Loading...
HomeMy WebLinkAboutNCG551229_Compliance Evaluation Inspection_20180212Margaret Williams 921 Kenion Road Hillsborough, NC 27278 Dear Ms Williams February° 12, 2018 R( -)Y 0001)1 I �N�ti�1l `1' IN111) A, (oi nl N IIPFR FEB 16 2018 Water Resources Subject Compliance Evaluation Inspection Permitting section Single Family Wastewater'Treatment Sy's'tem 713 NC Higtiway 86 Permit No. NC'G551229 :Durham County On January 26. 2017, Jane Bernard from the Raleigh Regional Office visited your single-family residence (SFR) �,k astevN, Liter treatment systen7 to evaluate compliance with the above perin'it to discharge wasted iter The checked bores helov� show �� hat conditions v� ere noted at your face l i ty ❑ In compliance: "You are reminded to regularly maintain the chlorine disinfection and dechlorination system. have the efllucnt sampled once a year, and ha%,e the septic tank pumped out every 3 to 5 years Your goad ,record of operation and meeting the permit requirements is highly commended ❑ Your home is improperly plumbed: Some of the tiwaste%v ater discharges aie going directly to the ens nonment wIthocit first passing through the treatment system Thus must be corrected immediately Please subnut a schedule to this office within 20 days of receipt of this letter that state5_%our plan `for correcting this deficiency The Mork is to be completed v" ithin the next 3 months ❑ Disinfection: Your system is lacking disinfection, either chlorine tablets or a UV fight system New rules put into place on AuguSC 1, 2007 require all SFR systems to have a means of disinsection (and dechlorination a�hcn chlorine tablets are used to dsinfect, if the system v� as installed since that date) Slice your system had no disinfection, the installation is to include a chlorine tablet, dispenser, a contact chambet' capable of providing a miuirrum 30 minute contact time, and anothei tablet dispenser- that tivill hold dechlorination tablets Please submit a schedule to this office w itlun 20 calendar days of receipt of this letter that statesyoui plan for corrce-tinu, this dcf7cicnUy ❑ Treatment tablets missin- oi- are NN'roinf; hind: You are responsible for always having chlorine tablets and dechlorination tablets (if a required part of your system) in place They must be the kind for waste�N ater ti eatment and not for s winumng pool ❑ Dechlorinatio'n: Your system was installed after August 1, 2007. so most have a means of clechloiniatLon located downs'trcam of fhe chlorinator and its contact chamber 3°"ji°`"yF� _11* t^,� See Disinfection paragraph above Please submit a schedule to this office within 20 calendar days of receipt of this letter stating your Man for correcting this deficiency ❑ Pumping the septic tank: The septic tank should be pumped out every 3 to 5 years A pumping company can check the status periodically, and determine when pumping is required ❑ Failure to analyze the effluent: The effluent that is di,schargcd from your system must be analyzed once each year See Part f(A) of your permit about his requirement A list of`1tC certified, laboratories that piovide this service was left at your residence during the inspection Make arran(,,ements for sampling to be carred out within the next 3 months, and submit results to this office within I weeks after the saniplmir has been done ❑ Locations of treatment units are unknoien: Determine this and report to this office within 30 days of receipt of this letter w ith a sketch or map ❑ Discharge outlet location: The discharge pipe was not risible and the vogetatitie overgrowth needs to be cut back to ensure the outlet is accessible Please ensure the outlet. and access to the outlet, is al%vays maintained and cleared of vegetation, soil and leaves ❑ Other: Chlorinator was overLLtockcd with Chloi me tablets This causes the tablets to jam in the tube not allowing tablets chlorine to contact with the waste watcr Please rei-aove the excess tablets and rinse the tube thoroug111% Once the, chlorinatoi is cleaned, place only 3-4 tablets in the tub at a time JT you have qu slions of coninicills above this inspectioii of Ilia r'4giw enfants to lakc. cot i (icuvc action, please contau Jane Bcinciid of file al 919-791-4200 L ican5cd pliwibers shwild be ilsa(l to make plumbing clianges within your home Conti acfors for installing disin echon or other equipment may be found iii the Yellow Pages under Em ironinental Consultants S iilcprCly �y S Daniel Smith, Supeivisor Water Quality RCS"tonal, SuperVIsor Raleigh Regional 01"111ee Attachments Inspection Reports cc RRO SNVP Files Charles Weaver, NPDES `Pernartting° Unit �v o attach iiients Vt�%Q%'3�e� <,.'vsz.,.f...:�'.,'s.ci`