HomeMy WebLinkAbout20140957 Ver 2_ACP_hearing officers rept_01162018_draft_20180116[Type here]
January XX, 2018
MEMORANDUM
To: Linda Culpepper
Interim Director, Division of Water Resources
From: Brian Wrenn, Ecosystems Branch Supervisor
Division of Water Resources, Water Sciences Section
Subject: Hearing Officer's Report and Recommendations
Atlantic Coast Pipeline, LLC
Individual 401 Water Quality Certification and Buffer Authorization Certificates
Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson
Counties
I served as the Hearing Officer for the subject Public Hearings held at the Fayetteville Technical
Community College in Fayetteville, NC on July 18, 2017 and at the Nash Community College in
Rocky Mount, NC on July 20, 2017. The public hearings were held underthe authority of Title 15A
NCAC 02H .0504. The purpose of these public hearings was to receive comment on the Division
of Water Resources' 401 Water Quality Certification (401 WQC) and buffer authorization
certificates application (Appendix A) submitted by Atlantic Coast Pipeline, LLC (ACP). A 401 WQC
and buffer authorization certificates are needed to construct a natural gas pipeline through
Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson Counties.
In addition to listening to oral comments at the public hearings, I have reviewed all written
comments received prior, during and after the public comment period. In preparation of this
report, I have considered all of the public comments, the public record, discussions with Division
of Water Resources (DWR) staff related to the rules, and their review of the applications for the
project.
The report has been prepared using the following outline:
1. Site History/ Background
11. July 18, 2017 Public Hearing Summary
Ill. July 20, 2017 Public Hearing Summary
IV. Comments
V. Recommendations
V1. Summary
VI 1. Appendices
1. History/ Background
On May 9, 2017, Atlantic Coast Pipeline, LLC (ACP) submitted an application for a 401 WQC
and buffer authorization certificates. ACP had previously applied to DWR on October 23,
2015. DWR requested additional information on November 18, 2015. The requested
information was not provided, therefore DWR returned the application on August 31, 2016.
ACP is proposing to construct and operate an approximately 605 -mile -long interstate natural
gas transmission pipeline system including laterals through West Virginia, Virginia and North
Carolina. In North Carolina, ACP is proposing to construct one compressor station and install
approximately 186 miles of transmission pipeline and appurtenances, including 3 metering
and regulating stations, 11 valve sites and 4 pig launchers/receivers, through Northampton,
Halifax, Nash, Wilson, Johnston, Sampson, Cumberland and Robeson Counties.
ACP is proposing over 300 crossings of streams and open waters, temporarily impacting over
35,000 linear feet and permanently impacting over 700 linear feet of stream. ACP is also
proposing crossing wetlands, temporarily impacting over 450 acres and permanently
impacting less than one acre of wetlands. ACP will impact protected riparian buffers within
the Neuse and Tar -Pamlico River basins, impacting over 648,000 square feet of zone 1 and
over 455,000 square feet of zone 2 protected riparian buffer.
DWR requested and received additional information several times throughout the application
review process:
Date
Action
June 27, 2017
Req. for Add Info (1)
July 12, 2017
Add Info Received (1)
September 14, 2017
Req. for Add Info (2)
September 22, 2017
Add Info Received (2)
October 2. 2017
Add Info Received (2)
October 13, 2017
Add Info Received (2)
October 26, 2017
Req. for Add Info (3)
November 4, 2017
Add Info Received (3)
November 15, 2017
Add Info Received (3)
November 28, 2017
Req. for Add Info (4)
December 8, 2017
Add Info Received (4)
December 14, 2017
Req. Correction to (4)
December 20, 2017
Add Info Received (4)
Under the authority of Title 15A NCAC 02H .0504, DWR held a public comment period from
June 16, 2017 until August 19, 2017 to accept public input on the application. The public
comment period included two public hearings described below.
In accordance with Title 15A NCAC 02H .0503, notice of the public hearings and availability of
the 401 WQC and riparian buffer authorization certificates application was published in The
Fayetteville Observer, the News & Observer, the Rocky Mount Telegram, the Roanoke -
Chowan News -Herald, the Robesonian and the Wilson Times on June 17, 2017, in the Daily
Herald and the Sampson Independent on June 18, 2017, and posted online and sent by mail
to the Water Quality Certification Mailing List on June 16, 2017 (Appendix B). A correction to
the public notice to correct a typo in the pipe diameter was posted online on June 19, sent to
the mailing list on June 20, and issued in the newspapers on June 21 and 22 (Appendix C). The
public comment period ended on August 19, 2017; however, since August 191h was a
Saturday, DWR accepted comments through Monday, August 21.
11. July 18, 2017 Public Hearing
A public hearing was held July 18, 2017, at 6 p.m. at the Fayetteville Technical Community
College in Fayetteville, NC. The public hearing was held under the authority of Title 15A NCAC
02H .0504. This was a public hearing to receive public comment for the DWR 401 WQC
application (Appendix A) submitted by ACID in order to construct a natural gas pipeline
through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson
Counties.
One hundred thirty-nine people attended the July 18 public hearing, including eight staff
members from the Department. A total of 131 individuals signed the attendance sign -in
sheets at the registration table (Appendices D and E). The hearing officer provided opening
remarks and Jennifer Burclette, DWR, presented background information on the 401 WQC
process and the proposed application before the hearing was opened for public comment.
Forty-four individuals registered in advance of the hearing to provide comments, and two
additional individuals made comments for a total of 46 speakers. Speakers were given three
minutes for initial presentations. Additional time was allowed for speakers after everyone
that registered to speak was finished, which was used by three speakers. The list of speakers
is included (Appendix E).
The public hearing transcript, incluc
H). DWR also received approximatE
period from local and state gover
(Appendix J). Approximately 8,2
approximately 1,370 were in favor.
comments provided during the public I
hearings and the comment period, along
on the certification decision makinR r)roc(
111. Julv 20, 2017 Public Hea
I comments, is attached to this report (Appendix
) written comments during the public comment
agencies, individual citizens, and citizen groups
nments were opposed to the project and
of the comments were written transcripts of the
arings. A summary of the comments for both
fith detailed responses that have a direct impact
; are included in Sections IV and V below.
