HomeMy WebLinkAboutBlasting Complaint - 3/15/2017C, '41(o closest Seismograph Calculate
Date gr vib gr vib I-# 0'A gr vib
Recod N dbI dbl / 2a, 5" dbl M
Time )�-:19 distance 96� distance 7%
Weather g rv/f req grv/freq
wvo�tj�, I 06'wp, M column
closest Seismograph Calculated
Date 9 gr vib gr vib gr vib
Recod No. dbI dbl dbl
Time distance 63T distance
Weather grv/freq grv/freq column 'V5 -177r
closest Seismograph Calculated
Date 071 Q11 0 gr vib gr vib I gr vib (is
Recod NO. dbI dbl ri dbl
Time Koir distance 603 distance 3
Weathpr g rv/freq grv/freq column
closest Seismograph Calculated
Date gr vib gr vib gr vib
Recod No. dbl dbl dbl
Time distance distance
Weather grv/freq g rvIf req
column
closest Seismograph Calculated
Date gr vib gr vib gr vib
Recod No. dbl dbl dbi
Time distance distance
Weather grv/freq grv/freq
column
closest Seismograph Calculated
Date gr vib gr vib gr vib
Recod No. dbl dbl dbI
Time distance distance
Weather grv/freq g rv/f req
column
N.C. Department of En,.ironment, Health, and Natural Resource -s
DO islon of Land Resources, Land Quality Section
Telephone Log
Djtc_ja_3 J_� o?D)� Shcti of
Timc OACM CaU Nactd ff"�'Rcccivcj C
PM Returned
County
Telcphone� Mi -
icc: Filed by:
LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET
(* = denotes fields where input data is needed)
Permit No.*: 95-03
Permittee*: radford quarries
Mine Name*: bamboo road quarry
Blast Report No.*: 3 Date of Blast*-. 09/02/16 Time of Blast*:.. �.� I a�ys
Peak Particle Velocity Check:
D Distance to closest offsite occupied structure (ft): D* = 756.00
W Maximum pounds of explosives per delay (pounds): W* = 844.00
SD = Scaled Distance: SD = D[WAO.5 SD = 26.02
V = Peak Particle Velocity (inches per second): V = 160 (SD)A-1 .6 V = 0.87
(*rnax. limit in mining permit is: V = 1.0 ips)
Based on known distances from the blast to the seismograph and any additional location,
the expected vibration level can be estimated at the second location as follows:
V = Particle velocity measured by the seismograph (ips).- V* = 1.02
DS = Distance from blast to seismograph (ft): DS* = 756.00
d = Distance from blast to second location (ft): d* = 756.00
PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips):
PPV = V(DS/d)"1.5 PPV= 1.0250
Airblast (Overpressure) Check:
P = Unconfined Airblast/Overpressure (psi): P = 82 (DNV,10.33)11-1.2 P = 0.415355
To convert (psi) to (dBL): (P/2.9xloA-9)logx2O P= 163.12
AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBIL (for quarry situation) AB= 128.12
(*rnax. limit in mining permit is: AB = dBL)
Explosives Column Check -
(this is a very approximate method based upon numerous assumptions;
specific densities may vary greatly depending upon the type and manufacturer
of the explosive products used in the shot; must consider each explosive used,
refer to Dupont Handbook for actual SPD, otherwise use the following )
Assumptions (per Ireco):
If "straight" emulsion is used, use SPD (specific density) = 1 20
If a "blend/slurry" is used, use SPD (specific density) = 1 25
If "straight" anfo is used, use SPD (specific density) = 0 85
Ratio between explosives.
Total pounds of Explos #1 14277 00
Total pounds of Explos. #2* = N/A
Ratio between explosives = N/A
Average pounds of explosives used per hole (pounds)* = 410 00
Breakdown of average pounds of explosives per hole due to ratio:
Explosive #1 = 14277.00
Explosive #2 = N/A
SPD = Specific densities for each explosive
SPD for Explos. #1 * = 1 20
SPD for Explos #2* = - N/A
HD Hole Diameter Used in Shot (inches) HD* = 4.50
LD Loading Density (pounds per foot of column) LD = SPD(.34)(HD)A 2
LD for Explos. #1 = 826
LD for Explos. #2 = N/A
Explosive column height for each explosive (feet)-
Explos. #1 = 49.62
Explos. #2 = N/A
Total explos column height = 49.62
Stemming height used in shot (feet)* = 1000
Total height of explosive column(s) and stemming in the hole = 59.62
Total depth of hole denoted on the blasting report for the shot in question* = 65.00
Analysis Completed By- Date.
0
LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET
(* = denotes fields where input data is needed)
Permit No.** 95-03
Permittee*: radford quarries
Mine Name' bamboo road quarry
Blast Report No.*. 1
Peak Particle Velocity Check -
Date of Blast*: 03/15/17 Time of Blast*: 16:37
D Distance to closest offsite occupied structure (ft): D* = 635.00
W Maximum pounds of explosives per delay (pounds): W* = 338.00
SD = Scaled Distance: SD = DIWAO .5 SD = 34.54
V = Peak Particle Velocity (inches per second): V = 160 (SD)A-1.6 V = 0.55
(*max. limit in mining permit is: V = 1 0 ips)
Based on known distances from the blast to the seismograph and any additional location,
the expected vibration level can be estimated at the second location as follows.
