Loading...
HomeMy WebLinkAbout20070124 Ver 1_Reports_20090225NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director February 25, 2009 Mr. J. J. Swain, Jr., P.F. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Subject: Inspection-NC Highway 146 DWQ Project 07-0124 'TIP No. R-2813 B Buncombe County Dear Mr. Swain: Dee Freeman Secretary On February 23, 2009, 1 inspected the construction work on NC Highway 146 project (Long Shoals Road) in Buncombe County. Construction work on the 1-26 and Long Shoals Road bridges are continuing. Utility construction is continuing along the new portion of Long Shoals Road. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. Please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Cole Hood, PE Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office (Swain) NC Highway 146 Inspection Letter February 2009 SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX : 828-299-7043 Customer Service: 1-877-623-6748 Internet: www.ncwaterguality.org An Equal Opportunity'. Affirmative Action Employer One NorthCarolina Aaturallt, DWQ Site Visits for DOT Projects Field Sheet DWQ repiesentative Michael R Parker Date February 23 2009 County Buncombe 1 Region Asheville DOT Division Division 13 Activity X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 # 07-0124V 5 NW Permit # IP # Project Name NC Hwhwav 146 WidenmQ Location of Project NC Highway 146 Long Shoals Road Fiom west of NCSR 2501 to east of 1-26 in Buncombe County Project Complete ?Yes X No Activities (DOT)- X? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit X? Wetland Mitigation ? Stream Restoration X? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other Fill If no, estimated date of completion Water Quality Concerns (DWQ): ? Steam Standards Violation X? Tu?bidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts X? yes ? no Estimate 0 40 acres 71 ? Zone i Est Acres ? Zone 2 Est Acres Additional Stream impacts ? yes X? no Est Linear feet Estimated linear feet of impact I I Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1 ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2 ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited •I `ti Name of Waterway(s) DWQ Site Visits for DOT Projects Background Info French Broad River and two unnamed tributaries to FBR Basin/ Subbasin FBR 040302 Wetland Type ?Isolated X?Non-Isolated (Waters of US) Stream Class ?Class B ?303d Listed ?WS-11 ?WS-V ?SB X?Class C ?ORW ?Trout ?WS-I11 ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact X?Culvert ?Bottomless Culvert X?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts Authorized Stream Impacts ?0 - I/ 10t1i acre X? I/ I I"' to 1/3 " acre X? 1/3`d to 1 0 acre ?> 1 0 acre ?< 150 linear feet X?> 150 linear feet Additional comments 0 38 acres of wetlands and 467 linear feet of stream mitigation through EEP On site stream relocation of 78 linear feet of ut to FBR at Site 2 Work continues on French Broad River and 1-26 bridges Most of the beams have been set over the river Construction continuing along widening part of NC 146 on west side of French Broad River with utilities being installed Roadbed continues to remain bare Prefab box culvert installed under new roadway Recommend seeding and/or matting around outlet area of box culvert to prevent material from getting into stream Outlet area above culvert is bare soil Also the fill area on the south side of NC 146 above the pond has bare steep slope and should be seeded and/or matted Continue to maintain erosion control devices and continue with seeding and matting as required Project looked to be in good condition and shape NC Highway 146 February 23, 2009 Inspection Report