Loading...
HomeMy WebLinkAbout20140957 Ver 2_ACP_hearing officers rept_01192018_draft_20180119[Type here] January XX, 2018 MEMORANDUM To: Linda Culpepper Interim Director, Division of Water Resources From: Brian Wrenn, Ecosystems Branch Supervisor Division of Water Resources, Water Sciences Section Subject: Hearing Officer's Report and Recommendations Atlantic Coast Pipeline, LLC Individual 401 Water Quality Certification and Buffer Authorization Certificates Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson Counties I served as the Hearing Officer for the subject Public Hearings held at the Fayetteville Technical Community College in Fayetteville, NC on July 18, 2017 and at the Nash Community College in Rocky Mount, NC on July 20, 2017. The public hearings were held underthe authority of Title 15A NCAC 02H .0504. The purpose of these public hearings was to receive comment on the Division of Water Resources' 401 Water Quality Certification (401 WQC) and buffer authorization certificates application (Appendix A) submitted by Atlantic Coast Pipeline, LLC (ACP). A 401 WQC and buffer authorization certificates are needed to construct a natural gas pipeline through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson Counties. In addition to listening to oral comments at the public hearings, I have reviewed all written comments received prior, during and after the public comment period. In preparation of this report, I have considered all of the public comments, the public record, discussions with Division of Water Resources (DWR) staff related to the rules, and their review of the applications for the project. The report has been prepared using the following outline: 1. Site History/ Background 11. July 18, 2017 Public Hearing Summary Ill. July 20, 2017 Public Hearing Summary IV. Comments V. Recommendations V1. Summary VI 1. Appendices 1. History/ Background On May 9, 2017, Atlantic Coast Pipeline, LLC (ACP) submitted an application for a 401 WQC and buffer authorization certificates. ACP had previously applied to DWR on October 23, 2015. DWR requested additional information on November 18, 2015. The requested information was not provided, therefore DWR returned the application on August 31, 2016. ACP is proposing to construct and operate an approximately 605 -mile -long interstate natural gas transmission pipeline system including laterals through West Virginia, Virginia and North Carolina. In North Carolina, ACP is proposing to construct one compressor station and install approximately 186 miles of transmission pipeline and appurtenances, including 3 metering and regulating stations, 11 valve sites and 4 pig launchers/receivers, through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland and Robeson Counties. ACP is proposing over 300 crossings of streams and open waters, temporarily impacting over 35,000 linear feet and permanently impacting over 700 linear feet of stream. ACP is also proposing crossing wetlands, temporarily impacting over 450 acres and permanently impacting less than one acre of wetlands. ACP will impact protected riparian buffers within the Neuse and Tar -Pamlico River basins, impacting over 648,000 square feet of zone 1 and over 455,000 square feet of zone 2 protected riparian buffer. DWR requested and received additional information several times throughout the application review process: Date Action June 27, 2017 Req. for Add Info (1) July 12, 2017 Add Info Received (1) September 14, 2017 Req. for Add Info (2) September 22, 2017 Add Info Received (2) October 2. 2017 Add Info Received (2) October 13, 2017 Add Info Received (2) October 26, 2017 Req. for Add Info (3) November 4, 2017 Add Info Received (3) November 15, 2017 Add Info Received (3) November 28, 2017 Req. for Add Info (4) December 8, 2017 Add Info Received (4) December 14, 2017 Req. Correction to (4) December 20, 2017 Add Info Received (4) Under the authority of Title 15A NCAC 02H .0504, DWR held a public comment period from June 16, 2017 until August 19, 2017 to accept public input on the application. The public comment period included two public hearings described below. In accordance with Title 15A NCAC 02H .0503, notice of the public hearings and availability of the 401 WQC and riparian buffer authorization certificates application was published in The Fayetteville Observer, the News & Observer, the Rocky Mount Telegram, the Roanoke - Chowan News -Herald, the Robesonian and the Wilson Times on June 17, 2017, in the Daily Herald and the Sampson Independent on June 18, 2017, and posted online and sent by mail to the Water Quality Certification Mailing List on June 16, 2017 (Appendix B). A correction to the public notice to correct a typo in the pipe diameter was posted online on June 19, sent to the mailing list on June 20, and issued in the newspapers on June 21 and 22 (Appendix C). The public comment period ended on August 19, 2017; however, since August 19th was a Saturday, DWR accepted comments through Monday, August 21. 11. July 18, 2017 Public Hearing A public hearing was held July 18, 2017, at 6 p.m. at the Fayetteville Technical Community College in Fayetteville, NC. The public hearing was held under the authority of Title 15A NCAC 02H .0504. This was a public hearing to receive public comment for the DWR 401 WQC application (Appendix A) submitted by ACID in order to construct a natural gas pipeline through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson Counties. One hundred thirty-nine people attended the July 18 public hearing, including eight staff members from the Department. A total of 131 individuals signed the attendance sign -in sheets at the registration table (Appendices D and E). The hearing officer provided opening remarks and Jennifer Burclette, DWR, presented background information on the 401 WQC process and the proposed application before the hearing was opened for public comment. Forty-four individuals registered in advance of the hearing to provide comments, and two additional individuals made comments for a total of 46 speakers. Speakers were given three minutes for initial presentations. Additional time was allowed for speakers after everyone that registered to speak was finished, which was used by three speakers. The list of speakers is included (Appendix E). The public hearing transcript, incluc H). DWR also received approximatE period from local and state gover (Appendix J). Approximately 8,2 approximately 1,370 were in favor. comments provided during the public I hearings and the comment period, along on the certification decision makinR r)roc( 111. Julv 20, 2017 Public Hea I comments, is attached to this report (Appendix 3 written comments during the public comment agencies, individual citizens, and citizen groups nments were opposed to the project and of the comments were written transcripts of the arings. A summary of the comments for both fith detailed responses that have a direct impact ; are included in Sections IV and V below. A second public hearing was held July 20, 2017, at 6 p.m. at the Nash Community College in Rocky Mount, NC. The public hearing was held under the authority of Title 15A NCAC 02H .0504. This was a public hearing to receive public comment forthe DWR 401 WQC application (Appendix A) submitted by ACID in order to construct a natural gas pipeline through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson Counties. One hundred seventy-six people attended the July 20 public hearing, including eight staff members from the Department. A total of 168 individuals signed the attendance sign in sheets at the registration table (Appendices F and G). The Hearing Officer provided opening remarks and Jennifer Burclette, DWR, presented background information on the 401 WQC process and the proposed application before the hearing was opened for public comment. Sixty-five individuals registered in advance of the hearing to make comments. Speakers were given three minutes for presentations and the hearing was held open an additional thirty minutes to allow all speakers that registered to speak. The list of speakers is included (Appendix G). 