HomeMy WebLinkAbout20210147 Ver 1_Revised U-5813 Preliminary JD Request Pages_20180219Carpenter,Kristi
From:
Sent:
To:
Cc:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
Andy and April,
Sullivan, William <William.Sullivan@kimley-
horn.com>
Monday, February 19, 2018 9:39 AM
andrew.e.williams2@usace.army.mil; Norton, April R
Dilday, Jason L; Reed, Beth
[External] Revised U-5813 Preliminary JD Request
Pages
U5813_Figure3_Aeria) Map.pdf; U5813_USACE -
Preliminary JD TABLE ONLY.PDF
Follow up
Flagged
Thanks for your input during the field review for U-5813 the other day. Attached for
your files are the updated Preliminary JD Request pages for the widening of US-64 in
Asheboro TIP U-5813 (JD Table and Figure 3: Jurisdictional Features). The specific
changes that were made are as follows:
• Extension of stream SA to the origin at the culvert outlet below US 64
• Expansion of wetland WA
• Extension of stream SI-INT upstream offsite
Thanks again for your assistance with this project. Please let Beth or me know if you
have any questions or need any additional information in the processing of this PreJD
request.
-Willie
, � , ,,�., „ „„ „ .�
� �, � � � �. �, � � 4 4 �
1