HomeMy WebLinkAbout20090189 Ver 1_More Info Received_20090309
J. Michael Stocks, PE
LETTER OF TRANSMITTAL
Paul D. Smith, PE
PO Box 1108
Nashville, NC 27856
252.459.8196 (0)
252.903.6891 (C)
D~-D\<Bg
3344 Hillsborough Street
Suite 250, Raleigh, NC 27607
919.821.2440 (0)
919.880.5886 (C)
To: Mr. Ian McMillan
401 Oversight/Permitting Unit
NCDENR Raleigh Office
2321 Crabtree Blvd., Suite 250
Raleigh, NC 27699-1650
Phone: 733-1786 I Overnight No~
Yes )(
We are sending you the followirig:
2f EC Plans
2f Contracts
2f Prints/Plans
x Permit Applications
2f Construction Plat 2f Site Plan Drawings
2f Site Work Calculations 2f
These are transmitted as checked below:
x For Approval 2f As Discussed
2f For Review and Comment
Job No. Z-2007 -016
Job Name: Cape Fear Valley Site
Date: 03.06.09
Sent By: Don Curry, PE
2f Computer Disk
2f For Your File 2f As Requested
2f For Your Signature, then return to:
Copies
Date
5
Page 4 PCN - REVISED
2f For Your Use
Description
MAR f' 2009
DENR, WATER QUALITY
WETLANDS Aim STORMWATER BRANCH
Remarks
Ian.
I am enclosina 5 cODies of revised Daae 4 of the PCN aDDlication for the Autumn Care CaDe Fear location
in Favetteville. at Ken Averitte's reauest. identifvina 60' of stream imDact. which is consistent with the
USACE aDDroved Dermit. I have also sent Ken a CODV for his review.
Feel free to contact me with anv auestions.
Thanks.
Don (Ra/eiah Office
Copies To: file
8q
O~-D\ Q t--, ,.... ,--) <'" r\ n i --, !"'\
" j~{('~Il:P; ,i\\(i ,= '
I r ~ L::J ~ t=1 U'...; 1..5' pH
C. Proposed Impacts Inventory i~ .,!j
U. L:l
1. Impacts Summary MAR C! 2[1"Q
t.- Uu.~
1a. Which sections were completed below for your project (check all that apply): DENR, WATER0.lIALlTY
VIET!..ANDS Ai'lD STORMY'IATER BRP.~lO;
~ Wetlands ~ Streams - tributaries D Buffers
o Open Waters o Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404,10 Area of impact
Permanent (P) or (if known) OWQ - non-404, other) (acres)
Temporary (T)
W1 ~ pDT FILL ~Yes o Corps 0.05
ONo OOWQ
W2 D P ~ T TEMP CLEARING ~Yes o Corps 0.01
ONo OOWQ
W3 0 POT o Yes o Corps
ONo OOWQ
W4 0 POT o Yes o Corps
ONa OOWQ
W5 0 POT o Yes o Corps
DNo OOWQ
W6 0 POT o Yes o Corps
ONo OOWQ
2g. Total wetland impacts 0.06
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site. then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent OWQ - non-404. width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ~ pDT Culvert/Road Unnamed Trib. ~PER ~ Corps 4
Crossing DINT ~OWQ 60
S2 D pDT DPER D Corps
DINT DOWQ
S3 0 POT DPER o Corps
DINT DOWQ
S4 D pDT DPER o Corps
DINT OOWQ
S5 0 POT o PER o Corps
OINT OOWQ
S6 0 POT OPER o Corps
OINT OOWQ
3h. Total stream and tributary impacts 60
3i. Comments:
Page 4 of 10
PCN Form - Version 1.3 Oecember 10, 2008 Version