Loading...
HomeMy WebLinkAbout20171365 Ver 2_U-4405 Modification_20180216Carpenter,Kristi From: Rivenbark, Chris Sent: Friday, February 16, 2018 9:47 AM To: sarah.e.hair@usace.army.mil; Steenhuis, Joanne Cc: AI-Dhalimy, Nadia A; AI-Ghandour, Majed N; Barclay, Car) A; Burns, Gregory W; Chapman, Amy; gary�jordan@fws.gov; Hanks, Brian; Carpenter,Kristi; Mellor, Colin; NCDOT Service Account - Roadway Design; rachel.sweeney@noaa.gov; Rerko, James J; Staley, Mark K; Wilson, Travis W.; Twisdale, John W; Cashin, Gordon E Subject: Permit modification request for U-4405, Cumberland County Follow Up Flag: Follow up Flag Status: Flagged A permit modification request for U-4405 has been prepared. The electronic copy can be viewed/downloaded at htt�s..�/xFe_r..se_rvi�es.:_n�dcrt.:.�ca.v/.pdea/I�_e_r_rn�A.p.ps./ This email serves as our permit modification request to the U.S. Army Corps of Engineers and N.C. Division of Water Resources. Chris Rivenbark Environmental Analysis Unit North Carolina Department of Transportation 919 707 6152 office crivenbark(a�ncdot.qov 1598 Mail Service Center Raleigh, NC 27699-1598 1020 Birch Ridge Drive Raleigh, NC 27610 I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��, STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR February 16, 2018 US Army Corps of Engineers Regulatory Field Office 69 Darlington Ave. Wilmington, NC 28403 Attention: Liz Hair NCDOT Coordinator JAMES H. TROGDON, III SECRETARY Subject: Modification request for Section 404 Nationwide Permits 12 and 14 and Section 401 Water Quality Certification for the construction of the US 401 improvements in Fayetteville, Cumberland County TIP No. U-4405. Debit $570 from WBS 39049.1.1. Reference: Section 404 USACE Action ID. SAW-2011-01806, issued December 1, 2017 Section 401 NCDWR Project No. 20171365, issued November 15, 2017 Dear Ms. Hair: As you are aware, the North Carolina Department of Transportation (NCDOT) proposes to improve US 401 in Fayetteville from Old Raeford Road to Robeson Street. It has come to our attention that the pernut application did not include all of the impacts due to erosion and sedimentation control measures. Although wetland impacts remain the same, there are additional impacts to surface waters, especially temporary channel impacts. Please replace previously provided pernut drawings with those included with this request. These changes are summarized as follows: Site 2: An additional 10 feet of temporary stream impacts have been added at the downstream end. The temporary channel impacts and surface water impacts have increased in the summary sheet by 10 feet and 0.01 acre. Site 3: Due to bank stabilization, temporary stream impacts were added on both streambanks up and downstream of the culvert. This increased channel impacts by 150 feet and OA2 ac. Site 4: The temporary impacts were lengthened slightly on the upstream and downstream end; the resulting total was still just under O.Olac. Site 5: The temporary stream impacts were extended on the upstream end (previously stopped just inside the DLTE, now extends between the DLTE and TDE) and shortened on the downstream end (previously extended to area between DUE and TDE, now stops inside of DLTE area). Temporary surface water impacts increased to OA2 ac. MailingAddress: Telephone: (919)707-6000 Location: NC DEPARTMENT OF TRANSPORTATION FCIx: �919� 212-5%$S 1 OZO BIRCH RIDGE DffiVE ENVIRONMENT ANALYSIS UNIT CuStOmeY' S¢rviC¢: 1-877-368-4968 RALEIGH NC 27610 IS9g MAIL SERVICE CENTER Website: www.ncdot.gov R.ai.EiGx NC 27699-1598 Regulatory Approvals Section 404: Modification is hereby requested to USACE Nationwide 404 Permit 12 and 14 as required for the above-described activities. Section 401: We are requesting a modification also to the Section 401 Water Quality Certification from NCDWR. Authorization to debit the $570 Permit Application Fee from WBS Element 39049.1.1 is hereby given. A copy of this permit modification request and its distribution list will be posted on the NCDOT website at: https://connect.ncdot.gov/resources/Environmental Thank you for your assistance with this project. If you have any questions or need additional information, please contact Gordon Cashin at or (919) 707-6107. Sincerely, �--- �,t' Philip S. Harris, III, P.E. C.P.M., Unit Head Environmental Analysis Unit cc: NCDOT Permit Application Standard Distribution List N � s DETAIL 2 -Y5' STANDARD BASE DITCH � ��� �, s�a�e, Pl Sta /5+g4.46 �°'°"' "°'"°' 0= 3/4�' A/0�' 44p.0p�' (RT) ,a�„a d z:, p 1'� �.o��d D- IV�/ TS� 5V.