Loading...
HomeMy WebLinkAbout20180073 Ver 1_USACE Correspondence_20180207Carpenter,Kristi From: Williams, Andrew E CIV USARMY CESAW (US) <Andrew.E.Williams2@usace.army.mil> Sent: Wednesday, February 07, 2018 2:35 PM To: King, Art C Cc: Norton, Apri) R; Williams, Andrew E CIV USARMY CESAW (US) Subject: [External] USACE Action ID SAW-2018-00108 Bridge 124 Montgomery County INCOMPLETE NOTIFICATION Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> A rt, This email serves as an incomplete notification for the following NCDOT projects: Bridge 124 replacement project in Montgomery County It is identified by the following Corps of Engineers Action ID/Project Description: SAW-2018-00108 (NCDOT/SR 1340 (Okeewemee Star Road/BR124/Division 8) Please provide the following: 1. Please label each fill listed in the PCN with a corresponding letter/number/specific identifier on the Permit Drawings. 2. Please provide additional information regarding avoidance and minimization. Specifically, please provide addition information regarding the placement of the bridge bent within the existing stream. The existing stream width is listed as 52 feet. Please indicate reasons that the bridge can't be designed to span the entire width. 3. Please provide additional information regarding avoidance and minimization. Specifically, please provide a brief discussion on the need to use a temporary workpad/causeway. If you have any questions or concerns, please contact me. Thanks. Andrew Williams Regulatory Project Manager US Army Corps of Engineers Wilmington District, Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 919-554-4884 ext. 26