Loading...
HomeMy WebLinkAbout20080965 Ver 3_Approval Letter_20090306 Beverly Eaves Perdue Governor AliA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary March 6, 2009 DWQ EXP # 08-0965v3 Lincoln County EXPRESS REVIEW ACCEPTANCE LETTER Mr. Ken Beuley TKC CXXVIII, LLC 5935 Carnegie Boulevard. Suite 200 Charlotte, NC 28209 Project Name: Crate and Barrel Distribution Center APPROVAL OF STORMW A TER MANAGEMENT PLAN On June 26, 2008, the Division of Water Quality (DWQ) issued a 40 I Water Quality Certification to you to place fill or otherwise impact 0,012 acre of wetland and 820 linear feet of an unnamed tributary to Larkard Creek in order to construct the "Crate and Barrel Distribution Center" in Lincoln County, On February 24. 2009. the 401 Oversight/Express Permitting Unit of the DWQ received a storm water management plan (SMP) dated February 18.2009 (Engineer's sealed date) from your engineer Mr. Mansour Edlin of Mansour Edlin Consulting for the purpose of meeting Condition #2 of the 401 Certification for this project On March 5. 2009. the DWQ received additional information with revised SMP dated March 3, 2009_ The revised SMP has been approved by the DWQ and satisfies the storm water condition required by the Water Quality Certification, You are required to meet the foll.owing conditions: 1_ The stormwater management system (consisting of three wet detention ponds, outlet plunge pools, and all associated stormwater conveyances and appurtenances), and the grading and drainage patterns depicted on the plans, as approved by this office must be maintained in perpetuity, No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality, The storm water manage.ment structures shall have maintenance access and at least lO,foot drainage easement on each side to allow for the ability to maintain the structures, and to perform corrective actions_ The stormwater easements shall be recorded to provide protection of the structures from potential alterations by future property owners_ 2_ All operation and maintenance activities shall be followed as stipulated in the Operation and Maintenance Agreement signed and notarized on August 6, 2008. and received in our office on February 24. 2009, 3, Notification of Construction: The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction, 401 OversighVExpress Review Permitting Unit 1650 Mail Service Center. Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-1786 \ FAX: 919-733-6893 Internet: http://h2o.enr.slate.nc.uslnC'NetlandsJ One , NorthCarohna )Vattlffll/!/ An Equal Opportunity \ Afflffilative Action Employel Ken Beuley Crate & Barrel Dis!. Center SMP Page 2 of2 March 6. 2009 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Joseph Gyamfi or Lia M, Gilleski at 919,733,1786, s~' K~ Cyndi Karoly. Supervisor 401/Express Review Oversight Unit CBKljg cc: Steve Chapin, USACE Asheville Regulatory Field Office Alan Johnson, DWQ Mooresville Regional Office File Copy Matt Matthews. DWQ Wetlands and Stonnwater Branch Manager Mansour Edlin Consulting, ISIS Mockingbird Lane Suite 802 Charlotte, NC 28209