A second public hearing was held July 20, 2017, at 6 p.m. at the Nash Community College in
Rocky Mount, NC. The public hearing was held under the authority of Title 15A NCAC 02H
.0504. This was a public hearing to receive public comment forthe DWR 401 WQC application
(Appendix A) submitted by ACID in order to construct a natural gas pipeline through
Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson
Counties.
One hundred seventy-six people attended the July 20 public hearing, including eight staff
members from the Department. A total of 168 individuals signed the attendance sign in
sheets at the registration table (Appendices F and G). The Hearing Officer provided opening
remarks and Jennifer Burclette, DWR, presented background information on the 401 WQC
process and the proposed application before the hearing was opened for public comment.
Sixty-five individuals registered in advance of the hearing to make comments. Speakers were
given three minutes for presentations and the hearing was held open an additional thirty
minutes to allow all speakers that registered to speak. The list of speakers is included
(Appendix G).
3
The public hearing transcript, including oral comments, is attached to this report (Appendix
1). DWR also received approximately 9,600 written comments during the public comment
period from local and state government agencies, citizens and citizen groups (Appendix J).
Approximately 8,220 comments were opposed to the project and approximately 1,370 were
in favor. Some of the comments were written transcripts of the comments provided during
the public hearings. A summary of the comments for both hearings and the comment period,
along with detailed responses that have a direct impact on the certification decision making
process, are included in Sections IV and V below.
IV. General Comments
The following is a summary of the comments received during the July 18, 2017 and July 20,
2017 public hearings and emails and other written comments received by DWR during the
public comment period. Comments received outside of the public comment period were
made part of the public record. An overwhelming majority of the comments were in
opposition to the pipeline for a variety of reasons.
Many comments received expressed concerns about the continued use of fossil fuels,
specifically fracked natural gas, and their negative impact on climate change. Manythink
NC and the US should be moving toward the use of renewable energy sources.
Proponents of the project believe that natural gas is a "clean" fuel option to replace coal
and other fossil fuels. These comments should be forwarded to the Division of Energy,
Mining, and Land Resources.
Many comments received were skeptical of ACP's promotion of the project as a job
creation opportunity and economic stimulator for local communities. Several pointed
out that ACP's own job creation estimates are very low and that the economic benefits
to local communities are vague. Proponents of the project reiterated that the pipeline
would bring jobs and economic development to NC. These comments shouldbe directed
to the Department of Commerce.
Many comments received expressed concerns about the cumulative impacts analysis
provided by ACID. Many believe that the analysis did not contain sufficient detail to
properly evaluate the cumulative impacts. Some comments indicated that the
temporary impacts from the project should be considered in the cumulative impact
analysis and that the sheer volume of temporary impacts should be calculated to equal
some level of permanent impacts. These comments should be directed to the
Department of Commerce.
Many comments received questioned the purpose and need of the project. Many
pointed to evidence that the growth of natural gas markets was estimated to be
negligible and questioned the need to build such a large and expensive pipeline. Many
noted that the market demand was generated through companies owned or affiliated
with Duke and Dominion power companies and that the need was self-serving rather
than one identified through public interest. Furthermore, several commenters stated
that the purpose of economic benefit was misleading as ACP's own estimates predict
little permanent job growth as a result of the project. These comments should be
al
directed to the Department of Commerce and the Division of Energy, Mining, and Land
Resources.
Many comments received expressed concerns about environmental justice issues
associated with pipeline's construction and operation. Many believe that the pipeline will
have a disproportionate impact on low-income and minority communities. Many
commenters feel that ACP has not made significant efforts to coordinate with these
communities or to consider other routes that would reduce the impacts on these
communities. Specifically, several commenters mentioned ACP's lack of coordination
with state -recognized tribes such as the Lumbee and Haliwa-Saponi. Furthermore, they
do not believe ACP has adequately addressed potential impacts to cultural resources
along the pipeline route.
• Several commenters expressed opposition to ACP's use of eminent domain to obtain
right-of-way for the pipeline.
• Several commenters raised concerns about Duke Power's past record of non-compliance
with environmental regulations and permits.
• Several commenters raised concerns about living within the "blast zone" of the pipeline
and questioned ACP's liability response should an explosion occur. Others believe that
the pipeline is a safe and efficient way to transport natural gas.
• Many comments received expressed concerns over ACP's potential impacts to water
quality from erosion and sedimentation. Many commenters feel that ACP's erosion and
sedimentation control plan is inadequate and lacks sufficient detail. Others believe that
trenching through streams and wetlands will have a negative effect on stream stability
and threaten wildlife. Concerns over blasting effects were also raised.
• Many comments received expressed concerns over impacts to wildlife, specifically
threatened and endangered species. Many felt that the construction activities could
destroy critical habitat and primary nursery areas for a variety of terrestrial and aquatic
species. Others felt that the extensive coordination process with the US Fish and Wildlife
Service and NC Wildlife Resources Commission (NCWRC) has adequately addressed any
potential impacts. These comments shouldbe directed to NCWRC.
• Many commenters believe that the 401 WQC application is incomplete. They pointed
to the lack of erosion and sedimentation control plans and site-specific water body
crossing details as evidence that necessary information was missing from the
application. In contrast, some commenters believe that the ACP project has gone
through an extensive regulatory review process.
• The overwhelming majorityof comments received raised concerns overthe degradation
of ground and surface waters as a result of the construction and operation of the
pipeline. Many commenters mentioned the large number of streams and wetlands that
would be crossed by the pipeline and raised red flags regarding the large amount of
temporary and permanent impacts. They connected these impacts with the degradation
of downstream uses including drinking water supply, aquatic life, primary and secondary
contact recreation, and fisheries. Furthermore, commenters spoke in detail of the loss
of wetlands through temporary impacts. Many felt the temporal and permanent
vegetation changes from temporary wetland impacts should be considered permanent
61
wetland impacts. Finally, many comments were made regarding potential impacts to
drinking water wells. A significant level of concern was present among the commenters
about impacts to wells from construction activities (mainly blasting activities) and
operation of the pipeline.
