HomeMy WebLinkAbout20010043 Ver 2_401 Application_20090227
1m]
O~~~WAr(O"i'oc;..
i;j Y
- r
> -
_ -i
o ""
0\- Ol~~ V2-
Office Use Only:
Corps action 10 no.
OWQ project no.
Form Version 1.3 Oec 102008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing-Application is being processed currently with a CAMA Express Application
1 a. Type(s) of approval sought from the o Section 404 Permit X Section 10 Permit
Corps:
1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? DYes XNo
1d. Type(s) of approval sought from the DWQ (check all that apply):
o 401 Water Quality Certification - Regular o Non-404 Jurisdictional General Permit
x 401 Water Quality Certification - Express o Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
DYes XNo DYes XNo
H. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation DYes xNo
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h x Yes DNo
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? x Yes DNo
2. Project Information
2a. Name of project: Masonboro Harbour HOA
2b. County: New Hanover ~
2c. Nearest municipality / town: Wilmington .A:~CEI'7~_
2d. Subdivision name: Masonboro Harbour .....:- - .
-
L"r-.....
2e. NCDOT only, T.I.P. or state I '-u .l ~ 2009
project no: Bv.
3. Owner Information .---..
3a. Name(s) on Recorded Deed: Masonboro Harbour HOA
3b. Deed Book and Page No. 2289/0886
3c. Responsible Party (for LLC if Howard Finneman ~ [~tar~O~I~ ill
applicable):
3d. Street address: 5106 Masonboro Harbour Drive U\ ~
3e. City, state, zip: Wilmington, NC 28409 r tlj ~ 'I LUUIJ
3f. Telephone no.: 910 793 2870 DENR - WATERQlIAUTY
3g. Fax no.: WE
3h. Email address: howardMHHA@aol.com
Page 1 of 10
PCN Fonn - Version 1.3 December 10, 2008 Version
4. Applicant Infonnation (if different from owner)
4a. Applicant is: D Agent D Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Infonnation (if applicable)
5a. Name: Jim Hundley
5b. Business name Waterline Marine Construction
(if applicable):
5c. Street address: PO Box 1646
5d. City, state, zip: Wrightsville Beach, NC 28480
5e. Telephone no.: 910 264 9977
5f. Fax no.: 855 850 0982
5g. Email address: jhundley@waterlinemarineconstruction.com
Page 2 of 10
B. Project Infonnation and Prior Project History
1. Property Identification
1 a. Property identification no. (tax PIN or parcel 10): R07709-001-006-000
1b. Site coordinates (in decimal degrees): Latitude: 34080870 Longitude: -77520619
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 2.66 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Myrtle Grove Sound
proposed project:
2b. Water Quality Classification of nearest receiving water:
2c. River basin: Cape Fear
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Upland basin that serves the residential neighborhood
3b. List the total estimated acreage of all existing wetlands on the property:
.25 acres or less
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
n/a
3d. Explain the purpose of the proposed project:
Installation of a new bulkhead to prevent failure of existing wall
3e. Describe the overall project in detail, including the type of equipment to be used:
New bulkhead will be installed 2' waterward of existing wall using excavator and vibratory hammer
4. Jurisdictional Detenninations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / DYes DNo x Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type D Preliminary D Final--N/A
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for X Yes DNo x Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
DWQ #20010043
6. Future Project Plans
6a. Is this a phased project? DYes xNo
6b. If yes, explain.
Page 3 of 10
peN Fonn - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
X Wetlands D Streams - tributaries D Buffers
D Open Waters D Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404,10 Area of impact
Permanent (P) or (if known) OWQ - non-404, other) (acres)
Temporary (T)
Temporary access
to remove and DYes X Corps 8000 sq. ft.
W1 D P X T reinstall Coastal
freestanding XNo XOWQ .184 acres
bulkheads
W2 D pDT Dyes D Corps
DNo DOWQ
W3DpDT DYes D Corps
DNo DOWQ
W4 DPDT Dyes D Corps
DNo DOWQ
W5 D PDT DYes D Corps
DNo DOWQ
wsDPDT DYes D Corps
DNo DOWQ
2g. Total wetland impacts .184 acres
2h. Comments: There will be no wetland impacts for this project
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404,10 stream length
Permanent (P) or intermittent OWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 D pDT DPER D Corps
DINT DOWQ
S2 D pDT DPER D Corps
DINT DOWQ
S3 DpDT DPER D Corps
DINT DOWQ
S4DPDT DPER D Corps
DINT DOWQ
S5 DPDT DPER D Corps
DINT DOWQ
ssDpDT DPER D Corps
DINT DOWQ
3h. Total stream and tributary impacts 0
3i. Comments: There will be no stream impacts for this project
Page 4 of 10
PCN Fonn - Version 1.3 Oecember 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuallv list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary (n
01 x P T Upland Basin Bulkhead Fill Upland Basin .003
02 DpDT
03 D pDT
04 D pDT
4f. Total open water impacts .003
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Pond 10 Wetland Impacts (acres) Stream Impacts (feet) Upland
Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments: There will be no pond or lake construction
5h. Is a dam high hazard permit required? DYes xNo If yes, permit 10 no:
5i. Expected pond surface area (acres): nla
5j. Size of pond watershed (acres): nla
5k. Method of construction: nfa
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If anv impacts require mitiaation, then you MUST fill out Section 0 of this form.
