HomeMy WebLinkAbout20140957 Ver 2_ACP_hearing officers rept_01042018_KHcomments_draft_20180104[Type here]
January XX, 2018
MEMORANDUM
To: Linda Culpepper
Interim Director, Division of Water Resources
From: Brian Wrenn, Ecosystems Branch Supervisor
Division of Water Resources, Water Sciences Section
Subject: Hearing Officer's Report and Recommendations
Atlantic Coast Pipeline, LLC
Individual 401 Water Quality Certification and Buffer Authorization Certificates
Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson
Counties
I served as the Hearing Officer for the subject Public Hearings held at the Fayetteville Technical
Community College in Fayetteville, NC on July 18, 2017 and at the Nash Community College in
Rocky Mount, NC on July 20, 2017. The public hearings were held underthe authority of Title 15A
NCAC 02H .0504. The purpose of these public hearings was to receive comment on the Division
of Water Resources' 401 Water Quality Certification (401 WQC) and buffer authorization
certificates application (Appendix A) submitted by Atlantic Coast Pipeline, LLC (ACP). A 401 Water
Quality Certification and buffer authorization certificates areis needed to construct a natural gas
pipeline through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and
Robeson Counties.
In addition to listening to oral comments at the public hearings, I have reviewed all written
comments received prior, during and after the public comment period. In preparation of this
report, I have considered all of the public comments, the public record, discussions with Division
of Water Resources (DWR) staff related to the rules, and their review of the applications for the
project.
The report has been prepared using the following outline:
1. Site History/ Background
11. July 18, 2017 Public Hearing Summary
Ill. July 20, 2017 Public Hearing Summary
IV.
Comments
V.
Recommendations
V1.
Summary
VI 1.
Appendices
1. History / Background
On May 9, 2017, Atlantic Coast Pipeline, LLC (ACP) submitted an application for a 401 WQC
and buffer authorization certificates. ACP had previously applied to DWR on October 23,
2015. DWR requested additional information on November 18, 2015. The requested
information was not provided, therefore DWR returned the application on August 31, 2016.
ACP is proposing to construct and operate an approximately 605 -mile -long interstate natural
gas transmission pipeline system including laterals through West Virginia, Virginia and North
Carolina. In North Carolina, ACP is proposing to construct one compressor station and install
approximately 186 miles of transmission pipeline and appurtenances, including 3 metering
and regulating stations, 11 valve sites and 4 pig launchers/receivers, through Northampton,
Halifax, Nash, Wilson, Johnston, Sampson, Cumberland and Robeson Counties.
ACP is proposing over 300 crossings of streams and open waters, temporarily impacting over
35,000 linear feet and permanently impacting over 700 linear feet of stream. ACP is also
proposing crossing wetlands, temporarily impacting over 450 acres and permanently
impacting less than one acre of wetlands. ACP will impact protected riparian buffers within
the Neuse and Tar -Pamlico River basins, impacting over 648,000 square feet of zone 1 and
over 455,000 square feet of zone 2 protected riparian buffer.
DWR requested and received additional information several times throughout the application
review process:
Date
Action
June 27, 2017
Req. for Add Info (1)
July 12, 2017
Add Info Re ceived (1)
September 14, 2017
Req. for Add Info (2)
September 22, 2017
Add Info Received (2)
October 2. 2017
Add Info Received (2)
October 13, 2017
Add Info Received (2)
October 26, 2017
Req. for Add Info (3)
November 4, 2017
Add Info Received (3)
November 15, 2017
Add Info Received (3)
November 28, 2017
Req. for Add Info (4)
December 8, 2017
Add Info Received (4)
December 14, 2017
Req. Correction to (4)
December 20, 2017
. Add Info Received (4)
Under the authority of Title 15A NCAC 02H .0504, DWR held a public comment period from
June 16, 2017 until August 19, 2017 to accept public input on the application. The public
comment period included two public hearings described below.
In accordance with Title 15A NCAC 02H .0503, notice of the public hearings and availability of
the 401 WQC and riparian buffer authorization certificates application was published in The
Fayetteville Observer, the News & Observer, the Rocky Mount Telegram, the Roanoke -
Chowan News -Herald, the Robesonian and the Wilson Times on June 17, 2017, in the Daily
Herald and the Sampson Independent on June 18, 2017, and posted online and sent by mail
to the Water Quality Certification Mailing List on June 16, 2017 (Appendix B). A correction to
the public notice to correct a typo in the pipe diameter was posted online on June 19, sent to
the mailing list on June 20, and issued in the newspapers on June 21 and 22 (Appendix C). The
public comment period ended on August 19, 2017; however, since August 19th was a
Saturday, DWR accepted comments through Monday, August 21.
PA
11. July 18, 2017 Public Hearing
A public hearing was held July 18, 2017, at 6 p.m. at the Fayetteville Technical Community
College in Fayetteville, NC. The public hearing was held under the authority of Title 15A NCAC
02H .0504. This was a public hearing to receive public comment for the DWR 401 WQC
application (Appendix A) submitted by ACID in order to construct a natural gas pipeline
through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson
Counties.
One hundred thirty-nine people attended the July 18 public hearing, including 8 staff
members from the Department. A total of 131 individuals signed the attendance sign -in
sheets at the registration table (Appendices D and E). The hearing officer provided opening
remarks and Jennifer Burclette, DWR, presented background information on the 401 WQC
process and the proposed application before the hearing was opened for public comment.
Forty-four individuals registered in advance of the hearing to provide comments, and two
additional individuals made comments for a total of 46 speakers. Speakers were given three
minutes for initial presentations. Additional time was allowed for speakers after everyone
that registered to speak was finished, which was used by three speakers. The list of speakers
is included (Appendix E).
The public hearing transcript, including oral cc
H). DWR also received approximately 9,600 \t\
period from local and state government agen
Approximately 8,220 comments were opposec
in favor. Some of the comments were written
the public hearings. A summary of the commer
alonR with detailed responses that have a dire
process are incl
111. July 20, 2017 Public Hei
A second public hearing wa!
