HomeMy WebLinkAbout20171139 Ver 1_Toe protection_20180212 (3)Carpenter,Kristi
From: Steenhuis, Joanne
Sent: Monday, February 12, 2018 3:38 PM
To: Lane, Stephen; Herndon, T. Mason
Cr. Shaver, Brad
Subject: RE: Onslow 181 Toe Protection
Mason,
The DWR will be adding the change to the file. Since no additional wetland impacts are
proposed no modification of the permit is required. Thank you!
Joanne
From: Lane, Stephen
Sent: Monday, February 12, 2018 3:32 PM
To: Herndon, T. Mason <tmherndon@ncdot.gov>
Cc: Shaver, Brad <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne
<joanne.steenhuis@ncdenr.gov>
Subject: RE: Onslow 181 Toe Protection
Hi Mason,
Please find attached a scanned copy of the modified GP for Onslow Bridge 181 to allow
an additional 186 linear feet of rip rap for toe protection. Please review, sign, scan, and
return to me via email. Let me know if you have any questions or if I can be of further
assistance with this project.
Thanks,
Stephen
From: Herndon, T. Mason
Sent: Monday, February 12, 2018 1:06 PM
To: Lane, Stephen <ste.phen..:_lane(c�_n�d_e_n_r:.�crv>
Cc: Shaver, Brad <�3_ra_d..:_�..�5_haver(c�_usa�e.:_a_r_m�.y:_m�_i.l>; Steenhuis, Joanne
<jcranne.steenhuis('�ncdenr.�crv>
Subject: RE: Onslow 181 Toe Protection
Stephen, I received a call from the Resident Engineers office today and that they would
like to extend the rip rap toe protection back to Sta. 18+90. Apparently after this
weekend's rain, they are observing flooding back to this point which is causing concerns
for vegetation establishment and long term maintenance issues in this area. Therefore
the revised proposed limits of toe protection would be 18+90 to 20+76 LT as shown on
the attached revised drawing dated 2/12/18.
Please let me know if DCM approves of this revision.
Thanks!
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
trrr� h e rn_d_cr n_..('_�.._n�d_crt,.�crv
5501 Barbados Blvd
Castle Hayne, NC 28429
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
From: Herndon, T. Mason
Sent: Friday, February 09, 2018 8:47 AM
To: Lane, Stephen <ste.phen..:_lane(c�_n�d_e_n_r:.�crv>
Cc: Shaver, Brad <I�_ra_d..:_�..�5_haver(c�_usa�e.:_a_r_m�.y:_m�_i.l>; Steenhuis, Joanne
<jcranne.steenhuis('�ncdenr.�crv>
Subject: Onslow 181 Toe Protection
Stephen,
As discussed at our field review on the Onslow Bridge No. 181 on Wednesday, NCDOT
would like to install rip rap toe protection from Sta. 20+36 to 20+76 LT. The rip rap
would be placed within the existing permitted toe of fill and extend up the shoulder
approximately 5 ft. This area is adjacent to an inundated wetland area which frequently
floods during rain events and overtops our erosion control measures. The Division is
concerned that we will not be able to get vegetation established which will result in
sloughing shoulders and maintenance issues. Attached is a revised permit drawing
showing the proposed placement of the toe protection.
Please let us know if DCM approves of this minor revision.
Thanks!
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
trrr�herndcrn(�ncdcrt.�crv
5501 Barbados Blvd
Castle Hayne, NC 28429
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,