[J GeaieMnc B Min. D- 2.0 Ft. L= 3// �S� Max. d= 6.0 Ft. T=/63.86� "n��c� B�. eo' B= 30 F R= 533.00' Type ol Liner- CLA55 I RIP RAP FROM STA.77+03 TO STA.77+90 -L- RT —L— Pls Sta 8/+2/,39 Pl Sta 84t7/,g4 Pls Sta 88+2/35 Bs = 0' 27' l7A` �= 5 45' S42' lRTI 6s = 0' 27' 17.0' LS = IOOAO' D= 0' S4' 34.0" LS = 100.00' LT = 66.67' L= 633.90' LT = 66.67' ST = 3333' T= 31722' ST = 3333' R = 6.300.00' SE = 0.025 PERMIT DRAWING SHEET 5 OF 18 FROM STA. 78+76 TO S7A. 78 ;95 -L- LT � —YS— PT S7a. /7+4855 O '��8, cuss u RIP RAP .� � �`' EST 52 TONS 85 � � � �— SF Sta. 8/+54J2 GEOTEXTILE � � �.� � Y' � \ � CL455 II RIP RAP �% � Y' � � � EST 95 TONS � ui ` ,� ,� � � E5T 90 SY ^ t '� � .� � y' �a>.y � GEOTE%71LE PROJECT REFERENCE NO. SHEET NO. U-4405 9 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCONLIl�LE E PLANS DO NOT USE �OR ! W .�CQIIISITION STAN�/CRD @/+ SE DITCH y. Y- y, ]3 SEE DETAIL 2` Y� BEGIN CONSTRUCTION � � � .� � � � �I i C5T tlDE=20 CV � Y- .. WAL-MART REALESTATE �• siore=o.��� � � � � � � % �� ^�� J BUSINE55 TRUST /� � ESY-30 TONS � � ,� -'F '� � �� . IRETP.IN SYSTEM I � I '� �'_ �8 9449 PG 76 / � rsT ns.�vi ceoT�xri� �IT� 2 � \ _ �� _-_ __ _ RETAIN Y 1 �, y- '� �'- \\ I ' � PBFTA4NPG SSM� � To SEE ENLA �E�v1ENT; T�iISyS�1EE'�f � � � � �� - � N EXIST \_ _ -'� � � � ,y_\ TOE PROTECTION �--��'��. H6 ` /,: i \ / y � -� ` SEE DETAIL 4 \' \ I I_'. TlE 4 Q / � l � 1� '� � y � I � _„_�q 1B wrMH '- _ � � \ � I i r0 � - I� � / � Y � � PDE Y -� / see srean� oera� �\ `\ \ tiil O EXlsr cn W - � � � m � �O � 1 � i �, 91 DO NOT DISTURB SIGN ��` / � Ql B RIP RAF� � m � �F `�RETAit�i Sv57EM } i TDE � EST 2yTON5 �*, � * * � i \\ �� EST 7 SY o #. k � �'� r % � —L— Sta.76+45.55 c * . � roe �._ � �, / � / _ _ � . � � ,iExii�E � � ---PUE � �' aEiniN-�, ��I I� .� � PUE �� U E � PUE L}41 1 * �pp��lLY URNI UF PUE PUE�-�-� PUE-`- I) -L- CS Sf0.8IfBB.6Z ExISiING +81.04' � � � � '�` f�: +K * �:1F \ �� TIE ��—� SIDEWALK � 25' 50'INC � * F `� OGF EX�r � � TIEAG \ II ZO — �'� � �� F------ PF, i �/�rF Xi°T F\- -- l�� ------ F w O o '-`� � -'DUE y �tEnnov GV. I CH-PUE�� k � � F w ��;�-- O m o p a���� 'v,� � ` �, �V+� 1� � E� " � PUE 1 � - � \ �- � - � v � m N I �o Sd LAN T % -�� � � �_ F J,� � b � �\ � R=5d � i / - - � - � R=5d �I I m � / A. � , �H' �.v� .� _ / i J �� c`�q�' �*+ \ � � � � k. � h� + 75" kCP iv � (RT �IRNI �c..L�� �� \n. .i. I -'"'_-��. i" C���1� 1 rs F' I �l D �-�� � .. v T i v I � r '_'I_ __ _ vREMOVE J�!�_ \� '� 5� �r���� + 25 � CF IF��1 ���.:.�- _ _ � I � ==� --_- J�- -( an ,:,.,,, , „ - _ _ ATf_ _ _ c ; I :,-«T . ;'�,-�_Z�` P _ _ . _I . . � _ -� -_ �°b'+W.cu1�+oJ6- FFat S __- _._--?-&� F Ccr+ �.�;� - - � . --C6_. _—�_ _ _—, . _ :1ii �� _ �.6BNG3lBRNA/� -�-- �TJ,J � �,1 � .4 __- . REMOVE-� � -.' '_ . _ _ _ _ _ _ _ _ _ _ - � � _ *2[{,-80 .rB _ 4tL nLY-LV .\ ..�8 `�"j .:GB - ' __ I� 1 � -- �y _ _ _ - _ - _ _ - _ _ _ _ _ _ � _ _ - _ _ _ _ _ _ _ = _ \ ' _ _ _ _ _ _ -_ _ ' - _ _ �q. R - ��CB - �� ._ . / _ _ _ ' _ _ _ �• � . _ T 11`PE 350 i ...—_ _ a3" ac - iv-- f �- ' W ' '� � W O N � � � � REMOVE � � . �N t' ` � COLLAR� A�ND EkTEND `�, � � DI , , � p� '4-5 d9" RCP-I � -- � J� Q W 1� ~ _ ' I� i � - - `n � 25 PROP.1'- "C&G -- - ` �. � oi - 19.75' � DI - _ -6"C&G 1� � N + N I� � v � I ; i � ^ DI DI `p� RCP-� � PRO /' is�� -v � .. ��_iv , 925' ,.....o� 1 L1,1� a � ' � 5" ONOLl7HIC; CONC. ISLQ_ND _ . � ., . � - - ' - - . . -P P.T-fi' C&G . �� . I W � i c ' ry� w e+��.. . V �����it_:R�� 5' RCF IV ./'_ ° Q W � y � - - - �. .. .:��_ � - - " - - � ' ' • = ECIAL COLLa2 AND E%TEND RCP -��ft�_�.�SIDFLYA'/X-=EMOVE �:� PR ~ \ W~ Ztn � � Q ^ ; "'� rc - � � tt„ I?CP-�v a (vA.v�Nr. < � 30„ _ � J , , iT = � � � - , ° -_ . _. _ -_ ~ - = J � -r" - - - .-.. � _ ce. - - - - - '--L - - , \ - - - - - - - - - - - - - Tl - - - - - 6":C&G i s' �► --- � .._. __ P _ _ _ _ _ Zcn � �a � =yi �<A,.��a r = _ - —o s ,`—i - �i--�\�. — t - V � �. i,�y,,,� 'p� x . r� _ � - 1 , .� _ _- _ . _- - � - _- _- _ _ � �_ �- - � 24, � 24 .J� 24, � - - _ - - - - - - F'1�JP:COIdC.SID€WAU( _ C .� �- - _ _ - �� � . .. - _ .. . �—�€a •r �, F F _ _ _ _ _ _ _ =J j' '��'�.' , v �.-F F _ �-,/ I � PJ7 cww.n .l! f,•'. REMOVE �= -J ----_ - ` F . ---�` _ 6� _ -i- _ _ _ � - � ' --_ .