V. Certification Specific Comments and Recommendations
Based on the review of public comments, the application, the North Carolina General Statutes
and Administrative Code, and discussions with DWR staff, I offer the following comments and
recommendations on the criteria for issuance of a 401 WQC pursuant to 15A NCAC 02H
.0506(b) and the issuance of Neuse and Tar -Pamlico River Basin Buffer Authorization
Certificates pursuant to 15A NCAC 02B .0233 and 15A NCAC 02B .0259, respectively.
15A NCAC 02H .0506(b)
(1) Has no practical alternative under the i
Paragraph (f) states: "A lack of practica
that, considering the potential for a rei
proposed activity and all alternative
practically accomplished in a manner
impact to surface waters or wetlands."
The project proposes to construct a pij
Pennsylvania through Virginia and /
proposed route will be constructed th
Sampson, Cumberlan and Robeson Countie
Commission (FERQ National Environmental
several alternatives to meet the nurDose and ni
energy
found I
best m
n alte
eria outlined in Paragraph (f) of this Rule.
ternatives may be shown by demonstrating
:tion in size, configuration or density of the
;igns the basic project purpose cannot be
Mch would avoid or result in less adverse
ransport natural gas from West Virginia and
olina. The North Carolina portion of the
rthampton, Halifax, Nash, Wilson, Johnston,
As part of the Federal Energy Regulatory
)1icy Act (NEPA) analysis, ACP investigated
d of the project including no build, alternative
atives. Of these alternatives, FERC and ACP
,pose and need of the project.
Next, ACP;- conducted an extensive alternatives analysis on potential route locations including
collocation of the ACP with existing pipelines as well as Eastern and Western route
alternatives. Ultimately, ACP chose the Eastern route as the best option based on G..+�-the
evaluation of a variety of criteria such as project length and human and natural resources.
ACP continued to refine the Eastern alternative balancing a variety of human and natural
environmental resources such as public lands, roads, conservation easements, forested lands,
streams and wetlands, known historical and cultural resources, and homes and businesses.
Development of the proposed pipeline route included the analysis of seventeen major route
alternatives and 37 minor adjustments in the North Carolina portion of the project in an effort
to avoid and minimize impacts to these resources. This analysis included pre- and post -
application communication with DWR and NC Wildlife Resources Commission (NCWRC) on
avoidance and minimization opportunities. ACP has continued to refine the avoidance and
minimization practices in response to additional information requestsfrom DWR and through
environmental commitments. A more detailed discussion of avoidance and minimization can
befound below.
11
Recommendation: None. The applicant has sufficiently demonstrated that there is no
practical alternative that can accomplish the project's basic purpose with less adverse impact
to surface waters or wetlands.
(2) Will minimize adverse impacts to the surface waters based on consideration of
existing topography, vegetation, fish and wildlife resources, and hydrological
conditions under the criteria outlined in Paragraph (g) of this Rule.
Paragraph (g) states: "Minimization of impacts may be demonstrated by showing that
the surface waters or wetlands are able to continue to support the existing uses after
project completion, or that the impacts are required due to:
(1) The spatial and dimensional requirements of the project; or
(2) The location of any existing structural or natural features that may dictate the
placement or configuration of the proposed project; or
(3) The purpose of the project and how the purpose relates to placement,
configuration or density.
The applicant has minimized impacts to surface waters and wetlands to the greatest extent
practical. The permanent impacts will be 766 linear feet of streams and 0.80 acres of
wetlands. The permanent impacts related to streams and wetlands will be a result of
upgrading and improving access roads constructed for installation and maintenance of the
pipeline, not from the pipeline itself. All crossings of major rivers will be conducted using
horizontal directional drilling (HDD) to avoid open trenching. The magnitude of the temporary
impacts is very high but within reason considering the size and scope of the project. The
applicant will use a narrower construction corridor when crossing wetlands and construction
techniques such as timber matting, temporary work bridges, and clean rock over piping to
minimize temporary impacts to streams and wetlands. Temporary impacts to streambanks
and wetland areas will be restored to the original contours and revegetated with native
plants. ACP will monitor any temporary impact areas in streams or wetlands to ensure there
is no permanent loss at these locations. The monitoring plan includes monitoring for a
minimum of two yearsfor streams and three yearsfor wetlands with stability, vegetation, and
hydrology requirements. Upon successful completion of the restoration and monitoring
activities, the stream and wetland impact areas will continue to support existing uses of
hydrology, vegetation, and aquatic and wildlife habitat.
The applicant has committed to a number of best management practices to avoid and
minimize impacts to streams and wetlands.
0 Demarcation of wetland boundaries with flogging and signs prior to start of
construction
Use of temporary work bridges, matting and pods to reduce the risk of soil compaction
Trench backfilling using native material to prevent soil contamination and to
accelerate revegetation
Limiting operation of construction equipment in wetlands to only that necessaryfor
clearing, excavation, pipe installation, backfilling, and restoration
Installing trench breakers or plugs at the boundaries of wetlands to prevent draining
of wetlands
7
Pump -out activities in the work area will be routed through an energy
dissipation/sedimentfiltration device prior to discharging to waterbodies
Use of a project -specific invasive plant species management plan
Stump removal, grading, and excavation will be limited to the area immediately over
the trench line to maintain native seed and rootstock
Coating for concrete -coated pipe will be conducted at least 100 feet from surface
waters and springs
Prohibiting use of live concrete as a building material so that wet concrete does not
come in contact with surface waters
Prohibiting storage of chemicals, fuels, hazardous materials, and lubricating oils
within 100feet of surface waters
Voluntarily implementing the requirements of the Construction Stormwater General
Permit No. NCGO10000
Use of horizontal directional drilling
Implementation of a Spill Preveni
Horizontal Directional Drill Drilling
plan
ACP has completed formal consultation with
threatened and endangered species along the
opinion, USFWS did not identify any threatened
in NC along the proposed corridor. ACP has al
This coordination began with the alternatives an
ACP worked with NCWRC to avoid threatened a,
and to develop relocation protocolsforfish and r
surveys for fish and mussels in the Neuse Rivf
surveys found that the mussel population wi
previously known. This survey and the continue
revised proposal to use HDD at the Neuse Riv,
developed a sensitive species relocation pit
crossiaqS, L['VBL' I I
// major river crossings
Control, and Countermeasure plan and a
� Monitoring, Operations, and Contingency
US Fish and Wildlife Service (USFWS) on
-orridor. In an October 16, 2017 biological
and endangered species or sensitive habitat
a coordinated extensively with the NCWRC.
ilysis and site-specific routing of the pipeline.
id endangered species and sensitive habitats
iussels. ACP&4e-conductedpre-construction
, at the proposed crossing location. These
s much more abundant and diverse than
I coordination with NCWRC resulted in ACPs
�r instead of open trenching. �CP has also
n for fish and mussels at open trench
Recommendation: The applicant has sufficiently demonstrated that impacts to surface
waters and wetlands are required due to spatial considerations, naturalfeatures and the
purpose of the project. The 401 WQC should include requirements for monitoring of
temporary impact areas in accordance with the proposed restoration and monitoring plan.