Rocky Mount, NC. The publ
.0504. This was a public heai
(Appendix A) submitted b
Northampton, Halifax, Na
Counties.
below.
ri
mments, is attached to this report (Appendix
ritten comments during the public comment
-ies, citizens and citizen groups (Appendix J).
to the project and approximately 1,370 were
transcripts of the comments provided during
ts for both hearings and the comment period,
't impact on the certification decision making
held July 20, 2017, at 6 p.m. at the Nash Community College in
c hearing was held under the authority of Title 15A NCAC 02H
ng to receive public comment forthe DWR 401 WQC application
ACID in order to construct a natural gas pipeline through
h, Wilson, Johnston, Sampson, Cumberland, and Robeson
One hundred seventy-six people attended the July 20 public hearing, including 8 staff
members from the Department. A total of 168 individuals signed the attendance sign in
sheets at the registration table (Appendices F and G). The Hearing Officer provided opening
remarks and Jennifer Burclette, DWR, presented background information on the 401 WQC
process and the proposed application before the hearing was opened for public comment.
Sixty-five individuals registered in advance of the hearing to make comments. Speakers were
given three minutes for presentations and the hearing was held open an additional thirty
3
minutes to allow all speakers that registered to speak. The list of speakers is included
(Appendix G).
The public hearing transcript, including oral comments, is attached to this report (Appendix
1). DWR also received approximately 9,600 written comments during the public comment
period from local and state government agencies, citizens and citizen groups (Appendix J).
Approximately 8,220 comments were opposed to the project and approximately 1,370 were
in favor. Some of the comments were written transcripts of the comments provided during
the public hearings. A summary of the comments for both hearings and the comment period,
along with detailed responses that have a direct impact on the certification decision making
process, are included in Section V below.
IV. General Comments
The following is a summary of the comments received during the July 18, 2017 and July 20,
2017 public hearings and emails and other written comments received by DWR during the
public comment period. Comments received outside of the public comment period were
made part of the public record. An overwhelming majority of the comments were in
opposition to the pipeline for a variety of reasons.
Many comments received expressed concerns about the continued use of fossil fuels,
specifically fracked natural gas, and their negative impact on climate change. Manythink
NC and the US should be moving toward the use of renewable energy sources.
Proponents of the project believe that natural gas is a "clean" fuel option to replace coal
and other fossil fuels.
Many comments received were skeptical of ACP's promotion of the project as a job
creation opportunity and economic stimulator for local communities. Several pointed
out that ACP's own job creation estimates are very low and that the economic benefits
to local communities are vague. Proponents of the project reiterated that the pipeline
would bring jobs and economic development to NC.
Many comments received expressed concerns about the cumulative impacts analysis
provided by ACP. Many believe that the analysis did not contain sufficient detail to
properly evaluate the cumulative impacts. Some comments indicated that the
temporary impacts from the project should be considered in the cumulative impact
analysis and that the sheer volume of temporary impacts should be calculated to equal
some level of permanent impacts.
Many comments received questioned the purpose and need of the project. Many
pointed to evidence that the growth of natural gas markets was estimated to be
negligible and questioned the need to build such a large and expensive pipeline. Many
noted that the market demand was generated through companies owned or affiliated
with Duke and Dominion power companies and that the need was self-serving rather
than one identified through public interest. Furthermore, several commenters stated
that the purpose of economic benefit was misleading as ACP's own estimates predict
little permanent job growth as a result of the project.
all
Many comments received expressed concerns about environmental justice issues
associated with pipeline's construction and operation. Many believe that the pipeline will
have a disproportionate impact on low-income and minority communities. Many
commenters feel that ACP has not made significant efforts to coordinate with these
communities or to consider other routes that would reduce the impacts on these
communities. Specifically, several commenters mentioned ACP's lack of coordination
with state -recognized tribes such as the Lumbee and Haliwa-Saponi. Furthermore, they
do not believe ACP has adequately addressed potential impacts to cultural resources
along the pipeline route.
• Several commenters expressed opposition to ACP's use of eminent domain to obtain
right-of-way for the pipeline.
• Several commenters raised concerns about Duke Power's past record of non-compliance
with environmental regulations and permits.
• Several commenters raised concerns about living within the "blast zone" of the pipeline
and questioned ACP's liability response should an explosion occur. Others believe that
the pipeline is a safe and efficient way to transport natural gas.
• Many comments received expressed concerns over ACP's potential impacts to water
quality from erosion and sedimentation. Many commenters feel that ACP's erosion and
sedimentation control plan is inadequate and lacks sufficient detail. Others believe that
trenching through streams and wetlands will have a negative effect on stream stability
and threaten wildlife. Concerns over blasting effects were also raised.
• Many comments received expressed concerns over impacts to wildlife, specifically
threatened and endangered species. Many felt that the construction activities could
destroy critical habitat and primary nursery areas for a variety of terrestrial and aquatic
species. Others felt that the extensive coordination process with the US Fish and Wildlife
Service and NC Wildlife Resources Commission has adequately addressed any potential
Many commenters believe that the 401 application was incomplete. They pointed to
the lack of erosion and sedimentation control plans and site-specific water body crossing
details as evidence that necessary information was missing from the application. In
contrast, some commenters believe that the ACP project has gone through an extensive
regulatory review process.
The overwhelming majority of comments received raised concerns overthe degradation
of ground and surface waters as a result of the construction and operation of the
pipeline. Many commenters mentioned the large number of streams and wetlands that
would be crossed by the pipeline and raised red flags regarding the large amount of
temporary and permanent impacts. They connected these impacts with the degradation
of downstream uses including drinking water supply, aquatic life, primary and secondary
contact recreation, and fisheries. Furthermore, commenters spoke in detail of the loss
of wetlands through temporary impacts. Many felt the temporal and permanent
vegetation changes from temporary wetland impacts should be considered permanent
wetland impacts. Finally, many comments were made regarding potential impacts to
drinking water wells. A significant level of concern was present among the commenters
about impacts to wells from construction activities (mainly blasting activities) and
61
operation of the pipeline.