- L'�, • _,., I .v' � iF�� ��' -- � - :<-- � e � __ _ �. :_ I _ _ i�j/� . :�� . .. � F ___ _ �-.. .. r. _ h —�. , � q � - - F , �_ -� ,. _ — U Q � ca R 50' �'o �Plte �--�-.._ . hUE—C�-- �'d * * * * r� _ --- � 'c — 5 R=So', -RErniN � - � -� —� �. 'F� t * * * * �* * x -- i <� p� �. F - I� ` L�R" .� 5 5{!.EM ! � - e -STP.IJDARD BASE DITCH I � / ��' f ' � '�" y, a� / I -� PUE -�y'�, �� ,. �I,� � I��„ � � i sFE otrni� 2 I —� �" � � � -- r -� � � I � � � I� � i�l� `. n' Esr DDE-15o CY o �30b' L'iJI�ORM L.NJE 5 ,� � I. * , PUE -=�- � - PU€ �-� PC1E PUE T� PUE � _ I {� � � E � s�oPe=i_���% � / ' in � � 1 � � -'E m � ='Co T�, � i1 i �-` Q� esr ias roNs � � ' � � � � � w � � C � .� /� � A IGc� �- �'3h I � ' ��� i� ���.���1_ � LST 350 5'Y GEOTEXTILE i ' � SI�C � �\ � I, ��c� 30' -CE �j IFEM +J/ A m ��� ` �S � L?� �5' r '� -i � I � RETAVN SVSI�EM (� ; � \�Y' �E H9 -y. � te�� � � �o�y OE� 8-3 :,c.:.:... � �` T� DUE- �� nS§ ana -� i'� � � CF-I • , / MT I 1� ? V �\/ E�T 1Y0 TONS q � '�' fjCP r / 2 - � 7� � < E5T 105 SV GE�ITEXTFkE �� ,yS��NE SEE' � W f.04"' ,� W� � � I_ � `, m� pGF 1� ��� '� � Izs craTioN = INLET DETAIL ST'4 23S �ED T 29 ' �1 � 1@60" RCP NTS (STA 82+50 -L-) 90 1@72" STEEL \ � -� 1@66" RCP W/RCP ENDS aF BURRIED XCAVATION _ 84 $7 \ � � EXCAVATION R6.75' - \ � ,� 50' 0' S0' 100' SCALE -� 200' 0' 200' 400' WSET SCA�E _ � DENOTES MECHANIZED CLEARING i: � _ p DENOTES FILL IN - W ETLAN D _ �DENOTES TEMPORARY IMPACTS IN SURFACE WATER �DENOTES IMPACTS IN SURFACE WATER �i * PROPOSED SIGNAL � ��'� - PROP GONC SIDEwALK _ •* A DESlGh' EXCEPZlON FOR LANE Ii7DTH /S "- - REQL'IRED FOR -L- S7A.38+95.00 TO -L- 319+93.00 �itia S ITE 2 I N LET � —L— TS Sta. 80+54.72 —YS— P! Sta 22+82J2 � = 25' l8' 13.3' (RTJ D = l0' 44' 5BB' L = 235.33' T = //9.65' R = 533.00' SE = OA2 \ �E y � \ 88 y � �i m � aass n �ia ear� ' �J',�� NG � �?.j _ S �sr zte �ons � � EST 210 SY GEOTEXTILE \ ' �'- � '�y `5' CLASS II � �- RIP RAP (TYP) � ._- WIDTH=S' WIDTH=6' WIDTH=7' T-Z� � � I' BENCH HEIGHT I' BENCH HEIGHT / ABOVE 8ED ABOVE BED � �i ExcavnnoN OUTLET DETAIL � � � � NTS (STA 82+50 -L-) � 1@72" STEEL �� � 1@60" RCP ��°66" RCP BURREDNI D' � 176.00 EXCAVATIDN �� ij>< � -- �>.��'>> �, NG /r, EXCAVATION = '�� ''�� CLASS II 135 CY +/- RIP RAP (TYP WIDTH=6' WIDTH=6' WI�TH=6' T=z� I' BENCH HEIGHT I' BENCH HEIGHT � ABOVE BED ABOVE BED NOTE: SEE SHEET 35 FOR —L— PROFILE SEE SHEET 46 FOR —Y5— PROFILE N Z � ti s W � W W _� 1.n + W^ N W� Z cn =J V Q< G I 1 � 1 � � ` \ \ -YS- PT S7a.17+48,55 73 WAL-MART REALESTATE � BUSINESS TRUST DB 9449 PG 76 PB 134 PG 55 / RfTAIN 5Y'STEM=\ nE 4 EXI�� DO NOT DISTURB SIGN \ /" \ RETAIN � / I EXISTING �\ +81-04' _ - SIDEWALK E R=Sa � , � �� I D,LL � �—__--1�-�I'�m' �./, Cc� cu� �"-- REnnOVE- y �-- - --------'�"'-- - - �_ �REMOVE � � - � � � . . � i IN � -Y5- Pl Sta /5+g4.46 o = s� ia �.o� rRr� D = l0' 44' 58.8' � = sn.ss� T = /63.86' R = 533.00' RETAIN -Np� TO N // Exisr i Q r � � W / I L; , / / � -L- I \� < PUE — -L- Pls Sta 8/+2/,39 Pl Sta 84t7/,g4 Pls Sta 88+2/35 Bs = 0' 27' l7A` �= 5 45' S42' lRTI 6s = 0' 27' 17.0' -- -- — LS = IOOAO' D= 0' S4' 34A" LS = 100.00' DETAIL 2 STANDARD BASE DITCH � ��� �, s�a�e, Ga� ,�� N ,<�� o���d 7:� p .��� G.o��d d Geai�Mnc B Min. D- 2.0 Ft. Max. d= 6.0 Ft. 'w1�c� B��. � eo' B= 3.0 F. TyPe ol Liner- CLA55 I RIP RAP FROM STA.77+03 TO STA.77+90 -L- RT LT = 66.67' L= 633.90' LT = 66.67' ST = 3333' T= 31722' ST = 3333' R = 6.300.00' SE = 0.025 PERMIT DRAWING SHEET 6 OF 18 FROM STA. 78+76 TO S7A. 78-95 -L- LT � O '_ CLASS II RIP RAP .� \e�� �` ` EST 52 TONS 85 � � � �= SF Sta. 8/+54J2 � iExiae � � � ��.� Y' �\ . CLA55 II RIP RAP � � \ EST 95 TONS � 1 t � .y � � -� � /rEST 99 SV '� � � '� �a>M / GEOTE%TILE srnNo�o @/ SE DITCH � � ,� � SEE DETAIL 2` ,� �E '� y, �� C57 ffDE=20 CV � � Y- '� � � SLOPE=O.�i � y� � '� y, � � � � ESY-30 TONS � � ,� -'F � �� rsr �s �v crolexri� � ���� � � � � � � � SEE ENLA �E�v1ENT; T�iISrS�1EE'�f � � � � � � � � � � � � ` - - � �. �\ � � � � � � � � � PDE� -� y. Y- g m Y- � QL B RIP RAf� � Y� ��C TDE � esT zyroNs o+, � * * � f4555� l � `, EST � sv a * * * � � �� E �—� � PUE 7EXiILE� � � , � 1Ae ,��, k. ,� \ � \ � �* � 6 Jb �J \' � GO - - . - `l, ! ���� F ----- � .•► � r � 1 /_ „� u � f_, c�r�, - . - � - - �/,6� � -J --_ — - -e��Mt3ve ,- - � i.. I cu� .: �� . R=50', - 1 -RETn{ir� ���`��X��� PUE—�y�, 1_ 5�51� � II��J, O d � � � d� � � h�� ' s ,= m G �` .. -T�%., '� . � ry, I � ' � � �CE ., �1�.'