The certification should also include reopener language in the event that temporarily
disturbed wetland areas do not return to wetland conditions as defined by the 1987 US Army
Corps of Engineers t(��Wetland Manual and determined b / a Coro " tive. The
reopener language should require a modification to the 401 WQC to accountfor the additional
permanent impacts and mitigation for a// permanent wetland impacts should the permanent
impacts exceed 1. 0 acre. Furthermore, the 401 WQC should be conditioned to comply with
any work moratoriums suggested by NCWRCfor the proposed project.
(3) Does not result in the degradation of groundwaters or surface waters.
A
The main risk to surface and groundwater from the ACP project will be during construction
activities. These risks include sedimentation and turbidity in surface waters, breaches of
drilling fluids during HDD, and spills of petroleum products and hydraulic fluids from fueling
and equipment maintenance. In addition, some commenters raised concerns regarding
impacts to drinking water wells from trenching and blasting activities associated with the
pipeline installation andfrom possible contamination due to pipeline leaks during operation.
The applicant has committed to working in the dryfor a// stream and wetland crossings unless
site-specific conditions warrant working in wet conditions and the applicant obtains prior
written approval from DWR. Proper erosion and sedimentation control measures will be
required for the entire project in accordance with the Division of Energy, Mineral and Land
Resources (DEMLR) sedimentation and erosion control Certificate of Plan Approval. All
temporaryfill placed in surface waters related to construction of the pipeline will be removed
once installation of the pipeline is completed at the crossing. The stream banks or wetlands
will be restored to the original contours and revegetated with a native seed mix to prevent
erosion. Only in areas where vegetative stabilization is not successful will hardened
stabilization (rip -rap, geogrid, etc.) techniques be used. No hardening will be placed below
the ordinary high water mark. Furthermore, the applicant has voluntarily agreed to meet the
requirements of the NPDES Construction Activities General Permit No. NCGO10000.
The applicant will store chemicalsfuels, hazardous materials, and lubricating oils and conduct
a// equipment and vehiclefueling and maintenance at least 100feetfrom surface waters and
200feetfrom private drinking water wells. In situations where equipment must continue to
operate during fueling activities such as dewatering pumps near surface waters, secondary
containment structures will be used to prevent any spillagefrom reaching the surface waters.
The applicant has conducted a desktop survey to identify a// known drinking water wells within
150 feet of the pipeline construction corridor. Almost 50 private drinking water wells were
located in NC The applicant proposes to test each well prior to construction for a suite of
parameters including pH, total suspended solids, total dissolved solids, conductivity, alkalinity,
acidity, sulfates, oillgrease, phenolic, iron, manganese, aluminum, fecal coliform, copper,
lead, nickel, silver, thallium, zinc, chromium, arsenic, mercury, selenium, cyanide, calcium
magnesium, hardness, chlorides, antimony, cadmium, and beryllium as well as well yields.
These tests will provide a baseline of groundwater quality and quantity against which to
measure any construction -related impacts. In the event that blasting will occur within 500
feet of a drinking water well, the applicant proposes to conduct pre -blasting monitoring for
the parameters listed above. Should the applicant receive a complaint regarding damage to
well water quality or quantity, the applicant proposes to conduct post -construction well
testing of the some parameters to verify no adverse impacts have occurred. Furthermore, in
the event that adverse impacts do occur as a result of construction activity, ACP has
committed to providing temporary water supplies, andlor a new water treatment system or
well.
and
(:iro tin dvva ter. An V p ost-construction storm water ('ien era ted as a result of im pervio u
installed durin('i construction are subiect to state and local storm water re('wirements, AC-Phas
A
committed to usim: sh—fflow and existin(y stormwater conveVances and draina e ditches, No
curb and (gitter stormwater mana ement will be constructed, For impervious stir aces
constructed in areas with no state or local stormvilater proarams these stormwater
r (.� ualit ,
roundwater, The
is not soluble in water, LiQuids contained
in the (ms are removed at a natural (ms processi I nq r4ant prior to trans
de minimus and is not li e
Recommendation: The project is not expected to violate water quality standards if the
conditions in the 401 Water Quality Certification are fully complied with by the applicant (or
its successor). The 401 WQC should be conditioned to require full compliance with the
following permits:
• Certificate of Plan Approval No. Cumbe-2018-036, issued by DEMLR, Fayetteville
Regional Office
• NPDES Permit No. NCGO10000 issued bv DEMLR
The 401 WQC should also be contingent on the issuance of a sedimentation and erosion
control Certificate of Plan Approval issued by DEMLR, Raleigh Regional Office and upon
issuance of appropriate state and local stormwater permits. FERC NEPA and 401 WQC
application documentation indicates that the applicant has agreed to conduct pre -
construction water aualitv testing for drinking water wells within 150 feet of the pipeline
construction corridor i
conditioned to require
150 feet of the constri
r a complaint i
quallty or quantity has
temporary water supp
qualified
within 500 feet of blasting activities. The 401 WQC should be
to conduct pre- and post -construction testing of a// wells within
n corridor and within 500 feet of blasting activities regardless of
-eived. Should post -construction testing indicate that well water
,7 impacted by the construction, ACP should be required to provide
andlor a new water treatment system or well. An independent,
Ialist should determine whether an impact has occurred or not.
The 401 WQC should be conditioned to require monthly ride -through inspections with
appropriate DWR and DEMLR staff to measure compliance with the respectively certifications
and permits. The 401 WQC should also require a pre -construction meeting with the
construction contractors, ACP staff, and DWR and DEMLR staff to review the conditions and
requirements of the respectively certifications and permitsfor clarity and understanding.