V = Particle velocity measured by the seismograph (ips): V* = 0.00
DS = Distance from blast to seismograph (ft): DS* = 635.00
d = Distance from blast to second location (ft): d* = 635.00
PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips).
PPV = V(DS/d)Al .5 PPV= 0.0010
Airblast (Overpressure) Check:
P = Unconfined Airblast/Overpressure (psi): P = 82 (D/WAO .33)A-1 .2 P = 0.356399
To convert (psi) to (dBL), (P/29xloA-9)logx20 P= 161.79
AB = Confined Airblast/Overpressure (dBL). AB = P (dBL) - 35 dBL (for quarry situation)
(*max. limit in mining permit is: AB = dBL)
AB= 126.79
Explosives Column Check:
(this is a very approximate method based upon numerous assumptions;
specific densities may vary greatly depending upon the type and manufacturer
of the explosive products used in the shot; must consider each explosive used-,
refer to Dupont Handbook for actual SPD, otherwise use the following:)
Assumptions (per Ireco):
If "straight" emulsion is used, use SPD (specific density) = 1.20
If a "blend/slurry" is used, use SPD (specific density) = 1.25
If "straight" anfo is used, use SPD (specific density) = 0.85
Ratio between explosives:
Total pounds of Explos. #1* = 17800.00
Total pounds of Explos. #2* = N/A
Ratio between explosives = N/A
Average pounds of explosives used per hole (pounds)* = 168.00
Breakdown of average pounds of explosives per hole due to ratio:
Explosive #1 = 17800.00
Explosive #2 = N/A
SPID = Specific densities for each explosive:
SPD for Explos. #1 * = 1.20
SPD for Explos. #2* = N/A
HD Hole Diameter Used in Shot (inches): HD* = 4.00
LD Loading Density (pounds per foot of column): LD = SPD(.34)(HD )A 2
LD for Explos. #1 = 6.53
LD for Explos. #2 = N/A
Explosive column height for each explosive (feet):
Explos. #1 = 25.74
Explos. #2 = N/A
Total explos. column height = 25.74
Stemming height used in shot (feet)*= 10.00
Total height of explosive column(s) and stemming in the hole = 35.74
Total depth of hole denoted on the blasting report for the shot in question* = 27.00
Analysis Completed By: Date:
0 0
LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET
(* = denotes fields where input data is needed)
Permit No.*: 95-03
Permiftee*. radford quarries
Mine Name*. bamboo road quarry
Blast Report No.*: 2 Date of Blast*. 07/21/17 Time of Blast* 13:08
Peak Particle Velocity Check:
D Distance to closest offsite occupied structure (ft): D* = 603.00
W Maximum pounds of explosives per delay (pounds): W* = 392.00
SD = Scaled Distance. SD = DAN A0 .5 SD = 30 46
V = Peak Particle Velocity (inches per second): V = 160 (SD),1-1.6 V = 068
(*max. limit in mining permit is- V = 1.0 ips)
Based on known distances from the blast to the seismograph and any additional location,
the expected vibration level can be estimated at the second location as follows:
V = Particle velocity measured by the seismograph (ips): V* = 0.15
DS = Distance from blast to seismograph (ft): DS* = 603 00
d = Distance from blast to second location (ft): d* = 603.00
PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips):
PPV = V(DS/d)AI .5 PPV= 0 1550
Airblast (Overpressure) Check:
P = Unconfined Airblast/Overpressure (psi)-. P = 82 (D/\N A 033)A-1 2 P = 0 402137
To convert (psi) to (dBL): (P/2.9 x 1 0A_9)Iog x 20 P = 162.84
AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB= 127.84
(*max. limit in mining permit is- AB = dBL)
Explosives Column Check:
(this is a very approximate method based upon numerous assumptions,
specific densities may vary greatly depending upon the type and manufacturer
of the explosive products used in the shot; must consider each explosive used;
refer to Dupont Handbook for actual SPD, otherwise use the following-)
Assumptions (per Ireco).
If "straight' emulsion is used, use SPD (specific density) = 1.20
If a "blend/slurry" is used, use SPD (specific density) = 1.25
If "straight" anfo is used, use SPD (specific density) = 0.85
Ratio between explosives*
Total pounds of Explos. *1* = 26980 00
Total pounds of Explos. #2* = N/A
Ratio between explosives = N/A
Average pounds of explosives used per hole (pounds)* = 196 00
Breakdown of average pounds of explosives per hole due to ratio:
Explosive #1 = 26980.00
Explosive #2 = N/A
SPD = Specific densities for each explosive
SPD for Explos. #1 * = 1 20
SPD for Explos. #2* = N/A
HD Hole Diameter Used in Shot (inches): HD* = 450
LD Loading Density (pounds per foot of column). LD = SPD(.34)(HD)A 2
LD for Explos #1 = 8.26
LD for Explos #2 = N/A
Explosive column height for each explosive (feet).