�.1 �' ��� �p � T EMCe ' cm ' 78' \` CBI I Q�y QE CF-I , � • = MATCN[I/�E �` r, ' � _ � � � f .O4 � �YS_ SEE , , STA 23S �EO T 29 � ,� 50' 0' S0' 100' SCALE _� 200' 0' 200' 400' WSET SCA�E _ � DENOTES MECHANIZED CLEARING �: � _ p DENOTES FILL IN W ETLAN D _ �DENOTES TEMPORARY IMPACTS IN SURFACE WATER � DENOTES IMPACTS IN s SURFACE WATER � n * PROPOSED SIGNAL o ��_ — PROP GONC SIDEwALK - •* A DESlGh' EXCEPZlON FOR LANE Ii7DTH /S "- - REQL'IRED FOR -L- S7A.38+95.00 TO -L- 319+93.00 �itia PROJECT REFERENCE NO. SHEET NO. U-4405 9 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCONLIl�LE E PLANS DO NOT USE �OR ! W .�CQIIISITION I l il1 I � � �- �� � ���1 __ � 'i i - � . _ _ 1 � . , � 1� I I I . \ 1 I ., \ I .. . ��� .. 1 1 I'I �• ^ I � .. �" � �, 4ETAIN SYSTEM I � ' 1 `� 1 � �;. \ .� � � I � 1 � "� ' �j � � � - -�--. 86 1 TO[ PROTECTION � / "� I I �i SEE DETAIL 4 —��� ��. � .. Ill�� ` �. � 1B wrMH . SEC SPECIAL DCiAIL r�E � 25' 50' INC � � * � * * * � \ j\/ �G � f = / F —F (� i' F �� w O O � �J' / T � C � � "�� I� --_ ' �—_N � p m o f , � � � � � �sa �aN r - `--- � I o '- n� � � � i � �S' BCP iv-,I 1 (RT URM I � L� ��7H� v v i7,. J v - I ��- _ _ _ — _' _ \ , G.— .�__ t -_ a - r :�-ri_r_ ' -L PdOP_C �G(��ALK _ F �_.��__.. S - _ _ _ itr�_ r8 4�i RLF. � �I - _ __ _ _ _ - _ _ � _ _ _ _I � � ✓ "_- � .. = � ----�. � _ �- — , � �� �. F — S ITE 2 I N LET STAIJDARD BASE DITCH S E DEiAIL 2 EST DDE-150 CY s�oPe-i_���,� t5T 16� TONS LST 3�0 5'Y GEOTEXIILE 83 At�D E%TrND --t��_-- - �- - i- - __i` �—I �24' i. �- -.�--� 24' -- �-' _�- _ � F 24' F ^ =_� —rt hU E —C� ---� I / � ��iJ��ORM LNJE S f O �i i i I o III I .� I� C C RETAVN SVS7�EM AG� L.:.:. I `.i WU ' V i I=��. V, ' � � i 84 8� -L- TS Sta. 80+54.72 -YS- P! Sta 22+82J2 � = 25' l8' 13.3' (RTJ D = l0' 44' 58B' L = 235.39' T = //9.65' R = 533.00' SE = OA2 CL455 II �'IP ess zt�. rons E5T ?10 SY GEOTEXTILE f ' , '� `���r' 1 �1 i '� i '. � 91 ` �RETAIf�! SVSIEM� � i I �._ � � II �UF(�}— PUE rue r�--�-'---� Pue �.....-;--- I,!- -L- CS Sta. 87t88.6� ��_' T�A EX�TI� � � 11 TO G �'F� �� ' �%IEIEIXIST F DUE �. I REnnove ��, ` II � PUE �� PUE � _ � -- F � _//.' I ���b , ui `cQl � � �'�2EM0�- /. � �-..� A �� - Tl`PE 350 - -_—,�' �`'b'+W.eu1:� �6 � � � - �e _ �— a3 ac ro .�t � DI. „..,._.._ �� R_5 i ,��__ * 2S� O F � � =---R&(1F6BNC.�l9€ld�A _ I� �� ':CB _ - _EK _ __—�-- - � �'� I � W O 46" RCP-�'� � � � Z� � a (/y -�. - _'�. PRO /'-6" C&G � o� 1 \ I 11J00 °�5" ecN iv PR� .l'- ° N _ _ 4' _..._ .--�. I -___ -' - _ _ _ _ -' _- _ _ _ ' _ - � __ '-" �::.'3: _•a 'f"':C�'i19�'� � — � PRO N / - i - - - - � - - - - - - - - T� �� - � � � � I I _ _ . _ _t � �'�`JP:t'OIdC 3/D€WA7J!- _ _I g _ _ _ _ � � - .,� F � - :T � ��- v � -•* U � �� ,* '� * � F =--- ---- Y�� '� �--� I- f ' ; * . t y ** ** �* ** B` - � j �9DI:,:� F < � - � r � �. �� I �� �, * PUE -=�- � --- PU€ �-F PYIE PUE '��� PUE - - �.. � � � � � �� ,� \ �5' / \,l5 ��\,- SI�E 1� � S�i � �� I _ �' I I I l y. � CLAS�'th2Y'� RAP -Y' � F,�T 7�%0 TONS ' i EST 705 SV GEgTEXTFNE � � � � � � � * ExcavarioN = INLET DETAIL � � 125 CY +/- NTS (STA 82+50 -L-) 1@60" RCP 1@72" STEEL \ � � -� 1@66" RCP W/RCP ENDS aF BURRIED XCAVATION � � EXCAVATION R6.75' \ — \ �F E � � 88 � � �' � . e; �l �Y'�� NG ' �. �\� ,� '�y `5' CLASS II , \ � t RIP RAP fTYP) WIDTH=S' WIDTH=6' WIDTH=7' T-z� ��'�, �` � �, �'. � I' BENCH HEIGHT I' BENCH HEIGHT 'I��'�i ',�� / � ABOVE 8ED ABOVE BED �, ''����, �i ExcavnnoN OUTLET DETAIL —��� �'�� � 1 i � � � � NTS (STA 82+50 -L-) 1\ ' 1 �`�'' \� \ 1@66" RCP 1@72" STEEL y �� ��, � 1@60" RCP W/RCP END$ ` ` � 176.00 BURRIED 1.D' ' I 11�`� � � � -; \ EXCAVATIDN 11'1 I . 1 ?j _' 1 ����'� , .,� �'� NG 1 I � � � `� � EXCAVATION = '� ''� CLASS II ' � ���`� 135 CY +/- RIP RAP (TYF '•,��' � WIDTH=6' WIDTH=6' WI�TH=6' T=z� I' BENCH HEIGHT I' BENCH HEIGHT .\�•,� ABOVE BED ABOVE BED �i . � _ � ,�\ _ '\ 90 NOTE: SEE SHEET 35 FOR -L- PROFILE SEE SHEET 46 FOR -Y5- PROFILE � INLET DETAIL 2C60" STEEL� NTS (STA 737+99 -L-) PIPES o _,8-� CLASS II RIP RAP(TYP) THICKNESS=2' CHANNEL WIDTH = 20' � � �NG � RETAINING WALL NOTE: BURRIED 1.0' —EXCAVATION EXCAVATION = 870 CY � � OUTLET DETAIL NTS (STA 737+99 -L-) 2@60" STEEL �EXCAVATION PIPES l `NG 0 - 30' CIASS II RIP RAP(fYP) NOTE: BURRIED 1.0' THICKNE55=2' CHANNEL EXCAVATION = 572 CY WIDTH = 20' � -L- P!s Sta /39tg5.56 Pl Sto 144+7/Al 6s =/' 43' 07.9' 0=/9' l8' S8.8' fRTI �= iso.oa o= z n� 3o.s� LT = IOOAO' L = 84283' � ST = 50A1Y T = 425.45' � R = 2,500A0' � I Z SE = OA3 Z � � o PERMIT DRAWING z SHEET 9 OF 18 1� SITE 3 -L- CLA 5 II RIP RAP EST 8 TONS EST 0 SY i 139 . . � PUE GL 'B' RIP RP,\\�S . EST 2 TONS ...