HomeMy WebLinkAbout20170968 Ver 1_RE Design update on removal_20180220Carpenter,Kristi
From: Ridings, Rob
Sent: Tuesday, February 20, 2018 8:27 AM
To: Murray, Christopher A; Alsmeyer, Eric C SAW
Cr. Gilchrist, Lisa B
Subject: RE: Design update on removal of existing pipe
structures and replacement with bridge structure on
SR 1637 (Redwood Road) over the Panther Creek
finger of Falls Lake in Durham (WBS: 15005.1032011)
Chris,
From the update, given that there are no new impacts, NCDOT will not need a
modification from us.
All general certification conditions apply.
We of course have major emphasis on regular NPDES monitoring and BMP inspections,
given the sensitive Water Supply watershed, after every rain event---in addition to
timely ground cover to the maximum extent possible.
Please keep us informed of construction progress regularly. We can schedule routine
reviews once construction commences.
Thank you,
Rob Ridings
Environmental Specialist
Transportation Permitting Unit, Division of Water Resources
NC Department of Environmental Quality
919-707-8786 office
rob.ridinqs(a�ncdenr.qov
512 North Salisbury Street, 12th Floor
1617 Mail Service Center
Raleigh, NC 27699
x:.
x�
x�=.
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
From: Murray, Christopher A
Sent: Monday, February 19, 2018 4:24 PM
To: Ridings, Rob <rob.ridings@ncdenr.gov>; Alsmeyer, Eric C SAW
<Eric.C.Alsmeyer@usace.army.mil>
Cc: Gilchrist, Lisa B <Igilchrist@ncdot.gov>
Subject: Design update on removal of existing pipe structures and replacement with
bridge structure on SR 1637 (Redwood Road) over the Panther Creek finger of Falls Lake
in Durham (WBS: 15005.1032011)
Action ID No.: SAW-2017-00908
NCDENR-DWR Project Number: 20170968 ver. 1
Eric and Rob,
The contractor completed removal of the damaged pipe structures at this location in
October 2017. The second and final phase of construction at the site is installation of
the single span (1 @ 107 ft) bridge structure. We do not anticipate any additional
jurisdictional impacts during this phase of the project and the contractor will be
adhering to the previously issued permits for the project. The current let date is May
23, 2018.
I have attached the following information:
-Roadway Plan
-Erosion Control Plan
-Structure Plan
-Stormwater Management plan
Please advise if you need additional information.
Thanks,
Chris Murray
Christopher A. Murray, PWS
Division Environmental Supervisor
Division 5
(919) 220-4633 office
cmurravCc�ncdot.qov
NCDOT-Division 5
2612 N. Duke Street
Courier: 17-27-03
Durham, NC 27704