Loading...
HomeMy WebLinkAbout20090367_Stormwater Plans_200902040 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR Stormwater Section N.C. Division of Water Quality 585 Waughtown St. Winston-Salem, NC 27107 Attention: Ms. Amy Euliss Dear Madam: .. . -January 16, 2009 :r :r. o '/L >7 wL' EUGENE A. CON`1R, JR. SECRETARY Subject: Stormwater Permit Request for the replacement of bridge no. 39 over South Fork New River on US 221 in Ashe County. TIP No. B-1037, Debit WBS 32579.1.1 $505. The North Carolina Department of Transportation (NCDOT) proposes to replace bridge no. 39 over South Fork New River on US 221. A Stormwater Application Form, the Project Scope Narrative, two sets of project plans, and the authority to debit $505 for the permit application fee are provided with this request. Please review this project for authorization by your division. Thank you for your time and consideration. Please contact Mr. Andrew Nottingham, P.E. at (919) 250-4100 if you have any questions or concerns. Enclosures (4) 1 " Cc: w/out attachments: Mr. Monte Mathews, USACE Mr. Brian Wrenn NCDWQ File B-1037 MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENTAND ENVIRONMENTALANALYSIS 1548 MAIL SERVICE CENTER RALEIGH INC 27699-1548 Sincerely, D.R. Henderson, P.E. State Hydraulics Engineer TELEPHONE: 919-733-3141 FAX: 919-733-9794 WEBSITE: WWW.DOH.DOr STATE.NC.US LOCATION: TRANSPORTATION BUILDING 1 SOUTH WILMINGTON STREET RALEIGH NC