-- �3$ . ES 7 5Y �_ CL455 II RIP RAP �`'�` GE EXTILE B EST 108 YONS �A��� , I ��`.�9oF, �EST 38 5Y GEOTExTILE i ✓S 9n / ti 9F`F,� I � C � -Y12- PC Sta. l0+50.86 - - *� - ' O.) CL'B'RIPRAP EST 2 TONS �.�j C5T 7 SY GEOTE%TILE � I O y QQ m l50'TAPER 27 1"URN! p N PUE N� p-- PUE� PUE PUE GRAu pl��— p�E o-� E PDE PDE v, r' e To_ P� - � �' ---F -- —_ --- --_ F �= ---�___ --- UE - �1�� w� R — --- --_ F sa- 20 PROP.CONC.SIDEW �/ — N -f- � ; • - ac , --- ' � � �n ; ; ,p.�. �_COLL4R AND � RLrnOVE WN � c "�� � ' eEnnov[ '^ � i wir �_ . Nr � �� � � � ASLE FlLL- is^ ecP-ro 5'MONO[.iT� CONC.fSLAND l� � - W H y , � 15" RCP-I`/ N A � ' \ ZN � ^_ � "_' R=SO' �O R=SO'�O IZS� N "� RCP-IV � _' \ M J - - � ., . REMOVE \ � [ 3c' P.CP-IV Z J PROP.CONC.SIDEW . �I � � - r _4i i �_�_ tcU �R . Frn � . � � � � E--�.� � i '� _Pp� �-�Eaenr�r+E E E F u—E �p vPD c � � p � � � � ReMove- 18" RCP �IV y {2625" o- N � n � Xi � -Y/2- 133 zsskiv e_ +50.00 Z J - r ` N _ / X �• i = ' ks����J _ �MTL ��� _ �- n �r � �' � � i r, _ « I l I - � �. ` �° � '�'�` — �J �� / � �- I 5� 2' -- I _ � 'S�� (LNM OR 2Y8<_7" I _ _ r � �--- �I �. _ � � � � W � , I I _ � �, � � -�T � 1 ���_ - 2 L'- PROP CONC SIDEWALK � �� � us � •` A D8S1GN &XCEP770N FOR L1NE {VlDTTi l5 � � i REQUlRED FOR -4 STA.38+95.00 TO -[r 319+95.00 8" RC'i- � �3rJ ..L. �. � � TlE TO EXIS7 �v � �_ � } REfAIN '. .. � �I \ �-Y12- POT Sto.12+7659 ./�g �_�� �_.,� _ r-�� �`���, � ISOK APi �� � {�'�� ��r_ iassr — � I'- _-____- — �� � �— -Y12- Pl Sta lO+g9Jl o= is oq ioz rRr� D = /6' S!' 06J' L = 95.85' T = 4825' R = 340.00' Y��.-� � c. �� ✓ I ; �� ISBK APT I '��[I I ISBK APT L . � .. I� F.� � 136 � � 350'TAPER !LT TU N! _5� � p a !00' SH/ �� �� PDE PD � [oi a a � 'a � � o � o� �� �d, m - DU � � D 250' LANE SHIfT 5" RCP � �------ � F -- .��. o--e � lyr 3a rj� `� �- � .� -p _ � dTAPER (LT TURNI �+ 0 7l CL 'B' RIP RAP j EXI� ESi 2 ioNS E5T i SY GEO7'EXTILE RETAINJ v O � 137 CL4SS II RIP RAPJ E5T 280 TONS EST 100 SY GEOTEXTILE PROJECT REFERENCE NO. SHEET NO. U-4405 /3 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INC�MII�LE E FLANS no Nor use ron > w ncalns�r�o.v � -L- SC Sto.140t4556 .�:�'H E M�oLGORti,� & PI��E 'a�i9 Pe 6s ' �1, 141 140 nE To � EXIST � �E —_ P �.,� WO --- ; � N -I- v a �... W � W ,.._ � N � � �� J _ C / =J � � �� / / � R-5ry I/ I�/ �TIE TO FVEXIS��/` F EXIS7 �' p[.Mov[ Q 2 < PU�.YIST�N6 PUE � TUE < d� � � �seK r� .— __— i�,i i.. CLASS II RIP RAP E5T 218 TONS EST 80 SV GEOiExTILE 142 SITE 3 143 1 1,1 I 1 - �. 1 5�� �� 50� ���� 11 � SCALE 1 1 DENOTES TEMPORARY 1 m � IMPACTS IN SURFACE WATER t � DENOTES IMPACTS IN � SURFACE WATER NOTE: SEE SHEET 37 FOR —L— PROFILE SEE SHEET 47 FOR —Y12— PROFILE N 0 � � � PROJECT REFERENCE NO. SHEET NO. -L- U-4405 /3 P!s Sta /39tg5.56 Pl Sto 144+7/Al ww SHEET NO. - eS = P 4.�J� O%.g 0=/9' l8' 58.8' fRTI ROADWAY DESIGN HYDRAULICS INLET DETAIL � 2@60" STEEL NTS (STA 137+99 -L-) � I I I PIPES � � �NG ' I � ' � �RETAINING '- 0 - 18, WALL ...-.` ��\` CLASS II NOTE: BURf RIP RAP(TYP) . TH ICKN ESS = 2' EXCAVATION � CHANNEL � - WIDTH = 20' EXCAVATION = LS = IJrO.00� D= Z�%I�3O.E� ENGINEER ENGINEER LT = IOOAO' L = 84283' � ST = 50A(Y T= 425.45' INC�MII�LE E FLANS � R= 2,500.00' no Nor use ron f w ncalns�r�o:v � I Z SE = OA3 U I °o z o PERMIT DRAWING z SHEET 10 OF 18 1� . � :,.. �/ � . �� ��. �� . . �`� � _� .. � � � , SITE 3 � �� \ � � 1 �� 11` � � �� � � ��� `� � V ` \ ! -L- TS Sta.138+95.56 � \ \ �- — _ � y\ . I .\ \ \� � \\ I \\ CLA 5 II RIP RAP `� -� � � �• � EST 8 TONS ,$` \ \ \ \ � ...�`1 ` EST 0 SY \ � ` ceorexri�e -L- SC Sto.140�G4556 � �' \ � `� ,� � \ I �' `\ � 139 131 / � �� � � I ' - PUE GL 'B' RIP RAP � I / � � �� E5T ? TONS �5�� � ' / c, �\ "-� �� �'':� � J�- �3S � EST 7 SY CL455 II RIP RAP i� ., - . I � 1 �., � �1 � � '�. �\ - /,1��-_ �_ � � GE fEX�ILE 9 \�� . EST 108 TONS , , I -'. . �--- , \ � �� , ! w � �F's�F, EST 38 5Y GEOTE%TILE �- : &--F„�M LGORA I � �' ,�` � ,p ^ . � � � - �-��, �' � � � _ - � d � sa 9s�,� j � .� a � y B '� �q ;. � � i. _,., � m .. _ _� 1- ��� �, + � � �--,a � PDE ���- � � -Y12- PC Sta. l0+50.86 - - _ —, � � � � - - 1(?