3 The public hearing transcript, including oral comments, is attached to this report (Appendix 1). DWR also received approximately 9,600 written comments during the public comment period from local and state government agencies, citizens and citizen groups (Appendix J). Approximately 8,220 comments were opposed to the project and approximately 1,370 were in favor. Some of the comments were written transcripts of the comments provided during the public hearings. A summary of the comments for both hearings and the comment period, along with detailed responses that have a direct impact on the certification decision making process, are included in Sections IV and V below. IV. General Comments The following is a summary of the comments 2017 public hearings and emails and other w public comment period. Comments received made part of the public record. An overA opposition to the pipeline for a variety of reas Many comments received eN specifically fracked natural ga NC and the US should be Proponents of the project bel and other fossil fuels. !ived during the July 18, 2017 and July 20, n comments received by DWR during the side of the public comment period were ,Iming majority of the comments were in S. ressed concerns about the continued use of fossil fuels, and their negative impact on climate change. Manythink ioving toward the use of renewable energy sources. ve that natural gas is a "clean" fuel option to replace coal These comments are outside c Administrative Codesfor the 401 1 and should be directed to the Fede ! evaluation criteria established in N.C. ind Buffer Authorization Certificates review ergy Regulatory Commission (FERC). Many comments received were skeptical of ACP's promotion of the project as a job creation opportunity and economic stimulator for local communities. Several pointed out that ACP's own job creation estimates are very low and that the economic benefits to local communities are vague. Proponents of the project reiterated that the pipeline would bring jobs and economic development to NC. These comments are outside of the evaluation criteria established in N.C. Administrative Codes for the 401 WQC and Buffer Authorization Certificates review and should be directed to the NC Department of Commerce. Many comments received expressed concerns about the cumulative impacts analysis provided by ACP. Many believe that the analysis did not contain sufficient detail to properly evaluate the cumulative impacts. Some comments indicated that the temporary impacts from the project should be considered in the cumulative impact analysis and that the sheer volume of temporary impacts should be calculated to equal some level of permanent impacts. Cumulative impacts are addressed in Section V below. Further comments should be directed to the NC Department of Commerce and the U.S. Army Corps of Engineers (Corps). al Many comments received questioned the purpose and need of the project. Many pointed to evidence that the growth of natural gas markets was estimated to be negligible and questioned the need to build such a large and expensive pipeline. Many noted that the market demand was generated through companies owned or affiliated with Duke and Dominion power companies and that the need was self-serving rather than one identified through public interest. Furthermore, several commenters stated that the purpose of economic benefit was misleading as ACP's own estimates predict little permanent job growth as a result of the project. These comments are outside of the evaluation criteria established in N.C. Administrative Codes for the 401 WQC and Buffer Authorization Certificates review and should be directed to FERC and the Corps. Many comments received expressed concerns about environmental justice issues associated with pipeline's construction and operation. Many believe that the pipeline will have a disproportionate impact on low-income and minority communities. Many commenters feel that ACP has not made significant efforts to coordinate with these communities or to consider other routes that would reduce the impacts on these communities. Specifically, several commenters mentioned ACP's lack of coordination with state -recognized tribes such as the Lumbee and Haliwa-Saponi. Furthermore, they do not believe ACP has adequately addressed potential impacts to cultural resources along the pipeline route. Environmental Justice is addressed in Section V below. • Several commenters expressed opposition to ACP's use of eminent domain to obtain right-of-way for the pipeline. These comments are outside of the evaluation criteria established in N.C. Administrative Codes for the 401 WQC and Buffer Authorization Certificates review. • Several commenters raised concerns about Duke Power's past record of non-compliance with environmental regulations and permits. These comments are outside of the evaluation criteria established in N.C. Administrative Codes for the 401 WQC and Buffer Authorization Certificates review. • Several commenters raised concerns about living within the "blast zone" of the pipeline and questioned ACP's liability response should an explosion occur. Others believe that the pipeline is a safe and efficient way to transport natural gas. These comments are outside of the evaluation criteria established in N.C. Administrative Codes for the 401 WQC and Buffer Authorization Certificates review and should be directed to FERC. Many comments received expressed concerns over ACP's potential impacts to water quality from erosion and sedimentation. Many commenters feel that ACP's erosion and sedimentation control plan is inadequate and lacks sufficient detail. Others believe that trenching through streams and wetlands will have a negative effect on stream stability and threaten wildlife. Concerns over blasting effects were also raised. Water Quality is addressed in Section V below. 