HomeMy WebLinkAbout20090367_Stormwater Plans_200902040
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
BEVERLY EAVES PERDUE
GOVERNOR
Stormwater Section
N.C. Division of Water Quality
585 Waughtown St.
Winston-Salem, NC 27107
Attention: Ms. Amy Euliss
Dear Madam:
.. . -January 16, 2009
:r
:r.
o '/L
>7
wL'
EUGENE A. CON`1R, JR.
SECRETARY
Subject: Stormwater Permit Request for the replacement of bridge no. 39 over South Fork New
River on US 221 in Ashe County. TIP No. B-1037, Debit WBS 32579.1.1 $505.
The North Carolina Department of Transportation (NCDOT) proposes to replace bridge no. 39 over South
Fork New River on US 221.
A Stormwater Application Form, the Project Scope Narrative, two sets of project plans, and the authority
to debit $505 for the permit application fee are provided with this request. Please review this project for
authorization by your division.
Thank you for your time and consideration.
Please contact Mr. Andrew Nottingham, P.E. at (919) 250-4100 if you have any questions or concerns.
Enclosures (4) 1 "
Cc: w/out attachments:
Mr. Monte Mathews, USACE
Mr. Brian Wrenn NCDWQ
File B-1037
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENTAND ENVIRONMENTALANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH INC 27699-1548
Sincerely,
D.R. Henderson, P.E.
State Hydraulics Engineer
TELEPHONE: 919-733-3141
FAX: 919-733-9794
WEBSITE: WWW.DOH.DOr STATE.NC.US
LOCATION:
TRANSPORTATION BUILDING
1 SOUTH WILMINGTON STREET
RALEIGH NC