� a'e' kia kna 350'TAPER !LT TU N! _5� � p . . E5T 2 TONS �nLLNING ,�41 C5T 7 SY GEOTE%TILE I00' SHl �l ��'C� � PDE � �PD � O m�� l50'TAPER'(UJURN! � a [u' � "�.9 /NC 140 Q�Q O W � - , N PUE N� (9— PUE� PUE � PUE F c,RAD �P�� PUE �� PUE PDE , _ PDE d m ^' , '0p� i„ RCP-iv EXIST° � r' E T� � �' ---F -- —.------ --_ __ `� ---__ ---- VE - � ���. p DU �.. /— UE_ DUE U F PUE E wO � R --- �—� F 36' R�e. i ROP.B" U�2" 36' �� � i � 42' 30' �— -- P W 20 PROP.CONC.SIDEWALK W \ '. GI-D ' . . 0 . CATI 5 r- --' LLJO N-f- � ; . - ac ; � _�_ , / � oP:r-s�c&c_ - -- -- e - � , � _�1 � p it� � � p. \ \_!'OI.IAR ANp �--" � RLMOVE �� REfJ�OVE �J � --" \ ♦� N T WN �. , ',. ' - � � � REMOVE ' 1� WN � V � � P.[MOV[ �? � I WIT I � DI�' CP-`✓ ��� W�" Nr ; �� � v n �e Fiu _- oi = W'- Q i 5'� Rc P-ro 5' MONO[If � CONC. fSLAND l� , - �� , � ' "" � N W �� , , � 15" RCP-IV N A A , ` � IS" RCP-IV � RCMOVE � 60" W[LD[D UI �0 1�' RCP-N D �� Z �' � \ ` , N �► � � R=50' � R=Sa �2S' N "� eCP� rv � ; ` ' , 5" MONOIJTHIC CONC.IS W � --- -- � � �► .Ztn N � . . � ' MC � . - -'_ - = J REn�civE PROP.CONC.SIDEW � �I �' �" �� � i � = R 6� Lcriv � R`� CF a2" PCP v��. .-.• �5 ` F � � _ Ce .� -� _'-'� � _____ ' � , " ����' V � . rn � —_ _ '� _ . �- .�.i __ . —...__. __ ` u'.'__ 48 i.iL p. /� i:� r 1'J �/ Ci / ZJ � 15' RC V I E--= W i PpF� jt°�ar_rE E E F L�—E E 'a e ��---- ,— V � ���F"{{{ E�p - E JPD moi � F p E ' '� 5��: � � � R-5d ��TIE TO � � a ` � � 30' � '- � I13�7� . �/E — EXIS7 � � REMOVE \ I C F + REMOVE Q 250'LANE SHIfT ' p-E TAPER (LT TURNJ �+ �.� �,;-rt r F �EXI 2, a, � � � �-: h 2�. w � . �t _ - — PROP CONC '. •• A DESIGN EXCEPT/OT �;� i REQUlRED FOR -4 STA IDEW/ � � FOR L3NE WlDTH !S 38+95.00 TO -4 319+95.00 18" RCP .IV y 18' Rc:P- /�1 _-- f26.25' o- �,4...l, � / TlE TO EXIS7 - PU�.YI3T�N6 PUE TUE 135 0 �' I m . �� � Tl CL '8' RIP RAP '.. � � - F T� fST 2 TONS p �� '� EXlS EST 7 SY GEOTEXTILE ` I� 1 d w f�, � j� H �����) �-tl L�~ . �! � �� GDNC t50K f� RETAIN� I REfAIN� :'� T l E T O v 1 � � ' � EXIST � 1 J � p c��- 2 � I1�1 ; i.; 136 I '1� P P E' _ c-� ; �� ' , �1�, � , / ��� - _ )� � .� �� _ f _ ,1 II , I A� _ i � � _ - i.- � � ��� IB � ����� 137 � � 143 � �' � �• � � � � � ���� � — - � � ' � � ��� � � i i \ ` — - ,, ; � , � i� �,� '-- % . . , , � , .: �-- � — � ESLT 228 TONSAP 1` 1� \ CL4SS II RIP NAP I -1 �_ �/ , -Y/2- Pl Sta 10+g9,1/ I � _ l6 09' l02' (RT) D = /6' S!' 06J' L = 95.85' � R = �4�0� �\ \� _ �\ � \ \ �� \ �\ ,���, ,;��� � `� ��� � � '�'/ � / � � � � �� V `� � Yi , �� . � � � � � � �� � � I '�I�j( , 1 \\. \. \� \. \ \ `, \. \. \ �\ . E5T 280 TONS EST 80 SV GEOiExTILE EST 100 SY GEOTEXiILE �4z SITE 3 � ���� � � �,- �� _. � n 1 � � 50' 0' 50' 100' / � SCALE % � 1 � DENOTES TEMPORARY ,i m ; IMPACTS IN SURFACE WATER � � DENOTES IMPACTS IN � SURFACE WATER NOTE: SEE SHEET 37 FOR —L— PROFILE SEE SHEET 47 FOR —Y12— PROFILE N Z 0 N � �` � \ �RETAIN RETAIN � �- i /' � �, � _ �� � � �-M ��: �" c �1� ' l ' �ETAIN I � � y /� � i 4- � � �' � � L—F //�� r1 �''/ � - - �m = yN _ 1 �m - �m -_�► � cn � "�. Q� RE � � E� _ � = w : �: n �, so� o� so� ioo� �� SCALE = ioo� o• ioo• zoo� � INSET SCALE - �DENOTES TEMPORARY IMPACTS IN SURFACE WATER � � DENOTES IMPACTS IN �� SURFACE WATER * PROPOSED SIGNAL �=n _ _ - PROP CONC SIDEWALK - ** A DESIGN LXCEPT70.N FOR LriNE lU7OTH IS - R6QU7RED FOR -Lr STA.38+95.00 TO -U 319+95.00 �;� n 15 -L- Pl SYa 144+7/Al Pls Sta 149+38.40 Pls Sta l53+0456 Pl Sta 155+1OJ7 0=/9' l8' S8.8' (RTl 6s = I' 43' 079' 9s = l' l4' S0.5' 0= S l0' 2/.2' (LT) D= 2'!I' 30.6' Ls = I50A(Y Ls = 150.00' D= f 39' 47.4' L= 842.83' LT = IOOA(Y LT = l00.00' L= 3/lAl' T= 425.45' S7 = 50A0' ST = 50.00' T= 155.6/' R = 2.500A0' R = 3,445A0' SE = OA3 SE = 0.03 V� �I' �BW����� a ;m �B 4 2 � � �� � � PB 112 PG� 2e� \ �"�� '- � � 5 � � 153 � � - _� �,: , �� �,.� �g '- �� t'' . . 3 � `�� f �° � `�� � �ETAIN � \ v � �SITE 4 ��ETA�N SITE 4 INLET SEE ENLARGEMENT, THIS SHEET CLA55 II RIP RAP �c ,oc r..ic _I _ !�C Ci.. /woloo Ztl INLET DETAIL EXCAVATION NTS (STA 143+37 -�-) l�a'�72" STEEL W/RCP ENDS NG BURIED 1.0' 2@72" RCP EXTENSIONS 2:7 EXCAVATION� � . ; ry CLA$$ II � J RIP RAP T=2' EXCAVATION VARIES 9'-26' CHANNEL =257 CY 1.5' BENCH HEIGHT WIDTH =8' ABOVE BED 738.5' OUTLET DETAIL RCP`eNos" NTS (STA 143+37 -L-1 BURRIED 1.0' 2L772" RCP777��� EXCAVATIOI NG� EXCAVATION � / \ / 1 2:1� d� �4�� `CLA55 II '•�. ,,' RIP RAP T=2' EXCAVATION VARIES 3'-23' CHANNEL =342 CY 7,5'BENCH HEIGHT WIDTH =8' ABOVE BED 137.2' � -L- ST Sta.150+38.39 \ � PROJECT REFERENCE NO. SHEET NO. U-4405 /4 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INC�MII�LE E FLANS no Nor use ron > w acalns�r�o.v PERMIT DRAWING SHEET 12 OF 18 _�N I � F— W� WD N i- W � W^ � WFQ Z(/� �I U -'i � � NOTE: SEE SHEET 37 & 38 FOR -L- PROFILE SEE SHEET 47 FOR -Y13- PROFILE SEE SHEET 48 FOR -Y14- PROFILE N Z 0 N � �' � \ — _" `RETAIN 1.