6a. D Neuse D Tar-Pamlico D Other:
Project is in which protected basin? D Catawba D Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Butter Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary c'n impact required?
B1 D pDT DYes
DNo
B2 DPDT DYes
DNo
B3 DPDT Dyes
DNa
6h. Total buffer impacts
6i. Comments: NfA
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Wetland crossing will involve matting. Non land disturbing anchors will be used to avoid excavation.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Mats will be used to cross wetlands. Backfill will be placed just after wall installation.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for DYes xNo
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): D DWQ D Corps
D Mitigation bank
2c. If yes, which mitigation option will be used for this D Payment to in-lieu fee program
project?
D Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type I Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. DYes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: D warm Dcool Dcold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
Sa. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
peN Fonn - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires DYes xNo
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified DVes xNo
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why. DVes DNo
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 0%
2b. Does this project require a Stormwater Management Plan? xVes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No additional discharges to state waters
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
Stormwater Permit #SW8001236
D Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program
D DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
D Phase II
3b. Which of the following locally-implemented stormwater management programs DNSW
D USMP
apply (check all that apply): D Water Supply Watershed
D Other:
3c. Has the approved Stormwater Management Plan with proof of approval been DVes DNo
attached?
4. DWQ Stormwater Program Review
x Coastal counties
4a. Which of the following state-implemented stormwater management programs apply D HQW
D ORW
(check all that apply): D Session Law 2006-246
D Other:
4b. Has the approved Stormwater Management Plan with proof of approval been DVes No
attached? Permit #SW8001236
5. DWQ 401 Unit Stormwater Review
Sa. Does the Stormwater Management Plan meet the appropriate requirements? Ves DNo
5b. Have all of the 401 Unit submittal requirements been met? Ves DNo
Page 8 of 10
peN Fonn - Version 1.3 December 10, 2008 Version
F. Supplementary Infonnation
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the DYes [8J No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an DYes DNo
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPAlSEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval DYes DNo
letter. )
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, DYes [8J No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? DYes [8J No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in DYes [8J No
additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
New Hanover County Sewer
Page 9 of 10
PCN Fonn - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or DYes ~No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act DYes ~No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. o Raleigh
o Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
See previous CAMA permit application and current CAMA Express application
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? DYes DNo
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
See previous CAMA permit application and current CAMA Express application
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation DYes DNo
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
See previous CAMA permit application and current CAMA Express application
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 1 OO-year floodplain? ~Yes DNo
8b. If yes, explain how project meets FEMA requirements: Existing upland basin
8c. What source(s) did you use to make the floodplain determination? Project surrounded by water
Jim Hundley ~ ;lJ_ 2/16/09
Applicant/Agent's Printed Name 7 Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 10 of 10
I ~ CIrl
elf:) Jo
~
~,
J .",
~1
f 4
CJ
~2: ~
PEl
:n
C>
=
;"-.-/
co
-
en
lJ..J
l..L..
\,..)
d.-
e..-
~
~
o
o
o
-
is
is
:;;;:
C>
1..
~
~~
<t..~
~~3.
'0 ~
a,...
II)
-
~
~
z
en
'"Cl
l::
..::l
....
C!)
~
]
en
c:I:l
o
U
(I.)
.e
~
~
~
~
CO
b
~
tJ
~
o
!!
.z
.'"
rE
o
t
8-
<t'
-
o
o
,...-.t
o
o
,...-.t
II
-
-
>-'0 v
~ 0 .~ I I
Fi~~.gll
~;.:: Jj g I I
..=: !;J Jl ~ /I
i-I,.<:i ~ 8 I I
-
o
,...-.t
b::
z
.....:l
~
~
+
-g
~
"5
I!l
.......
o
0..
o
E-<
v
~
.....:l
'"0
S
o
d
]
U
I::
-<
t;:j
I!l
en
;:l
0..
.~
5::
"'0""" rJ:J
a ca :::=
r:/J~N~
s:: ~:::= s::
.~ Z ~ ~
~~"'O~
~ CI)""" CI)
CI)~o...o
~ '0"'0 ~
~coad
......
~
~
-g
Q)
i.a
"5
I!l
.......
o
g.
.....
t;:j
~
+
.....:l
~ L~:ad
. I.C)ro;:l
~ 1~1!l
'"0
I::
;:l
o
....
o
o
Q)
....
;:l
en
o
~
~
00
~
;:l
en
o
~
~
00
s
.~
rJ1
'"0
ro
~
"5
I!l
~
U
~
2g
~ ~ 0
....0
~-
~::E
-u
~
CI)
CI)
...c:
r:/J
"'0
ro
CI)
~
......
~
co
gf
.-
"'0
a
~
r:/J
CI)
CI)
~
~
~
o
Cl)
S
Cl)
u
~
-
~
"'0
~
Cl)
~
-
;:i
~
~.;3 Q)
~ g'g s
o t:Q ::E 'a
:>vQ)u
;;>:.= .s .E
C'd~i::~
;"",.c: ~ 0
Qu~U
'"0
S
o
....
o
lL;J