Loading...
HomeMy WebLinkAboutSW3100301 - Hopewell Baptist Church - Worship Addition' e-7.1 benesch Transmittal Form To '-RECEIVED FEB 13 2016 DENR•LAND QUALITY STORMWATER PERMITTING Alfred Benesch & Company 2359 Perimeter Pointe Parkway, Suite 350 Charlotte, NC 28208 www.benesch.com P 704-521-9880 F 704-521-8955 NCDEQ- 1621 Mail Service Center Raleigh, NC 27669-1621 Date: 2.6.18 Job No. 17000199 Subject: Hopewell Baptist Church -Worship Addition 1.29.18 Storm Water Management Permit 1 Application submittal ❑ Mail ❑ Messenger ❑ Next Day Delivery WE ARE SENDING YOU: ®Attached COPIES DATE DESCRIPTION ® UPS Ground ❑ Other: ❑ Under separate cover: 2 1.29.18 Storm Water Management Permit Application Form (1 orig, 1 copy) 1 1.29.18 Check #11206 for $505.00 for permit fee 1 1.15.18 Supplement EZ Form 2 1.29.18 Sets of Site drawings 1 6.30.09 Property Deeds 1 12.28.09 Geotechnical Report 1 1.15.18 Storm Water Management Report THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑Return corrected prints ❑ For review and comment Remarks: The attached information is submitted for your review and approval. Since these BMPs are existing, the previously submitted O&M agreements are still applicable. We have not included them again. Please let me know as soon as possible if I failed to provide some of the required information. Signature: Z4 z —%L Wesley E. Sherrill, PE, LEED AP PS01-0998-06 form --a+a,(., -yyt,-)k DEMLR USE ONLY Date Received F e Paid Permit Number O d Applicable Rules: El Coastal SW -1995 ❑ Coastal SW - 2008 El Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORMr[g���� This form may be photocopied for use as an original fI)Mt - IY�'l( w I. GENERAL INFORMATION OWHzMkM, 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Hopewell Baptist Church - Worship Addition 2. Location of Project (street address): 8900 Concord Highway City:Fairview County:Union Zip:28110 3. Directions to project (from nearest major intersection): From I-485 and Fairview Road, take the exit heading east on Fairview Road. At the intersection of Fairview Road and Concord Hwy (601), turn left onto Concord Hwy heading north. Turn right (eastLonto Old Dutch Road from Concord HwX, site is on the right side of the road. 4. Latitude:35° 10' 30" N Longitude:800 32' 18" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW3100301 , its issue date (if known)06/02/2014 , and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ❑High Density ❑Drains to an Offsite Stormwater System ®Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 12.63 ❑NPDES Industrial Stormwater ❑404/401 Permit. Proposed Impacts ac of Disturbed Area b. If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/ir/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 ;U III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Hopewell Baptist Church Signing Official & Title:Lee Pigg - Pastor b. Contact information for person listed in item 1a above: Street Address:420 Hovewell Church Road City:Monroe State:NC Zip:28110 Mailing Address (if applicable):same as above City: State: Zip: Phone: (704 ) 753-1084 Fax: Email:lee@whatasavior.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/ Organization: Signing Official & b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if City: State: Zip: State: Phone: ( ) Fax: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Benesch Signing Official & Title:Kevin Westra, PE - Project Engineer b. Contact information for person listed in item 3a above: Mailing Address:2359 Perimeter Pointe Parkway, Suite 350 City:Charlotte State:NC Zip:28208 Phone: (704 1 521-9880 Fax: (704 ) 521-8955 Email:kwestra@benesch.com 4. Local jurisdiction for building permits: Union County Point of Contact:Terry Griffin Phone #: (704 1 283-3594 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be conveyed via ditches and pipes to an existing wet detention basin on the eastern side of the property. outflow from the basin drains to an existing level spreader with a 30' engineered filter strip. The wet pond will be enlarged with this project to treat the -increase in built -upon -area. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph H - Post Construction 3. Stormwater runoff from this project drains to the Yadkin -Pee Dee River basin. 4. Total Property Area: 85.568 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:85.568 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h,Water (AUM line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHA line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 33.91 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Goose Creek Stream Class * C Stream Index Number * 13-17-18 Total Drainage Area (sf) 1,308,044 On-site Drainage Area (sf) 1,308,044 Off-site Drainage Area (so 0 Proposed Impervious Area** (so 443,531 Impervious Area** total 33.91 Impervious— Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Draina e Area _ On-site Buildings/Lots (so 85,542 On-site Streets (sf) 0 On-site Parking (so 318,583 On-site Sidewalks (sf) 28,135 Other on-site (sf) 11,271 Future (so 0 Off-site (sf) 0 Existing BUA*** (so 267,778 Total (so: 443,531 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org eb/w /ps/csu/classi cations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off-site impervious area listed above determined? Provide documentation. N/A Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per 15A NCAC 02B 0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmg-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hn://portal.ncdenr.org/web/wq/ws/su/`statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/mates.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hft://12ortal.ncdenr.org/web/wq/ws/su/statesw/­forms docs. 1. Original and one copy of the Stormwater Management Permit Application Form. G✓ L 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants /� t Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. /G f 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to G✓ L hgp://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for / y 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. A '�.5, 7. Sealed, signed and dated calculations (one copy). ;� 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p: Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHVVT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 05164 Page No: 56 _ 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC _ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 21H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hM://www.secretaiy.state.nc.us/CoEporations/CSearch.gsiRx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from bW://portal.ncdenr.org/web/Ir/state-stormwater- forms docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Wesley Sherril, PE Consulting Firm: Benesch Mailing Address:2359 Perimeter Pointe Parkway, Suite 350 City:Charlotte Phone: (704 ) 521-9880 Email:wsherrill@benesch.com State:NC Zip:28208 Fax: (704 ) 521-8955 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Fonn SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company. and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, 0 rr, a Notary Public for the State of Vi r� Garro 1ri,.s County of Ca -wt 6 rw , do hereby certify that Le$ 191'4 a personally appeared before me this g day of a 14 y ct 2019 , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal,�j/lt ��• �C LORRI S. RICHEY SEAL NOTARY PUBLIC Cabarrus County North Carolina My Commission Expires 10/26/2022 My commission expires / O/Z G /';2a X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Lee Pigg certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1.1000 and any other applicable state stormwater requirements. f Signature: Date: I, a Notary Public for the State of NJY'11 (a r0 'f , County of do hereby certify that LP •!i A'A C, personally appeared before me this 21 day of (1LLVIt/A 2)14 and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, 15ea t .t !/ LORRI S. RICHEY NOTARY PUBLIC SEAL Cabarrus County North Carolina My Commission Expires 10/26/2022 My commission expires /0 12& /22 Form SWU-101 Version Oct. 31, 2013 Page 6 of 6