Explos. #1 = 23.72
Explos. #2 = N/A
Total explos column height = 23 72
Stemming height used in shot (feet)* = 700
Total height of explosive column(s) and stemming in the hole = 30 72
Total depth of hole denoted on the blasting report for the shot in question* = 34.00
Analysis Completed By. Date,
',A
PIP4, M 0
qg--
Dyno Nobel North America BLAST REPORT 1.5 201-DYNO
SERVICE SITE LOCATION: Olin — ORDER NO.: 1000431 Dyno Nobel
BLAST NUMBER: 3 BLAST TIME� 12:18 pm BLAST DATE: 09/02/2016
CUSTOMER: RADFORD QUARRIES MINE: BOONE ADDRESS: BOONE, NC
ROCKTYPE: Granite Tons/Yd3: 2.30 EXPECTED VIBRATION: 0,870
LOCATION OF BLAST
LOCATION OF BLAST IN MINE: North BENCH: Bench 3
BLAST GPS POINTS: N036,21633 & W -081.63594
WEATHER
WEATHER.- Cloudy CEILING: Low TEMPERATURE: 75 WIND DIRECTION & SPEED: North 5
NEAREST NON -OWNED STRUCTURE
NAME: 101 ChipmunkTrail GPS Points: N 036,21506. & W -081.63392
DISTANCE: 756 F7 DIRECTION: 1270
SEISMOGRAPH DATA
LOCATION DISTANCE GPS POINTS CALIBRATION DATE
1 101 Chipmunk Trail 756 Ft N 036,21506 & W -081,63392 10/29/2015
L (F)
(F V F) AIR (db) SE�ISMOGRAPH SERIAL OPERATOR
L�—��
1 1 1 �025 20
I P
10.450 32 0.390 27 122.5 �MIN MATE US BI BE21828 P, Radford
BLAST DATA
NUMBER OF HOLES (EA) 35 — EXPLOSIVES SIZE, TYPE & WEIGHT_
HOLE DIAMETER (IN) 4.5 SIZE
TYPE WEIGHT
HOLE DEPTH (FT) 62 7
SPARTAN. 350SR 26.25
FACE HEIGHT (FT) 59 1.00
SPARTAN 450SR 35
SUB DRILLING (FT) 3 BULK
TITAN XL 1000 Q 14,27
TIT
AVG STEM FACE HOLES (FT) 14.125
—
STEM OTHER HOLES (FT) 9.444
BURDEN FRONT ROW (FT) 20
BURDEN OTHER ROWS (FT) 9
SPACING FRONT ROW (FT) 6
SPACING OTHER ROWS (FT) 9
TOTAL WE .25
DETONATORS USED IN BLAST: Electronic MATS USED� No STEM TYPE: CRUSHED STONE
TYPE MFG DATE CODE USED TYPE MFG JDATE CODE USED
DIGISHDT 30 FT Dyno Nobel Global 08AU16S1 34 DIGISHOT 60FT Dyno Nobel Global I1JY16S1 3
DIGISHOT 80FT Dyno Nobel Global 11JY16S1 35 S SR Dyno obel Global 27JU16J1 37
SPARTAN 450SR Dyno Nobel Z31obal 4AU16J2 35
CU YDS IN SHOT 6,877 SCALED DISTANCE FACTOR: 26 % OF ANFO: 0
TONS IN SHOT 15,815 HOLES/DELAY 2 FUEL OIL % (BULK): 0
MAX LBS/DELAY: 844 . ....... AVERAGE LBS/HOLE: 410
POWDER FACTOR (TONS/LB): 1.10 POWDER FACTOR POUNDSND3: 2�09
BLASTERS NAME: Vrerweir iiii BLASTERS NUMBER & STATE: N/A - N/A
V
.UW Yes
BLASTERS SIGNAT JRE SITE SAFETY INSPECTION PERFORMED]
MINE MGT. SIGNATURE: NUMBER OF PERSONNEL ON SITE-.- 3
j
REMARKS .- shot loaded well some wet holes depth ran from 61-63. Used 62'as an average depth. Moe layout, front row
burden est at 20'some trees came down (again). used two extra caps and boosters to deck 2 holes.