-�� RETAIN � � , � `�j, I����� �I .-. 'g� C:� 35 +'� vi. -.:J�� f� --- � � .. � � . ISM GL"'� �ic � � . I . . .., � ETAIN .. I'—��;� � �� , r . 'li 4.. — �.. � � E� _ f ; W � n �, so� o� so� ioo� �� SCALE = ioo� o• ioo• zoo� � INSET SCALE - �DENOTES TEMPORARY IMPACTS IN SURFACE WATER � � DENOTES IMPACTS IN �� SURFACE WATER * PROPOSED SIGNAL �=n _ - — PROP CONC SIDEWALK - ** A DESIGN LXCEPT70.N FOR LriNE lU7OTH IS -- - 7 T- R6QU7RED FOR -Lr STA.38+95.00 TO -U 319+95.00 �;� n 15 -L- Pl SYa 144+7/Al Pls Sta 149+38.40 Pls Sta l53+0456 Pl Sta 155+1OJ7 0=/9' l8' S8.8' (RTl 6s = I' 43' 079' 9s = l' l4' S0.5' 0= S l0' 2/.2' (LT) D= 2'!I' 30.6' Ls = I50A(Y Ls = 150.00' D= f 39' 47.4' L= 842.83' LT = IOOA(Y LT = l00.00' L= 3/lAl' T= 425.45' S7 = 50.00' ST = 50.00' T= 155.6/' R = 2.500A0' R = 3,445A0' SE = OA3 SE = 0.03 I /J JI U. /V � JV.VV .... - . � \� / . --�� � . / WII 9E�SY r / . \�I� ��� BB4���P�6i. .��. I PB I� PG 2e� � �� I � � ) � � ��/ �� �� � i =�__ � � �ss — _ �� ..�-� _ � L� _��= -`� - ,. � . '__� �ETAIN y I RCP-N 7 = SITE 4 �ETA�N ;f SEE ENLARGEMENT, THIS SHEET ^'T... ` �ccLA55�sIIRIP^RAP SITE 4 INLET _I _ nC Ci.. /woloo Z!1 INLET DETAIL EXCAVATION OUTLET DETAIL 'acP eN�sE� NTS (STA 143+37 -�-) NTS (STA 143+37 -L-1 BURRIED 1.0' l�a'�72" STEEL W/RCP ENDS NG EXCAVATIOI BURIED 1.0' 2L772" RCP 2@72" RCP - NG EXCAVATION EXCAVATON��,� . � ,.,� I Z'�� ,. ; ry CLA$$ II � J RIP RAP T=2' EXCAVATION VARIES 9'-26' CHANNEL =257 CY 1.5' BENCH HEIGHT WIDTH =8' ABOVE BED 738.5' d� �4�� `CLA55 II '•�. ,,' RIP RAP T=2' EXCAVATION VARIES 3'-23' CHANNEL =342 CY 7,5'BENCH HEIGHT WIDTH =8' ABOVE 8ED 137.2' // � � � O � � / '" � - O N �- �; �/� o � - � � J� / / �-- � � � i � - %�.- J J' I I / f � —L— ST Sta.150+38.39 \ II� � PROJECT REFERENCE NO. SHEET NO. U-4405 /4 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INC�MII�LE E FLANS DO NOT USE �OII f W ACQUISITION PERMIT DRAWING SHEET 13 OF 18 v �'� �` "� J I I NOTE: SEE SHEET 37 & 38 FOR -L- PROFILE SEE SHEET 47 FOR -Y13- PROFILE SEE SHEET 48 FOR -Y14- PROFILE Z O N � o� r r W � W � y + W � W N N W � Z cn J I = J Vi H � —L— Pl Sta 220+67.3/ 0 = P 04' 3/9" (LT) D = 0' 34' 22G L = 187.7/' T = 9386' R = 10,000.00' SE=NC —L— PC Sta. 2/9t73.45 �1 - 219 �-: n ` 50' 0' S0' 100' FLOODPLAIN 6ENCH CLA55 II RIP RAP = SCALE 397 TONS IOO' O' IOO' ZOO' 420 $Y GEOTEXnLE �' INSET SCALE _ �DENOTES TEMPORARY IMPACTS IN SURFACE WATER 22� ^ � DENOTES IMPACTS IN SURfACE WATER is w * PROPOSED SIGNAL ;n �'��'' - PROP CONC SIDEWALK �=s ,_ `� A DESIGN EXC6PT70N FOR LANE N'lDTH 7S REQU/RED FOR -L- STA.38+95.00 TO -L- 3l9+95.00 � � i FLOODPLAIN BENCH W,' _ CLA55 II RIP RAP 746 TONS 188 SV GEOTEXTILE CLA55 II RIP RAP � zs TONs N 32 SY GEOTEXTILE N SITE 5 � SEE ENLARGEMENT, THIS SHEET 188 SY GEOTEICTILE SITE 5 INLET PROJECT REFERENCE NO. SHEET NO. U-4405 20 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 0 c� INC�M][�LE E FLANS � Q no Nor use ron > w ecalns�r�o.v U �� Z � Q Z PERMIT DRAWING � SHEET 15 OF 18 N NO&RWOODIpE 8(��AYN JR D8 2389CPG 7I9� �� r N r W � W � N + w�j w N N W � ZN J I = J V� H 2 � i. II I II, I�' ..L, /Gr�,�.(J(J II r � � I —Y25— POT Sta. /4+5/24 NOTE: SEE SHEET 40 FOR -L- PROFILE SEE SHEET 48 FOR -Y25- PROFILE N Z O � � � W� w� y+ W� WN N 6i.a Q Z c~i� J 2� Vi � � —L— Pl Sta 220+67.3/ 0 = P 04' 3/9" (LT) �, �__' , \ D= 0' 34' 22G � � � % � �a\ L = /87.7/' I I I ,�� r � T= 9386' I� 1 / I�� R= 1OA00.00' I I j' SE = NC REIAIN 227 RCTHIN--� E PUE —� ��: REMOV[ � 3— 0' - F�T+�.� PUE �' \ I I I / � s ( k � � , r , , � �'; � � � I � � —L— PT Sta. 22 —L— PC Sta.2/9+73.45 2Z6 \\� ��� i �� I" I PUE -� DUE �I RrT �: � 2� niN . I aiN F Hv� r:- i REMOVE- QI--�_. . ,�3o��f �+ �� ?� \'4 `�w�f•'� �k �';'r I GRAD'c TO� ORAIN � �"'' I 3�:i�b ' RC 1—' COLLA D I ,, �EXTEN 2" RCP-IV . �Ti / F $PECIAI. �%' � i_.L---J COLLAF'�-! � 7r�'�"�w.a�'_........._.__.