(4) Does not result in cumulative impacts, based upon past or reasonably anticipated
future impacts, that cause or will cause a violation of downstream water quality
standards.
Cumulative impacts are those impacts that would result from the incremental effects of the
project added to other post, present and reasonably foreseeable future activities (15A NCAC
01C.0103). This includes secondary impacts or impacts from future activities that occur as a
10
result of the proposed project. The proposed project for the most part will consist of
temporary water quality impacts from the installation of the pipeline. These_h22p(:icts
w4lcould include sedimentation and temporary disturbance of aquatic and riparian habitat
during construction. Permanent impacts will occur in streams and wetlandsfrom access road
improvements. The temporary and permanent impacts will be reduced through avoidance
and mitigation efforts, erosion and sedimentation control and stormwater best management
practices (BMPs), and spill prevention, control, and countermeasure practices. Any projects
occurring in similar locations to the proposed project will be subject to local, state, andfederal
regulations that address stream and wetland impacts, stormwater management, and
watershed protection.
Almost 80% of the increased natural gas supply has been
plants. The remaining supply will be available for commerci
However, only three distribution points or M&R stations will
stations will be located in Johnston, Cumberland, and
development as a result of the pipeline is likely to befocused
therefore, water quality impacts are most likely in proximi
conducted a qualitative analysis of the potential secondary
three counties.
committed to natural gas power
a17�_industrial and residential use.
be constructed in NC. These M&R
Robeson Counties. Secondary
around these distribution points,
ty to these areas. The applicant
and cumulative imoacts in these
In the qualitative analysis, the applicant completed an "indirect (secondary) and cumulative
effects screening matrix" where a series of parameters including scope of the project,
population growth, available land, waterlsewer availability, natural gas availability, market
for development, public policy, and notable water resources were evaluated on their ability to
contribute to indirect and cumulative effects on water quality. Based on these ratings, areas
of potential growth and development were identified. These growth areas were then
compared in an action/no-action forecast where the differences in growth and development
between building the pipeline and not building the pipeline were determined. Areas that had
significant increases in growth and developmentfrom building the pipeline were mapped.
As discussed above, any new development projects will be subject to state and federal
regulations for impacts to streams and wetlands and erosion and sedimentation control.
However, stormwater management regulations are variable by location. Existing state and
local stormwater programs were overlain on the areas of potential growth identified in
action/no-action analysis to predict the net impact to water quality resulting from secondary
development.
The action/no-action analysis demonstrated that growth could significantly increase in
Johnston and Cumberland Counties if the pipeline is built. These areas have existing
infrastructure for waterlsewer and transportation, are predicted to have population growth,
and have a number of shovel -ready development sites. Johnston and Cumberland Counties
are almost entirely covered by state and local stormwater programs and Johnston County is
subject to the Neuse River Nutrient Sensitive Waters Management Strategy. Any potential
water quality impacts due to growth in the area would be mitigated through these programs.
Most of Robeson County does not have state or local stormwater programs. Those that are
present are associated with High Quality Waters or Water Supply Watersheds and are limited
11
in area. However, the action/no-action analysis demonstrated that Robeson County is not
expected to have a significant increase in growth and development as a result of the pipeline.
According to ACPs analysis, locking infrastructure, population decline, and separation from
metropolitan areas has stunted growth in this area. Only one shovel -ready industrial site is
available in Robeson County, and it is located in the protected Water Supply Watershed and
would be subject to a local stormwater program. Water quality impacts from secondary
growth in this area would be minimal.
Recommendation: The project is not expected to result in cumulative impacts that violate
water quality standards, if the conditions in the 401 WQC are fully implemented by the
applicant (or its successor). This report and the qualitative cumulative impacts analysis should
beforwarded to the Department of Commercefor informational purposes.
(5) Provides for protection of downstream
site stormwater control measures.
Post -construction stormwater is another paten
of the proposed pipeline project will not result
new impervious surfaces are proposed as part oj
multiole imoroved access roads eleven valve st
and regulating (M&R) stations, and multip
unpaved roads that will be improved to a
safely pass. Improvements will include
upgrades (e.g., minor pipelculvert extensi
pipeline for safety, operation, and mainh
located in Northampton County, and t
Cumberland, and Robeson Counties. The
managea Dy usIng e
ces
naged
draina
Ul
ater quality standards through the use of on -
tial water quality concern. The vast majority
in new impervious surfaces. However, some
the project. The impervious surfaces include
ations, a compressor station, three metering
contractor yards. The access roads are existing
w construction and maintenance equipment to
inor widening andlor surface water crossing
s). The valve sites are needed to segment the
ince purposes. The compressor station will be
M&R stations will be located in Johnston,
9plicant has indicated that stormwater will be
ind swales for access roads. Nocurbandgutter
e compressor or M&R stations, and stormwater
Tches and swales.
Stormwater management for these impervious surfaces will be regulated through state
programs in Phase // communities or by local programs where applicable. Valve sites and
access roads in a small portion of Nash County and access roads, valve sites, and a contractor
yard in Cumberland County will be regulated through the state -implemented Phase //
Stormwater Program. ACP will have to meet the requirements of SWG040000 — General
Permit To Construct A Linear Utility Line and Associated Incidental Built -Upon Area (SWG04)
or an individual state stormwater permit. SWG04 and individual state stormwater permits
require compliance with the conditions of the respective permits and with the provisions of
15A NCAC 02H.1000, Sf��,ion Law 2006-246, and Session Law 2008-211 which ensure the
protection of downstream water quality standards through on-site stormwater control
measures. Any impervious surfaces built in areas covered by local stormwater programs will
have to meet the requirements of the local storm water program. The applicantalso proposes
to build impervious surfaces in areas where no state or local programs are applicable. Based
on the descriptions of stormwater best management practices proposed by the applicant,
storm water is not expected to violate downstream water quality standards in these areas.
12
Recommendation: Session Low 2017-10 prohibits DWR from requiring on-site stormwater
management through a 401 WQC. As discussed above, the 401 WQC should be conditioned
to require compliance with a// applicable state and local storm water permits for construction
of a linear utility line and associated incidental built -upon area.
(6) Provides for replacement of existing uses through mitigation.
