Loading...
HomeMy WebLinkAboutNotice of Deficiency - 6/10/2014� A=_'61 RA NCDENR North Carolina Department of Environment and Natural Resources June 6, 2014 Pat McCrory, Governor John E. Skvarla, III, Secretary CERTIFIED MAIL 70111570 00018545 7350 RETURN RECEIPT REQUESTED Mr. Danny Cecile Radford Quarries of Boone, Inc. P.O. Box 2071 Boone, NC 28607 RE: Mining Pen -nit No. 95-03 Bamboo Road Quarry Watauga County New River Basin Dear Mr. Cecile: NOTICE OF DEFICIENCY OVED �p L � F,0T1 ON _ qg4J_,JTY 5 On May 29, 2014, an inspection of the subject mine was performed by a representative of this office. As discussed with your mine operator on the site, several deficiencies were observed that require your prompt attention. The deficiencies discovered and the necessary corrective actions are as follows: 1. All buffer zones shown on the Mining Permit Map last revised March 28, 2004 and received by the Land Quality Section on May 20, 2004 shall be maintained to Division of Energy, Mineral, and Land Resources Land Quality Section Winston-Salem Regional Office 585 Waughtown Street, Winston-Salem, NC 27107 Phone: (336) 771-5000 / Fax: (336) 771-4631 Mr. Danny Cecile Notice of Deficiency June 6, 2014 Page 2 - / protect adjoining property. These buffer zones, with the exception of the installation of required sediment control measures and approved earthen berrns, shall remain undisturbed. The buffer zone requirement is addressed in Condition 3C of the Mining Permit. The 100 foot buffer zone adjacent to the homes along Sunny Knoll Acres must be re-established as discussed during the May 29, 2014, site meeting. 2. All disturbed buffer zones along the southern boundary of the quarry where fill material has been placed must be re -vegetated to prevent any off-site sedimentation onto adjoining property. This requirement is outlined in Condition 3D of the Mining Permit. 3. All affected acreage boundaries along the southern side of the southern fill area must be clearly and permanently marked at 50 foot intervals. This is required in Condition 3E of the Mining Pen -nit. 4. Provide adequate mechanical barriers to prevent any off-site sedimentation from the southern portion of the mine. Areas needing attention include: maintenance of silt fence, installation of a rock darn in front of the NCDOT pipe under Bamboo Road, installation of a skimmer device in the newly constructed sediment basin and the installation of a diversion berm to direct runoff to the sediment trap below the portion of the mining operation located on the west side of Bamboo Road. This is required in Condition 4A of the Mining Permit. 5. All mining activities must be conducted according to the Mine Map dated March 29, 2004. The existing Mining Permit for this site expires on July 7, 2014. The map submitted for the permit renewal must show all disturbed areas noted during the May 29, 2014 inspection. This area includes all new disturbances on the southern portion of the mine. This is required in Condition 4B of the Mining Permit. 6. All surface runoff from disturbed areas located on the southern portion of the mine and on the west side of Bamboo Road must be directed into appropriate sediment and erosion control devices. This is required in Condition 4C of the Mining Permit. 7. The sediment trap located on the west side of Bamboo Road must be cleared of all sediment and vegetation to ensure the functionality of the measure. This is required in Condition 4D of the Mining Permit. 8. A sediment and erosion control plan must be submitted to this Department addressing all newly disturbed areas on the southern portion of the Mine. These activities were undertaken without prior approval from this Department. This requirement is noted in Condition 4E of the Mining Permit. Division of Energy, Mineral, and Land Resources Land Quality Section Winston-Salem Regional Office 585 Waughtown Street, Winston-Salem, NC 27107 Phone: (336) 771-5000 / Fax: (336) 771-4631 Mr. Danny Cecile Page 3 Notice of Deficiency June 6, 2014 9. A high wall barrier above the open pit must be included on the southern side of the Mine. During the inspection conducted on May 29, 2014, the placement of large boulders was discussed and deemed acceptable by this Department. This barrier is required in Condition 9A of the Mining Permit. 10. Visual screening is required along Sunny Knoll Acres Road and the southern side of the Mine. This visual screening is required in Conditions I OA and 1 OB of the Mining Permit. 11. Permanent vegetation must be provided in the following areas on the south side of the Mine: under the power line off of Bamboo Road, on the slopes of the sediment basin on the south side of the Mine, and as needed within the 100 foot buffer zone on the south side of the Mine If the previously described deficiencies are not corrected within 30 days following your receipt of this Notice, this matter may be referred to the Director, Division of Land Resources, Department of Environment and Natural Resources, for the issuance of an official Notice of Violation in an effort to secure compliance at the site. Do not hesitate to contact Tim Latham or me at (336) 771-5000 regarding any questions you may have about this matter. Sincerely, Matthew E. Gantt, P.E. Regional Engineer Land Quality Section Attachment: Mine Inspection Report cc: Ms. Janet Boyer, P.E., State Mining Specialist Mr. Toby Viwson� P.E., Luad Quality Section Chief Division of Energy, Mineral, and Land Resources Land Quality Section Winston-Salem Regional Office 585 Waughtown Street, Winston-Salem, NC 27107 Phone: (336) 771-5000 / Fax: (336) 771-4631 North Carolina Department of Environment and Natural Resources, Division of Energy, Nlineral, and Land Resources, Land Quality Section MINE INSPECTION REPORT PERMITTED MINE SITE [:] UNPERMITTED MINE SITE 1. MINE NAME: Bamboo Road Quarry— 2. MINE LOCATION: Bamboo Road 3. COUNTY: Watauga 4. RIVER BASIN: New— 5. CASE: 6. OPERATOR: Radford