START TIM=END TIME I TOTAL TR TPI 1(-,K 1\11 "Amr-mc'
9�00 AM 1 10:55 AM F 01:55 1329
Dyno Nobel North America DIAGRAM
CUSTOMER NAME: BOONE BLAST DATE: 09/02/2016 DYNO
BENCH: Bench 3 BLAST NUMBER: 3
BLASTER'S NAME: Verweire, Jim Dyno Nobel
np
Dyno Nobel
Mir Instantel
DatefTime Vert at 12:18,26 September 2, 2016
Serial Number
BE21828 V 10.72-8 17 MiniMate Plus
Trigger Source Geo: 0.040 in/s, Mic: 124.0 dB(L)
Battery Level
5.9 Volts
Range Geo: 10.000 in/s
Unit Calibration
October 29, 2015 by Instantel
Record Time 5.0 sec at 1024 sps
File Name
—TEMP.EVT
Notes
USBM R18607 And 0SMRE
Location:
Client:
User Name, J Verweire
General: Dyno Nobel
Extended Notes
Microphone Linear Weighting
PSPL 122.5 dB(L) at 0.627 sec
2
ZC Freq 4.9 Hz
Channel Test Passed (Freq 20.1 Hz Amp 590 mv
Tran Vert Long
/0
PPV 0,450 0.390 1 �025 in/s
ZC Freq 32 27 20 Hz
0.5
000
A00
Time (Rel. to Trig) 0.098 0.165 0.053 sec
.2
+
Peak Acceleration 0.239 0.265 0:437 g
0 X ++
Peak Displacement 0,003 0.002 0.007 in
+ -ko +
IfX,
+ +
Sensor Check Passed Passed Passed
++
x X +Oit X
Frequency 7.1 72 7.2 Hz
0.2-1
OX +
+
++++
X *
Overswing Ratio 4.1 4.0 3.7
x + ++
X ++
Peak Vector Sum 1.026 in/s at 0.053 sec
X X oi- +
x
0.11
X
+
x
+ +
0.05
0 x
x
0.0394
4 - 0-----o
0 x
0
2
5 10 20
50 100 >
Frequency (Hz)
Tran: + Vert: x Long o
Micl- 91"1 IV
00
- --------------
- - - - ------------------ - --- --- -
Long
0.0
Vert
0.0
Tran
0.0
A
0.0 1.0 2.0
3.0
4.0 5.0
Time Scale: 0.20 sectdiv Amplitude Scale: Geo, 0.500 in/s/div Mic: 0.001 psI(L)IdIV
Sensor Check
Trigger = 0- . .4
Printed: September 2,2016 (V 10.72 -10.72) Format@ 1996-2014 Xmark Corporation
Dyno Nobel North America BLAST REPORT DYNO
SERVICE SITE LOCATION: Olin ORDER NO.: 1034277 Dyno Nobel
BLAST NUMBER: 1 BLAST TIME: 4:37 pm BLAST DATE: 03/15/2017
CUSTOMER: RADFORD QUARRIES MINE: BOONE ADDRESS: BOONE, NC
ROCK TYPE: Granite TonsNd3: 2.30 EXPECTED VIBRATION: 0.550 ips
LOCATION OF BLAST
LOCATION OF BLAST IN MINE: North BENCH: Bench 1
BLASTGPSPOINTS: N036.21617 & W-081.63558
WEATHER
WEATHER: Partly Cloudy CEILING: Medium TEMPERATURE: 24 F WIND DIRECTION & SPEED: South 20 MPH
NEAREST NON -OWNED STRUCTURE
NAME: 101 ChipmunkTrail GPS Points: N 036.21506 & W -081.63392
DISTANCE: 635 (FT) DIRECTION: 1290
SEISMOGRAPH DATA
LOCATION DISTANCE GPS POINTS CALIBRATION DATE
1 101 Chipmunk Trail 635 (FT) N 036.21506 & W -081.63392 1 11/07/2016
L ( ) I T (F) V (F) AIR (db) I SEISMOGRAPH SERIAL I OPERATOR
1 NrT N/T I N1T N/T Nrr N/T I N/T IMINIMATE PLUS BI BE21828 I P, Radford
BLAST DATA
NUMBER OF HOLES (EA) 107 EXPLOSIVES SIZE, TYPE & WEIGHT
HOLE DIAMETER (IN) 4 SIZE TYPE WEIGHT
HOLE DEPTH (FT) 27-43 0.44 SPARTAN 20OG 47.08
FACE HEIGHT (FT) 27-33 1.00 SPARTAN 450 107
SUB DRILLING (FT) 3 BULK TITAN XL 1000 G 17,800
AVG. STEM FACE HOLES (FT) 10.588
STEM OTHER HOLES (FT) 10
BURDEN FRONT ROW (FT) 11
BURDEN OTHER ROWS (FT) 9
SPACING FRONT ROW (FT) 8
SPACING OTHER ROWS (FT) 9 TOTAL WEIGHT (LB)] 17,954.08
DETONATORS USED IN BLAST: Non -Electric MATSUSED:No STEM TYPE: CRUSHED STONE TOTAL DRILL DEPTH: 3,838 (FT
TYPE MFG DATE CODE USED TYPE MFG DATE CODE USED
EZDET 25/350 30 FT Dyno Nobel Global 18JY16W1 107 EZDET 25/350 50 FT Dyno Nobel Global 05SE16XI 6
EZDET 25/350 50 FT Dyno Nobel Global 04MY15X1 6 EZDET 25/350 50 FT Dyno Nobel Global 04JA16X1 19
EZDET 25/350 50 FT Dyno Nobel Global 03AU15X1 9 EZDET 25/350 50 FT Dyno Nobel Global 08AU16X1 8
EZDET 25/350 50 FT Dyno Nobel Global 28NO16XI 46 EZDET 251350 60 FT Dyno Nobel Global 23JA17X1 13
EZTL 42MS 20FT D no Nobel Global 05SE16X1 14 EZTL 9MS 20 FT Dyno Nobel Global 14NO16X1 5
LEADLINE 250OFT Dyno Nobel Global 02JAl 7W1 1 SPARTAN 20OG Dyno Nobel Global 07FE17J2 107
SPARTAN 450 Dyno Nobel Global 07FE17,11 107
CU YDS IN SHOT 10,693 SCALED DISTANCE FACTOR: 34 % OF ANFO: 0
TONS IN SHOT 24,592 HOLES/DELAY: 2 FUEL OIL % (BULK): 0
MAX LBS/DELAY' 338 AVERAGE LBS/HOLE.' 168
POWDER FACTOR (TONS/LB): 1.37 POWDER FACTOR (POUNDS/YD3): 1.68
BLASTERS NAME: Verweire, Jim BLASTERS NUMBER & STATE: N/A N/A
BLASTERS SIGNATURE: SITE SAFETY INSPECTION PERFORMED: Yes
MINE MGT. SIGNATURE: NUMBER OF PERSONNEL ON SITE: 4
REMARKS : holes ranged from 30'-43' used 36 as an average depth. long time to start loading, wait to get stemming out.
many holes not to depth most of these 27' deep, lots of hole issues blocked with rocks, most cleared up. paired
holes could not be drilled where they should have gone, because of ground conditions. seismograph did not get
the shot.