Both federal and state requirements allow for the purchase of in lieu fee credits to offset
unavoidable impacts to streams and wetlands. DWR requires mitigation [15A NCAC 02H
.0506(h)] at a 1:1 ratio for permanent perennial stream impacts above 300 linearfeet and a
1:1 ratio for permanent wetland impacts above one acre. Perennial stream and wetland
impacts for this project will not exceed the respective mitigation thresholds, therefore, no
stream or wetland mitigation is required by DWR. Mitigation is required, however, by the U.S.
Army Corps of Engineers for the wetland conversion i
_yppocts. Riparian buffer mitigation is
requiredfor the uses identified in the Table of Uses of the Neuse and Tor -Pamlico River Basins
Nutrient Sensitive Waters Management Strategies [15A NCAC 02B.0233(6) and 15A NCAC
02B .0259(6), respectively] as "ALLOWABLE WITH MITIGATION."' "ALLOWABLE WITH
MITIGATION" uses are defined in 15A NCAC 02B.0233(7)(c) and 15A NCAC 02B.0259(7)(c),
respectively. Buffer mitigation is discussed below in the buffer authorization certificates
section.
Recommendation: No mitigation is
proposed project. The 401 WQC
mitigation should
Neuse and Tar --I
The Neuse River
manent impact i
ico Nutrient Sen
River Basin Nutrient Sen
requirements [15A NCAC 0
the mitigation requiremen
Neuse and Tar -Pamlico R
respectively] and both mak
For the purposes of this re
be combined in one discuss
sitive
2B .0:
ts for
iver B
e refe
E,d for stream or wetland impacts as a result of the
d be conditioned to include language requiring
ges occur that exceed mitigation thresholds.
Management Strategy
ansitive Waters Management Strategy and the Tar -Pamlico
Waters Management Strategy have the exact same
133 and 15A NCAC 02B .0259, respectively]. Furthermore,
impacts to protected buffers are exactly the same for the
asins [15A NCAC 02B .0242 and 15A NCAC 02B .0260
rence to the buffer mitigation rules [15A NCAC 02B .02951.
rt, the buffer authorization certificates recommendations will
15A NCAC 0213.0233 and ISA NCAC 02B .0259
(5) DIFFUSE FLOW REQUIREMENT. Diffuse flow of runoff shall be maintained in the
riparian buffer by dispersing concentrated flow and reestablishing vegetation.
As discussed above in Section 5 of the 15A NCAC 02H.0506 discussion, the vast majority of
the proposed project will not result in new impervious surfaces that will create concentrated
stormwaterflow. However, there will be improved temporary and permanent access roads,
andfive valve sites constructed and maintained in the Neuse and Tor -Pamlico River Basins as
part of the project. The access roads are existing unpaved roads that will be improved to allow
construction and maintenance equipment to safely pass. Upgrades will include minor
13
widening andlor surface water crossing upgrades (e.g., minor pipelculvert extensions). The
valve sites will consist of gravel pods around above -ground valves with gravel driveways.
Stormwater from these areas will be managed by sheetflow or by using existing roadside
ditches and swales. Sheetflow from the access roads meets the diffuse flow requirements
associated with the Neuse and Tor -Pamlico River Basins Nutrient Sensitive Waters
Management Strategies [15A NCAC 02B.0233(5) and 15A NCAC 02B.0259(5), respectively].
ACP has committed to managing the existing roadside ditches and swales to minimize
sediment, nutrients, and other pollution prior to entering surface waters. The Table of Uses
for the Neuse and Tor -Pamlico River Basins Nutrient Sensitive Waters Management Strategies
[15A NCAC 02B.0233(6) and 15A NCAC 02B.0259(6), respectively] identifies use of existing
drainage ditches, roadside ditches, and stormwater outfalls provided they are managed to
minimize the sediment, nutrients, and other pollution that convey to waterbodies as
"EXEMPT"uses. "EXEMPT" uses are defined in 15A NCAC 02B.0233(7)(0) and 15A NCAC 02B
.0259(7)(a), respectively.
The applicant proposes to locate the Smithfield
subject to the Neuse River Buffer Rules. This s
permitting requirements as part of the Phase // st
and diffuseflow requirements will addressed thro
Recommendation: The buffer authorization
that diffuse flow conditions be maintainec
flowing to or within the protected buffers in
stated above or other applicable buffer clarif
(6) TABLE OF USES.
Non -electric utility lir
Imoacts other
impacts otner tnan
i -electric utility lines:
• Perpendicular cros!
than 150 linear fee,
feet in width - Alloi
• Perpendicular cros!
Allowable with Mit
ndic
M&R station in Johnston County which is
-ation is also subject to state stormwater
:)rmwaterrules. Storm water management
Phase // process.
�hould include conditions requiring
,nwater from impervious surfaces
withthedi seflow requirements
ff u
in Zone 2 — Allowable
in Zone 1 — Allowable with Mitigation
ngs that disturb greater than 40 linear feet but equal to or less
of riparian buffer with a maintenance corridor greater than 10
able with Mitigation
ngs that disturb greater than 150 linear feet of riparian buffer —
The proposed project is categorized as a non -electric utility line. The proposed project includes
perpendicular and non -perpendicular crossings of streams and other surface waters subject
to this rule. Due to the width of the maintenance corridor, 50 feet, G// buffer impacts are
"ALLOWABLE WITH MITIGATION" uses. "ALLOWABLE WITH MITIGATION" uses are defined in
15A NCACO2B.0233(7)(c) and 15A NCACO2B.0259(7)(c), respectively.
Recommendation: None. The proposed project is e41eweWe--wiM--mitk- t. 'ALLO BLE
yca 46W WA
WITH MITIGATION" under the Table of Uses.
(8) DETERMINATION OF -NO PRACTICAL ALTERNATIVES." Persons who wish to
undertake uses designated as allowable or allowable with mitigation shall submit a
14
request for a "no practical alternatives" determination to the Division or to the
delegated authority. The applicant shall certify that the criteria identified in Sub -Item
(8)(a) of this Rule are met. The Division or the delegated local authority shall grant an
Authorization Certificate upon a "no practical alternatives" determination. The
procedure for making an Authorization Certificate shall be as follows:
(a) For any request for an Authorization Certificate, the Division or the delegated local
authority shall review the entire project and make a finding of fact as to whether
the following requirements have been met in support of a "no practical
alternatives" determination:
(i) The basic project purpose cannot be practically accomplished in a manner that
would better minimize the disturbance, preserve aquatic life and habitat, and
protect water quality.
