Loading...
HomeMy WebLinkAbout20180195 Ver 1_401 Application_20180209i W ---- __.__------------ _____. _..._.-. --- _----- ___ ..._ ....----- ------ ----------- -_._._..___._ Civil & Environmental Consultants, Inc. n �i tzNi=UiiYVt`� S /( ( Vj �E`iEIVE,riJn ..D February 5, 2018 �. b U 1 PAN�F-B h WQROS North Carolina Department of Environmental Quality (NCDEQ) 00RESVILLF RFGl0NAL OFFICE Division of Water Resources C^ 610 East Center Avenue XN Mooresville, North Carolina 28115 moo od a�F�L,p o To whom it may concern: �P"d X 16 Subject: 401 & Buffer Permitting Park 1764 Off -Site Sewer Project p, CEC Project 171-287 Attached for your review and approval are the following items for 401 & buffer permitting for Park 1764 Off -Site Sewer Project, located at 2461 Startown Rd, Newton, NC. The following are included in this submittal: • Application fee of $570.00 (Check made out to N.C. Division of Water Resources); • Four (4) complete and collated copies of the PCN Application and supporting documentation; and • Four (4) full size plans (24" x 36"). Should you have any questions or require any additional information in support of this application, please do not hesitate to contact me at 980-237-0373. Sincerely, CIVIL & ENVIRONMENTAL CONSULTANTS, INC. Ben Lowry Staff Consultant Attachments IR GkoP= FEB 0 9 2018 DEO-WATER1 8 BUFFER PER IT71 8 1900 Center Park Drive, Suite A I Charlotte, NC 28217 1 p: 980-237-0373 f: 980-237-0372 1 www.cecinc.com of WAtE9 REC5IVED/NCi,�.,\:' r_,y, o� pG Office Use Only: FFP Corps action ID no. o DWQ project no. wQ� Form Version 1.4 January 2009 : SVILLF c��CF Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form VU A. Applicant Information 9 FEB b 10 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit 1b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: N/A 1 c. Has the NWP or GP number been verified by the Corps? ❑x Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): 0 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑x No For the record only for Corps Permit: ❑ Yes ❑x No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑x No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑x No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑x No 2. Project Information 2a. Name of project: Park 1764 Off -Site Sewer Project 2b. County: Catawba 2c. Nearest municipality / town: Newton 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Margaret B. Lutz Heirs, Carol Yount Lutz, Ruth B. Lutz, Kevin Eric Lutz 3b. Deed Book and Page No. DB 2548 PG 814, DB 2013E PG 271, DB 3137 PG 793, DB 2308 PG 1829 3c. Responsible Party (for LLC if applicable): City of Hickory 3d. Street address: PO Box 3315, 2437 Settlemyre Bridge Rd, 2405 Startown Rd, 3514 Highway 182 3e. City, state, zip: Hickory, NC 28603 / Newton, NC 28658 / Newton, NC 28658 / Lincolnton, NC 28092 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: 0 Agent ❑ Other, specify: 4b. Name: Warren Wood 4c. Business name (if applicable): City of Hickory 4d. Street address: 76 North Center Street 4e. City, state, zip: Hickory, NC 28601 4f. Telephone no.: 828-323-7412 4g. Fax no.: 4h. Email address: wwood@hickorync.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Shad Walters, P.E. 5b. Business name (if applicable): Civil & Environmental Consultants, Inc. 5c. Street address: 1900 Center Park Drive, Suite A 5d. City, state, zip: Charlotte, NC 28217 5e. Telephone no.: 980-237-0373 5f. Fax no.: 980-237-0372 5g. Email address: swalters@cecinc.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 372118301185, 372117105489, 372 1 1 831 1 271, 372117119870 1 b. Site coordinates (in decimal degrees): Latitude: 35.681519 Longitude: 81.285792 1 c. Property size: 203.89 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Muddy Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Catawba River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site is undeveloped with a mixture of wooded areas and grass meadows. 3b. List the total estimated acreage of all existing wetlands on the property: 1.06 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Explain the purpose of the proposed project: Gravity sewer line extension to service the Park 1764 Business Park Project. 3e. Describe the overall project in detail, including the type of equipment to be used: Project consists of a installation of approximately 2,400 linear feet of gravity sewer. Equipment to excavate and backfill soil will be required. This includes trackhoes, compaction equipement, and loaders. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall riot phases)in the past? 0 Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? 0 Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): W. Brandon Fulton, LSS, PSC, PWS Agency/Consultant Company: ECS Southeast, LLP Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. September 15th and 20th, 2017 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes X❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes 0 No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): x❑ Wetlands Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 T Utility Installation Unknown Yes 404 & 401 0.0754 W2 T Utility Installation Unknown Yes 404 & 401 0.0015 W3 Choose one Choose one Yes/No - W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.08 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T Excavation 'See comments PER 404 & 401 4 40 S2 T Excavation 'See comments PER 404 & 401 2 40 S3 T Excavation 'See comments PER 404 & 401 4 40 S4 T Excavation 'See comments PER 404 & 401 4 40 S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 160 3i. Comments: S1, S2, S3 and S4 are all proposed temporary impacts to an unknown tributary to Muddy Creek Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. 5e: Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number – Permanent (P) or 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet —Temporary Bi Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5of10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. During the design process, the sewer was routed to minimize any impacts to streams and wetlands. The proposed impacts were limited to only what was necessary. The sewer was routed on the low side of the stream in order to service future development to the greatest extent possible. The location was chosen in order to minimize the amount of cross creek connections for future development. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. During construction, a variety of erosion control practices will be utilized to minimize impacts from the project. A designated limits of disturbance will be specified in the field and silt fence will be placed parallel to the stream to capture sediment. Since this is a utility extension project, all disturbed areas will be completely restored to pre-existing conditions. Wetland areas will be restored with native vegetation and stream banks will be re -stabilized. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? E] Yes Q No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ YesX❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. N/A ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The proposed project does not add impervious surfaces to the site. Gravity sewer installation only at this time. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a. In which localgovernment's 'urisdiction is thisproject? Catawba County 0 Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No N/A attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No N/A attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑x Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No N/A letter.) N/A Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No sewage will be generated from the proposed project. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑X Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S. Fish & Wildlife Service Response Letter, dated June 24th 2014. Letter written as a response to a request for comments by ECS Carolinas, LLC. Response Letter written by Janet Mizzi, Field Supervisor. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Website EFH - http://www.habitat.noaa.gov/protection/efh/habitatmapper.htmi 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina State Historic Preservation Office - http://gis,ncdcr.gov/hpoweb 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: No filling in the 100 -year floodplain is proposed. Site topography will be restored to pre-exiting conditions at completion of project. 8c. What source(s) did you use to make the floodplain determination? FEMA Floodplain Map number 3710372000J and 3710372100J Warren Wood, City Manager i,�09 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is rovided. Page 10 of 10