Loading...
HomeMy WebLinkAboutDOT - approved copy - 1/18/2002009 STATE OF NORTH CAROLINA -4- DEPARTMENT OF TRANSPORTATION Michael F. Easley P. 0. Box 25201, Raleigh, NC 27611-5201 do T t 00 S '� 8 2 GOVERNOR PHONE: 919-733-2520 SECRETARY 1 002 December 28, 2001 [By:— PROJECT NUMBER: 6.759002T, Etc. (R-529BA & R-529BB) COUNTY: Watauga CONTRACT NO.: C104957 DESCRIPTION: US 421 From Just West of the South Fork New River to West of Blue Ridge Parkway East of Boone SUBJECT: Waste Reclamation Plan Approval Wright Brothers Construction Co., Inc. P. 0. 437 Charleston, TN 3 73 10 Attn: 1kAr. Wendall Marlar Dear Mr. Marlar, Please find attached your approved copy of the waste pit reclamation plan for the Radford Quarries of Boone, Inc. property. The following conditions shall be complied with: 1. The contractor shall install and maintain the haul road into the waste area at no cost to the Department. 2. Any improvements or additions to existing drainage on private property shall be at no cost to the Department. The Department shall not participate in the cost of installing and or maintaining the erosion control on the quarry site. All measures should already be installed according to the mining permit. With the approval of this waste area, it will be necessary that the following items are closely adhered to: 1. All erosion control devices shall be installed and maintained according to the mining permit number 95-03 as approved by the NC Dept. of Environment and Natural Resources. 2. Stockpiles of rock material shall be constructed in the areas shown on the plan that was submitted to the Department for approval. If the stockpiles are not constructed in the areas designated on the submitted plan, hauling to the quarry site shall be stopped immediately. 160 DEN MAc DRIVE, SuITE A, BOONE, NC 28607 PHONE (828) 265-5088 FAx (828) 265-5093 Mr. Wendall Marlar December 28, 2001 Page 2 3. It is understood that only rock material shall be brought to the quarry site. No earth material or dirt shall be deposited on the quarry site. The rock material is to be stockpiled for crushing purposes only. Once the rock is crushed, it is understood that the stone shall be sold to the public. Please be advised that if the waste pit needs to be expanded, a revised or additional reclamation plan must be submitted. Also note that any local ordinances or laws, if applicable, must be complied with in addition to this reclamation plan. Should you have any questions, please contact me at any time. Sincerely, F. I Gioscio Resident Engineer Attachments FJG\fg cc: R. C. McCann, P. E. S. D. DeWitt, P. E. (letter only) J. Wilson, P. E. (letter only) M. Gantt, P. E. D. Lawson N. Trivette H. Slaughter Radford Quarries of Boone, Inc. Tracy Davis, P. E. (letter only) File