(ii) The use cannot practically be reduced in size or density, reconfigured or
redesigned to better minimize disturbance, preserve aquatic life and habitat,
and protect water quality.
(iii) Best management practices shall be used if necessary to minimize disturbance,
preserve aquatic life and habitat, and protect water quality.
The project proposes to construct a pipelii
Pennsylvania through Virginia and Non
proposed route will be constructed throu
Sampson, Cumberland, and Robeson Coun
521,430 square feet and 594,070 square I
Basin and the Tor -Pamlico River Basin, re.�
investigated several alternatives to meet
build, alternative energy, energy conserva;
the build alternative best met the nurnose
e to transport natural gas from West Virginia and
� Carolina. The North Carolina portion of the
fh Northampton, Halifax, Nash, Wilson, Johnston,
.-ies. The proposed project will permanently impact
�et of protected riparian buffers in the Neuse River
pectively. As part of the FERC NEPA analysis, ACP
the purpose and need of the project including no
ion, andsystem alternatives. Of these alternatives,
and need of the project.
Next ACP, conducted an extensive alternatives analysis on potential route locations including
collocation of the ACP with existing pipelines as well as Eastern and Western route
alternatives. Ultimately, ACP chose the Eastern route as the best option based on an
evaluation of a variety of criteria such as project length and human and natural resources.
ACP continued to refine the Eastern alternative balancing a variety of human and natural
environmental resources such as public lands, roads, conservation easements, forested lands,
streams, wetlands, protected riparian buffers, known historical and cultural resources, and
homes and businesses. Development of the proposed pipeline route included the analysis of
seventeen major route alternatives and 37 minor adjustments in the North Carolina portion
of the project in an effort to avoid and minimize impacts to these resources. This analysis
included pre- and post -application communication with DWR and NCWRC on avoidance and
minimization opportunities. ACP has continued to refine the avoidance and minimization
practices in response to additional information requests from DWR and through
environmental commitments.
The applicant has demonstrated that the basic project purpose cannot be practically
accomplished in a manner that would better minimize the disturbance, preserve aquatic life
and habitat, and protect water quality. The applicant has demonstrated that the use cannot
15
practically be reduced in size or density, reconfigured or redesigned to better minimize
disturbance, preserve aquatic life and habitat, and protect water quality. The applicant has
proposed a number of best management practices in an effort to minimize disturbance,
preserve aquatic life and habitat, and protect water quality including but not limited to the
following:
Use of temporary work bridges, matting and pods to reduce the risk of soil compaction
Trench backfilling using native material to prevent soil contamination and to
accelerate revegetation
Pump -out activities in the work area will be routed through an energy
dissipation/sedimentfiltration device prior to discharging to waterbodies
Coating for concrete -coated pipe will be conducted at least 100 feet from surface
waters and springs
Use of horizontal directional drilling for a// major river crossings
Implementation of a Spill Prevention, Control, and Countermeasure plan and a
Horizontal Directional Drill Drilling Fluid Monitoring, Operations, and Contingency
plan
Use of a project -specific invasive plant species management plan
Limiting operation of construction equipment in wetlands to only that necessaryfor
clearing, excavation, pipe installation, backfilling, and restoration
• Stump removal, grading, and excavation will be limited to the area immediately over
the trench line to maintain native seed and rootstock
• Voluntarily implementing the requirements of the Construction Stormwater General
Permit No. NCGO10000
Recommendation: The applicant has sufficiently demonstrated that there is no practical
alternative that can accomplish the project's basic purpose with less adverse impacts to
protected buffers. The buffer authorization certificates should be conditioned to incorporate
the best management practices proposed by the applicant intended to minimize disturbance,
preserve aquatic life and habitat, and protect water quality. Furthermore, the buffer
authorization certificates should require demarcation of protected buffer with flogging or
signs prior to the initiation of construction and limiting operation of construction equipment
in buffers to only that necessary for clearing, excavation, pipe installation, backfilling, and
restoration
(10) Mitigation. Persons who wish to undertake uses designated as allowable with
mitigation shall meet the following requirements in order to proceed with their
proposed use.
(a) Obtain a determination of "no practical alternatives" to the proposed use
pursuant to Item (8) of this Rule.
(b) Obtain approval for a mitigation proposal pursuant to 15A NCAC 0213.0242 [.260].
15A NCAC 0213.0242 and .0260 have been repealed and replaced with 15A NCAC 0213.0295.
As discussed above, the applicant has demonstrated that there is no practical alternative that
can accomplish the project's basic purpose with less adverse impacts to protected buffers.
Due to the fact that the maintenance corridorfor the proposed pipeline will have a width of
16
greater than 10 feet, a// of the buffer impacts are considered "ALLOWABLE WITH
MITIGATION" uses and subject to the buffer mitigation requirements [15A NCAC 02B.0295].
However, impacts to wetlands within the buffers are not subject to the buffer mitigation
requirements and are regulated under 15A NCAC 02H.0506(h) as discussed above in section
(6) of the 401 WQC application review process. The buffer mitigation totals reflect the
removal of wetland areas within the buffer.
The applicant has proposed to obtain a// buffer mitigation credits through the in -lieu fee
program with the Division of Mitigation Services (DMS). A letter addressed to the applicant
from DMS dated May 4, 2017 and renewed on October 6, 2017, states that DMS is willing to
accept payment for the buffer mitigation credits for the proposed project. DMS will
administer the mitigation credits in accordance with the In -Lieu Fee program instrument
datedJuly 28, 2010 and 15A NCAC 02B.0295.
Recommendation: The buffer authorization certificates should include conditions requiring
buffer mitigation in accordance with the table below:
River Basin
Zone 1 (square feet)
Zone 2 (square feet)
Total (square feet)
Neuse
460,005
209,093
669,098
Tor -Pamlico
418,596
175,134
593,730
Total
1,262,828
Environmental Justice
One of the most common topics of the commenters was environmental justice. As discussed
above in the General Comments Section, many comments received expressed concerns
about environmental justice issues associated with pipeline's construction and operation.
