelf = Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) PPE = 598.00 -ft P P Perimeter = 986.16 -ft Vpp = 285,681 02-cf App = 58,760.76-sf Bottom of Shelf Elev = 597.50 -ft A(bottom of shelf) = 53� 908.56-sf V(shelf) = 1,232 70-cf70-cf Davg = 5.28 -ft Determine The Orifice Size of the Riser Structure 1-year, 24-hour Storm Pre-Development Runoff Volume = 27,299.00-cf (See Hydraflow Hydrographs) 1-year, 24-hour Storm Post-Development Runoff Volume = 73,789.00-cf (See Hydraflow Hydrographs) Difference = 46,490 00-cf Vpp = 285,681.02-cf 1-year, 24-hour Storm Volume in Wet Pond #1 = 332,171.02-cf 1-year, 24-hour Storm Elevation in Wet Pond #1 = 598.75-ft CA(2gH)o.s = Q C = 0.6 A= 12.57 int g = 32.2 ftlsec H = 0.37 ft Orifice Diameter= 4 in Qout = 026 cfs Drawdown Time = 210 days OK Pond N o . 1 - POND 3 PPE=593 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v104 -800 -700 -500 -400 -300 SleIf - 1 00 —000 Stage (ft) Top of pond --\ Elev 605 00 Elev 598 00 Section 25 -yr NTS 10 -yr 100 -yr 2 -yr 50 -yr 1 -yr Inflow hydrograph = 2 SCS Runoff - POND 3 POST -DEV Project: Braeburn Pond 3 gpw Tuesday, 12 / 19 / 2017 Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10 4 Tuesday, 12 / 19 / 2017 Pond No. 1 - POND 3 PPE=598 Pond Data Contours -User-defined contour areas Conic method used for volume calculation Beglning Elevation = 598 00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 000 59800 58,761 0 0 050 59850 63,770 30,621 30,621 100 59900 65,304 32,264 62,886 200 60000 68,413 66,845 129,731 300 601 00 71,579 69,983 199,714 400 60200 74,801 73,177 272,890 500 60300 78,080 76,427 349,317 600 60400 81,415 79,734 429,051 700 60500 84,807 83,097 512,148 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 3600 400 000 000 Crest Len (ft) = 16.00 2000 000 000 Span (in) = 3600 400 0.00 000 Crest EI. (ft) = 60200 60300 000 000 No. Barrels = 1 1 0 0 Weir Coeff. = 333 333 333 333 Invert EI. (ft) = 59800 59800 000 000 Weir Type = 1 Clpltl --- --- Length (ft) = 5000 050 000 000 Multi -Stage = Yes No No No Slope (%) = 050 000 000 n/a N -Value = 013 013 013 n/a Orifice Coeff. = 0.60 060 060 060 Exfil (in/hr) = 0 000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 000 Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for onfice conditions (ic) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Clv A CIV B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 000 0 59800 000 000 --- --- 000 0.00 --- --- --- --- 0 000 050 30,621 59850 0 26 ic 0 24 ic --- --- 000 000 -- --- --- --- 0 240 1 00 62,886 59900 0 37 is 0 37 ic --- --- 0.00 000 --- --- --- - 0 372 200 129,731 60000 0 55 ic 0 55 ic --- --- 000 000 --- --- --- 0 554 300 199,714 601 00 0 74 ic 0 69 ic --- --- 000 000 --- --- --- --- 0 690 400 272,890 60200 0 81 ic 0 81 ic --- --- 000 000 --- --- --- --- 0 806 500 349,317 60300 50 96 oc 0 36 ic --- --- 50 59 s 0.00 --- --- --- --- 50.96 600 429,051 60400 70 65 ic 0 18 ic --- --- 70 46 s 6660 --- --- --- --- 137.25 700 512,148 60500 79 24 ic 0.12 ic --- --- 79 09 s 18837 --- --- --- --- 26758 Starmount Cove CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND #3 CS #3 Unit wt of concrete (pcf) = 150 Ib/ft3 Unit wt. of H2O = 62.4 Ib/ft3 TOP OF RISER ELEV = 60200 ft INV OUT OF RISER ELEV = 591 50 ft INT WIDTH OF RISER= 48 in INT LENGTH OF RISER= 48 in WALL THICK OF RISER= 6 in BASE THICK. OF RISER = 6 in VOL. OF RISER= 2750 ft' BUOYANT FORCE = 17160.0 lbs Vol of Riser x Unit wt. of H2O VOL. CONC. IN RISER = 107 ft3 SINKING FORCE OF RISER = 9373.2 lbs CONC. PAD THICKNESS = 24 in CONC PAD WIDTH/LENGTH = 8 ft VOL OF CONC PAD= 128.00 ft' SINKING FORCE OF PAD = 11212.8 lbs TOTAL SINKING FORCE = 20586.0 lbs Factor of safety = SINKING FORCE BUOYANT FORCE Vol. of Conc. x (Unit wt. of Conc. - Unit wt. of H2O) L x W x H/ Pad Thickness Vol. of Pad x (Unit wt. of Conc. - Unit wt. of H2O) F.S. = 1.20 OK F F.S. MUST BE GREATER THAN 1.10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 19 / 2017 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 0.358 cfs Storm frequency = 1 yrs Time to peak = 21.90 hrs Time Interval = 2 min Hyd. volume = 64,774 cuft Inflow hyd. No. = 2 - POND 3 POST -DEV Max. Elevation = 598.93 ft Reservoir name = POND 3 PPE=598 Max. Storage = 58,611 cuft Storage Indication method used Q (cfs) 30.00 25.00 20.00 15.00 1000 500 0 00 WET POND 3 PPE=598 Hyd. No 3 --1 Year Q (cfs) 3000 2500 20.00 15.00 1000 500 wi7iTil 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No 3 Hyd No 2 =IT] Total storage used = 58,611 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 19 / 2017 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 0.420 cfs Storm frequency = 2 yrs Time to peak = 23.30 hrs Time interval = 2 min Hyd. volume = 84,154 cuft Inflow hyd. No. = 2 - POND 3 POST -DEV Max. Elevation = 599.23 ft Reservoir name = POND 3 PPE=598 Max. Storage = 78,307 cuft Storage Indication method used Q (cfs) 4000 30.00 2000 10.00 WET POND 3 PPE=598 Hyd. No 3 -- 2 Year Q (cfs) 4000 30.00 20.00 1000 000 "`' ' 0.00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No 3 Hyd No. 2 1.171_1711 Total storage used = 78,307 cult Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 3 WET POND 3 PPE=598 _.. Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - POND 3 POST -DEV Max. Elevation Reservoir name = POND 3 PPE=598 Max. Storage Storage Indication method used Q (cfs) 70.00 6000 5000 40.00 3000 2000 10.00 WET POND 3 PPE=598 Hyd No 3 --10 Year Tuesday, 12 / 19 / 2017 = 0.583 cfs = 24.07 hrs = 134,996 cuft = 600.20 ft = 143,649 cult Q (cfs) 70.00 .I 11 50.00 40.00 30.00 2000 1000 0.00 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No 3 Hyd No 2 ;LE(= Total storage used = 143,649 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 19 / 2017 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 0.660 cfs Storm frequency = 25 yrs Time to peak = 24.07 hrs Time interval = 2 min Hyd. volume = 159,079 cuft Inflow hyd. No. = 2 - POND 3 POST -DEV Max. Elevation = 600.75 ft Reservoir name = POND 3 PPE=598 Max. Storage = 182,511 cuft Storage Indication method used I I Q (cfs) WET POND 3 PPE=598 Hyd. No 3 -- 25 Year Q (cfs) 80 00 80.00 70.00 7000 60.00 5000 6000 40.00 5000 30.00 4000 30.00 - — ---___------ --- -- 2000 --- --- — ----- — 20.00 1000 n nn 10.00 n nn 0 10 Hyd No 3 20 30 40 Hyd No 2 50 60 70 80 90 .I— I LCl_Cll Total storage used = 182,511 cuft 100 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. N®. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - POND 3 POST -DEV Max. Elevation Reservoir name = POND 3 PPE=598 Max. Storage Q (cfs) 9000 8000 70.00 6000 5000 ' 40 00 30.00 2000 1000 000-� WET POND 3 PPE=598 Hyd. No 3 -- 50 Year 0 10 20 30 40 Hyd No 3 Hyd No 2 Tuesday, 12 / 19 / 2017 = 0.712 cfs = 24.07 hrs = 175,641 cuft = 601.17 ft = 212,104 cuft 50 60 70 80 90 LECA Total storage used = 212,104 cuft 100vvV Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - POND 3 POST -DEV Max. Elevation Reservoir name = POND 3 PPE=598 Max. Storage Storage Indication method used Q (cfs) Tuesday, 12/19/2017 = 0.744 cfs = 24.10 hrs = 186,088 cuft = 601.44 ft = 232,005 cuft WET POND 3 PPE=598 Hyd No 3 --100 Year Q (cfs) 100 00 100 00 90 00 90.00 8000 80.00 —_ —" _— 7000 70.00 6000 6000 5000 5000 4000 4000 30.00 3000 20.00 2000 10.00 000 10.00 000 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No. 3 Hyd No. 2 =I11 Total storage used = 232,005 cult G. Wet Pond 4 Pre -Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 4 TOC Pre-Dev Braeburn - Pond 4 - TOC Calcs Pre-Dev 12/14/2017 Time of Concentration (Tc) or Travel Time (Tt) Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Wet Pond 4 TOC Pre-Dev 1. SHEET FLOW SEGMENT ID A B 1 Surface description (table 3-1) Grass -Short Grass -Short 2 Manning's roughness coefficient, n (table 3-1) . .. 0.15 0.15 3 Flow length, L (total L <_ 300 ft) ..ft 57 43 4 Two-year 24-hour rainfall, P In 312 1 312 5 Land slope, s ... .ft/ft '00175 1 0.0095 6 Tt = 0.007 (nL)^0 8 Compute Tt hr 0.11 + Oil 022 P2"0 5 s"0 4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID B C 7 Surface description (paved or unpaved) Unpaved Unpaved 8 Flow length, L ... ... ...... .. ............. ..ft 911 1192 9 Watercourse slope, s ft/ft 00170 0.0143 10 Average velocity, V (figure 3-1) 2 104 1 93 11. Tt = L Compute Tt hrI 0.12 + 017 0.29 3600 V 3. CHANNEL FLOW SEGMENT ID 12 Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a .. ft2 14 Wetted perimeter, pw ft 15. Hydraulic radius r = a/pw Compute r ..ft 16 Channel slope, s ... ft/ft 17 Manning's roughness coefficient, n . 18. V = [1 49 r^(2/3) s^(1/2)] / n Compute V ... .. ...ft/s 19 Flow length, L ft 20 Tt = L Compute Tt hr I + I 1 0001 3600 V 21 Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Hr = 0 51 Min = 3061 Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 4 TOC Pre-Dev Braeburn - Pond 4 - TOC Calcs Pre-Dev 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Pond 4 CN Pre -Development C Runoff Curve Ntimber Soil Cover Description CN* Area Product Hydrologic (cover type, treatment of Tbl. Fig. Fig. Group and hydrologic condition) 2-2 2-3 2-4 Acres CN x area B _ Woods, Good condition 55 2.527 13900 (TaB) B Open space, Good condition (grass cover> 75%) 4 — -- 61 1.044 6371 (TaB) B oay) _ _ __. Dirt Roads_ Including right -f w - 82 0.238 1956 (TaB) C _ _ _ _ _ _ _ Woods,_Good condition (ScA) 70 23 723' 166059 C Open space, Good condition (grass cover > 75%) _ _ 74 3 469 25671 (ScA) C _ _ DirtRoads (including right_of-way) _ _ . _ _ - 87 0.397 3457 (ScA) C _ _Paved areas, streets,_roofs, driveways, etc (excl-ROW) -- - - - 98 0.000 0.00 (ScA) D _ Woods, Good condition _ _ _ _ _ - 77 23 104 177903 (CmB) D __Open space, Good condition (grass cover > 75%) _ _ , _ _ 80 8.668 69344 (CmB) D ing,right-of-w_� _ Dirt Roads cluday) _ (in _ _ _- 89 0.086 765 (CmB) D Paved areas, streets, roofs, driveways, etc (excl.ROW} _ _- --- -- - - - - - 98 0 000 0 00 (CmB)-- * Use only one CN source per line Totals= 63.258 465426 CN (weighted) total product = 4654 26 = 736 Use CN= 74 total area 632576 2, Runoff, z _ Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall, P (24-hour) in 4.20 650 1030 Runoff, Q in 174 3 61 703 (Use P and CN with table 3-11, fig 2-1, and equation 3-14) Reference. Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service US Department of Agriculture, June 1986 ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Rainfall, P, taken from ,NCDENR BMP Design Manual, July 20071 1 Pond 4 CN Pre-Deveiopment Braeburn - Pond 4 - CN Calcs Pre-Dev 12/14/2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 4 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 63.260 ac Basin Slope = 0.0% Tc method = User Total precip. = 2.58 in Storm duration = 24 hrs Q (cfs) 3500 3000 2500 20.00 1500 1000 500 Tuesday, 12/12/2017 Peak discharge = 30.45 cfs Time to peak = 12.23 hrs Hyd. volume = 151,999 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 30.60 min Distribution = Type II Shape factor = 484 POND 4 PRE -DEV Hyd. No 1 -- 1 Year Q (cfs) 3500 30.00 2500 2000 1500 10.00 5.00 000 - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 Time to peak POND 4 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 63.260 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.12 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 1000 0 00 -L 0 Tuesday, 12/12/2017 Peak discharge = 49.15 cfs Time to peak = 12.23 hrs Hyd. volume = 229,075 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 30.60 min Distribution = Type II Shape factor = 484 POND 4 PRE -DEV Hyd No. 1 -- 2 Year Q (cfs) 50.00 4000 3000 2000 10.00 0.00 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil MID 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 1 POND 4 PRE -DEV Hydrograph type = SCS Runoff Peak discharge = 117.11 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 512,855 cuft Drainage area = 63.260 ac Curve number = 74 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.60 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 12000 100.00 8000 60.00 1 4000 2000 POND 4 PRE -DEV Hyd. No. 1 -- 10 Year Q (cfs) 12000 10000 40.00 2000 000 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 1 POND 4 PRE -DEV Hydrograph type = SCS Runoff Peak discharge = 159 75 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 693,819 cuft Drainage area = 63.260 ac Curve number = 74 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.60 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 16000 14000 12000 10000 :1 11 • 1 11 40.00 2000 0 00 0 2 4 Hyd No 1 i POND 4 PRE -DEV Hyd No. 1 -- 25 Year Q (cfs) 16000 14000 12000 10000 :1 11 •1 11 4000 2000 000 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 1 POND 4 PRE -DEV Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 63.260 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.48 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 12 / 2017 = 192.99 cfs = 12.20 hrs = 835,269 cuft = 74 = 0 ft = 30.60 min = Type II = 484 Q (cfs) POND 4 PRE -DEV Hyd No 1 -- 50 Year Q (cfs) 210.00 21000 - A -- - l---- 180.00 -� - 180.00 - 150.00 15000 _ - 12000 12000 9000 90.00 6000 6000 _ 30.00 3000 000 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2015 by Autodesk, Inc v10 4 I Hyd. No. 1 ' Time to peak POND 4 PRE -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 63.260 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.96 in Storm duration = 24 hrs Q (cfs) 24000 210.00 180.00 15000 12000 9000 6000 3000 Tuesday, 12 / 12 / 2017 Peak discharge = 215.54 cfs Time to peak = 12.20 hrs Hyd. volume = 931,695 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 30.60 min Distribution = Type II Shape factor = 484 POND 4 PRE -DEV Hyd No 1 -- 100 Year Q (cfs) 24000 210.00 180.00 150.00 12000 3000 000 - - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) -41 I G- Q (cfs) 24000 210.00 180.00 150.00 12000 3000 000 - - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 1 Time (hrs) H. Wet Pond 4 Post -Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Reference. Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 4 POST -DEV TOC Braeburn - Pond 4 - TOC Calcs Post-Dev 12/14/2017 Time of Concentration (Tc) or Travel Time (Tt) Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Developed Wet Pond 4 POST -DEV TOC 1. SHEET FLOW SEGMENT ID A 1 Surface description (table 3-1) Grass -Short 2 Manning's roughness coefficient, n (table 3-1) 0.15 3 Flow length, L (total L:5 300 ft) ft 100 4 Two-year 24-hour rainfall, P ...in 3 12 5. Land slope, s ......... ..ft/ftl 00288 6 Tt = 0 007 (nL)^0 8 Compute Tt hrl 014 + 1 0.14 P210.5 s"0.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID B C 7. Surface description (paved or unpaved) Unpaved Unpaved 8 Flow length, L ft 136 170 9 Watercourse slope, s ft/ft 00288 0.0048 10. Average velocity, V (figure 3-1) ..... 