Loading...
HomeMy WebLinkAbout20130743_Email_20090105R-2519B -.US 19E - Merger Team Update - Elevation Subject: R-2519B - US 19E - Merger Team Update - Elevation From: "Brown, Steven L" <slbrown@ncdot.gov> Date: Thu, 17 Jul 2008 08:34:50 -0400 To: "Baker, David" <David.K.Baker@saw02.usace.anny.mil>, "Buncick, Marella" <marella buncick@fws.gov>, "Militscher, Chris" <militscher.chris@epa.gov>, "Nicholson, Charles P." <cpnicholson@tva.gov>, "Wrenn, Brian" <Brian.Wrenn@ncmai 1. net>, Marla Chambers <mar]a.chambers@ctc.net>, Renee Gledhill-Earley <renee.gledhill-earley@ncmail.net>, "Hughes, Craig" <chughes@regiond.org> CC: "Stone, Dwight L" <lstone@ncdot.gov>, "Hart, Teresa A" <thart@ncdot.gov>, "Thorpe, Gregory J" <gthorpe@ncdot.gov>, "Dagnino, Carla S" <cdagnino@ncdot.gov>, "Hemphill, Jeffrey L" <jemphill@ncdot.gov>, "Williams, Logan" <loganwilliams@ncdot.gov>, "Renninger, Heather L" <hlrenninger@ncdot.gov>, "Moore, Brenda L" <blmoore@ncdot.gov>, "Nottingham, Andrew T" <anottingham@ncdot. gov> Merger Team: The following is to provide an update for the team on the status of the merger process on this project: As you may remember, our last Merger Team meeting on this project was a Concurrence Point 4A meeting in April 2007. Concurrence was not reached, largely due to disagreement among the team regarding the crossing of Big Crabtree Creek. Following this meeting, dissenting agencies submitted issue briefs on the matter and the Merger Elevation process was begun. Concurrently (and somewhat uniquely to this project), the Biological Assessment (BA), which included R-2519B and the preceding three projects in the corridor (R-2518A, R-25188, and R-2519A) was being finalized for submission to USFWS. Also, the 404/401 Permitting and Certification for the corridor projects was split to include R-2518A, R-2518B and R-2519A under one permit, and R-2519B under a separate permit/certification at a later date. Completion of the BA, issuance of the Biological Opinion (BO), and finalization of the 404/401 permit and certification for R-2518A, R-2518B, and R-2519A was an urgent priority for NCDOT, as the first two projects in the corridor (R-2518A and R-2518B) were due to Let in late 2007/early 2008. The BA, BA Addendums and additional information for the Corridor was submitted to USFWS between August 2007 and February 2008. The USFWS issued a BO on the Corridor in March 2008. The BO contains a condition (Item #9, Terms and Conditions) that requires that the existing culvert at the Big Crabtree Creek crossing be removed and that the culvert is replaced with a bridge. An Individual 404 Permit for projects R-2518A, R-25186, and R-2519A was issued in April 2008. The IP states that "If and until the BO is revised or supplemented", NCDOT will be required to install a bridge on Big Crabtree Creek. Projects R-2518A and R-2518B were Let on 7/15/08. Project R-2519A is scheduled to Let in February 2010. Project R-2519B is currently scheduled for Right-of-Way in 2009, and Let is scheduled for 2012. Meanwhile, during discussions on the BA/BO and 404 permits with the Corps of Engineers (USACOE), USACOE recommended that, in light of the fact that there was a signed BO containing a condition that stipulates a resolution to the disagreement that prompted elevation of the Merger Process, NCDOT pursue any elevation of the issue through the Section 7 Consultation Process instead of through the Merger Process. Therefore, NCDOT will pursue elevation of the issue through the Section 7 Consultation Process. Currently, NCDOT is supplementing and refining design, hydraulic, and environmental comparative information on the Big Crabtree Creek crossing for submittal to USFWS. The target date for submittal of this additional information is November 2008. I of 2 1/5/2009 3:22 PM R-2519B - US 19E - Merger Team Update - Elevation K 16" I appreciate your patience on this project as we navigate through a number of inter-related project/corridor issues. If