HomeMy WebLinkAbout20180207 Ver 1_B-5339_Permit drawings_20180213Carpenter,Kristi
From: Steenhuis, Joanne
Sent: Tuesday, February 13, 2018 2:40 PM
To: Carpenter,Kristi
Subject: FW: B-5339 Bridge 233 over Black River along SR
1544 Harnett County
Attachments: B-5339_Permit drawings.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
I know that I am going to have to break the news to Jim about using the Laserfiche
addendum page. But in the meantime, can I please get a BIMS # for this. Thanks!
From: Rerko, James J
Sent: Tuesday, February 13, 2018 2:03 PM
To: Hair, Sarah E SAW (Sarah.E.Hair@usace.army.mil) <Sarah.E.Hair@usace.army.mil>;
Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Subject: B-5339 Bridge 233 over Black River along SR 1544 Harnett County
Liz / Joanne
We reviewed this bridge last Tuesday 02/06/18 in Harnett County. This is the site where
there was a failed dam upstream of the project. Permanent wetland impacts are 0.02
acre of fill. Please respond that the project is a non-reporting Nationwide Permit #3.
James J. Rerko, PWS
Division 6 Environmental Officer
North Carolina Department of Transportation
910 364-0834 office
910 486 1959 fax
lirerko .ncdot.qov �rrn�il
1000 Transportation Drive
Fayetteville, NC 28302
���: i .
� �t n 'v : .
� w.
� � � t�
# ����
� hxr
��. ..�.
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,
�
�
�
•�
�
V
�
�
0
V
_r� �h;��t i i� l rir li��r�.k ��t �li�ei =
�� ��� ��� ������� ���������,�
i ? I'��1��I�4 � o ���` I��I�`���� ���5
HARI�ETT COUI�TY
LOCATIOIV: BRIDGE 1V0.233 OVER BLACK RIVER
01V SR 1544 (GUY RD.)
STAT6 STxTE PRO.I�CT REPERENCC NO.
PERMIT DRAWING �,�o B-5339
S H E E T 1 O F 4 TC PROJ N0.
46053.1.1
TYPE OF WORK GRADI11tG, DRAI11lAGE, PAVING F�' STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
TO SR I500
(BENSON RD.)
SR 1544 (GUY RD.)
BEGIN NCDOT
PROJECT B-5339
—L— POT STA.11 +21.00
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
GRAPHIC SCALES
30 15 0 30 60
PLANS
30 15 0 30 60
PROFILE (HORIZONTAL)
2
DESIGN DATA
ADT 2017 = 710
T = 6 % *
V = 55 MPH
(TTST =3% + DUAL =;
FUNC CLASS =
RURAL LOCAL
SUBREGIONAL TIER
PROJECT LENGTH
LENGTH ROADWAY PROJECT B-5339 =
LENGTH STRUCTURE PROJECT B-5339 =
TOTAL LENGTH PROJECT B-5339 =
�
�
U
�
ro
�I
NCDOT CONTACT: CHRISTY W. HUFF, PE
Dli'/5/ON 6 BRIDGE PROGRAM MAK9GE72
—L— STA. I3 + 66.00
—L—
— — TO SR 1532
(LANGDON RD.)
END NCDOT
PROJECT B-5339
—L— POT STA. l5 + 86.00
`�
Nq�
" �SRS 8�
'\��
����.i�d���� ��.�N�
00 NOT USE f+OR COYSTRUCTfOY
DIVISION OF HIGHWAYS
DIVISI0111 SIX
558 GILLESPIE STREET, FAYETTEVILLE NC, ?8301
0.073 MILES z0l2 STANDARD SPECfF7CATlONS
0.015 MILES EDWARD G, WETHERILL,_PE
RIGHT OF WAY DATE: —
O.OHH MILES PROJECT ENGIN&ER
LETTING DATE: I GREG S. PURVIS, PE
PROJECT DESfGN F.NGINEER
�;-ti,i rr��
� �� � ���;s
s Neo r �
SHCF.TS
�
��,oN
, UTIL., WW
TRANSPoRTATION PLANNIN6/DESIGN - BRIDGf/STRUCTURE DESIGN
CNIL/SiTE DESIGN - GlS/GPS - CONSTRUCTiON OBSERVATiON
BRIDGE #420233
UOCUMENT NOT CONSIDEREU FINAL
UNLE55 ALL SIGNATURES GOMPLETEO
HYDRAULICS EIVGINEER
P.E.
ROADWAY DESIGN
ENGINEER
P.E.
C!!E��l+•�*��"�V!! �
� ��.1�'rl����I �
�I� ��1��
�II�Cli�v'L� `���.�91�
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 11+10 TO 14+50 ROAD/BRIDGE 1@80' 0.02 50
TOTALS': 0.02 0 50 0
*Rounded totals are sum of actual impacts
NOTES:
�
F �i�h�v�l�� North Carolina Department of Transportation
S tOl"Y114V ti t�`S'
, ..., . Highway Stormwater Program � � i
STORMWATER MANAGEMENT PLAN —
(Version 2.01; Released December 2014) FOR NCDOT PROJECTS
WBS Element: 46053.1.1 TIP No.: B-5339 Count ies): Harnett Pa e 1 of 2
General Project Information
WBS Element: 46053.1.1 TIP Number: B-5339 Project Type: Bridge Replacement Date: 12/20/2017
NCDOT Contact: James J. Rerko Contractor I Designer: Wetherill Engineering, Inc. / Harminder Singh, PE
Address: Highway Division 6 Address: 1223 Jones Franklin Rd.
500 Transportation Dr. (PO Box 1150, 28302)
Fayetteville, NC 28301 Raleigh, NC 27606
Phone: (910)437-0207 Phone: 919-851-8077
Email: JJRERKO(a�ncdot.qov Email: hsinqh(a�wetherillenq.com
CitylTown: N/A County(ies): Harnett
River Basin(s): Cape Fear CAMA County? No
Wetlands within Project Limits? Yes
Project Description
Project Length (fin. miles or feet): 0.09 Surrounding Land Use: Residential, Wooded
Proposed Project Existing Site
Project Built-Upon Area (ac.) 0.3 ac. 0.2 ac.
Typical Cross Section Description: (2) 10' lanes with grassed shoulders and up to 5.42' shoulders with guardrail. (2) 9' lanes with grassed shoulders
Annual Avg Daily Traffic (vehlhr/day): Design/Future: 710 Year: 2017 Existing: Year:
General Project Narrative: Replace bridge no. 233 over Black River on SR 1544 Guy Rd. Use 1@80' 33" Box Beam. A TB 2G1 will outlet on upstream and downstream side of the bridge with 15" RCP
(Description of Minimization of Water with Class B rip rap used to stabilize the outlet. No deck drains will discharge directly into channel.
Quality Impacts)
Waterbody Information
Surface Water Body (1): Black River NCDWR Stream Index No.: 18-68-12-1
NCDWR Surface Water Classification for Water Body Primary Classification: Class C None
Supplemental Classification: Swamp Waters (Sw) None
Other Stream Classification: None
Impairments: None
ThreatenedlEndangered Species? No Comments: NO EFFECT: Bald Eagle, Cape Fear Shiner, Red-cockaded Woodpecker, Rough-leaved Loosestrife, Atlantic Pigtoe
NRTR Stream ID: Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N!A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)