V. Certification Specific Comments and Recommendations
Based on the review of public comments, the application, the North Carolina General Statutes
and Administrative Code, and discussions with DWR staff, I offer the following comments and
recommendations on the criteria for issuance of a 401 WQC pursuant to 15A NCAC 02H
.0506(b) and the issuance of Neuse and Tar -Pamlico River Basin Buffer Authorization
Certificates pursuant to 15A NCAC 02B .0233 and 15A NCAC 02B .0259, respectively.
15A NCAC 02H .0506(b)
(1) Has no practical alternative under the criteria outlined in Paragraph (f) of this Rule.
Paragraph (f) states: "A lack of practical alternatives may be shown by demonstrating
that, considering the potential for a reduction in size, configuration or density of the
proposed activity and all alternative designs the basic project purpose cannot be
practically accomplished in a manner which would avoid or result in less adverse
impact to surface waters or wetlands."
The project proposes to construct a pipeline to transport i
Pennsylvania through Virginia and North Carolina. T
proposed route will be constructed through Northampto
Sampson, Cumberland, and Robeson Counties. As part
Commission (FERC) National Environmental Policy Act
several alternatives to meet the purpose and need of the pt
energy, energy conservation, and system alternatives. 0
found that the build alternative best met the purpose and
�ural gasfrom West Virginia and
North Carolina portion of the
Halifax, Nash, Wilson, Johnston,
F the Federal Energy Regulatory
EPA) analysis, ACP investigated
?ct including no build, alternative
hese alternatives, FERC and ACP
?ed of the project.
Next ACP, conducted an extensive alternatives analysis on potential route locations including
collocation of the ACP with existing pipelines as well as Eastern and Western route
alternatives. Ultimately, ACP chose the Eastern route as the best option based on an
evaluation of a variety of criteria such as project length and human and natural resources.
ACP continued to refine the Eastern alternative balancing a variety of human and natural
environmental resources such as public lands, roads, conservation easements, forested lands,
streams and wetlands, known historical and cultural resources, and homes and businesses.
Development of the proposed pipeline route included the analysis of seventeen major route
alternatives and 37minor adjustments in the North Carolina portion of the project in an effort
to avoid and minimize impacts to these resources. This analysis included pre- and post -
application communication with DWR and NC Wildlife Resources Commission (NCWRC) on
avoidance and minimization opportunities. ACP has continued to refine the avoidance and
minimization practices in response to additional information requestsfrom DWR and through
environmental commitments. A more detailed discussion of avoidance and minimization can
befound below.
Recommendation: None. The applicant has sufficiently demonstrated that there is no
practical alternative that can accomplish the project's basic purpose with less adverse impact
to surface waters or wetlands.
11
(2) Will minimize adverse impacts to the surface waters based on consideration of
existing topography, vegetation, fish and wildlife resources, and hydrological
conditions under the criteria outlined in Paragraph (g) of this Rule.
Paragraph (g) states: "Minimization of impacts may be demonstrated by showing that
the surface waters or wetlands are able to continue to support the existing uses after
project completion, or that the impacts are required due to:
(1) The spatial and dimensional requirements of the project; or
(2) The location of any existing structural or natural features that may dictate the
placement or configuration of the proposed project; or
(3) The purpose of the project and how the purpose relates to placement,
configuration or density.
The applicant has minimized impacts to surface
practical. The permanent impacts will be 76
wetlands. The permanent impacts related to
upgrading and improving access roads constru
pipeline, not from the pipeline itself. All crossi
horizontal directional drilling (HDD) to avoid ope
impacts is very high but within reason conside
applicant will use a narrower construction corric
techniques such as timber matting, temporary
minimize temporary impacts to streams and we
and wetland areas will be restored to the ori
plants. ACP will monitor any temporary impact
is no permanent loss at these locations. The
minimum of two yearsfor streams and three yea
hvdroloav reauirements. UDon successful com
activities, the stream an
hydrology, vegetation, or
The applicant has cc
minimize iMDOCtS to S
0 Demarcation of
I wetland imj
d oauatic and
waters and wetlands to the greatest extent
6 linear feet of streams and 0.80 acres of
streams and wetlands will be a result of
-ted for installation and maintenance of the
ngs of major rivers will be conducted using
n trenching. The magnitude of the temporary
ring the size and scope of the project. The
or when crossing wetlands and construction
work bridges, and clean rock over piping to
t1ands. Temporary impacts to streambanks
7inal contours and revegetated with native
areas in streams or wetlands to ensure there
monitoring plan includes monitoring for a
rsfor wetlands with stability, vegetation, and
pletion of the restoration and monitoring
is will continue to support existing uses of
habitat.
to a number of best management practices to avoid and
d wetlands.
nd boundaries with flogging and signs prior to start of
Use of temporary work bridges, matting and pods to reduce the risk of soil compaction
Trench backfilling using native material to prevent soil contamination and to
accelerate revegetation
Limiting operation of construction equipment in wetlands to only that necessaryfor
clearing, excavation, pipe installation, backfilling, and restoration
Installing trench breakers or plugs at the boundaries of wetlands to prevent draining
of wetlands
Pump -out activities in the work area will be routed through an energy
dissipation/sedimentfiltration device prior to discharging to waterbodies
Use of a project -specific invosive plant species management plan
7
* Stump removal, grading, and excavation will be limited to the area immediately over
the trench line to maintain native seed and rootstock
* Coating for concrete -coated pipe will be conducted at least 100 feet from surface
waters and springs
* Prohibiting use of live concrete as a building material so that wet concrete does not
come in contact with surface waters
* Prohibiting storage of chemicals, fuels, hazardous materials, and lubricating oils
within 100feet of surface waters
* Voluntarily implementing the requirements of the Construction Stormwater General
Permit No. NCGO10000
Use of horizontal directional drilling for a// major river crossings
Implementation of a Spill Prevention, Control, and Countermeasure plan and a
Horizontal Directional Drill Drilling Fluid Monitoring, Operations, and Contingency
plan
ACP has completed formal consultation with
threatened and endangered species along the c
opinion, USFWS did not identify any threatened
in NC along the proposed corridor. ACP has als
This coordination began with the alternatives ana
ACP worked with NCWRC to avoid threatenec
and to develop relocation protocolsforfish an
surveys for fish and mussels in the Neuse R
surveys found that the mussel population
previously known. This survey and the contin
revised proposal to use HDD at the Neuse Rivi
US Fish and Wildlife Service (USFWS) on
orridor. In an October 16, 2017 biological
ind endangered species or sensitive habitat
) coordinated extensively with the NCWRC.
lysis and site-specific routing of the pipeline.
d endangered species and sensitive habitats
ussels. ACP also conducted pre -construction
. at the proposed crossing location. These
s much more abundant and diverse than
coordination with NCWRC resulted in ACPs
istead of open trenching.
Recommendation: The applicant has sufficiently demonstrated that impacts to surface
waters and wetlands are required due to spatial considerations, natural features and the
purpose of the project. The 401 WQC should include requirements for monitoring of
temporary impact areas in accordance with the proposed restoration and monitoring plan.
The certification should also include reopener language in the event that temporarily
disturbed wetland areas do not return to wetland conditions as defined by the 1987 US Army
Corps of Engineers Wetland Manual. The reopener language should require a modification to
the 401 WQC to account for the additional permanent impacts and mitigation for G//
permanent wetland impacts should the permanent impacts exceed 1.0 acre. Furthermore,
the 401 WQC should be conditioned to comply with any work moratoriums suggested by
NCWRCfor the proposed project.
(3) Does not result in the degradation of groundwaters or surface waters.
The main risk to surface and groundwater from the ACP project will be during construction
activities. These risks include sedimentation and turbidity in surface waters, breaches of
drilling fluids during HDD, and spills of petroleum products and hydraulic fluids from fueling
and equipment maintenance. In addition, some commenters raised concerns regarding
A
impacts to drinking water wells from trenching and blasting activities associated with the
pipeline installation andfrom possible contamination due to pipeline leaks during operation.
The applicant has committed to working in the dryfor a// stream and wetland crossings unless
site-specific conditions warrant working in wet conditions and the applicant obtains prior
written approval from DWR. Proper erosion and sedimentation control measures will be
required for the entire project in accordance with the Division of Energy, Mineral and Land
Resources (DEMLR) sedimentation and erosion control Certificate of Plan Approval. All
temporaryfill placed in surface waters related to construction of the pipeline will be removed
once installation of the pipeline is completed at the crossing and the stream banks or wetlands
will be restored to the original contours and revegetated with a native seed mix to prevent
erosion. Only in areas where vegetative stabilization is not successful will hardened
stabilization (rip -rap, geogrid, etc.) techniques be used. No hardening will be placed below
the ordinary high water mark. Furthermore, the applicant has voluntarily agreed to meet the
requirements of the NPDES Construction Activities General Permit No. NCGO10000.
The applicant will store chemicalsfuels, hazardous materials, and lubricating oils and conduct
a// equipment and vehiclefueling and maintenance at least 100feetfrom surface waters and
200 feet from private drinking water wells. In situations where equipment must continue to
operate during fueling activities such as dewatering pumps near surface waters, secondary
containment structures will be used to prevent any spillagefrom reaching the surface waters.
The applicant has conducted a desktop survey to identify a// known drinking water wells within
150 feet of the pipeline construction corridor. Almost 50 private drinking water wells were
located in NC. The applicant proposes to test each well prior to construction for a suite of
parameters including pH, total suspended solids, total dissolved solids, conductivity, alkalinity,
acidity, sulfates, oillgrease, phenolic, iron, manganese, aluminum, fecal coliform, copper,
lead, nickel, silver, thallium, zinc, chromium, arsenic, mercury, selenium, cyanide, calcium
magnesium, hardness, chlorides, antimony, cadmium, and beryllium as well as well yields.
These tests will provide a baseline of groundwater quality and quantity against which to
measure any construction -related impacts. In the event that blasting will occur within 500
feet of a drinking water well, the applicant proposes to conduct pre -blasting monitoring for
the parameters listed above. Should the applicant receive a complaint regarding damage to
well water quality or quantity, the applicant proposes to conduct post -construction well
testing of the some parameters to verify no adverse impacts have occurred. Furthermore, in
the event that adverse impacts do occur as a result of construction activity, ACP has
committed to providing temporary water supplies, andlor a new water treatment system or
well.
Recommendation: The project is not expected to violate water quality standards if the
conditions in the 401 Water Quality Certification are fully complied with by the applicant (or
its successor). The 401 WQC should be conditioned to require full compliance with the
following permits:
• Certificate of Plan Approval No. Cumbe-2018-036, issued by DEMLR, Fayetteville
Regional Office
• NPDES Permit No. NCGO10000 issued by DEMLR
A
The appropriate state and local storm water permit(s) for construction of a linear utility
line and associated incidental built -upon area.
The 401 WQC should also be contingent on the issuance of a sedimentation and erosion
control Certificate of Plan Approval issued by DEMLR, Raleigh Regional Office and upon
issuance of appropriate state stormwater permits. FERC NEPA and 401 WQC application
documentation indicates that the applicant has agreed to conduct pre -construction water
quality testing for drinking water wells within 150 feet of the pipeline construction corridor
and within 500feet of blasting activities. The 401 WQC should be conditioned to require ACP
to conduct pre- and post -construction testing of a// wells within 150 feet of the construction
corridor and within 500 feet of blasting activities regardless of whether a complaint is
received. Should post -construction testing indicate that well water quality or quantity has
been impacted by the construction, ACP should be required to provide temporary water
supplies, andlor a new water treatment system or well. An independent, qualified
groundwater specialist should determine whether an impact has occurred or not.
(4) Does not result in cumulative impacts, based upon past or reasonably anticipated
future impacts, that cause or will cause a violation of downstream water quality
standards.
Cumulative impacts are those impacts that would result from the incremental effects of the
project added to other post, present and reasonably foreseeable future activities (15A NCAC
01C.0103). This includes secondary impacts or im eacts from )Fbture activities that occur as a
result f the gr pose'id project, The oro9ose(: 4-r the most Dart will concict nf
1_iLE__EL2�
ation of the oiPeline, These will include
sedimentation and an habitat during
construction, Permanent imoacts will occur in streams and wetlands from access road
and mitigation, efforts erosion and sedimentation control and stormwater best mana('iement
co tin term easurp- I ractices, Arw oroiects
occurring in similar locations to the of'oposed iect will be sy I iect to local state qn(:
rmwater management. and
watershe('. rotection,
Almost 80% ot the increased natural (yas sup -A, has been committed to natural (yas Dower
ndustrial and residential use,
However, onlv three distribu-tion ooints or M&R stations will be constructed in NC, TheseM&R
d around these
distribution ooints- therefore water (: ualit,l impacts are most likelv in vroyimitu tn these
areas, The (:Ipplicant conducted a aualitative analuci f th otential seco
cumulative impacts in these three counties,
In the - ualitative anal sis the a oficant co, feted an "in ct "second(: 0 and cumulative
ameters includina sc--- -f "-
esources were evaluated on their abilitv to
10
contribute to indirect and cumu ative effects on water (7yalitV, Based on these ratin
[ag�s�in( �sareas
s in (:irowth and ent
between buildin(:i the oiPeline and not buildinc the oiDeline are determined, Areas that had
d,
As discussed above, anV new develoomenIL ects will be subject to state and federal
_p��
and erosion and sedimentation control,
However stormvvater manaaement reaulations are vark ble bLI loco tiqoLn,_E-x istin (Lsto te and
Cumberland f the i eline is built.
vvaterZsevver and transLgortation, are_j9redictg
n timber ot sh o vel -read devel mentsites. N19+
ff �� Q
almost entirehl covered by state (:in(l local str
water oualitv imoacts due to arowth in the area
?se areas have exi 1:i i �i� i ��� i! fri i strLicture_for
tg_have� oLqulation arovyth and have a
Johnston and Cu�n_berland Counties (ire
wvater oroarams and johnston Countv is
'ers Mano(:iement Strate0mi. Any
)uld be mitioated throuah these oroarams,
Most nf Robeson Coun does not have state or local stormwater i9roryrrymc, Those that are
W -(.'iter SUDPIV W(itersheds and are limited
in area However o -action on(: se; demonstrated that Robeson CountLl is not
d development as a result of the ninplinp
According to ACPs analysis, L� lack n
is area, OnlV one
y industrial
site is available in Robeson Countv and it is located in the orotected W -('iter Singolv W-(:itershed
(:irowth would be minimal
Recommendation: The project is not expected to result in cumulative impacts that violate
water quality standards, if the conditions in the 401 WQC are fully implemented by the
applicant (or its successor).
(5) Provides for protection of downstream water quality standards through the use of on-
site stormwater control measures.
Post -construction stormwater is another potential water quality concern. The vast majority
of the proposed pipeline project will not result in new impervious surfaces. However, some
new impervious surfaces are proposed as part of the project. The impervious surfaces include
multiple improved access roads, eleven valve stations, a compressor station, three metering
and regulating (M&R) stations, and multiple contractor yards. The access roads are existing
unpaved roads that will be improved to allow construction and maintenance equipment to
safely pass. Improvements will include minor widening andlor surface water crossing
upgrades (e.g., minor pipelculvert extensions). The valve sites are needed to segment the
pipeline for safety, operation, and maintenance purposes. The compressor station will be
11
located in Northampton County, and the M&R stations will be located in Johnston,
Cumberland, and Robeson Counties. The applicant has indicated that stormwater will be
managed by using existing drainage ditches and swalesfor access roads. No curb and gutter
stormwater conveyances are proposedfor the compressor or M&R stations, and stormwater
will be managed through existing drainage ditches and swales.
Stormwater management for these impervious surfaces will be regulated through state
programs in Phase // communities or by local programs where applicable. Valve sites and
access roads in a small portion of Nash County and access roads, valve sites, and a contractor
yard in Cumberland County will be regulated through the state -implemented Phase //
Stormwater Program. ACP will have to meet the requirements of SWG040000 — General
Permit To Construct A Linear Utility Line and Associated Incidental Built -Upon Area (SWG04)
or an individual state stormwater permit. SWG04 and individual state stormwater permits
require compliance with the conditions of the respective permits and with the provisions of
15A NCAC 02H .1000, S.L. 2006-246, and S.L. 2008-211 which ensure the protection of
downstream water quality standards through on-site stormwater control measures. Any
impervious surfaces built in areas covered by local stormwater programs will have to meet
the requirements of the local stormwater program. The applicant also proposes to build
impervious surfaces in areas where no state or local programs are applicable. Basedonthe
descriptions of stormwater best management practices proposed by the applicant,
storm water is not expected to violate downstream water quality standards in these areas.
Recommendation: Session Low 2017-10 prohibits DWR from requiring
on-site stormwater management through a 401 WQC As discussed above, the 401 WQC
should be conditioned to require compliance with a// applicable state and local stormwater
permitsfor construction of a linear utility line and associated incidental built -upon area.
(6) Provides for replacement of existing uses through mitigation.
Both federal and state requirements allow for the purchase of in lieu fee credits to offset
unavoidable impacts to streams and wetlands. DWR requires mitigation [15A NCAC 02H
.0506(h)] at a 1:1 ratio for permanent perennial stream impacts above 300 linearfeet and a
1:1 ratio for permanent wetland impacts above one acre. Perennial stream and wetland
impacts for this project will not exceed the respective mitigation thresholds, therefore, no
stream or wetland mitigation is required by DWR. Mitigation is required however by the U.S.