STARTTIME END TIME TOTALTIME I TRUCK NUMBERS
12.15 PM 3.35 PM 0320 1 HT1175
Dyno Nobel
North America
DIAGRAM
DYNO
CUSTOMER NAME:
BOONE
BLAST DATE. 03/15/2017
BENCH:
Bench 1
BLAST
NUMBER: 1
Dyno Nobel
BLASTER'S NAME
Verweire, Jim
v
0
—9 0
01
'34
0
0 0 C)
0
0 0
C 0
-252
0
0
0 0
0
9
59
84 109 134
159
184 209 218 227
277
302
0
(42
0,
67
92
117
142
167 192 217
242
267
292 317
342
367
392
0
0
C'I
0
0
0
0
0 0
0
0
0
O�
0
0
0
log
3 44
159
184
209
234 259 284
309
--9;
—�O,
359 384
—�C,.,
409
434
459
0
0
0
0
0
0 0 0
0
0
0 01
0
13
176
2M
226
251
276
301 326 351
376
401
426 451
476
501
526
0
0
0
0
0
0 0 0
0
0
0 0
0
C
13
243
268
293
318
343
368 393 418
443
468
493 518
543
568
593
310
33
360
385
410
435 460 485
510
535
560 585
610
635
660
0
'0
0
0
0
0 0 0
0
0
0 0
0
0
0
377
40
427
452
477
502 527 552
577
602
627 652
677
702
727
Dyno Nobel North America BLAST REPORT DYNO
SERVICE SITE LOCATION: Olin ORDER NO..- 1060122 Dyno Nobel
BLAST NUMBER: 2 BLASTTIME: 1:08am BLAST DATE: 07/21/2017
CUSTOMER: RADFORD QUARRIES MINE-, BOONE ADDRESS.- BOONE, NC
ROCK TYPE.- Granite Tons/Yd3: 2.30 EXPECTED VIBRATION: 0.680 ips
LOCATION OF BLAST
LOCATION OF BLAST IN MINE: North BENCH: Bench 2
BLAST GPS POINTS: N 036.21611 & W-081�63550
WEATHER
WEATHER: Partly Cloudy CEILING� High TEMPERATURE: 88 F WIND DIRECTION & SPEED: East 3 NIPH
NEAREST NON -OWNED STRUCTURE
NAME: 101 Chipmunk Trail GPS Points: N 036.21506 & W -081.63392
DISTANCE: 603 (FT) DIRECTION: 1291
SEISMOGRAPH DATA
LOCATION DISTANCE GPS POINTS CALIBRATION DATE
1 1 101 Chipmunk Trail 1603 (FT) N 036.21506 & W -081.63392 1 11/07/2016
1 L (F) I T (F) I V (F)
SEISMOGRAPH SERIAL I OPERATOR
1
1 0.155 28 10.135 28 10.120 26 1 119.4 IMINIMATEPLUSBI
BE21828 I R Radford
BLAST DATA
NUMBER OF HOLES (EA) 139 EXPLOSIVES SIZE, TYPE & WEIGHT
HOLE DIAMETER (IN) 4.5 SIZE
TYPE WEIGHT
HOLE DEPTH (FT) 29-39 &75
SPARTAN 350 104.25
FACE HEIGHT (FT) 26-36 1 �00
SPARTAN 450 139
SUB DRILLING (FT) 3 BULK
TITAN XL 1000 G 26,980
AVG. STEM FACE HOLES (FT) 7,133
STEM OTHER HOLES (FT) 7
BURDEN FRONT ROW (FT) 9
BURDEN OTHER ROWS (FT) 9
SPACING FRONT ROW (FT) 9
SPACING OTHER ROWS (FT) 9
TOTAL WEIGHT (LB):l 27,223.25
DETONATORS USED IN BLAST: Non -Electric MATS USED: No STEM TYPE� CRUSHED STONE TOTAL DRILL DEPTH: 4,452 (FT
TYPE MFG DATE CODE USED TYPE MFG DATE CODE1 USED
EZOET 25/350 30 FT Dyno Nobel Global 06MA17WI 140 EZDET 25/350 40 FT Dyno Nobel Global 27MA17W1 82
EZDET 25/350 40 FT Dyno Nobel Global 20MA17W1 6 EZDET 25/350 50 FT Dyno Nobel Global 05DE16XI 30
EZDET 25/350 50 FT Dyno Nobel Global 27FE17X1 20 EZTL 42MS 20FT Dyno Nobel Global 05DE16XI 15
EZTL 9MS 50FT Dyno Nobel Global 20JU16X1 3 SPARTAN 350 Dyno Nobel Global 24MY17J2 139
SPARTAN 450 Dyno Nobel Global 29JU17J1 139
CU YDS IN SHOT 12,105 SCALED DISTANCE FACTOR: 30 % OF ANFO: 0
TONS IN SHOT 27,842 HOLES/DELAY: 2 FUEL OIL % (BULK): 0
MAX LBS/DELAY,- 392 AVERAGE LBS/HOLE: 196
POWDER FACTOR (TONS/LB): 1.02 POWDER FACTOR (POUNDS/YD3): 2.25
BLASTERS NAME: Verweire jillp BLASTERS NUMBER & STATE: NIA NIA
BLASTERS SIGNATURE: SITE SAFETY INSPECTION PERFORMED: Yes
MINE MGT, SIGNATURE: NUMBER OF PERSONNEL ON SITE: 5
REMARKS -. customer layot.�t really needed tighter spacing on the front row, two trucks used . many short holes in this one,
lots of water. very nice ramp was made to get up on the shot, all company supplied help worked out nicely.