there any questions or concerns, please write or call me at your convenience. thanks, Steve Steve L. Brown, P.E. Project Planning Engineer North Carolina Department of Transportation Project Development and Environmental Analysis 1548 Mail Service Center Raleigh, NC. 27699-1548 Phone. (919) 733-7844 est. 235 Far: (919) 733-9794 http://www.ncdot.org/doh/l)rcconstruct/pe/ 2 of 2 1/5/2009 3:22 PM I RE: R-2519B - US 19E - Merger Team Update - Elevation - CLARI... Subject: RE: R-2519B - US 19E - Merger Team Update - Elevation - CLARIFICATION From: "Brown, Steven L" <slbrown@ncdot.gov> Date: Fri, 18 Jul 2008 08:20:33 -0400 To: "Militscher.Chris@epamail.epa.gov" <Militscher.Chris@epamail.epa.gov> CC: "Baker, David" <David.K.Bakcr@saw02.usace.army.mil>, "Buncick, Marella" <marella_buncick@fws.gov>, "Nicholson, Charles P." <cpnicholson@tva.gov>, "Wrenn, Brian" <Brian.Wrenn@ncmail.net>, Marla Chambers <marla.chambers@ctc.net>, Renee Gledhill-Earley <renee.gledhill-earley@ncmail.net>, "Hughes, Craig" <chughes@regiond.org>, "Stone, Dwight L" <Istone@ncdot.gov>, "Hart, Teresa A" <thart@ncdot.gov>, "Thorpe, Gregory J" <gthorpe@ncdot.gov>, "Dagnino, Carla S" <cdagnino@ncdot.gov>, "Hemphill, Jeffrey L" <jemphill@ncdot.gov>, "Williams, Logan" <loganwilliams@ncdot.gov>, "Renninger, Heather L" <hlrenninger@ncdot.gov>, "Moore, Brenda L" <blmoore@ncdot.gov>, "Nottingham, Andrew T" <aottingham@ncdot.gov> Chris: Thanks for the response - Let me clarify one thing: My understanding of the recommendation by USACOE is that the condition USFW S put forward in the signed BO needs to be addressed/elevated first - not in lieu of - the merger process. In other words, NCDOT is to deal with any issue we have with that BO condition, then readdress elevation of the CP4A. The logic seems to be that until any issue NCDOT has with the BO condition is resolved, elevation through the merger process cannot continue. In reviewing my phrasing below in the original e-mail, I shouldn't have used "Section 7 instead of the Merger Process" - sorry about that... The way I see this going is that: 1) NCDOT addresses it's concerns with the BO condition through the Section 7 process-then 2) We (Merger Team) revisit CP 4A/continue with the elevation process... I hope that is more clear - I am also cc'ing everyone on the original list - including all Merger Team members with this clarification. thanks, Steve From: Militscher.Chris@epamail.epa.gov [mailto:Militscher.Chris@epamail.epa.gov] Sent: Friday, July 18, 2008 7:59 AM To: Brown, Steven L Subject: RE: R-2519B - US 19E - Merger Team Update - Elevation Importance: High Steve: The original e-mail must have truncated addresses somehow. I printed out a copy of your entire and message and the address list stops at TVA's CP Nicholson. Are you planning to provide other team members (particularly the resource agencies that prepared elevation briefs) with the information that you are providing FWS? Do you have a CID 4A form signed by the USACE or other agencies? Has NCDWQ concurred on avoidance and minimization? Furthermore, I do not agree with the statement: "USACOE recommended that, in ligh of the fact that there was a signed BO containing a condition that stipulates a resolution to the 1 of 2 1/5/2009 3:22 PM RE: R-2519B - US. 19E - Merger'ream Update - Elevation - CLARI... disagreement that prompted elevation of the Merger Process, NCDOT pursue any elevation of the issue through the Section 7 Consultation Process instead of through the Merger Process". Section 7 of the ESA had nothing to do with EPA's elevating the culvert vs. bridge. EPA has no direct authority to elevate anything under ESA. EPA elevated the issue due to water quality concerns and avoidance and minimization requirements under the Clean Water Act. I plan to discuss this matter further with EPA Atlanta to determine our next steps. Thank you. Christopher A. Militscher, REM, CHMM USEPA Raleigh Office 919-856-4206 2 of 2 1/5/2009 3:22 PM