Army Corps of Engineers for the wetland conversion. Riparian buffer mitigation is required
for the uses identified in the Table of Uses of the Neuse and Tor -Pamlico River Basins Nutrient
Sensitive Waters Management Strategies [15A NCAC 02B .0233(6) and 15A NCAC 02B
.0259(6), respectively] as Allowable with Mitigation. Buffer mitigation is discussed below in
the buffer authorization certificates section.
Recommendation: No mitigation is requiredfor stream or wetland impacts as a result of the
proposed project. The 401 WQC should be conditioned to include language requiring
mitigation should permanent impact changes occur that exceed mitigation thresholds.
Neuse and Tar Pamlico Nutrient Sensitive Waters Management Strategy
12
The Neuse River Basin Nutrient Sensitive Waters M a nagement Strategy and Tar -Pam I ico River
Basin Nutrient Sensitive Waters Management Strategy have the exact same requirements
[15A NCAC 02B .0233 and 15A NCAC 02B .0259, respectively]. Furthermore, the mitigation
requirements for impacts to protected buffers are exactly the same for the Neuse and Tar -
Pamlico River Basins [15A NCAC 02B.0242 and 15A NCAC 02B.0260 respectively] and makes
reference to the buffer mitigation rules [15A NCAC 02B .02951. For the purposes of this
report, the buffer authorization certificates recommendations will be combined in one
discussion.
15A NCAC 02B .0233 and 15A NCAC 02B .0259
(5) DIFFUSE FLOW REQUIREMENT. Diffuse flow of runoff shall be maintained in the
riparian buffer by dispersing concentrated flow and reestablishing vegetation.
As discussed above in Section 5 of the 15A P
the proposed project will not result in
concentrated stormwaterflow. However, th
access roads, andfive valve sites constructe
River Basins as part of the project. The acce
improved to allow construction and mainte
include minor widening andlor surface wa
extensions). The valve sites will consist of gra
driveways.
Stormwater from these areas
ditches and swales. Sheetflot4
associated with the Neuse
Management Strategies [15A
ACP has committed to mana
sediment, nutrients, and other
for the Neuse and Tar -Pamlico)
[15A NCAC 02B.0233(6) and 1
drainage ditches, roadside ditc
minimize the sediment, nutri
"EXEMPT"uses. "EXEMPT"use
.025_9(7)(a), respectively.
CAC 02H.0506 discussion, the vast majority of
new impervious surfaces that would create
ere will be improved temporary and permanent
d and maintained in the Neuse and Tar -Pamlico
ss roads are existing unpaved roads that will be
ionce equipment to safely pass. Upgrades will
ter crossing upgrades (e.g., minor pipelculvert
vel pods around above -ground valves with gravel
will be managed by sheetflow or by using existing roadside
,from the access roads meets the diffuse flow requirements
and Tar -Pamlico River Basins Nutrient Sensitive Waters
ICAC 02B.0233(5) and 15A NCAC 02B.0259(5), respectively].
7ing the existing roadside ditches and swales to minimize
pollution prior to entering surface waters. The Table of Uses
?iverBasins Nutrient Sensitive Waters Management Strategies
5A NCAC 02B.0259(6), respectively] identifies use of existing
hes, and stormwater outfalls provided they are managed to
sws, and other pollution that convey to waterbodies as
s are defined in 15A NCAC 02B.0233(7)(a) and 15A NCAC 02B
The applicant proposes to locate the Smithfield M&R station in Johnston County which is
subject to the Neuse River Buffer Rules. This station is also subject to state stormwater
permitting requirements as part of the Phase // stormwater rules. Stormwater management
and diffuseflow requirements will addressed through the Phase // process.
Recommendation: The buffer authorization certificates should include conditions requiring
that diffuse flow conditions be maintained for a// stormwater from impervious surfaces
flowing to or within the protected buffers in accordance with the diffuse flow requirements
stated above or other applicable buffer clarification memos.
(6) TABLE OF USES.
13
Non -electric utility lines:
Impacts other than perpendicular crossings in Zone 2 — Allowable
Impacts other than perpendicular crossings in Zone 1 — Allowable with Mitigation
Non -electric utility lines:
• Perpendicular crossings that disturb greater than 40 linear feet but equal to or less
than 150 linear feet of riparian buffer with a maintenance corridor greater than 10
feet in width - Allowable with Mitigation
• Perpendicular crossings that disturb greater than 150 linear feet of riparian buffer —
Allowable with Mitigation
The proposed project is categorized as a non -electric utility line. The proposed project includes
perpendicular and non -perpendicular crossings of streams and other surface waters subject
to this rule. Due to the width of the maintenance corridor, 50 feet, G// buffer impacts are
"ALLOWABLE WITH MITIGATION" uses. "ALLOWABLE WITH MITIGATION" uses are defined in
15A NCAC 02B. 0233(7)(c) and 15A NCAC 02B.0259(7)(c), respectively.
Recommendation: None. The proposed
of Uses.
(8) DETERMINATION OF -NO PRACI
undertake uses designated as alloi
request for a "no practical altern
delegated authority. The applicant
(8)(a) of this Rule are met. The Divi
Authorization Certificate upon a
procedure for making an Authoriza
is allowable with mitiaation under the Table
CAL ALTERNATIVES." Persons who wish to
shal
sion
(a) For any request for an Authorizati
shal
iving
alternative!
(i) The bas
would b
review tne entire p
requirements hav
etermination:
ic project purp
etter minimiz
water quality.
e or allowable with mitigation shall submit a
as" determination to the Division or to the
I certify that the criteria identified in Sub -item
or the delegated local authority shall grant an
practical alternatives" determination. The
Certificate shall be as follows:
Certificate, the Division or the delegated local
3ject and make a finding of fact as to whether
been met in support of a "no practical
cannot be practically accomplished in a manner that
a disturbance, preserve aquatic life and habitat, and
(ii) The use cannot practically be reduced in size or density, reconfigured or
redesigned to better minimize disturbance, preserve aquatic life and habitat,
and protect water quality.
(iii) Best management practices shall be used if necessary to minimize disturbance,
preserve aquatic life and habitat, and protect water quality.