STARTTIME END TIME TOTAL TI TRUCK NUMBERS
9:00 AM 12:15 PM I HT1175
Dyno Nobel North America
CUSTOMER NAME: BOONE
BENCH: Bench 2
BLASTER'S NAME: Verweire, Jim
DIAGRAM
BLAST DATE: 07/21/2017
BLAST NUMBER:2
A NO ',*',
,4
3-V
114
"q
IN
1�1 12
2m
3w
IM
4A
4,9
424
SM
J26
1
ssi
60
�93
59
616
.1
V4
Ils '4)0
311
M
1 $110
, SC5
61�
V's
ew
os
"0
Isa
fM
A NO ',*',
Wehner, Judy
From: Gantt, Matt
Sent: Wednesday, August 23, 2017 10:26 AM
To: Boyer, Janet
Cc: Vinson, Toby; Cole, Brad; Wehner, Judy; Latham, Tim
Subject: RE: blasting complaint Bamboo Quarry
Attachments: D00082317-08232017101753.pdf
Janet,
Here is the information from our file regarding the blasting complaint of March 15, 2017 at Bamboo Road. I was at the
quarry performing an inspection on March 13, 2017, and found the site to be compliant. We have not received any
further blasting complaints since the March 15, 2017 event.
Thanks,
Matt
From: Boyer, Janet
Sent: Friday, July 07, 2017 4:58 PM
To: Gantt, Matt <matt.gantt@ncdenr.gov>
Cc: Vinson, Toby <toby.vinson@ncdenr.gov>
Subject: blasting complaint Bamboo Quarry
Matt,
This is the other blasting complaint that I was talking about today. I have not received hard copies (just email) of
blasting records, and we have not any records or information of a shot since March 15, 2017.
Janet S. Boyer, PE
State Mining Specialist
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
919-707-9220 office
Janet, boyer(q-)_ncdenr.gov
512 N. Salisbury Street —Archdale Building
1612 Mail Service Center
Raleigh, INIC 27699
�Nothing Cornpares.,_,.
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and n7ay be disclosed to third parties,
Gantt, Matt
From:
Sent: Thursday, March 16, 2017 3:59 PM
To: Gantt, Matt
Subject: Radford Rock Quarry
Mr. Gantt,
Yesterday, March 15, 2017 around 4:30 p.m. the Radford Rock Quarry generated a blast that shook the
windows at our house at in the Sunny Knoll Subdivision. We don't think that the quarry
should use dynamite of that magnitude due to the closeness of our neighborhood.
Please make a record of this complaint and help us to prevent this from recurring. As I stated in an email to you
dated October 27, 2016, our neighborhood is very concerned and frightened about the dust, noise and damage
to our properties due to this closeness.
I would greatly appreciate it if you would send me any helpful information on what we can do.
Sincerely,
MINE BLASTING COMPLAINT FORM
NAME OF PERMITTEE; Radford Quarries of Boone
MINE NAME/MINING PERMIT NUMBER: Bamboo Road Quarry/95-05
COUNTY: Watauga
COMPLAINANT=5 NAME: -
AbbRESS: Sunny Knoll Subdivision, Boone
PHONE #:
APPROX DISTANCE OF COMPLAINANT=S RESIDENCE TO MINE:
DATES OF SEVERE BLASTS. 3/15/2017
WEATHER CONDITIONS DURING THE BLASTS IN QUESTION, IF KNOWN:
Unknown
NATURE OF COMPLAINT/COMMENTS: Blast at Bamboo Road Quarry shook the
windows at home.
