HomeMy WebLinkAbout2012-06-13_Buffer Authorization.pdf���
�����
NCDENR
North Carolina Department of Environment and Natural Resaurces
Beverly Eaves Perdue
Governor
Town of Carborro
Attn: Jeff Brubaker
301 W. Main Street
Carrboro, NC 27510
Subject Property:
Division of Water Quality
Charies Wakild PE
Director
June 13, 2012
Dee Freeman
Secretary
DWQ Project # 12-0497
Oran�e County
Homestead — Chapel Hill High School Multe-Use Path Project
Bolin Creek [030606, 16-4]-1-15-1-(4), WS-IV; NSW]
Jordan Lake Water Supply Watershed Riparian Buffer Protection Rules (15A NCAC 2B .02G7)
Authorization Certificate with additiona! conditions
Dear Mr. Brubaker:
You have our autharization, in accordance with 15A NCAC 02B .0267 and any conditions listed below, to impact
approximately 6,985 ft'` of Zone 1 and 6,710 ft� of 7one 2 of the protected riparian buffers to construct a
greenway, as described within your application dated May 11, 2012 and received by the Division of Water
Quality (DWQ) on May 23, 2012. In addition, you should obtain or otherwise comply with any other required
federal, state or local permits before you go ahead with your project including (but not limited to) Crosion and
Sediment Control, Non-discharge regulatians.
This authorization certification is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the property is sold, the
new owner must be given a copy of this authorization letter and is thereby responsible for complying «�ith all
conditions. This authorization requires you to follow the conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The f��[lowing impacts are hereby approved as long as all of the other specific and general conditions of
this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including
incidenta] impacts:
Amount A roved (Units) Plan Location or Reference
Zone 1 Buffers 6,985 (s uare ft.) ermanent im act PCN a e 7 of 12
Zone 2 Buffers 6,710 (s uare ft.) ermanent impact PCN page 7 of 12
North Carolina Olvlsion o1` Water Quality Raleigh Regional Office Surtace Water Protection Phone (919) 791-42D0
Internet: www.ncvvaterquality-org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 788-7159
An Equal OpportunitylAffirmatfve Action Employer — 50% Recycletlll0 % Post Consumer Paper
NorthCarolina
— �i�turallt�
Cusiomer Service
877-623-6748
Page 2
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications governing the
proper design, installation and operation and maintenance of such Best Management Practices in order to
protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and
Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of the
North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased
borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the Pre-Construction Notification. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards, statutes,
or rules occur. �
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval
by the Division. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, design and placement of temporary erosion control measures shall not be conducted in a
manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream
and down stream of the above structures. All sediment and erosion control devices shall be removed and
the natural grade restored within two (2) months of the date that the Division of Land Resources or locally
delegated program has released the project.
5. Diffuse Flow
All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream
buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B
.0267
6. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing (or
similar high visibility material) for the areas that have been approved to infringe within the buffer,
wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2H .0500.
7. Notification of Project Commencement
Please notify DWQ (Lauren Witherspoon at (919) 791-4251 or lauren.witherspoon(a�ncdenr. o�v) of the
proposed start date of the project.
Page 3
8. Certificate of Completion
Upon completion of all work approved within this authorization, and any subsequent modifications, the
applicant is required to return the attached certificate of completion to the Wetlands, Buffers, Stormwater,
Compliance and Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center,
Raleigh, NC, 27699-1650.
Any disputes over determinations regarding this Authorization (associated with the approved buffer
impacts) shall be referred in writing to the Director within thirty (30) days of receipt of this notice for a decision.
You can contest the Director's decision as provided in Articles 3 and 4 of G.S. 150B. To contest the
Director's decision you must file a petition for an administrative hearing. You may obtain the petition form from
the office of Administrative hearings. You must file the petition with the office of Administrative Hearings
within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of
Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings
Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original
and one (1) copy of the petition must be filed with the Office of Administrative Hearings.
The petition may be faxed-provided the original and one copy of the dacument is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919)-733-2698, Facsimile: (919)-733-3478
A copy of the petition must also be served on DENR as follows:
General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699-1601
This Authorization shall expire five (5) years from the date of this letter.
Page 4
This letter completes the review of the "No Practical Alternatives" determination under 1 SA NCAC 2B .0267. If
you have any questions please call Lauren Witherspoon at (919) 791-4251. This letter does not authorize any
impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of
Engineers (USACE) or NC Division of Water Quality (DWQ) if any impacts are proposed to waters on this
project.
Si ely,
4
���� � �
Danny Smith
Surface Water Protection Section Supervisor
Raleigh Regional Office
Enclosures: Certificate of Completion
cc: DWQ Central Office — WeBSCaPe — 1650 Mail Service Center
RRO File Copy
Anna Reusche — Kimley-Horn and Associates, Inc., 3001 Weston Parkway, Cary, NC 27513
Filename: 12-0497_Homestead-Chapel Hill High School Multi-Use Path Project_JBR Approval
Beverly Eaves Perdue
Govemor
DWQ Project No.:
Applicant:
���
� ��
NCD�ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Charles Wakild, PE
Director
County:
Project Name:
Date of Issuance of 401 Water Quality Certification:
�e�€eate ef Eempletion
Dee Freeman
Secretary
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 /Wetlands Unit, North Cazolina Division
of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant,
the applicant's authorized agent, or the project engineer. It is not necessary to send certiiicates from all of these.
Applicant's Certification
I, hereby state that, to the best of my abilities, due caze and diligence was used
in the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: �te:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was used
in the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e., Engineer, Landscape
Architect, Surveyor, etc.) in the State of North Cazolina, having been authorized to observe (periodically, weekly, full time)
the construction of the project, for the Perrnitee hereby state that, to the best of my abilities, due caze and diligence was used
in the observation� of the construcl[ion such tha�"t ine consttucl:ion �Nas observed to be built within substantial complliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature:
Date
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 512 N Salisbury St Floor 9 Raleigh North Carolina 27604-1170
Phone; 919-807�3011 FAX: 919-807�494
Intemet• www.ncwaterquality.org
An Equal Opportuniiy 1 Affirtna6ve Action Employer
Registration No.
NorthCarolina
��l'tldP'�l�`l