Loading...
HomeMy WebLinkAbout20180125 Ver 1_Approval Letter_20180214NOT A CAMA PERMIT Water Resources Environmental Qualilp February 14, 2018 NCDEQ— NC Division of Marine Fisheries Attn:Jason Peters PO Box 769 Morehead City, NC 28557 ROY COOPER Gowgwar MICHAEL S. REGAN Secretary LINDA CULPEPPER lnfe!'i n DU@CfOr DWR # 18-0125 DARE County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS NC DIVISION OF MARINE FISHERIES - AR -165 Dear Mr. Peters: You have our approval for the impacts listed below for the purpose described in your application dated January 11, 2018 and received by the Division of Water Resources (Division) on January 23, 2018. These impacts are covered by the attached Water Quality General Certification Number4144 and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)] Type of Impact Amount Approved Amount Reduced Plan location/ (units) (units) Reference Permanent Temporary Attached Open Water OW -1 (Fill from two vessels and 8,000 tons of recycled precast 9.3 (acres) 0 (acres) Figure 3 concrete) 2. Water Quality Certification State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 NCDEQ- DIVISION OF MARINE FISHERIES DWRff 18-0125 401 APPROVAL Page 2 of 3 The proposed project must comply with all the conditions of the General Water Quality Certification(s) 4144. [15A NCAC 02B .0507(c)] Continuing Compliance 3. Turbidity Standard The Permittee shall adhere specially to 15A NCAC 02B .0220 Tidal Salt Water Quality for Class SB Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. [15A NCAC 02B .0222) 4. Recycled Concrete Inspection All reuse and/or recycled concrete must be free from loose dirt, fine particulate material, and other pollutants. This Office will require an initial on-site meeting between the Division staff, Division of Marine Fisheries and the demolition contractor representatives prior to the two vessels being deployed to ensure materials are free from pollutants. [15A NCAC 02B .0222] Other Conditions 5. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51 These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: if sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: NCDEQ- DIVISION OF MARINE FISHERIES DWR# 18-0125 401APPROVAL Page 3 of 3 William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Rules. Please contact Anthony Scarbraugh at 252-948-3924 or anthony.scarbraugh@ncdenr.gov if you have any questions or concerns. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 4144 Certification of Completion cc: Gregg Bodnar, DCM Morehead City Office (via email) Frank Jennings, DCM Elizabeth City (via email) Josh Pelletier, USACE Washington Regulatory Field Office (via email) Laserfiche File 0 250 500 1 000 Feet AR -165 Figure Date flovember 16 2017 Reef Centroid Coordinates: 35° 41.672'N/ 75° 26.313'W a) 18 W s0 57 a ss % 59 80 61 E2 • • • • • • • • • • • • 83 61 65 fib 68 69 70 71 72 73 75 TB 71 IB 79 80 81 82 33 81 as 86 87 88 89 90 91 92 97 91 96 97 99 to to to to I ti 10 II in • • • • • • • • •10 • • • • 11 II 114 Ill lie 11 12 I2 12 121 I *121 *12f 13 13 13 12 13 134 131 IN 131 II 1/ 11 11 11 1'! 1 1 • • • • • • • • • • • • • • • • I/ 1 141 1- ISWK IS I6 161 16 I6 16 1 168 16 17 1? IT 1] 17 17 11 1500' Reef Site Radius 150' Construction Buffer 150' x 150' Construction Grids �I Concrete Vessel + AR -165 Centroid Reef Construction Zone Reef Buffer Area Figure 3. AR -165 site plan showing planned deployment locations for concrete material and vessels. The reef site is 162.77 acres in size. Received . y CM -EG