2.738 1.12 11 Tt = L Compute Tt hrl 001 + 004 0.05 3600 V 3. CHANNEL FLOW SEGMENT ID D E 12 Channel type (Pipe or Open Channel) Open Channel Pipe 13 Cross sectional flow area, a .... ftZ 1200 3.14 14 Wetted perimeter, pw ft 1265 6.28 15 Hydraulic radius r= a/pw Compute r ft 095 050 16 Channel slope, s ft/ft 0 010 0 005 17. Manning's roughness coefficient, n 0 040 0.012 18. V = [1 49 r^(2/3) s^(1/2)] / n Compute V .... ft/s 360 553 19 Flow length, L ft 153 2497 20 Tt = L Compute Tt hr 001 1 + 1 0.13 1 0141 3600 V 21 Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Hr= L 033 Min = 19.8 Reference. Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 Wet Pond 4 POST -DEV TOC Braeburn - Pond 4 - TOC Calcs Post-Dev 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd Fort Mill, SC 29708 Plione 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project Braeburn By CAL Date 12/8/2017 Location Indian Trail, Union County, NC Checked MRR Date 12/8/2017 Circle One: Present Develope Pond 4 Post -Development CPI 1: Runoff Curve Number - Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition) 2-2 2-3 2-4 Acres CN x area B Residential, 1/8 acre or less (town houses) 85 3.812 32399 (TaB) C Residential, 1/8 acre or less (town houses) 90 27 589 248302 (ScA) D Residential, 1/8 acre or less town houses - ( _ _ __._ _ _ __ 92 31 859 2931 01 (CmB) * Use only one CN source per line Totals = 63 260 573803 CN (weighted) total product = 5738 03 = 907 Use CN= 91 total area 63.2596 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall , P (24-hour) in 420 650 1030 Runoff, Q in 321 545 920 (Use P and CN with table 3-11, fig 2-1, and equation 3-14) Reference Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U S Department of Agriculture, June 1986 Rainfall, P, taken from NCDENR BMP Design Manual, July 2007 ESP Assocates, PA Pond 4 Post -Development CN PoBox 7030 Braeburn - Pond 4 - CN Calcs Post-Dev Charlotte NC 28241 12/14/2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Hyd. No. 2 Time to peak POND 4 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 63.260 ac Basin Slope = 0.0% Tc method = User Total precip. = 2.58 in Storm duration = 24 hrs Q (cfs) 14000 120.00 100.00 80.00 4000 20.00 Tuesday, 12 / 12 / 2017 Peak discharge = 122.95 cfs Time to peak = 12.07 hrs Hyd. volume = 386,550 cuft Curve number = 91 Hydraulic length = 0 ft Time of conic. (Tc) = 19.80 min Distribution = Type II Shape factor = 484 POND 4 POST -DEV Hyd. No. 2 -- 1 Year Q (cfs) 140.00 12000 100.00 4000 20.00 0.00 1 1 1 1 1 1 1 -1 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 4 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 158.27 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 501,353 cuft Drainage area = 63.260 ac Curve number = 91 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POND 4 POST -DEV Q (cfs) Hyd No. 2 -- 2 Year 160.00 140.00 120.00 10000 - . — .- -- — --- -- ----- 80 00 -- ------ -- 60 00 4000 2000 — Q (cfs) 16000 140.00 120.00 10000 4000 2000 0.00 - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. N®. 2 POND 4 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 268.13 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 869,883 cuft Drainage area = 63.260 ac Curve number = 91 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28000 24000 160.00 12000 8000 4000 POND 4 POST -DEV Hyd No 2 -- 10 Year Q (cfs) 280.00 240.00 20000 160.00 120.00 40.00 0.00 —I i i i i r— —, '— 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 2 POND 4 POST -DEV Hydrograph type = SCS Runoff Peak discharge = 330.44 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,084,444 cuft Drainage area = 63.260 ac Curve number = 91 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POND 4 POST -DEV Q (cfs) Hyd No. 2 -- 25 Year 35000 300.00 25000 200.00 15000 10000 5000 Q (cfs) 350.00 30000 25000 200.00 15000 10000 50.00 0.00 - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2015 by Autodesk, Inc v10 4 Hyd. No. 2 Time to peak POND 4 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 63.260 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.48 in Storm duration = 24 hrs Q (cfs 400.00 35000 300.00 25000 20000 15000 10000 5000 Tuesday, 12/12/2017 Peak discharge = 376.93 cfs Time to peak = 12.07 hrs Hyd. volume = 1,246,385 cuft Curve number = 91 Hydraulic length = 0 ft Time of conc. (Tc) = 19.80 min Distribution = Type II Shape factor = 484 POND 4 POST -DEV Hyd No 2 -- 50 Year Q (cfs) 40000 35000 30000 25000 200.00 15000 10000 5000 000 - - 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2015 by Autodesk, Inc v10 Hyd. No. 2 Time to peak POND 4 POST -DEV Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 63.260 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.96 in Storm duration = 24 hrs Tuesday, 12 / 12 / 2017 Peak discharge = 407.81 cfs Time to peak = 12.07 hrs Hyd. volume = 1,354,695 cuft Curve number = 91 Hydraulic