Quarries of Boone, Inc. 7. ADDRESS: P.O. Box 2071 - Boone, NC 28607 S. MINING PERMIT#: 95-03 M N/A 9. PERMIT EXPIRATION DATE: 7/7/2014_[] N/A 10. PERSON(S) CONTACTED AT SITE: D.J. Cecile, Randy Marsh, Derrik Goddard_ n. PICTURES? X Yes F� No TAKEN BY: Tim Lathpm 12. TYPE OF INSPECTION: A. Initial Inspection (13upermitt e*d Mine Sites) 1. Size of affected land: ac. (attach sketch map) 2. How was this area measured? Measured by: B. Routine Inspection (Permitted Mine Sites) C. Follow-up Inspection 13. Date of last inspection: 5126/2011 14. Any mining since that date? g Yes D No If yes, cite evidence of such mining activity: 15. Was mine operating at time of inspection? JX Yes El No If yes, explain: 16. Is the mine in compliance with the Operating Conditions of the Permit? El Yes D9 No El N/A Yf no, explain: (LPlease see attached page) 17. Is the mine in compliance with the Reclamation Conditions of the Permit? D Yes El No N/A If no, explain: 18. Is there any off-site damage? A. W Yes B. El No C. El None observed If A, describe the type and severity of the damage: Slight off-site sedimentation noted into NCDOT ditebline along Bamboo Road. If B or C, is there potential for offshe damage? '9 Yes El No Explain: Possible further sediment loss near access read on south side of mine into Bamboo Road. 19. Corrective measures needed and/or taken: (L?Iease see attached page) 20. Other recommendations and comments: Areas disturbed on south side of property without prior approval from this Department. Buffer zone on south side of Mine needs to be re-established. High wall barriers need to be installed. New Mine Map must address all disturbances on the south side of the mine. Sediment trap on south side of Bamboo Road needs to be cleared of sediment and vegetation. Installation of skimmer basin needs to be completed. All areas under power line need to be vegetated. Rock dam is needed in front of NCDOT culvert pipe replacement on Bamboo Road. Mine permit expires on 7/7/14. 21. Is the Annual Reclamation Report,+/- map accurate? [I Yes [I No (Explain)X Not Reviewed El Na 22. Follow-up inspection needed? Z Yes El No . Proposed date -7 111 W* 23. No. of additional pages of Inspection Report 7., 24. Copy of Report seiit to operator INSPECTED BY: Matthew Gantt, Tim Latham, Toby Yinson DATE 5/29/2014 Telephone No: 336-771-5000 Copy to file Copy to operator Copy to Mining Specialist , 0 CORRECTIVE ACTIONS REQUIRED — BAMBOO ROAD QUARRY (95-03) MAY 29,2014 - 1 . All buffer zones shown on the Mining Permit Map last revised March 28, 2004 and received by the Land Quality S ection on May 20, 2004 shall be maintained to protect adjoining property. These buffer zones, with the exception of the installation of required sediment control measures and approved earthen berms, shall remain undisturbed. The buffer zone requirement is addressed in Condition 3C of the Mining Permit. The 100 foot buffer zone adjacent to the homes along Sunny Knoll Acres must be re-established as discussed during the May 29, 2014, site meeting, 2. All disturbed buffer zones along the southern boundary of the quarry where fill material has been placed must be re -vegetated to prevent any off-site sedimentation onto adjoining property. This requirement is outlined in Condition 3D of the Mining Permit. 3. All affected acreage boundaries along the southern side of the southern fill area must be clearly and permanently marked at 50 foot intervals. This is required in Condition 3E of the Mining Permit. 4. Provide adequate mechanical barriers to prevent any off-site sedimentation from the southern portion of the mine. Areas needing attention include: maintenance of silt fence, installation of a rock darn in front -of the NCDOT pipe under Bamboo Road, installation of a skimmer device in the newly constructed sediment basin, and the installation of a diversion berm to direct ranoff to the sediment trap below the portion of the mining operation located on the west side of Bamboo Road. This is required in Condition 4A of the Mining Permit. 5. All mining activities must be conducted according to the Mine Map dated March 29, 2004. The existing Mining Permit for this site expires on July 7, 2014. The map submitted for the.permit renewal must show all disturbed areas noted during the May 29, 2014inspection. This area includes all new disturbances on the southern portion of the mine. This is required in Condition 4B. of the Mining Permit. 6. All surface runoff from disturbed areas located on the southern portion of the mine and on the west side of Bamboo Road must be directed into appropriate sediment and erosion control devices. This is required in Condition 4C. of the Mining Permit. 7. The sediment trap located on the west side of Bamboo Road must be cleared of all sediment and vegetation to ensure the fimetionality of the measure. This is required in Condition 4D of the Mining Permit. 8. A sediment and erosion control plan must be submitted to this Department addressing all newly disturbed areas on the southern portion of the Mine. These .0 Page 2 activities were undertaken without prior approval from this Department. This requirement is noted in Condition 4E of the Mining Permit. 9. A high wall barrier above the open pit must be included on the southern side of the Mine. During the inspection conducted on May 29, 2014, the placement of large boulders was discussed and deemed acceptable by this Department. This barrier is required in Condition 9A of the Mining Permit. 10. Visual screening is required along Sunny Knoll Acres Road and the southern side of the Mine. This visual screening is required in Conditions 1 OA and I OB of the Mining Permit. 11. Permanent vegetation must be provided in the following areas on the south side of the Mine: -under the power line off of Bamboo Road, on the slopes of the sediment basin on the south side of the Mine, and as needed within the 100 foot buffer zone on the south side of the Mine