FERC's Final Environmental Impact Statement determined, "as a result of the project, no
disproportionately high and adverse impacts on environmental justice populations as a result
of air quality impacts, including impacts associated with the proposed Compressor Station 2,
would be expected as a result of ACP and SHP. Also, no disproportionately high and adverse
impacts on environmental justice populations as a result of other resources impacts would
be expected." Many commenters disagreed with this determination and requested that the
401 WQC be denied based on the potential environmental justice impacts.
The Director evaluates a 401 WQC application based on five criteria including a no practical
alternatives analysis, minimization of adverse impacts to surface waters, an analysis of the
degradation of groundwaters or surface waters, a cumulative impacts analysis, and
replacement of existing uses through mitigation. Environmental justice is not included in the
criteria upon which the Director must evaluate the application. Although environmental
justice is not an evaluation criteria, the Department has been intimately engaged with the
stakeholders of North Carolina through the permitting process.
On March 23, 2017, the Department hosted a stakeholder meeting in Raleigh, NC to provide
information and receive feedback on the proposed pipeline project. Eight environmental
17
organizations, four government agencies, and a representative of the Commission of Indian
Affairs were in attendance.
On July 18 and 20, 2017, the Department hosted 401 WQC Application Public Hearings. This
was to allow the citizens of North Carolina to comment on the certification. Notification of
the public hearings was provided in accordance with 15A NCAC 02H .0506(d) and (e). In
addition, the Division of Water Resources provided notices of the hearings by mailing flyers
in both English and Spanish to community organizations, such as churches, government and
non-government organizations, libraries, etc.
On August 9, 2017, the Department participated in an Environmental Justice Forum hosted
by the Haliwa-Saponi Indian Tribe and the North Carolina Commission of Indian Affairs. The
forum allowed an opportunity for tribal leaders, commission members, state and federal
regulators, and other stakeholders to discuss information on the proposed Atlantic Coast
Pipeline.
Between August 15 and 17, 2017, the Department hosted three listening sessions along the
proposed pipeline route to obtain additional public feedback on the project. In addition to
the Department, the NC Department of Commerce, NC Department of Natural and Cultural
Resources, and the US Army Corp of Engineers were present.
On October 20 and 21, 2017, the Department participated in the North Carolina
Environmental Justice Network's Summit. This allowed for the Department to provide a
summary of the permitting status of the project.
In addition to the various stakeholder engagements listed above, the Department has been
transparent with citizens who requested to sign up forthe email news feed on the project, as
well as meetings with the Commission of Indian Affairs. The Department has been thorough
in its review of the applications submitted forthe proposed Atlantic Coast Pipeline.
V1. Summary
Public comments concerning the two public hearings focused on several major issue areas,
including the degradation of water quality, cumulative impacts, environmental justice,
sedimentation and erosion control, the permitting process, impacts on wildlife including
threatened and endangered species, and ground and surface water supply protection. Due
to the number of public comments, many of which expressed concerns on the same issues,
each comment is not addressed individually. Only comments that have direct relevance to
the certification decision have been addressed in the recommendations (Section V).
As stated above, a thorough review of all public comments received and the project record
has been conducted, and additional insight has been obtained through discussions with DWR
staff. Based on all of this information, it is my recommendation that the 401 Water Quality
Certification and Buffer Authorization Certificates be issued and subject to the conditions
included in the recommendations in Section V. It is further recommended that DWR include
any additional conditions necessary to ensure that the project will meet state water quality
standards.
18
VII. Appendices (available on Laserfiche)
A. May 8, 2017 401 Water Quality Certification Application
a. Laserfiche Folder Name: 401 Application
b. Laserfiche link:
http://edocs.deg.nc.gov/WaterResources/o/fol/S47SlS/Rowl.asp
B. Notice of Public Hearings —June 16-18, 2017
a. Laserfiche Filename: Listserve Public Notice 06 16 2017
b. Laserfiche link:
htto://edocs.dea.nc.Lyov/WaterResources/o/doc/547S28/PaLye1.asr.
C. Correction to Notice of Public Hearings —June 19-22, 2017
a. Laserfiche Filename: Listserve Public Notice Correction 06 19 2017
b. Laserfiche link:
http://edocs.deg.nc.govLWate(Resources/o/doc 547588/Pagei.aspx
D. July 18, 2017 Non -speaker sign -in sheets
a. Laserfiche Filename: ACP July18 FayettevilleHearing_Non-SpeakerSignInSheets
b. Laserfiche link:
http://edocs.deg.nc.g,gyjWaterResources 0/doc/55261VEagel.aspx
E. July 18, 2017 Speaker list
a. Laserfiche Filename: ACP July18 Fayetteville Hearin gSpeakerSign InSh eets
b. Laserfiche link:
hl!p-Z/gdQg_deg..nc.goy.LWateCResourcgsL dod 52611/Pagel.aspx
F. July 20, 2017 Non -speaker sign -in sheets
a. Laserfiche Filename: ACP July2GL RockyMtHearin g- Non -SpeakerSignInSh eets
b. Laserfiche link:
hjtp_-fledg�� �.de ..nc.govLWaterResources/o/doc/SS324S/Pagel.asp
G. July 20, 2017 Speaker list
a. Laserfiche Filename: ACP July2GLRockyMt Hearin g_SpeakerSignInSh eets
b. Laserfiche link:
httD://edocs.dea.nc.Lyov/WaterResources/o/doc/SS3247/PaLye1.asox
H. July 18, 2017 Public Hearing transcript, including oral comments
a. Laserfiche Filename: ACP July18 Fayetteville Hearing- Transcripts
b. Laserfiche link:
http://edocs.deg.nc.gov/WaterResources/O/doc/SS7323/Pagel.asp?�
1. July 20, 2017 Public Hearing transcript, including oral comments
a. Laserfiche Filename: ACP July2GLRockyMt Hearing- Transcripts
b. Laserfiche link:
http://edocs.deg.nc.gov/WaterResources/o/doc/SS7322/Pagel.asp?�
J. Written comments received during the comment period, including at the public
hearings
a. Laserfiche Folder Name: Public Notice Comments
19
b. LaserDche link:
20