HomeMy WebLinkAbout20080965 Ver 3_Approval Letter_20090306
Beverly Eaves Perdue
Governor
AliA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Coleen H. Sullins
Director
Dee Freeman
Secretary
March 6, 2009
DWQ EXP # 08-0965v3
Lincoln County
EXPRESS REVIEW ACCEPTANCE LETTER
Mr. Ken Beuley
TKC CXXVIII, LLC
5935 Carnegie Boulevard. Suite 200
Charlotte, NC 28209
Project Name:
Crate and Barrel Distribution Center
APPROVAL OF STORMW A TER MANAGEMENT PLAN
On June 26, 2008, the Division of Water Quality (DWQ) issued a 40 I Water Quality Certification to you
to place fill or otherwise impact 0,012 acre of wetland and 820 linear feet of an unnamed tributary to
Larkard Creek in order to construct the "Crate and Barrel Distribution Center" in Lincoln County,
On February 24. 2009. the 401 Oversight/Express Permitting Unit of the DWQ received a storm water
management plan (SMP) dated February 18.2009 (Engineer's sealed date) from your engineer Mr.
Mansour Edlin of Mansour Edlin Consulting for the purpose of meeting Condition #2 of the 401
Certification for this project On March 5. 2009. the DWQ received additional information with revised
SMP dated March 3, 2009_ The revised SMP has been approved by the DWQ and satisfies the storm water
condition required by the Water Quality Certification, You are required to meet the foll.owing conditions:
1_ The stormwater management system (consisting of three wet detention ponds, outlet plunge
pools, and all associated stormwater conveyances and appurtenances), and the grading and
drainage patterns depicted on the plans, as approved by this office must be maintained in
perpetuity, No changes to the structural storm water practices shall be made without written
authorization from the Division of Water Quality, The storm water manage.ment structures shall
have maintenance access and at least lO,foot drainage easement on each side to allow for the
ability to maintain the structures, and to perform corrective actions_ The stormwater easements
shall be recorded to provide protection of the structures from potential alterations by future
property owners_
2_ All operation and maintenance activities shall be followed as stipulated in the Operation and
Maintenance Agreement signed and notarized on August 6, 2008. and received in our office on
February 24. 2009,
3, Notification of Construction: The applicant and/or authorized agent shall contact the DWQ
Express Review Program in writing at the letterhead address within ten (10) days of the
commencement of construction,
401 OversighVExpress Review Permitting Unit
1650 Mail Service Center. Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone: 919-733-1786 \ FAX: 919-733-6893
Internet: http://h2o.enr.slate.nc.uslnC'NetlandsJ
One ,
NorthCarohna
)Vattlffll/!/
An Equal Opportunity \ Afflffilative Action Employel
Ken Beuley
Crate & Barrel Dis!. Center SMP
Page 2 of2
March 6. 2009
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please contact Joseph Gyamfi or Lia M, Gilleski at 919,733,1786,
s~' K~
Cyndi Karoly. Supervisor
401/Express Review Oversight Unit
CBKljg
cc: Steve Chapin, USACE Asheville Regulatory Field Office
Alan Johnson, DWQ Mooresville Regional Office
File Copy
Matt Matthews. DWQ Wetlands and Stonnwater Branch Manager
Mansour Edlin Consulting, ISIS Mockingbird Lane Suite 802 Charlotte, NC 28209