NVESTIGATOR=S NAME: Matthew Gantt
DATE COMPLAINT RECEIVED: 3/16/2017
INE BLASTING COMPLAINT FORM
NAME OF PERMITTEE: Radf ord Quarries of Boone
MINE NAME/MINING PERMIT NUMBER: Bamboo Road Quarry/95-05
COUNTY: Watauga
COMPLAINANT=S NAME:
ADDRESS; Sunny Knoll Subdivision, Boone
PHONE #:
APPROX. DISTANCE OF COMPLAINANT=5 RESIDENCE TO MINE:
DATES OF SEVERE BLASTS: 3/15/2017
WEATHER CONDITIONS DURING THE BLASTS IN QUEST -ION, IF KNOWN:
Unknown
NATURE OF COMPLAINT/COMMENT5: Blast at Bamboo Road Quarry shook
house,
INVESTIGATOR=5 NAME: Matthew Gantt
DATE COMPLAINT RECEIVEb-- 3/17/2017
*-Dyno Nobel North America BLAST REPORT
DYN"O',
SERVICE SITE LOCATION: Olin ORDER NO.: 1034277 - Dyno Nobel
BLAST NUMBER: 1 BLAST TIME: 4:37 prn BLAST DATE: 03/1512017
CUSTOMER: RADFORD QUARRIES VINE: BOONE ADDRESS: BOONE, NC
ROCK TYPE: Granite Tons/Yd3: 2.30 EXPECTED VIBRATION: 0.650 ips
LOCATION OF BLAST
LOCATION OF BLAST IN MINE: North
BLASTGPSPOINTS. N036.21617
-BENCH: Bench I
& W-081.63558
WEATHER
WEATHER: Partly Cloudy CEILING: Medium TEMPERATURE: 24 F WIND DIRECTION & SPEED: South 20 MPH
NAME: 101 ChipmunkTrail
DISTANCE: 635 (FT)
NEAREST NON -OWNED STRUCTURE
GPS Points: N D36.21506 & W -081.63392
DIRECTION: 129*
SEISMOGRAPH DATA
LOCATION
DISTANCE GPS POINTS CALIBRATION DATE
1 1 101 Chipmunk Trail 1635 (FT) I N 036.21506 & W -081.63392 11/07/2016
L (F) T (F)
V (F) I AIR (db)
I SEISMOGRAPH SE�RIAL OPERATOR
NIT N/T N/T NIT
N/T NIT I N/T
IMINIMATE PLUS BI BE21828 P, Radford
BLAST DATA
NUMBER OF HOLES (EA)
107 EXPLOSIVES SIZE, TYPE & WEIGHT
HOLE DIAMETER (IN)
4 SIZE TYPE WEIGHT
HOLE DEPTH (Fr)
27-43 0.44 SPAR -TAN 2000 47.08
FACE HEIGHT (FT)
27-33 1.00 SPARTAN 450 107
SUB DRILLING (Fr)
3 BULK TITAN XL 1000 G 17,800
AVG. STEM FACE HOLES (FT)
10.588
STEM OTHER HOLES (FT)
10
BURDEN FRONT ROW
BURDEN OTHER ROWS
9
SPACING FRONT ROW (FT)
8
SPACING OTHER ROWS (Fr)
9 TOTAL WEIGHT (LB) 17,954.08
DETONATORS USED IN BLAST. Non -Electric
MATS USED: No STEM TYPE CRUSHED STONE TOTAL DRILL DEPTH: 3,838 (FT
TYPE MFG
DATE -CODE USED TYPE MFG DATE CODE USED
EZDET 25/350 30 FT DynD Nobel Global
18JY16W1 107 E7_DET 25/350 50 FT Dyno Nobel Global 05SE16X1 6
E7_DET 25/350 50 FT DynD Nobel Global
G4MY15X1 6 EZDET 25/350 50 FT Dyno Nobel Global 04JAl 6X 1 19
EZDET 25/350 50 FT Dyno Nobel Global
03AU15X1 9 EZDET 25/350 50 FT Dyno Nobel Global 08AU16X1 a
EZDET25/350 50 FT Dyno Nobel Global
28N016X1 46 E7_DET 25250 60 FT Dyno Nobel Global 23JA17XI 13
EM 42MS 201FT DynD Nobel Global
Q5SE16X1 14 EZTL 9MS 20 FT Dyno Nobel Global 14N01SX1 5
LEADLINE250OFT Dyno Nobel Global
02JA17WI 1 SPARTAN 200G Dyno Nobel Global 07FEI 7.12 107
SPARTAN 450 Dyno Nobel Global
07FE17.11 107
CU YDS IN SHOT: 10,693 SCALED DISTANCE FACTOR: 34 % OF ANFO: 0
TONS IN SHOT. 24,592 HOLES/DELAY: 2 FUEL OIL % (BULK): 0
MAX LBS/DELAY: 338 AVERAGE LBS/HOLE: 168
POWDER FACTOR (TONS/LB): 1.37 POWDER FACTOR (POUNDS/YD3): 1.68
BLASTERS NAME: Verweire. JIM BLASTERS NUMBER & STATE: N/A NIA
BLASTERS SIGNATURE: SITE SAFETY INSPECTION PERFORMED: Yes
MINE MGT. SIGNATURE: NUMBER OF PERSONNEL ON SITE: 4
REMARKS : holes ranged from 30'-43' used 36 as an average depth. long time to start loading, wait to get stemming out.
many holes not to depth most of these 27' deep, lots of hole issues blocked with rocks, most cleared up. paired
holes could not be drilled where they should have gone, because of ground conditions. seismograph did not get
the shot.
START TIME END TIME TOTALTIME I TRUCK NUMBERS
12:15 PM 3:35 PM 03:20 1 HT1175
Dyno Nobel North America
DIAGRAM
CUSTOMER NAME: BOONE
BLAST DATE: 03/15/2017
Dymo
BENCH: Bench I
BLAST NUMBER: I
ho
BLASTERS NAME: Verweire, Jim
D 4o'bel
IN
0 0
10
.'0'- 0 a- 0
0
0 0 0
0
0
0
0
0.
9 9
34 59 84 109 134
159
184
-20 218
227
-252
277
302
0-
0
0--
0 a 0 0-
Q
0
0
0
0
0
0
42
.0-
q7
92
117
142 167 192 --217
242
267
292
317
342
367
392-
0
0
0
0 0 0
0309
0
0
0
�434
0
�4559
jgq�
1�4
184
209 234 259 L2284
-M�0354�
354
384
409
0
0-
0
0,
0 0
0
0
0
0
0
176
201
296 -
--251
276 301 326 351
376
401
426',
451
476
501
526
0
243
0
968
0.1
20-
0
3-18
0 0 a 0.,
343 -369 393 410
0
443
0
468
0
-493
0
518
543
568
0
591
0
310
0
335
0
30P
-0
385
0 0 0 0
410 435 460 485
Q.
$10
0
535
, 0
560
0
585
610
635
0.
66G-
0
377
0
402
0
4ZI
0
452
0 0 0
4ZI 5 "552
577
0
69Z
0
627
0
652 -
0
677
0
702
0
727-
North Carolina Department of Enviromental Quality,
Division of Energy, Mineral, and Land Resources, Land Quality Section
MINE INSPECTION REPORT
PERMI[TTED MINE SITE F� UNPERMITTED M[INE SITE
1. AffiliE NAME: Bamboo Road Quarry 2. YHNE LOCATION: Glendale School Road
3. COUNTY: Watauga 4. RIVER BASIN: New 5. CASE: N/A
6. OPERATOR: Radford Quarries, Inc.
7. ADDRESS: P.O. Box 2071, Boone, NC 28607 Attn: Mr. DJ Cecile, PhD
8. MINING PERM(IT 9: 95-03 F N/A 9. PERMT EXPIRATION DATE: 11/4/2025 F] N/A
10. PERSON(S) CONTACTED AT SITE: D.J. Cecile (Radford Quarries), Derek Goddard (BREC)
11. PICTURES? Z Yes F1 No TAKEN BY: Matthew Gantt
12. TYPE OF INSPECTION:
F1 A. Initial Inspection (Unpermitted M[ine Sites)
1. Size of affected land: ac. (attach sketch map)
2. How was this area measured? Measured by:
B. Routine Inspection (Permitted Mine Sites)
C. Follow-up Inspection
13. Date of last inspection: 5/29/2014
14. Any mining since that date? E Yes D No If yes, cite evidence of such mining activity: Yes, mining
activity observed during inspection.
15. Was mine operating at time of inspection9 M Yes 0 No If yes, explain: M[ine was operational
during inspection
16. Is the mine in compliance with the Operating Conditions of the Permit? Z Yes E] No N/A
If no, explain:
17. Is the mine in compliance with the Reclamation Conditions of the Permit? 0 Yes D No N/A
If no, explain: N/A
18. Is there any off-site damage? A. E] Yes B. Z No C. F-1
If A, describe the type and severity of the damage: None Observed
If B or C, is there potential for oftsite damage? 0 Yes X No Explain: NA
19. Corrective measures needed and/or taken: Areas along the 50 -foot unexcavated buffer have been
stabilized with vegetation and white pine trees. The portion of the BREMCO access road within the 50 -foot
unexcavated buffer (on the south side of the mine) has been stabilized with base stone. A rip -rap ditch line
has been established along the north side of the BREMCO access road. The access to the mine off of Sunny
Knoll Acres Drive has been chained off. A good stand of vegetation is now present on the slopes of the
sediment skimmer basin located below the proposed plant and the proposed stockpile arm The lower
portion of the BREMCO access road off of Bamboo Road has also been covered with base stone. A new
drainage box has been installed at the inlet to the NCDOT culvert pipe under Bamboo Road. Mr. Cecile is in
the process of obtaining a metal grate from NCDOT to cover the top of the drainage box noted above.
Runoff from the upper portion of the BREMCO access road has been directed into the mining pit.
20. Other recommendations and comments: Meeting held on site with Mr. DJ Cecile and Mr. Derek
Goddard (BREC) at the request of Mr. Cecile to evaluate the condition of the 50 -foot unexcavated buffer on
the south and southeast portions of the mine. The white pine trees within the 50 -foot unexcavated buffer are
now roughly 4-5 feet tall. A good stand of volunteer vegetation (briars) is now present between the white
pine trees and the property boundary. Mr. Goddard has had the 50 -foot unexcavated buffer surveyed and
the buffer is now marked with wooden stakes and pink ribbons. Mining equipment, primarily dump trucks,
were parked outside of the 50 -foot unexcavated buffer. Trash and debris were being removed from the 50 -
foot buffer during the inspection. The lower portion of the quarry located on the west side of Bamboo Road
was als - o inspected. A small hole has been excavated on the outlet side of the drainage culvert under Bamboo
Road to capture any possible sediment running through the.culvert pipe. No flow was noted within the
channel below the NCDOT pipe during the inspection. Several stockpiles were noted on the west side of
Bamboo Road. Mr. Cecile indicated that the inventory was low at this time of year and will need to be
replaced in the spring. Travel areas on the west side of Bamboo Road had been stabilized with base stone.
21. Is the Annual Reclamation Report +/- map accurate? 0 Yes E:1 No (Explain) Z Not Reviewed EJ N/A
22. Follow-up inspection needed? E Yes X No Proposed date: March 13,2018
23. No. of additional pages of Inspection Report 0
24. Copy of Report sent to operator 3/16/2016
INSPECTED BY: Matthew Gantt
DATE March 13, 2017
Telephone No: 336-776-9800
Copy to file
Copy to operator
Copy to Min�g Specialist