The project proposes to construct a pipeline to transport natural gas from West Virginia and
Pennsylvania through Virginia and North Carolina. The North Carolina portion of the
proposed route will be constructed through Northampton, Halifax, Nash, Wilson, Johnston,
Sampson, Cumberland, and Robeson Counties. The proposed project will permanently impact
521,430 squarefeet and 594,070 squarefeet of protected riparian buffers in the Neuse River
Basin and the Tor -Pamlico River Basin, respectively. As part of the FERC NEPA analysis, ACP
investigated several alternatives to meet the purpose and need of the project including no
14
build, alternative energy, energy conservation, and system alternatives. Of these alternatives,
the build alternative best met the purpose and need of the project.
Next ACP, conducted an extensive alternatives analysis on potential route locations including
collocation of the ACP with existing pipelines as well as Eastern and Western route
alternatives. Ultimately, ACP chose the Eastern route as the best option based on an
evaluation of a variety of criteria such as project length and human and natural resources.
ACP continued to refine the Eastern alternative balancing a variety of human and natural
environmental resources such as public lands, roads, conservation easements, forested lands,
streams, wetlands, protected riparian buffers, known historical and cultural resources, and
homes and businesses. Development of the proposed pipeline route included the analysis of
seventeen major route alternatives and 37 minor adjustments in the North Carolina portion
of the project in an effort to avoid and minimize impacts to these resources. This analysis
included pre- and post -application communication with DWR and NCWRC on avoidance and
minimization opportunities. ACP has continued to refine the avoidance and minimization
practices in response to additional information requests from DWR and through
environmental commitments.
The applicant has demonstrated
accomplished in a manner that woi
and habitat, and protect water qua
practically be reduced in size or i
disturbance, preserve aquatic life a
proposed a number of best mono
that the basic j
ild better minimi;
ity. The applican
fensity, reconfigL
7d habitat, and p
preserve aquatic life and habitat, and pro�
following:
0 Use of temporary work bridges, ma
rq
-t purpose cannot be practically
disturbance, preserve aquatic life
demonstrated that the use cannot
)r redesigned to better minimize
t water quality. The applicant has
n effort to minimize disturbance,
'ty including but not limited to the
-ing and pods to reduce the risk of soil compaction
aterial to prevent soil contamination and to
acceierate revegetation
• Pump -out activities in the work area will be routed through an energy
dissipation/sedimentfiltration device prior to discharging to waterbodies
• Coating for concrete -coated pipe will be conducted at least 100 feet from surface
waters and springs
Use of horizontal directional drilling for a// major river crossings
Implementation of a Spill Prevention, Control, and Countermeasure plan and a
Horizontal Directional Drill Drilling Fluid Monitoring, Operations, and Contingency
plan
Use of a project -specific invosive plant species management plan
Limiting operation of construction equipment in wetlands to only that necessaryfor
clearing, excavation, pipe installation, backfilling, and restoration
Stump removal, grading, and excavation will be limited to the area immediately over
the trench line to maintain native seed and rootstock
Voluntarily implementing the requirements of the Construction Stormwater General
Permit No. NCGO10000
15
Recommendation: The applicant has sufficiently demonstrated that there is no practical
alternative that can accomplish the project's basic purpose with less adverse impacts to
protected buffers. The buffer authorization certificates should be conditioned to incorporate
the best management practices proposed by the applicant intended to minimize disturbance,
preserve aquatic life and habitat, and protect water quality. Furthermore, the buffer
authorization certificates should require demarcation of protected buffer with flogging or
signs prior to the initiation of construction and limiting operation of construction equipment
in buffers to only that necessary for clearing, excavation, pipe installation, backfilling, and
restoration
(10) Mitigation. Persons who wish to undertake uses designated as allowable with
mitigation shall meet the following requirements in order to proceed with their
proposed use.
(a) Obtain a determination of "no practical alternatives" to the proposed use
pursuant to Item (8) of this Rule.
(b) Obtain approval for a mitigation proposal pursuant to 15A NCAC 0213.0242 [.260].
15A NCAC 0213.0242 and .0260 have been ret)ealed and reDlaced with 15A NCAC 0213.0295.
As discussed above, the applica
can accomplish the project's b
Due to the fact that the mainte
greater than 10 feet, a// of
MITIGATION" uses and subject
However, impacts to wetlands
requirements and are regulatec
(6) of the 401 WQC application r
mitigation credits through the
(DMS). A letter addressed to t
October 6, 2017, states that DIV
for the proposed projeCL DM
In -Lieu Fee program instrumer
Recommendation: The buffei
buffer mitiqation in accordanc
nt has demonstrated that there is no practical alternative that
asic purpose with less adverse impacts to protected buffers.
nonce corridorfor the proposed pipeline will have a width of
the buffer impacts are considered "ALLOWABLE WITH
to the buffer mitigation requirements [15A NCAC 02B.0295].
within the buffers are not subject to the buffer mitigation
under 15A NCAC 02H.0506(h) as discussed above in section
t
wprocess. The applicant has proposed to obtain a// buffer
'eu fee program with the Division of Mitigation Services
ipplicant from DMS dated May 4, 2017 and renewed on
willing to accept paymentfor the buffer mitigation credits
administer the mitigation credits in accordance with the
ed July 28, 2010 and 15A NCAC 02B. 0295.
authorization certificates should include conditions requiring
with the table below:
River Basin
Zone 1 (square feet)
Zone 2 (square feet)
Total (square feet)
Neuse
460,005
209,093
669,098
Tor -Pamlico
418,596
175,134
593,730
Total
1,262,828
Environmental Justice
One of the most common topics of the commenters was environmental justice. As discussed
above in the General Comments Section, many comments received expressed concerns
about environmental justice issues associated with pipeline's construction and operation.
FERC's Final Environmental Impact Statement determined, "as a result of the project, no
disproportionately high and adverse impacts on environmental justice populations as a result
16
of air quality impacts, including impacts associated with the proposed Compressor Station 2,
would be expected as a result of ACP and SHP. Also, no disproportionately high and adverse
impacts on environmental justice populations as a result of other resources impacts would
be expected." Many commenters disagreed with this determination and requested that the
401 WQC be denied based on the potential environmental justice impacts.
As discussed above, the Director evaluates a 401 WQC application based on five criteria
including a no practical alternatives analysis, minimization of adverse impacts to surface
waters, an analysis of the degradation of groundwaters or surface waters, a cumulative
impacts analysis, and replacement of existing uses through mitigation. Environmental justice
is not included in the criteria upon which the Director must evaluate the application.
Although environmental justice is not an evaluation criteria, the Department has been
intimately engaged with the stakeholders of North Carolina through the permitting process.
On March 23, 2017, the Department hosted
information and receive feedback on the 1
organizations, four government agencies, at
Affairs were in attendance.
On July 18 and 20, 2017, the Depar
was to allow the citizens of North
the public hearings was provided
addition, the Division of Water Res
ment host
a
;takeholder meeting in Raleigh, NC to provide
iposed pipeline project. Eight environmental
a representative of the Commission of Indian
a to commen
)rdance with
Drovided not
in both English and Spanish to community orga
non-government organizations, libraries, etc.
On August 9, 2017, the Department participat(
by the Haliwa-Saponi Indian Tribe and the Norl
forum allowed an opportunity for tribal leadE
. and other stakeholders to discm
Pipeline.
/QC Application Public Hearings. This
t on the certification. Notification of
15A NCAC 02H .0506(d) and (e). In
ices of the hearings by mailing flyers
s, such as churches, government and
!d in an Environmental Justice Forum hosted
:h Carolina Commission of Indian Affairs. The
rs, commission members, state and federal
information on the proposed Atlantic Coast
Between August 15 and 17, 2017, the Department hosted three listening sessions along the
proposed pipeline route to obtain additional public feedback on the project. In addition to
the Department, the NC Department of Commerce, NC Department of Natural and Cultural
Resources, and the US Army Corp of Engineers were present.
On October 20 and 21, 2017, the Department participated in the North Carolina
Environmental Justice Network's Summit. This allowed for the Department to provide a
summary of the permitting status of the project.
In addition to the various stakeholder engagements listed above, the Department has been
transparent with citizens who requested to sign up forthe email news feed on the project, as
well as meetings with the Commission of Indian Affairs. The Department has been thorough
in its review of the applications submitted for the proposed Atlantic Coast Pipeline.
V1. Summary
17
Public comments concerning the two public hearings focused on several major issue areas,
including the degradation of water quality, cumulative impacts, environmental justice,
sedimentation and erosion control, the permitting process, impacts on wildlife including
threatened and endangered species, and ground and surface water supply protection in the
Cape Fear River Basin. Due to the number of public comments, many of which expressed
concerns on the same issues, each comment is not addressed individually. Only comments
that have direct relevance to the certification decision have been addressed in the
recommendations (Section V).
As stated above, a thorough review of all public commenti
has been conducted, and additional insight has been obtain
staff. Based on all of this information, it is my recommend
Certification and Buffer Authorization Certificates be issu
included in the recommendations in Section V. It is further
any additional conditions necessary to ensure that the proj
standards.
V11. Appendices (available on Laserfiche)
received and the project record
ed through discussions with DWR
ation that the 401 Water Quality
ed and subject to the conditions
recommended that DWR include
ect will meet state water quality
A. May 8, 2017 401 Water Quality Certification Application
a. Laserfiche Folder Name: 401 Application
b. Laserfiche link: bltpl.Ledocs.dg_q.n(;.goyL\NaterRigsourCE
B. Notice of Public Hearings —June 16-18, 2017
a. Laserfiche Filename: Listserve Public Notice 06 16 2017
b. Laserfiche link: httr)://edocs.deq.nc.fzov/WaterResources)
C. Correction to Notice of P
a. Laserfiche Filenan
b. Laserfiche link:
http://edocs..deg.
D. July 18,2017Non-speak(
a. Laserfiche Filenan
b. Laserfiche link:
httr)://edocs.dea.
earings —June 19-22, 2017
;erve Public Notice Correction 06 19 2017
ic.gov/WaterResources/O/doc/S47S88/Pagel.asp
r sign -in sheets
e: ACP July18 FayettevilleHearin g_ Non -SpeakerSignInSh eets
ff���11111101
E. July 18, 2017 Speaker list
a. Laserfiche Filename: ACP July18 Fayetteville Hearin g_SpeakerSign InSh eets
b. Laserfiche link:
http://edocs.deg.nc.gov/WaterResources/o/doc/552611/PgEel.asp��
F. July 20, 2017 Non -speaker sign -in sheets
a. Laserfiche Filename: ACP July2GL RockyMtHearin g_ Non -SpeakerSignInSh eets
b. Laserfiche link:
http://edocs.deg.nc.gov/WaterResources/o/doc/SS324S/Pagel.asp?�
G. July 20, 2017 Speaker list
a. Laserfiche Filename: ACP July2GLRockyMt Hearin g_SpeakerSignInSh eets
18
b. Laserfiche link:
http://edocs.deg.nc.gov/WaterResources/o/doc/SS3247/Pagel.asp?�
H. July 18, 2017 Public Hearing transcript, including oral comments
a. Laserfiche Filename: ACP July18 Fayetteville Hearing- Transcripts
b. Laserfiche link:
http://edocs.deg.nc.gov/WaterResources/o/doc/SS7323/Pagel.asp?�
1. July 20, 2017 Public Hearing transcript, including oral comments
a. Laserfiche Filename: ACP July2GLRockyMt Hearing— Transcripts
b. Laserfiche link:
http://edocs.deg.nc.gov/WaterResources/0�Zd.oc/SS7322/Pagel.as
J. Written comments received during the comment period, including at the public
hearings
a. Laserfiche Folder Name: Public Notice Comments
b. Laserfiche link:
httD://edocs.dea.nc.eov/WaterResources/o/fol/548242/Rowl.asox
19