length = 0 ft Time of conc. (Tc) = 19.80 min Distribution = Type II Shape factor = 484 POND 4 POST -DEV Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 42000 42000 36000 36000 30000 30000 240.00 240.00 18000 18000 12000 120.00 6000 6000 000 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Wet Detention Basin Worksheet Basin ID Wet Pond #4 Required Designer Input= Project Name Braebum Project # FM26 420 Designer C Ludwig Date 12/08/17 Rev 1 Basin Drainage Area Summary Total Impervious Area 28 21 ac 1,228,786.66 sf Total Pervious Area 35 05 ac 1,526,809.86 sf Total Future Impervious Area 0 00 ac TotalArea• 63.26 ac 2,755,596.52 sf Percent BUA 44.59 Calculate The Design Volume Design Rainfall 1,00 -in Determine the Runoff Coefficient (Rv) for the 1 -in rainfall R„=005+09x(1) 1= 4459% Rv = 0.45 Determine the Water Quality Volume (WQv) WQ , = Design Rainfall x Rv x Onsite Drainage Area Design Rainfall is 1 Inch Rv is 0 45 Drainage Area is 63 26 Acres V(design) = 2.36 -ac -ft 103,640.65-cf Calculate The Required Main Pool Volume Equation 1: Main Pool Volume, VmP VMp = 0.87 * HRT * DV T, Where: 0.87 = Factor to adjust for the volume in the forebay VMP = Main pool volume, not Including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) TS = Average time between storm events (5 days) DV = Design volume (cubic feet) VMP = 252,466.63-cf Calculate The Required Forebay Volume V(forebay) = 20% of Vmp = 50,493.73-cf Calculate the Permanent Pool Elevation from Proposed Contours with Forebay Assumed Elev Of Permanent Pool 600.00 -ft Elevation at Bottom of Littoral Shelf 600.00 -ft Required Permanent Pool Volume 302,962.35-cf Forebay Crest Elevation = 599.50 -ft % Forebay = 16.41 Required PPE = 596 41 -ft Proposed PPE = 600 00 -ft Basin Detention Stage/Storage Above Permanent Pool Elevation Elev Contour Area Basin Permanent Pool Stage/Storage Accumul Vol 60000 123,918 23 sf Elev Forebay Area 1 Forebay Area 2 Main Bay Area Total Area Forebay Incr Vol Forebay Accumulated Vol Main Bay Incr Vol Main Bay Accumulated Vol Total Accumulated Vol 59300 735840 925 97 sf 72,523 42 sf 80,807 79 sf 0 00-cf 0 00-cf 0 00-cf 0 00-cf 0 00-cf 59400 841491 1,420 37 sf 76,413 76 sf 86,249 04 sf 9,059 83-cf 9,059 83-cf 74,468 59-cf 74,468 59-cf 83,528 42-cf 59500 9538.13 1,983 37 sf 80,377 73 sf 91,899 23 sf 10,678 39-cf 19,738 22-cf 78,395 75-cf 152,864 34-cf 172,602 55-cf 59600 1072736 2,604 65 sf 84,415 50 sf 97,747 51 sf 12,426 76-cf 32,164 97-cf 82,396 62-cf 235,260 95-cf 267,425 92-cf 59700 1198261 3,284 21 sf 1 88,527 08 sf 103,793 90 sf 14,299 42-cf 46,464 39-cf 86,471 29-cf 321,732 24-cf 368,196.63-cf 59800 1330388 4,022 04 sf 92,712 47 sf 110,038 39 sf 16,296 37-cf 62,760 76-cf 90,619 78-cf 412,352 02-cf 475,112 77-cf 59900 14691 17 4,818 15 sf 96,971 67 sf 116,480 99 sf 18,417 62-cf 81,178 38-cf 94,842 07-cf 507,194 09-cf 588,372 46-cf 59950 1542016 5,434 52 sf 99,128 86 sf 119,983 54 sf 10,091 00-cf 91,269 38-cf 49,025 13-cf 556,219 22-cf 647,488 59-cf 60000 000 00 sf 123,918 23 sf 123,918 23 sf 0 00-cf 91,269 38-cf 55,761 77-cf 611,980 99-cf 703,250 37-cf % Forebay = 16.41 Required PPE = 596 41 -ft Proposed PPE = 600 00 -ft Basin Detention Stage/Storage Above Permanent Pool Elevation Elev Contour Area Incr Vol Accumul Vol 60000 123,918 23 sf 0 00 cf 703,250 37 c 60050 132,577.47 sf 64,123 93 cf 767,374 29 cf 601.00 141,393 33 sf 68,492 70 cf 835,865 99 c 60200 146,758 22 sf 144,075 78 cf 979,942 77 c 60300 152,179 63 sf 149,468 93 cf 1,129,411 69 cf 60400 157,657 55 sf 154,918 59 cf 1,284,330 28 cf 60500 163,191 99 sf 160,424 77 cf 1,444,755 05 cf 60600 168,782 94 sf 165,987 47 cf 1,610,742 52 c 60700 174,432.21 sf 171,607 58 cf 1,782,350 09 c 60800 180,136 57 sf 177,284 39 cf 1,959,634 48 cf 60850 183,009 96 sf 90,786 63 cf 2,050,421 11 c Calculate the Average Depth of the Pond Equation 2. Average depth when the shelf is not submerged or the shelf is being included in the average depth calculation VPP Davit = APP Where Davg = Average depth In feet VPP = Volume of permanent pool (feet3) APP = Area of permanent pool (feet') Equation 3. .overage depth when the shelf is submerged and the shelf is being excluded from the average depth calculation VPP—Vshelf Davg = Ahottomofshelf Where- Dati,q = Average depth in feet VPP = Total volume of permanent pool (feet3) Vshelf = Volume over the shelf only (feet3) — see below Abottom of shelf = Area of wet pond at the bottom of the shelf (feetz) Vshelf = 0.5 * Depth,,,axover shelf Perimeterpern,pool * Widthsubmergedpart ofshelf Where: Dmatiover shelf = Depth of water at the deep side of the shelf as measured at permanent pool (feet) Perimeterpermanent pool = Perimeter of permanent pool at the bottom of the shelf (feet) Widthsabmerged part of shelf = Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) PPE =W600.00-ft P P Perimeter= Vpp = App = Bottom of Shelf Elev = A(bottom of shelf) = 123,918.23-sf Vshelf) = 0.00-cf Davg = 5 68 -ft Determine The Orifice Size of the Riser Structure 1 -year, 24-hour Storm Pre -Development Runoff Volume =1 151,999.00-cf (See Hydraflow Hydrographs) 1 -year, 24-hour Storm Post -Development Runoff Volume= 386,550.00-cf (See Hydraflow Hydrographs) Difference = 234,551.00-cf Vpp = 703,250.37-cf 1 -year, 24-hour Storm Volume in Wet Pond 01 = 937,801.37-cf 1 -year, 24-hour Storm Elevation in Wet Pond #1 = .01.71 ft CA(2gH)a.s = Q C = 0.6 A= 28.27 in' 9 = 32.2 ftfsec H= 085 ft Orifice Diameter= 6 in Qout = 0.87 cfs Drawdown Time = 3.11 days OK Pond No. 1 - WET POND 4 PPE=600 M011161 -800 -600 -400 IM1111 —000 Stage (ft) Hydraflow Hydrographs Extension for AutoCAD@) Civil 3D@) 2015 by Autodesk, Inc v10 4 Top of pond —\ Elev 608 50 Elev 600 00 25 -yr Section 10 -yr NTS 100 -yr 2 -yr 50 -yr 1 -yr Inflow hydrograph = 2 SCS Runoff - POND 4 POST -DEV Project Braeburn Pond 4.gpw Thursday, 12 / 14 / 2017 Pond Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Pond No. 1 - WET POND 4 PPE=600 Pond Data Contours -User-defined contour areas Conic method used for volume calculation Beglning Elevation = 600 00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 000 60000 123,918 0 0 050 601 00 132,577 64,105 64,105 1.00 601 00 141,393 68,474 132,579 200 60200 146,758 144,053 276,632 300 60300 152,180 149,446 426,078 400 60400 157,658 154,895 580,973 500 60500 163,192 160,401 741,374 600 60600 168,783 165,963 907,337 700 60700 174,432 171,582 1,078,919 800 60800 180,137 177,259 1,256,178 850 60850 183,010 90,777 1,346,955 Culvert/ Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 4200 600 1200 000 Crest Len (ft) = 2000 2000 000 000 Span (in) = 4200 600 36.00 000 Crest EI. (ft) = 60500 60650 000 000 No. Barrels = 1 1 3 0 Weir Coeff. = 333 333 333 333 Invert EI. (ft) = 600.00 600.00 60300 0.00 Weir Type = 1 CIPltl --- --- Length (ft) = 11700 050 050 000 Multi -Stage = Yes No No No Slope (%) = 050 000 000 n/a N -Value = 013 013 013 n/a Orifice Coeff. = 060 060 060 0.60 Exfil.(in/hr) = 0 000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 000 Note Culvert/Onfice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for onfice conditions (ic) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Civ A CIV B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 000 0 60000 000 000 000 --- 000 000 --- --- --- --- 0 000 050 64,105 601 00 0 82 is 0 79 is 000 --- 000 000 --- --- --- --- 0 789 1 00 132,579 601 00 0 91 Ic 0 77 is 000 --- 000 000 --- --- --- --- 0 775 200 276,632 60200 1.20 is 1 20 ic 0 00 --- 000 000 --- --- --- --- 1204 300 426,078 60300 1 53 is 1 52 is 000 --- 000 000 --- --- --- --- 1 519 400 580,973 60400 31 86 oc 1 16 ic 30 64 ic --- 000 000 --- --- --- --- 31 80 500 741,374 60500 48 77 oc 1 04 is 47 73 ic --- 000 000 --- --- --- --- 4877 600 907,337 60600 84 66 oc 0 64 is 29 30 ic --- 5471 s 000 --- --- --- --- 8465 700 1,078,919 60700 103 31 oc 0 39 ic 17 98 ic --- 84 93 s 2355 --- --- --- --- 12685 800 1,256,178 60800 115 01 IC 0 27 ic 12 60 is --- 102 10 s 12235 --- --- --- --- 237.33 850 1,346,955 60850 119 78 ic 0 24 is 10 91 ic --- 108 58 s 18837 --- --- --- --- 308.10 Starmount Cove CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND #4 CS #4 Unit wt of concrete (pcf) = 150 Ib/ft3 Unit wt of H2O = 62.4 Ib/ft3 TOP OF RISER ELEV. = 60500 ft INV. OUT OF RISER ELEV = 59300 ft INT WIDTH OF RISER = 60 in INT. LENGTH OF RISER = 60 in WALL THICK. OF RISER = 6 in BASE THICK OF RISER= 6 in VOL OF RISER= 4500 ft3 BUOYANT FORCE = 28080.0 lbs Vol. of Riser x Unit wt of H2O VOL. CONC. IN RISER = 150 ft3 SINKING FORCE OF RISER = 13140 lbs CONC PAD THICKNESS = 42 in CONC. PAD WIDTH/LENGTH = 8 ft VOL OF CONC PAD= 224.00 ft3 SINKING FORCE OF PAD = 19622.4 lbs TOTAL SINKING FORCE = 32762.4 lbs Factor of safety = SINKING FORCE BUOYANT FORCE Vol. of Conc. x (Unit wt. of Conc. - Unit wt. of H2O) L x W x H/ Pad Thickness Vol. of Pad x (Unit wt. of Conc. - Unit wt. of H2O) F.S. = 1.17 OK F.S. MUST BE GREATER THAN 1.10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. N®. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 1.322 cfs Storm frequency = 1 yrs Time to peak = 24.13 hrs Time interval = 2 min Hyd. volume = 318,041 cuft Inflow hyd. No. = 2 - POND 4 POST -DEV Max. Elevation = 602.35 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 329,619 cuft Storage Indication method used WET POND 4 PPE=600 Q (Cfs) Hyd No 3 -- 1 Year 14000 120.00 10000 80.00 6000 4000 2000 0 00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No 3 Hyd No 2 TJ] LTA Total storage used = 329,619 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 1.873 cfs Storm frequency = 2 yrs Time to peak = 24.07 hrs Time interval = 2 min Hyd. volume = 368,858 cuft Inflow hyd. No. = 2 - POND 4 POST -DEV Max. Elevation = 603.04 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 431,807 cuft Storage Indication method used WET POND 4 PPE=600 Q (cfs) Hyd. No. 3 -- 2 Year 16000 14000 -- -- -- - - --------------- - — 12000 --- — - - - ---- - - --- ------ 100 00 -------- -- --------- --- - -- ------ - ------ -- - 80.00406000 00 20.00 n nn 0 10 20 30 40 Hyd No 3 Hyd No 2 50 60 70 80 90 ZT_= Total storage used = 431,807 cuft 100vvV Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2015 by Autodesk, Inc v10 4 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - POND 4 POST -DEV Max. Elevation Reservoir name = WET POND 4 PPE=600 Max. Storage Storage Indication method used I Q (cfs) 28000 240.00 20000 160.00 12000 :1 11 4000 WET POND 4 PPE=600 Hyd. No. 3 -- 10 Year Tuesday, 12 / 12 / 2017 = 22.84 cfs = 12.90 hrs = 730,949 cuft = 603.79 ft = 548,539 cuft 10 20 30 40 Hyd No. 3 Hyd No 2 Q (cfs) 28000 24000 20000 160.00 120.00 :1 11 4000 000 50 60 70 80 90 100 Time (hrs) FF Total storage used = 548,539 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 41.71 cfs Storm frequency = 25 yrs Time to peak = 12.60 hrs Time interval = 2 min Hyd. volume = 944,413 cuft Inflow hyd. No. = 2 - POND 4 POST -DEV Max. Elevation = 604.44 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 651,654 cuft Storage Indication method used Q (cfs) 350.00 300.00 25000 20000 150.00 10000 5000 0.00 -' 0 10 20 Hyd No 3 WET POND 4 PPE=600 Hyd No 3 -- 25 Year Q (Cfs) 350.00 300.00 250.00 200.00 MR1614It 100.00 5000 -' ' 000 30 40 50 60 70 80 90 100 Time (hrs) Hyd No. 2 LET= Total storage used = 651,654 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 49.11 cfs Storm frequency = 50 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 1,105,698 cuft Inflow hyd. No. = 2 - POND 4 POST -DEV Max. Elevation = 605.01 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 743,803 cuft Storage Indication method used WET POND 4 PPE=600 Q (cfs) Hyd. No 3 -- 50 Year 400 00 350.00 300 00 25000 200.00 15000 10000 1000 0.00 - 000 0 10 Hyd No 3 20 30 40 Hyd No. 2 50 60 70 80 90 E� Total storage used = 743,803 cuft 100 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc v10 4 Tuesday, 12 / 12 / 2017 Hyd. N®. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 60.80 cfs Storm frequency = 100 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 1,213,617 cuft Inflow hyd. No. = 2 - POND 4 POST -DEV Max. Elevation = 605.36 ft Reservoir name = WET POND 4 PPE=600 Max Storage = 801,392 cuft Storage Indication method used Q (cfs) 42000 36000 300.00 240.00 180.00 120.00 • 1 11 (I f)o —!— — — WET POND 4 PPE=600 Hyd No. 3 -- 100 Year 10 20 30 40 Hyd No 3 Hyd No 2 Q (cfs) 42000 36000 300.00 24000 18000 120.00 •1 11 0.00 50 60 70 80 90 100 Time (hrs) fLCC 3 Total storage used = 801,392 cult I. Summary f SUMMARY TABLE POND 1 SUMMARY TABLE STORM PRE -DEV 1 -YEAR STORM FLOW POND DA (AC) PRE -TOC PRE -CN POST -TOC POST -CN 1 13.29 22.2 70 16.8 89 2 19.71 33 70 10.2 90 3 12.30 17.4 73 11.4 90 4 63.26 30.6 74 19.8 91 SUMMARY TABLE POND 1 STORM PRE -DEV 1 -YEAR STORM FLOW ROUTED 1 -YEAR STORM FLOW DIFFERENCE 1 -YEAR 5.51 0.25 -526 2 -YEAR 9.81 0.29 -952 10 -YEAR 26.15 0.59 -25.56 25 -YEAR 36.72 2.33 -34.39 50 -YEAR 45.1 4.92 -40.18 100 -YEAR 50.82 778 -43.04 SUMMARY TABLE POND 2 STORM PRE -DEV 1 -YEAR STORM FLOW ROUTED 1 -YEAR STORM FLOW DIFFERENCE 1 -YEAR 6.33 0.31 -6.02 2 -YEAR 11.30 0.62 -10.68 10 -YEAR 30.67 11.86 -18.81 25 -YEAR 43.23 32.07 -11.16 50 -YEAR 53.07 5031 -2.76 100 -YEAR 59.78 5792 -1.86 SUMMARY TABLE POND 3 STORM PRE -DEV 1 -YEAR STORM FLOW ROUTED 1 -YEAR STORM FLOW DIFFERENCE 1 -YEAR 7.67 0.36 -7.32 2 -YEAR 1245 0.42 -12.03 10 -YEAR 29.98 0.58 -29.40 25 -YEAR 41.16 0.66 -40.50 50 -YEAR 49.83 0.71 -49.12 100 -YEAR 55.71 0 742 -54.97 SUMMARY TABLE POND 4 STORM PRE -DEV 1 -YEAR STORM FLOW ROUTED 1 -YEAR STORM FLOW DIFFERENCE 1 -YEAR 30.45 1.32 -29.13 2 -YEAR 49.15 1.87 -47.28 10 -YEAR 117.11 2284 -94.27 25 -YEAR 159.75 41.71 -118.04 50 -YEAR 192.99 49.11 -143 88 100 -YEAR 215.54 60.8 -154.74 8. Impervious Area Calculations r v Pond 1 Impervious Areas Buildings Roads and Curb Driveways Sidewalks Tota I Impervious Area Drainage Area % Impervious 149,360.34 sf 58,075.03 sf 17,302.32 sf 17,807.97 sf 242,545.66 sf 578,715.60 sf 4191% 3.43 ac 133 ac 0 40 ac 0.41 ac 5.57 ac 13.29 ac 4191% Pond 2 Impervious Areas Buildings Roads and Curb Driveways Sidewalks Total Impervious Drainage Area Area % Impervious 220,160.47 sf 115,631.28 sf 34,105.68 sf 36,350.93 sf 406,248 36 sf 858,405.62 sf 4733% 5.05 ac 2 65 ac 0.78 ac 0 83 ac 9.33 ac 19 71 ac 47.33% Pond 3 Impervious Areas Buildings Roads and Curb Driveways Sidewalks Tota I Impervious Drainage Area Area % Impervious 133,901 37 sf 46,136.31 sf 23,940.00 sf 15,721.27 sf 219,698 95 sf 535,608.39 sf 4102% 3.07 ac 1.06 ac 0.55 ac 0.36 ac 5.04 ac 12.30 ac 4102 Pond 4 Impervious Areas Buildings Roads and Curb Driveways Sidewalks Amenity Total Impervious Center Area Drainage Area % Impervious 631,026 91 sf 288,233.04 sf 108,108.00 sf 95,193.74 sf 106,224.97 sf 1,228,786 66 sf 2,755,596.52 sf 4459% 14.49 ac 6.62 ac 2.48 ac 2.19 ac 2 44 ac 28.21 ac 63 26 ac 44.59% 9. Drainage Map to be reduced using step 2 to adjust the flow rate for the basin's volume. (It needs a 3.2" diameter orifice.) 11/2" skimmer: 1,728 cubic feet in 24 hours 6,912 cubic feet in 4 days with a 1'/" head 3,456 cubic feet in 2 days 12,096 cubic feet in 7 days 5,184 cubic feet in 3 days 2" skimmer: 3,283 cubic feet in 24 hours 13,132 cubic feet in 4 days with a 2" head 6,566 cubic feet in 2 days 22,982 cubic feet in 7 days 9,849 cubic feet in 3 days 2%" skimmer: 6,234 cubic feet in 24 hours 24,936 cubic feet in 4 days with a 2.5" head 12,468 cubic feet in 2 days 43,638 cubic feet in 7 days Revised 11-6-07 18,702 cubic feet in 3 days 3" skimmer: 9,774 cubic feet in 24 hours 39,096 cubic feet in 4 days with a 3" head 19,547 cubic feet in 2 days 68,415 cubic feet in 7 days 29,322 cubic feet in 3 days 4" skimmer: 20,109 cubic feet in 24 hours 80,436 cubic feet in 4 days with a 4" head 40,218 cubic feet in 2 days 140,763 cubic feet in 7 days Revised 11-6-07 60,327 cubic feet in 3 days 5" skimmer: 32,832 cubic feet in 24 hours 131,328 cubic feet in 4 days with a 4" head 65,664 cubic feet in 2 days 229,824 cubic feet in 7 days 98,496 cubic feet in 3 days 6" skimmer: 51,840 cubic feet in 24 hours 207,360 cubic feet in 4 days with a 5" head 103,680 cubic feet in 2 days 362,880 cubic feet in 7 days 155,520 cubic feet in 3 days 8" skimmer: 97,978 cubic feet in 24 hours 391,912 cubic feet in 4 days with a 6" head 195,956 cubic feet in 2 days 685,846 cubic feet in 7 days CUSTOM 293,934 cubic feet in 3 days MADE BY ORDER CALL! Determining the Orifice Step 2. To determine the orifice required to reduce the flow rate for the basin's volume and the number of days to drain the basin, simply use the formula volume = factor (from the chart below) for the same size skimmer chosen in the first step and the same number of days. This calculation will give the area of the required orifice. Then calculate the orifice radius using Area = Tr r2 and solving for r, r = (Area 13.14) .The supplied cutter can be adjusted to this radius to cut the orifice in the plug. The instructions with the plug and cutter has a ruler divided into tenths of inches. Again, this step is not always necessary as explained above. An alternative method is to use the orifice equation with the head for a particular skimmer shown on the previous page and determine the orifice needed to give the required flow for the volume and draw down time. C = 0.59 is used in this chart. Example: A 4" skimmer is the smallest skimmer that will drain 39,000 cubic feet in 3 days but a 4" inlet will drain the basin too fast (in 1.9 days) To determine the orifice required use the factor of 4,803 from the chart below for a 4" skimmer and a drawdown time of 3 days. 39,000 cubic November 6, 2007 2 feet _ 4,803 = 8.12 square inches of orifice required. Calculate the orifice radius using Area = Z r2 and solving for r, r = (8.12/3.14) and r = 1.61". As a practical matter 1.6" is about as close as the cutter can be adjusted and the orifice cut.. Factors (in cubic feet of flow per square inch of opening through a round orifice with the head for that skimmer and for,the drawdown times shown) for determining the orifice radius for a basin's volume to be drained. This quick method works because the orifice is centered and has a constant head (given above in Step 1). 1%" skimmer: 960 to drain in 24 hours 3,840 to drain in 4 days 9,677 to drain in 7 days 1,920 to drain in 2 days 6,720 to drain in 7 days 4" skimmer: 1,601 to drain in 24 hours 2,880 to drain in 3 days Revised 11-6-07 3,202 to drain in 2 days 2" skimmer: 1,123 to drain in 24 hours 4,492 to drain in 4 days 2,246 to drain in 2 days 7,861 to drain in 7 days 3,369 to drain in 3 days 2'/2" skimmer 1,270 to drain in 24 hours 5,080 to drain in 4 days Revised 11-6-07 2,540 to drain in 2 days 8,890 to drain in 7 days 3,810 to drain in 3 days 3" skimmer: 1,382 to drain in 24 hours 5,528 to drain in 4 days 2,765 to drain in 2 days 9,677 to drain in 7 days 4,146 to drain in 3 days 4" skimmer: 1,601 to drain in 24 hours 6,404 to drain in 4 days Revised 11-6-07 3,202 to drain in 2 days 11,207 to drain in 7 days 4,803 to drain in 3 days 5" skimmer 1,642 to drain in 24 hours 6,568 to drain in 4 days 3,283 to drain in 2 days 11,491 to drain in 7 days 4,926 to drain in"3 days 6" skimmer: 1,814 to drain in 24 hours 7,256 to drain in 4 days 3,628 to drain in 2 days 12,701 to drain in 7 days 5,442 to drain in 3 days 8" skimmer: 1,987 to drain in 24 hours 7,948 to drain in 4 days 3,974 to drain in 2 days 13,909 to drain in 7 days 5,961 to drain in 3 days J. W. Faircloth & Son, Inc. Post Office Box 757 412-A Buttonwood Drive Hillsborough, North Carolina 27278 Telephone (919) 732-1244 FAX (919) 732-1266 FairclothSkimmer.com jwfaircloth@embargmaii.com Orifice sizing Revised 2-2-01, 3-3-05, 2-1-07, 11-6-07 November 6, 2007 3