61 Many comments received expressed concerns over impacts to wildlife, specifically threatened and endangered species. Many felt that the construction activities could destroy critical habitat and primary nursery areas for a variety of terrestrial and aquatic species. Others felt that the extensive coordination process with the US Fish and Wildlife Service and NC Wildlife Resources Commission (NCWRQ has adequately addressed any potential impacts. Aquatic species are addressed in Section V below. Further comments should be directed to NCWRC. Many commenters believe that the 401 WQC application is incomplete. They pointed to the lack of erosion and sedimentation control plans and site-specific water body crossing details as evidence that necessary information was missing from the application. In contrast, some commenters believe that the ACP project has gone through an extensive regulatory review process. The Division requested additional information multiple times as detailed in Section above. The overwhelming majorityof comments received raised concerns overthe degradation of ground and surface waters as a result of the construction and operation of the pipeline. Many commenters mentioned the large number of streams and wetlands that would be crossed by the pipeline and raised red flags regarding the large amount of temporary and permanent impacts. They( of downstream uses including drinking wa- contact recreation, and fisheries. Further of wetlands through temporary impact� vegetation changes from temporary wetk wetland impacts. Finally, many commen- drinkine water wells. A sienificant level of about impacts to wells operation of the pipeline. Degradation is addre� V. Certification Specific Cor cons nnected these impacts with the degradation r supply, aquatic life, primary and secondary ore, commenters spoke in detail of the loss Many felt the temporal and permanent d impacts should be considered permanent were made regarding potential impacts to )ncern was present among the commenters i activities (mainly blasting activities) and ion V below. nts and Recommendations Based on the review of public comments, the application, the North Carolina General Statutes and Administrative Code, and discussions with DWR staff, I offer the following comments and recommendations on the criteria for issuance of a 401 WQC pursuant to 15A NCAC 02H .0506(b) and the issuance of Neuse and Tar -Pamlico River Basin Buffer Authorization Certificates pursuant to 15A NCAC 02B .0233 and 15A NCAC 02B .0259, respectively. 15A NCAC 02H .0506(b) (1) Has no practical alternative under the criteria outlined in Paragraph (f) of this Rule. Paragraph (f) states: "A lack of practical alternatives may be shown by demonstrating that, considering the potential for a reduction in size, configuration or density of the proposed activity and all alternative designs the basic project purpose cannot be 11 practically accomplished in a manner which would avoid or result in less adverse impact to surface waters or wetlands." The project proposes to construct a pipeline to transport natural gas from West Virginia and Pennsylvania through Virginia and North Carolina. The North Carolina portion of the proposed route will be constructed through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson Counties. As part of the Federal Energy Regulatory Commission (FERC) National Environmental Policy Act (NEPA) analysis, ACP investigated several alternatives to meet the purpose and need of the project including no build, alternative energy, energy conservation, and system alternatives. Of these alternatives, FERC and ACP found that the build alternative best met the purpose and need of the project. Next, ACP conducted an extensive alternatives analysis on potential route locations including collocation of the ACP with existing pipelines as well as Eastern and Western route alternatives. Ultimately, ACP chose the Eastern route as the best option based on the evaluation of a variety of criteria such as project length and human and natural resources. ACP continued to refine the Eastern alternative balancing a variety of human and natural environmental resources such as public lands, roads, conservation easements, forested lands, streams and wetlands, known historical and cultural resources, and homes and businesses. Development of the proposed pipeline route included the analysis of seventeen major route alternatives and 37 minor adjustments in the North Carolina portion of the project in an effort to avoid and minimize impacts to these resources. This analysis included pre- and post - application communication with DWR and NC Wildlife Resources Commission (NCWRC) on avoidance and minimization opportunities. ACP has continued to refine the avoidance and minimization practices in response to additional information requestsfrom DWR and through environmental commitments. A more detailed discussion of avoidance and minimization can befound below. Recommendation: None. The applicant has sufficiently demonstrated that there is no practical alternative that can accomplish the project's basic purpose with less adverse impact to surface waters or wetlands. (2) Will minimize adverse impacts to the surface waters based on consideration of existing topography, vegetation, fish and wildlife resources, and hydrological conditions under the criteria outlined in Paragraph (g) of this Rule. Paragraph (g) states: "Minimization of impacts may be demonstrated by showing that the surface waters or wetlands are able to continue to support the existing uses after project completion, or that the impacts are required due to: (1) The spatial and dimensional requirements of the project; or (2) The location of any existing structural or natural features that may dictate the placement or configuration of the proposed project; or (3) The purpose of the project and how the purpose relates to placement, configuration or density. The applicant has minimized impacts to surface waters and wetlands to the greatest extent practical. The permanent impacts will be 766 linear feet of streams and 0.80 acres of wetlands. The permanent impacts related to streams and wetlands will be a result of 7 upgrading and improving access roads constructed for installation and maintenance of the pipeline, not from the pipeline itself. All crossings of major rivers will be conducted using horizontal directional drilling (HDD) to avoid open trenching. The magnitude of the temporary impacts is very high but within reason considering the size and scope of the project. The applicant will use a narrower construction corridor when crossing wetlands and construction techniques such as timber matting, temporary work bridges, and clean rock over piping to minimize temporary impacts to streams and wetlands. Temporary impacts to streambanks and wetland areas will be restored to the original contours and revegetated with native plants. ACP will monitor any temporary impact areas in streams or wetlands to ensure there is no permanent loss at these locations. The monitoring plan includes monitoring for a minimum of two yearsfor streams and three yearsfor wetlands with stability, vegetation, and hydrology requirements. Upon successful completion of the restoration and monitoring activities, the stream and wetland impact areas will continue to support existing uses of hydrology, vegetation, and aquatic and wildlife habitat. The applicant has committed to a number of best management practices to avoid and minimize impacts to streams and wetlands. 0 Demarcation of wetland boundaries with flogging and signs prior to start of construction Use of temporary work bridges, matting and pods to reduce the risk of soil compaction Trench backfilling using native material to prevent soil contamination and to accelerate revegetation Limiting operation of construction equipment in wetlands to only that necessary for clearing, excavation, pipe installation, backfilling, and restoration Installing trench breakers or plugs at the boundaries of wetlands to prevent draining of wetlands Pump -out activities in the work area will be routed through an energy dissipation/sedimentfiltration device prior to discharging to waterbodies Use of a project -specific invasive plant species management plan Stump removal, grading, and excavation will be limited to the area immediately over the trench line to maintain native seed and rootstock Coating for concrete -coated pipe will be conducted at least 100 feet from surface waters and springs Prohibiting use of live concrete as a building material so that wet concrete does not come in contact with surface waters • Prohibiting storage of chemicals, fuels, hazardous materials, and lubricating oils within 100feet of surface waters • Voluntarily implementing the requirements of the Construction Stormwater General Permit No. NCGO10000 Use of horizontal directional drilling for a// major river crossings Implementation of a Spill Prevention, Control, and Countermeasure plan and a Horizontal Directional Drill Drilling Fluid Monitoring, Operations, and Contingency plan A ACP has completed formal consultation with US Fish and Wildlife Service (USFWS) on threatened and endangered species along the corridor. In an October 16, 2017 biological opinion, USFWS did not identify any threatened and endangered species or sensitive habitat in NC along the proposed corridor. ACP has also coordinated extensively with the NCWRC. This coordination began with the alternatives analysis and site-specific routing of the pipeline. ACP worked with NCWRC to avoid threatened and endangered species and sensitive habitats and to develop relocation protocols for fish and mussels. ACP conducted pre -construction surveys for fish and mussels in the Neuse River at the proposed crossing location. These surveys found that the mussel population was much more abundant and diverse than previously known. This survey and the continued coordination with NCWRC resulted in ACP's revised proposal to use HDD at the Neuse River instead of open trenching. ACP has also developed a relocation plan forfish and mussels in coordination with NCWRC. Recommendation: The applicant has sufficient, waters and wetlands are required due to spatioi purpose of the project. The 401 WQC should temporary impact areas in accordance with the T f demonstrated that impacts to surface considerations, natural features and the include requirements for monitoring of ine certIllcation snoula also inciude reopener long disturbed wetland areas do not return to wetland concl Corps of Engineers (Corps) Wetland Manual and confi reopener language should require a modification to the permanent impacts and mitigation for all permanent vi impacts exceed 1.0 acre. Furthermore, the 401 WQC any work moratoriums suggested by NCWRCfor the pr I restoration and monitoring plan. 7e in the event that temporarily Pns as defined by the 1987 US Army ed by a Corps representative. The I WQC to accountfor the additional and impacts should the permanent luld be conditioned to comply with project. (3) Does not result in the degradation of groundwaters or surface waters. The main risk to surface and groundwater from the ACP project will be during construction activities. These risks include sedimentation and turbidity in surface waters, breaches of drilling fluids during HDD, and spills of petroleum products and hydraulic fluids from fueling and equipment maintenance. In addition, some commenters raised concerns regarding impacts to drinking water wells from trenching and blasting activities associated with the pipeline installation andfrom possible contamination due to pipeline leaks during operation. The applicant has committed to working in the dryfor a// stream and wetland crossings unless site-specific conditions warrant working in wet conditions and the applicant obtains prior written approval from DWR. Proper erosion and sedimentation control measures will be required for the entire project in accordance with the Division of Energy, Mineral and Land Resources (DEMLR) sedimentation and erosion control Certificate of Plan Approval. All temporaryfill placed in surface waters related to construction of the pipeline will be removed once installation of the pipeline is completed at the crossing. The stream banks or wetlands will be restored to the original contours and revegetated with a native seed mix to prevent erosion. Only in areas where vegetative stabilization is not successful will hardened stabilization (rip -rap, geogrid, etc.) techniques be used. No hardening will be placed below the ordinary high water mark. Furthermore, the applicant has voluntarily agreed to meet the requirements of the NPDES Construction Activities General Permit No. NCGO10000. A The applicant will store chemicals, fuels, hazardous materials, and lubricating oils and conduct a// equipment and vehiclefueling and maintenance at least 100feetfrom surface waters and 200feetfrom private drinking water wells. In situations where equipment must continue to operate during fueling activities such as dewatering pumps near surface waters, secondary containment structures will be used to prevent any spillagefrom reaching the surface waters. The applicant has conducted a desktop survey to identify a// known drinking water wells within 150 feet of the pipeline construction corridor. Almost 50 private drinking water wells were located in NC. The applicant proposes to test each well prior to construction for a suite of parameters including pH, total suspended solids, total dissolved solids, conductivity, alkalinity, acidity, sulfates, oillgrease, phenolic, iron, manganese, aluminum, fecal coliform, copper, lead, nickel, silver, thallium, zinc, chromium, arsenic, mercury, selenium, cyanide, calcium magnesium, hardness, chlorides, antimony, cadmium, and beryllium as well as well yields. These tests will provide a baseline of groundwater quality and quantity against which to measure any construction -related impacts. In the event that blasting will occur within 500 feet of a drinking water well, the applicant proposes to conduct pre -blasting monitoring for the parameters listed above. Should the applicant receive a complaint regarding damage to well water quality or quantity, the applicant proposes to conduct post -construction well testing of the some parameters to verify no adverse impacts have occurred. Furthermore, in the event that adverse impacts do occur as a result of construction activity, ACP has committed to providing temporary water supplies, andlor a new water treatment system or well. Operation of the pipeline is not expected to have adverse effects on surface waters and groundwater. Any post -construction storm water generated as a result of impervious surfaces installed during construction are subject to state and local storm water requirements. ACPhas committed to using sheetflow and existing storm water conveyances and drainage ditches. No curb and gutter stormwater management will be constructed. For impervious surfaces constructed in areas with no state or local stormwater programs, these stormwater management techniques will be protective of water quality. Many commenters raised concerns about leaksfrom the pipeline impacting groundwater. The pipeline will be transporting dry natural gas which is not soluble in water. Liquids contained in the gas are removed at a natural gas processing plant prior to transport and at liquid separators at compressor stations. Any remaining liquid will be de minimus and is not likely to impact groundwater. Recommendation: The project is not expected to violate water quality standards if the conditions in the 401 Water Quality Certification are fully complied with by the applicant (or its successor). The 401 WQC should be conditioned to require full compliance with the following permits: Certificate of Plan Approval No. Cumbe-2018-036, issued by DEMLR, Fayetteville Regional Office NPDES Permit No. NCGO10000 issued by DEMLR The 01 WQC should also be contingent on the issuance of a sedimentation and erosion control Certificate of Plan Approval issued by DEMLR, Raleigh Regional Office and upon 10 issuance of appropriate state and local stormwater permits. FERC NEPA and 401 WQC application documentation indicates that the applicant has agreed to conduct pre - construction water quality testing for drinking water wells within 150 feet of the pipeline construction corridor and within 500 feet of blasting activities. The 401 WQC should be conditioned to require ACP to conduct pre- and post -construction testing of a// wells within 150 feet of the construction corridor and within 500 feet of blasting activities regardless of whether a complaint is received. Should post -construction testing indicate that well water quality or quantity has been impacted by the construction, ACP should be required to provide temporary water supplies, andlor a new water treatment system or well. An independent, qualified groundwater specialist should determine whether an impact has occurred or not. The 401 WQC should be conditioned to require monthly ride -through inspections with appropriate DWR and DEMLR staff to measure compliance with the respective certifications and permits. The 401 WQC should also require a pre -construction meeting with the construction contractors, ACP staff, and DWR and DEMLR staff to review the conditions and requirements of the respective certifications and permitsfor clarity and understanding. (4) Does not result in cumulative impacts, based upon past or reasonably anticipated future impacts, that cause or will cause a violation of downstream water quality standards. Cumulative impacts are those project added to other post, p 01C.0103). This includes seco result of the proposed proje temporary water quality impc include sedimentation and te construction. Permanent im impacts that would resultfirom the incremental effects of the resent and reasonably foreseeable future activities (15A NCAC ndary impacts or impacts from future activities that occur as a ct. The proposed project for the most part will consist of cts from the installation of the pipeline. These impacts could and mitigation efforts, erosion a, practices (BMPs), and spill preve occurring in similar locations to t regulations that address streo watershed,orotection. ,ry disturbance of aquatic and riparian habitat during Ivill occur in streams and wetlands from access road permanent impacts will be reduced through avoidance ?dimentation control and stormwater best management n, control, and countermeasure practices. Any projects ,oposed project will be subject to local, state, andfiederal ,nd wetland impacts, stormwater management, and Almost 80% of the increased natural gas supply has been committed to natural gas power plants. The remaining supply will be availablefor commercial, industrial and residential use. However, only three distribution points or M&R stations will be constructed in NC. These M&R stations will be located in Johnston, Cumberland, and Robeson Counties. Secondary development as a result of the pipeline is likely to befocused around these distribution points, therefore, water quality impacts are most likely in proximity to these areas. The applicant conducted a qualitative analysis of the potential secondary and cumulative impacts in these three counties. In the qualitative analysis, the applicant completed an "indirect (secondary) and cumulative effects screening matrix" where a series of parameters including scope of the project, population growth, available land, waterlsewer availability, natural gas availability, market 11 for development, public policy, and notable water resources were evaluated on their ability to contribute to indirect and cumulative effects on water quality. Based on these ratings, areas of potential growth and development were identified. These growth areas were then compared in an action/no-action forecast where the differences in growth and development between building the pipeline and not building the pipeline were determined. Areas that had significant increases in growth and developmentfrom building the pipeline were mapped. As discussed above, any new development projects will be subject to state and federal regulations for impacts to streams and wetlands and erosion and sedimentation control. However, stormwater management regulations are variable by location. Existing state and local stormwater programs were overlain on the areas of potential growth identified in action/no-action analysis to predict the net impact to water quality resulting from secondary development. The action/no-action analysis demonstrated Johnston and Cumberland Counties if the I infrastructure for waterlsewer and transporta and have a number of shovel -ready developrr, are almost entirely covered by state and local subject to the Neuse River Nutrient Sensitive Water water quality impacts due to growth in the area wou that growth could significantly increase in �peline is built. These areas have existing ion, are predicted to have population growth, sites Most of Robeson County does not have state or present are associated with High Quality Waters in area. However, the action/no-action analysi expected to have a significant increase in growtf According to ACPs analysis, locking infrastruca metr000litan areas has stunted arowth in this c ova Co would be subject to a local st growth in this area would be m Recommendation: The project water quality standards, if thi applicant (or its successor). Th( to the NC Department of Comn d it is locat� rmwater Dr inston and Cumberland Counties grograms and Johnston County is Ygement Strategy. Any potential itigated through these programs. local stormwater programs. Those that are or Water Supply Watersheds and are limited demonstrated that Robeson County is not and development as a result of the pipeline. re, population decline, and separation from rea. Only one shovel -ready industrial site is the protected Water Supply Watershed and m. Water quality impacts from secondary is not expected to result in cumulative impacts that violate conditions in the 401 WQC are fully implemented by the qualitative cumulative impacts analysis should beforwarded erce. (5) Provides for protection of downstream water quality standards through the use of on- site stormwater control measures. Post -construction stormwater is another potential water quality concern. The vast majority of the proposed pipeline project will not result in new impervious surfaces. However, some new impervious surfaces are proposed as part of the project. The impervious surfaces include multiple improved access roads, eleven valve stations, a compressor station, three metering and regulating (M&R) stations, and multiple contractor yards. The access roads are existing unpaved roads that will be improved to allow construction and maintenance equipment to safely pass. Improvements will include minor widening andlor surface water crossing 12 upgrades (e.g., minor pipelculvert extensions). The valve sites are needed to segment the pipeline for safety, operation, and maintenance purposes. The compressor station will be located in Northampton County, and the M&R stations will be located in Johnston, Cumberland, and Robeson Counties. The applicant has indicated that stormwater will be managed by using existing drainage ditches and swalesfor access roads. No curb and gutter stormwater conveyances are proposedfor the compressor or M&R stations, and stormwater will be managed through existing drainage ditches and swales. Stormwater management for these impervious surfaces will be regulated through state programs in Phase // communities or by local programs where applicable. Valve sites and access roads in a small portion of Nash County and access roads, valve sites, and a contractor yard in Cumberland County will be regulated through the state -implemented Phase // Stormwater Program. ACP will have to meet the requirements of SWG040000 — General Permit To Construct A Linear Utility Line and Associated Incidental Built -Upon Area (SWG04) or an individual state stormwater permit. SWG04 and individual state stormwater permits require compliance with the conditions of the respective permits and with the provisions of 15A NCAC 02H.1000, Session Low 2006-246, and Session Low 2008-211 which ensure the protection of downstream water quality standards through on-site stormwater control measures. Any impervious surfaces built in areas covered by local stormwater programs will have to meet the requirements of the local storm water program. The applicantalso proposes to build impervious surfaces in areas where no state or local programs are applicable. Based on the descriptions of stormwater best management practices proposed by the applicant, storm water is not expected to violate downstream water quality standards in these areas. Recommendation: Session Low 2017-10, management through a 401 WQC. As dis to require compliance with a// applicable s of a linear utility line and associated inci& es for existin ts DWR from requiring on-site stormwater above, the 401 WQC should be conditioned d local storm water permits for construction -upon area. through mitigation. Both federal and state requirements allow for the purchase of in lieu fee credits to offset unavoidable impacts to streams and wetlands. DWR requires mitigation [15A NCAC 02H .0506(h)] at a 1:1 ratio for permanent perennial stream impacts above 300 linearfeet and a 1:1 ratio for permanent wetland impacts above one acre. Perennial stream and wetland impacts for this project will not exceed the respective mitigation thresholds, therefore, no stream or wetland mitigation is required by DWR. Mitigation is required, however, by the U.S. Army Corps of Engineers for the wetland conversion impacts. Riparian buffer mitigation is requiredfor the uses identified in the Table of Uses of the Neuse and Tor -Pamlico River Basins Nutrient Sensitive Waters Management Strategies [15A NCAC 02B.0233(6) and 15A NCAC 02B .0259(6), respectively] as "ALLOWABLE WITH MITIGATION." "ALLOWABLE WITH MITIGATION" uses are defined in 15A NCAC 02B.0233(7)(c) and 15A NCAC 02B.0259(7)(c), respectively. Buffer mitigation is discussed below in the buffer authorization certificates section. 13 Recommendation: No mitigation is requiredfor stream or wetland impacts as a result of the proposed project. The 401 WQC should be conditioned to include language requiring mitigation should permanent impact changes occur that exceed mitigation thresholds. Neuse and Tar -Pamlico Nutrient Sensitive Waters Management Strategy The Neuse River Basin Nutrient Sensitive Waters Management Strategy and the Tar -Pamlico River Basin Nutrient Sensitive Waters Management Strategy have the exact same requirements [15A NCAC 02B .0233 and 15A NCAC 02B .0259, respectively]. Furthermore, the mitigation requirements for impacts to protected buffers are exactly the same for the Neuse and Tar -Pamlico River Basins [15A NCAC 02B .0242 and 15A NCAC 02B .0260 respectively] and both make reference to the buffer mitigation rules [15A NCAC 02B .02951. For the purposes of this report, the buffer authorization certificates recommendations will be combined in one discussion. 15A NCAC 02B .0233 and 15A NCAC 02B .0 (5) DIFFUSE FLOW REQUIREMENT. Dif riparian buffer by dispersing concent As discussed above in Section 5 of the 15A the proposed project will not result in new stormwaterflow. However, there will be ir andfive valve sites constructed and mainta part of the project. The access roads are exi. construction and maintenance equipmen widening andlor surface water crossing up valve sites will consist of gravel pods aroun, flow of runoff shall be maintained in the I flow and reestablishing vegetation. 92H.0506 discussion, the vast majority of . ous surfaces that will create concentrated I temporary and permanent access roads the Neuse and Tar -Pamlico River Basins as ipaved roads that will be improved to allow fely pass. Upgrades will include minor (e.g., minor pipelculvert extensions). The �-ground valves with gravel driveways. Stormwater from these areas will be managed by sheetflow or by using existing roadside ditches and swales. Sheetflow from the access roads meets the diffuse flow requirements associated with the Neuse and Tar -Pamlico River Basins Nutrient Sensitive Waters Management Strategies [15A NCAC 02B.0233(5) and 15A NCAC 02B.0259(5), respectively]. ACP has committed to managing the existing roadside ditches and swales to minimize sediment, nutrients, and other pollution prior to entering surface waters. The Table of Uses for the Neuse and Tar -Pamlico River Basins Nutrient Sensitive Waters Management Strategies [15A NCAC 02B.0233(6) and 15A NCAC 02B.0259(6), respectively] identifies use of existing drainage ditches, roadside ditches, and stormwater outfalls provided they are managed to minimize the sediment, nutrients, and other pollution that convey to waterbodies as "EXEMPT"uses. "EXEMPT" uses are defined in 15A NCAC 02B.0233(7)(0) and 15A NCAC 02B .0259(7)(a), respectively. The applicant proposes to locate the Smithfield M&R station in Johnston County which is subject to the Neuse River Buffer Rules. This station is also subject to state stormwater permitting requirements as part of the Phase // stormwater rules. Stormwater management and diffuseflow requirements will addressed through the Phase // process. 14 Recommendation: The buffer authorization certificates should include conditions requiring that diffuse flow conditions be maintained for a// stormwater from impervious surfaces flowing to or within the protected buffers in accordance with the diffuse flow requirements stated above or other applicable buffer clarification memos. (6) TABLE OF USES. Non -electric utility lines: Impacts other than perpendicular crossings in Zone 2 — Allowable Impacts other than perpendicular crossings in Zone 1 —Allowable with Mitigation Non -electric utility lines: • Perpendicular crossings that disturb greater than 40 linear feet but equal to or less than 150 linear feet of riparian buffer with a maintenance corridor greater than 10 feet in width - Allowable with Mitigation • Perpendicular crossings that disturb greater than 150 linear feet of riparian buffer — Allowable with Mitigation The proposed project is categorized as a non -electric utility line. The proposed project includes perpendicular and non -perpendicular crossings of streams and other surface waters subject to this rule. Due to the width of the maintenance corridor, 50 feet, G// buffer impacts are "ALLOWABLE WITH MITIGATION" uses. "ALLOWABLE WITH MITIGATION" uses are defined in 15A NCACO2B.0233(7)(c) and 15A NCACO2B.0259(7)(c), respectively. Recommendation: None. The proposed project is "ALLOWABLE WITH MITIGATION" under the Table of Uses. (8) DETERMINATION OF -NO PRACTICAL ALTERNATIVES.- Persons who wish to undertake uses designated as allowable or allowable with mitigation shall submit a request for a "no practical alternatives" determination to the Division or to the delegated authority. The applicant shall certify that the criteria identified in Sub -Item (8)(a) of this Rule are met. The Division or the delegated local authority shall grant an Authorization Certificate upon a "no practical alternatives" determination. The procedure for making an Authorization Certificate shall be as follows: (a) For any request for an Authorization Certificate, the Division or the delegated local authority shall review the entire project and make a finding of fact as to whether the following requirements have been met in support of a "no practical alternatives" determination: (i) The basic project purpose cannot be practically accomplished in a manner that would better minimize the disturbance, preserve aquatic life and habitat, and protect water quality. (ii) The use cannot practically be reduced in size or density, reconfigured or redesigned to better minimize disturbance, preserve aquatic life and habitat, and protect water quality. (iii) Best management practices shall be used if necessary to minimize disturbance, preserve aquatic life and habitat, and protect water quality. The project proposes to construct a pipeline to transport natural gas from West Virginia and Pennsylvania through Virginia and North Carolina. The North Carolina portion of the 15 proposed route will be constructed through Northampton, Halifax, Nash, Wilson, Johnston, Sampson, Cumberland, and Robeson Counties. The proposed project will permanently impact 521,430 squarefeet and 594,070 squarefeet of protected riparian buffers in the Neuse River Basin and the Tor -Pamlico River Basin, respectively. As part of the FERC NEPA analysis, ACP investigated several alternatives to meet the purpose and need of the project including no build, alternative energy, energy conservation, and system alternatives. Of these alternatives, the build alternative best met the purpose and need of the project. Next ACP, conducted an extensive alternatives analysis on potential route locations including collocation of the ACP with existing pipelines as well as Eastern and Western route alternatives. Ultimately, ACP chose the Eastern route as the best option based on an evaluation of a variety of criteria such as project length and human and natural resources. ACP continued to refine the Eastern alternative balancing a variety of human and natural environmental resources such as public lands, roads, conservation easements, forested lands, streams, wetlands, protected riparian buffers, known historical and cultural resources, and homes and businesses. Development of the proposed pipeline route included the analysis of seventeen major route alternatives and 37 minor adjustments in the North Carolina portion of the project in an effort to avoid and minimize impacts to these resources. This analysis included pre- and post -application communication with DWR and NCWRC on avoidance and minimization opportunities. ACP has continued to refine the avoidance and minimization practices in response to additional information requests from DWR and through environmental commitments. The applicant has demonstrated that the basic project purpose cannot be practically accomplished in a manner that would better minimize the disturbance, preserve aquatic life and habitat, and protect water quality. The applicant has demonstrated that the use cannot practically be reduced in size or density, reconfigured or redesigned to better minimize disturbance, preserve aquatic life and habitat, and protect water quality. The applicant has proposed a number of best management practices in an effort to minimize disturbance, preserve aquatic life and habitat, and protect water quality including but not limited to the following: Use of temporary work bridges, matting and pods to reduce the risk of soil compaction Trench backfilling using native material to prevent soil contamination and to accelerate reveaetation • Pump -out activities in the work area will be routed through an energy dissipation/sedimentfiltration device prior to discharging to waterbodies • Coating for concrete -coated pipe will be conducted at least 100 feet from surface waters and springs Use of horizontal directional drilling for a// major river crossings Implementation of a Spill Prevention, Control, and Countermeasure plan and a Horizontal Directional Drill Drilling Fluid Monitoring, Operations, and Contingency plan Use of a project -specific invasive plant species management plan Limiting operation of construction equipment in wetlands to only that necessaryfor clearing, excavation, pipe installation, backfilling, and restoration 16 • Stump removal, grading, and excavation will be limited to the area immediately over the trench line to maintain native seed and rootstock • Voluntarily implementing the requirements of the Construction Stormwater General Permit No. NCGO10000 Recommendation: The applicant has sufficiently demonstrated that there is no practical alternative that can accomplish the project's basic purpose with less adverse impacts to protected buffers. The buffer authorization certificates should be conditioned to incorporate the best management practices proposed by the applicant intended to minimize disturbance, preserve aquatic life and habitat, and protect water quality. Furthermore, the buffer authorization certificates should require demarcation of protected buffer with flogging or signs prior to the initiation of construction and limiting operation of construction equipment in buffers to only that necessary for clearing, excavation, pipe installation, backfilling, and restoration (10) Mitigation. Persons who wish to undertake uses designated as allowable with mitigation shall meet the following requirements in order to proceed with their proposed use. (a) Obtain a determination of "no practical alternatives" to the proposed use pursuant to Item (8) of this Rule. (b) Obtain approval for a mitigation proposal pursuant to 15A NCAC 0213.0242 [.260]. 15A NCAC 0213.0242 and .0260 have been repealed and replaced with 15A NCAC 0213.0295. As discussed above, the applicant has demonstrated that there is no practical alternative that can accomplish the project's basic purpose with less adverse impacts to protected buffers. Due to the fact that the maintenance corridorfor the proposed pipeline will have a width of greater than 10 feet, a// of the buffer impacts are considered "ALLOWABLE WITH MITIGATION" uses and subject to the buffer mitigation requirements [15A NCAC 02B.0295]. However, impacts to wetlands within the buffers are not subject to the buffer mitigation requirements and are regulated under 15A NCAC 02H.0506(h) as discussed above in section (6) of the 401 WQC application review process. The buffer mitigation totals reflect the removal of wetland areas within the buffer. The applicant has proposed to obtain a// buffer mitigation credits through the in -lieu fee program with the Division of Mitigation Services (DMS). A letter addressed to the applicant from DMS dated May 4, 2017 and renewed on October 6, 2017, states that DMS is willing to accept payment for the buffer mitigation credits for the proposed project. DMS will administer the mitigation credits in accordance with the In -Lieu Fee program instrument datedJuly 28, 2010 and 15A NCAC 02B.0295. Recommendation: The buffer authorization certificates should include conditions requiring buffer mitigation in accordance with the table below: River Basin Zone 1 (square fee ne2(squarefeet) Total (square feet) Neuse 460,005 209,093 669, 098 17 Tor -Pamlico 418,596 175,134 593,730 Total 1,262,828 Environmental Justice One of the most common topics of the commenters was environmental justice. As discussed above in the General Comments Section, many comments received expressed concerns about environmental justice issues associated with pipeline's construction and operation. FERC's Final Environmental Impact Statement determined, "as a result of the project, no disproportionately high and adverse impacts on environmental justice populations as a result of air quality impacts, including impacts associated with the proposed Compressor Station 2, would be expected as a result of ACP and SHP. Also, no disproportionately high and adverse impacts on environmental justice populations as a result of other resources impacts would be expected." Many commenters disagreed with this determination and requested that the 401 WQC be denied based on the potential environmental justice impacts. The Director evaluates a 401 WQC application based on five criteria including a no practical alternatives analysis, minimization of adverse impacts to surface waters, an analysis of the degradation of groundwaters or surface waters, a cumulative impacts analysis, and replacement of existing uses through mitigation. Environmental justice is not included in the criteria upon which the Director must evaluate the application. Although environmental justice is not an evaluation criteria, the Department has been intimately engaged with the stakeholders of North Carolina through the permitting process. On March 23, 2017, the Department hosted a stakeholder meeting in Raleigh, NC to provide information and receive feedback on the proposed pipeline project. Eight environmental organizations, four government agencies, and a representative of the Commission of Indian Affairs were in attendance. On July 18 and 20, 2017, the Department hosted 401 WQC Application Public Hearings. This was to allow the citizens of North Carolina to comment on the certification. Notification of the public hearings was provided in accordance with 15A NCAC 02H .0506(d) and (e). In addition, the Division of Water Resources provided notices of the hearings by mailing flyers in both English and Spanish to community organizations, such as churches, government and non-government organizations, libraries, etc. On August 9, 2017, the Department participated in an Environmental Justice Forum hosted by the Haliwa-Saponi Indian Tribe and the North Carolina Commission of Indian Affairs. The forum allowed an opportunity for tribal leaders, commission members, state and federal regulators, and other stakeholders to discuss information on the proposed Atlantic Coast Pipeline. Between August 15 and 17, 2017, the Department hosted three listening sessions along the proposed pipeline route to obtain additional public feedback on the project. In addition to the Department, the NC Department of Commerce, NC Department of Natural and Cultural Resources, and the US Army Corp of Engineers were present. 18 On October 20 and 21, 2017, the Department participated in the North Carolina Environmental Justice Network's Summit. This allowed for the Department to provide a summary of the permitting status of the project. In addition to the various stakeholder engagements listed above, the Department has been transparent with citizens who requested to sign up forthe email news feed on the project, as well as meetings with the Commission of Indian Affairs. The Department has been thorough in its review of the applications submitted for the proposed Atlantic Coast Pipeline. V1. Summary Public comments concerning the two public hearings focused on several major issue areas, including the degradation of water quality, cumulative impacts, environmental justice, sedimentation and erosion control, the permitting process, impacts on wildlife including threatened and endangered species, and ground and surface water supply protection. Due to the number of public comments, many of which expressed concerns on the same issues, each comment is not addressed individually. Only comments that have direct relevance to the certification decision have been addressed in the recommendations (Section V). As stated above, a thorough review of all public comr has been conducted, and additional insight has been o staff. Based on all of this information, it is my recomr Certification and Buffer Authorization Certificates be included in the recommendations in Section V. It is fu any additional conditions necessary to ensure that thi standards. V11. Appendices (available on Laserfiche) its received and the project record ined through discussions with DWR idation that the 401 Water Quality ued and subject to the conditions �r recommended that DWR include .0ject will meet state water quality A. May 8, 2017 401 Water Quality Certification Application a. Laserfiche Folder Name: 401 Application b. Laserfiche link: http://edocs.d��g.nc.gov I_WaterResources/o/fol/S47SlS/Rowl.aspx B. Notice of Public Hearings —June 16-18, 2017 a. Laserfiche Filename: Listserve Public Notice 06 16 2017 b. Laserfiche link: http://edocs.deg.nc.gov/WaterResources/O/doc/S47S28/Pagel.aspx C. Correction to Notice of Public Hearings —June 19-22, 2017 a. Laserfiche Filename: Listserve Public Notice Correction 06 19 2017 b. Laserfiche link: http://edocs.deg.nc.gov/WaterResources/o/doc/S47S88/Pagel.asp?� D. July 18, 2017 Non -speaker sign -in sheets a. Laserfiche Filename: ACP July18 FayettevilleHearin g_ Non -SpeakerSignInSh eets b. Laserfiche link: http://edocs.deg.nc.gov/WaterResources/O/doc/SS2613/Pagel.asp?� 19 E. July 18, 2017 Speaker list a. Laserfiche Filename: ACP July18 Fayetteville Hearin g­SpeakerSign InSh eets b. Laserfiche link: http://edocs.deg.nc.gov/WaterResources/o/doc/552611/PgEel.asp�� F. July 20, 2017 Non -speaker sign -in sheets a. Laserfiche Filename: ACP July2GL RockyMtHearin g- Non -SpeakerSignInSh eets b. Laserfiche link: http://edocs.deg.nc.gov/WaterResources/o/doc/SS324S/Pagel.asp?� G. July 20, 2017 Speaker list a. Laserfiche Filename: ACP July2GLRockyMt Hearin g_SpeakerSignInSh eets b. Laserfiche link: httD://edocs.dea.nc.2ov/WaterResources/o/doc/SS3247/Pa2el.aSDX H. July 18, 2017 Public Hearing transcript, incl a. Laserfiche Filename: ACP July18 Fa b. Laserfiche link: http://edocs.deg.nc.gov/WaterReso 1. July 20, 2017 Public Hearing transcript, incl a. Laserfiche Filename: ACP July2GLRo b. Laserfiche link: J. Written comments received during th hearings a. Laserfiche Folder Name: Public b. Laserfiche link: 20 ing oral comments teville Hearing- Transcripts :es/O/doc/SS7323/Pa,qeI.as ing oral comments Mt Hearing- Transcripts Comments cluding at the public