Loading...
HomeMy WebLinkAbout20170595 Ver 1_Utility Impacts - Pasquotank 29_20171212 (2)Carpenter,Kristi From: Sent: To: Subject: Attachments: Williams, Paul C Tuesday, December 12, 2017 7:54 AM Ward, Garcy; Barnes, Kyle W SAW Utility Impacts - Pasquotank 29 Utility Impacts - Pasquotank 29.pdf As we discussed in the preconstruction meeting, Albemarle EMC hand cleared approximately 1,250 sq. ft. (0.287 acres) of wetlands during their temp. powerline relocation. This resulted in the cutting of 10 mature hardwoods. At my onsite meeting with them on 8/7/2017, the utility rep. indicated they would not need to clear any of the timber. Their plan at that time was to conduct heavy limbing to provide the necessary clearance of their lines. Apparently their crew doing the work thought otherwise. After the project, AEMC will relocate the powerline to the original alignment, and the temp. hand cleared area should not be maintained by AEMC. A permit drawing is attached with the impact area depicted. Please let me know if you need any additional information. Thanks, Paul C. Williams, Jr. Environmental Specialist Division One NC Department of Transportation (252) 482-1861 office (252) 333-9812 mobile (252) 482-8722 fax ��willi�m����u��dr�t.� 113 Airport Dr. Suite 100 Edenton, NC 27932 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,