___ —can---_--__._�: TF6A�c=�"- -- -- - _ � --- _ f� � P � REMOVE 'E Z \ ` �_ —�r— �^- — � � ��''�"�q'� ' "��Q �T'�� F b�"�'i �s�j ' _`v' ��--F= r� � I � I � /:�, _ I II I � ..._. ; i FLOODPLAIN 6ENCH-�W/ � t _ _ C1A55 II RIP RAP ' � ; 1<4'TONS ' 188 SY GEOTEXTILE �_ CLq.55 II RIP RAP � � � . � 25 TONS N 32' SY GEOTEXTILE N SITE 5 SEE ENLARGEMENT, THIS SHEET _ I a� ' _ �� ISBK BUS c> i �T Q � I �c� � � Ci �r I � i � % � PUE � PUE PUE 30' F 8 P� F 3d F ��� \�P Q�,�ONC.-` .-,.�� .\�_. _. _ __ PROP2'-GC&G iv ,1 ce 510 . REMOVE LR � � `�1F �N�� S.i I —q[:�,Dvr- � \ �. � ' � 48" RCP-IV �� O � - � � �'(� � � � I�SPeCInL 16 PUE � PUE �—� UU� � PU _�_�\ i F �PG �, \ "'J m � F j � ��__JI �w '� VE e— \ F G -�L ,— � exisriar/`+" `� KtMOVE 36 �y eciai � F ---- � F. m E ��E—\ � �P�LUGPAND 220 � ocu R .`�' E� � �` -��p�,!anNooNg� � ,, �: � ���F mecv �u ��/�t� I p ��' � l5 APE ( RN) � ,�VE I TAPER (LT 7URNl� BIDI'RT =,s,ti,rr. � I ' 0 0 � a / � °� ; � ��F� � SVE 76.n' R 4 / `, 1 - `- �9J� �PDE UE - � � _ / � \ / ' � �H° 5 � . _ �i. . � l _; � � " ��` ,, , � '�, - " �' . �-'S 2z2 � 228 PUE SITE 5 INLET � ��'�� � I _ Ir � � '�� � �, �`'�S@K BLIS SlF TCI� EXIST � I {L I R=Id I \ 48'�� —]� 1� � . E� F ! �, � �F � r PUE --- — PUE �ti� pUE pi if F�Jf -� : s%�. M F \ F ��=� � i i _,_ —;T� �I1i'� RCP..IV �-�g� — exreNo �is�� ;� � ncP-fv�c Z � ` 5'MONOLITHIC CONC.ISLAND �:EMOV�E � ExTEND 15" � 25'lNC ~ '�-,rk�P �� ; °' -- ~ /� F � ?!�E —PUE 233 - _ /% � �. � . I . . �—. i RETAIN SVSTEM � / / I 1i 219 � �� � i I � � � �� `\ � � � �; �� I r � , � �i � SITE 5 � � ���A; ,V'��� �� � � — - �� \ \\ �; ` � �\ j ` \ \ I - - � \�i � \ � �''� - SO' O' SO' IOO' . f�COODPLAIN 6ENCH � '�..�I I�l 11�� \\' \ D\ �\ I . /CLASS �I RIP RAP \ � SCALE .' 397 TONS - - . . ' \ \ . � 100' 0' 100' 200' 420 SY GEOTEX71Le �� _ ; ` `� -. i' INSET SCALE I %� cuss II RIP RAP )�� � ' '- �� � 178 TONS / - . - 188- SY GEOTE%TILE � �� / i � / \ / , i \ _ �DENOTES TEMPORARY � . �� . IMPACTS IN SURFACE WATER / � �' 22� / � ^� � DENOTES IMPACTS IN ,,. � : %�� � - SURfACE wATER /j��� � � % s - L /. . �i '� i / i /�� � �I � � / ���.i i � / i���\ PROPOSED SIGNAL '� ' , , - � ! / � / . � "-- , �C % . , /�' _ �'�'; — PROP CONC SIDEWALK, � � , � =�s,_ `�A DESIGN EXCEPTION FOR LANE N'lDTH 7S � � REQU/RED FOR -L- STA.38+95.00 TO -L- 3l9+95.00 � . � � � n — �--- _,___�c�,�', � � �� � PL•E PUE - R= ' `-'��� . � 225 � 224 � INLET DETAIL NTS (STA 221+2p -L-) 3�60' NG� TYP)VATION� r176.79'I . CLASS II ..' RIP RAP EXCAVATION = 245 CY T=1.5' �� CLASS II RIP R, 72" W/GEOTEXTILE BURRIED I.0' (TYP) VARIES 6' - 10' �, _ 25, I.5' BENCH HEIGHT ABOVE 8ED OUTLET DETAIL NTS (STA 221+22 -L-) 3� �.n'� rEXCAVATION �NG � (TYP) L,c-a=+� EXCAVATION = 390 CY I.5' BENCH HEIGHT ABOVE BED CLASS II RIP RAP� W/GEOTExTILE (TYP) FILL SCOUR FIOLE — W/SELECT MATERIAL �CLA55 II RIP RAP -72, T=1.5' BURRIE� I.0' VAPoES 8' - 14' ��/�� /� I�71G71i PROJECT REFERENCE NO. SHEET NO. U-4405 20 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INC�MII�LE E FLANS no Nor use ron f w ncalns�r�o.v PERMIT DRAWING � SHEET 16 OF 18 N NO&RWpqDIpE� (��Ayp�JR D8 2389 PG 7I9 �� `f�Dl �� �REMovr � a� ovE �\ ! � 1 , i REMOVE i a=sa _ 4' RCP=1v �� v.F �; ��t L. _ > -R[ ovr� � ! R 1 � � � CIVCB 15' R P-I`/�� PUE -- � �O� C wO �_ . PR�IDEW ` _ W lii C8 "n'" FCG� IV � N + �-ro � o = r � 25' lNC � >_ w:�i � oi� NN 5" D o'- x 3i W � RCP_IV � � 'p�I' ZN ;, � J CB 48' I? P I-� � = J �rP;iOP.CONC.SID Al� �. _ V � --- < � PROP.2'-6"C � ��PUE - 2 ;�� +l .08 4p�.� � � �.-R[TAIN SY'STEM �, \� r� 232 , �b \A nF rn _ ' �'F EXIST 1 C � J�� Q � � =��I � ��� � uHc � �I�: NOTE: SEE SHEET 40 FOR —L— PROFILE SEE SHEET 48 FOR —Y25— PROFILE WETLAND AND SURACE WATER IMPACTS SUMMARY Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (FromlTo) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L1- 96+44/96+g2 LT EXTENSION OF 2@48" RCP < 0.01 < 0.01 8 43 EXTENSION OF 1@60", 1@66" RCP & 1@72" 2 -L- 81+47/84+g2 RT & LT TRENCHLESS WELDED STEEL 0.10 0.10 0.03 0.04 201 41 EXTENSION OF 4@10'X12' RCBC & 2@60" 3 -L- 137+03/138+25 RT & LT TRENCHLESS WELDED STEEL 0.03 0.03 33 42 EXTENSION OF 4@10'X12' RCBC & 2@60" BANK STABLIIZATION TRENCHLESS WELDED STEEL 176 171 SLIPLINE EX. 2@84" CMP W/ 72" LINER & 4 -L- 143+03/144+02 RT &LT 1@72" TRENCHLESS WELDED STEEL 0.07 < 0.01 216 51 EXTENSION OF 3@60" RCP & 1@72" 5 -L- 143+03/144+02 RT &LT TRENCHLESS WELDED STEEL 0.09 0.02 206 27 TOTALS': 0.10 0.10 0.22 0.11 840 375 0 *Rounded totals are sum of actual impacts NOTES: