HomeMy WebLinkAbout20180172 Ver 1_B-5656_BUFFER_PERMIT_20180124_20180207i
�o
�
�o
�
�
�
.,
�
V
�
0
"r
�
�
�
V\
�
�
O
V
• �
�
V
�
�
O
V
See Sheet 9-A For Index of Sheets
5�'sF��'1� ��I�° �i ���� II---1� (�'s'� I ' c�Iel�� � �^�
1T���'��lI!���,� �1T�' lI�1I�lI����'1y�
WA Y1�E CO U1�TY
S E P I Te29 9a 89 �5605
E N G I N E E R I N G fl Fax'915-]B9�9591
C 0 N 5 T R U C t i 0 N Licenu C-219]
LOCATI011t: BRIDGE 1110. 950133 OVER . YELLOW MARSH BRAIVCH
ON SR 1127 (HERRING ROAD).
TYPE OF WORK: GRADING, DRAINAGE, PAVI11lG AND STRUCTURE.
BUFFER IMPACTS PERMIT
___ 4
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABL�SHED BY METHOD II MODIFIED.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
GRAPHIC SCALES
20 10 0 20 40
PLANS
20 10 0 20 40
PROFILE (HORIZONTAL)
4 2 0 4 S
DESIGN DATA
ADT 2016 = 1400
ADT =
K = %
D = %
T = 6 % *
V = 55 MPH
* 1TST =3%a DUAL 3%
FUNC CLASS =
RURAL LOCAL
5UB REGIONAL
TIER
PROJECT LENGTH
LENGTH ROADWAY PROJECT = 0.066 MI
LENGTH STRUCTURE PROJECT = 0.010 MI
TOTAL LENGTH OF PROJECT = 0.076 MI
NCDOT CONTACT: VIRGINIA MABRY
MANAGER, PRIORITY PROJECTS UNIT
P�epared in tle 0((lce of:
VAUGHN f� MELTON
1318-F PATTON AVE.
ASHEVILLE NC, 28806
FOR THE NORTH CAROLINA ONISION OF HIGMNAYS
2012 STANDARD SPECIFIG9TIONS
RIGHT OF WAY DATE: �oHN LANSFORD, Pe
NOVEMBER 15, 2016 PRo�cr sxcrNEen
LETTING DATE: KEITH BRIDGERS
NOVEMBER 15. 2016 f'ROJECT DESIGN ENGINEER
BT�'IS BTATB VRW6C1' REPBRBNCB NQ T�ecic
\ e�o ������ lL
SI'AT8 P0.0l.NQ F.A.PROI.NQ OEBC0.1PIfON
_
NA 11
BUFFER DRAWING
SHEET 1 OF 7
r ❑ Boone.NC
828�355�9933
❑ Tri-Cities. TN
923�467�8401
❑ Knoxville, TN
Vi7Uq1�Y & MCIIOn 865 546 5800
Consulting Engfneers � Spartanourg,SC
864�574�4775
QSfI@Vllle, O Cnarieston.SC
■ North Corolino 843•974 5650
828�253 �2796 ❑ Mitldiesboro. Kr
❑ Rolelgh,NC ❑ Chorlotie.NC 606�248�6600
919�977•9455 704�357•0488 ❑ Ationto,GA
770�627�3509
1 CopYrlgM1t Q 2006 Vaughn 8 Melton,lnc. AIIRlghtS Reserved
HI'DRAULICS ENGINEER
ROADWAY DESIGN
ENGINEER
P.E.
INC�MFLETE PLr1NS
DO VOT t'SE FOR R! W A('OUIgITION
DOCUMENT NOT CONSIOEREO FINAL
UNLE55 ALL SIGNATURES COMPLETED
Z
O
�
�
SITE I
� RAYNOR FAMILY FARMS, LLC
�� � m
m ��
'°' - � cn�
- � ��
�� � � WOOD�
- J/
— — _WLB� �
L � � I
_ — �
— — — —91M— — — —_ —
— —T— —
HER�
— —r— — _ -T��
— B — — TB — —
i
P RA�BA�AN�
SEE DE AIL 5
SPECIAL CUT 2 FT BASE
;KIE GILLIAMCHANNEL CHANGE
, —SEE—QETAI L 1
48" R�IV �
� BZ 2 _
L'6' RIP RAP AT EMBANKMENT
SEE DETAIL 5
SPECIAL CUT 'V' DITCH �
SEE DETAIL 4
�
E�T. 1 T�ON W+ N
EST.5 S���GF m �'
/ PDE�
I� /
EXIS I ING R/W / w E 'I_I'
RD. SR, ll�
-T�
BST
�/ � �� i� /
■ ■ ■ ■ ■
■ ■ ■ ■ ■
.�. �
i
DONALD HERRING
; CLAS 'II' RIP RAP
� TO LEVATION 108.2
�
N
N
S H E E T q � CAVA�Tl,,�O N
� I
#133
-
I _ � I�
LESLIE MAM �
SITE 4 �
F N� a
LASS 'B' R�P WOODS
/ Z �°
M
�
SITE 2
S�� I Te?9 g- gg 4 605
E N G I N E E R I N G 8 Fax�.9'19-789-9591
c o N 5 T R U c T I 0 N License' G2197
BUFFER DRAWING
SHEET 2 OF 7
�
PROJECT REFERENCE NO.
8-5656
RNJ SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
EXISTIN R/W _
� �- ��k�k�k���kr�kr��-��-
—_— — �-----� �—�--� —
HERRING RD, SR 1127 20' BST
- �C / , , �
EXI '
� _
� CLASS ' ' RIP RQ,P,
BANK TABILIZATI�N -
- TB M RSH �LOI�fi
- _ _ e�'qNCy
J�T
SITE 3 �5�� �
+ ___ ___ --__
w
SPECIAL�b.JT 2 FT�BAS 0° CL. 'll' RIP RAP
CH�iJNEL CH NGE �AT EMBANKMENT
W/CL. '�' R P RAP SEE DETAIL 3
SEE D�TAIL 2
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 1 ������� (PARALLEL IMPACTS)
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2 MITIGABLE IMPACTS ZONE 1& 2
(BRIDGE) (PARALLEL IMPACTS)
_ ��� �_� �
-F�_r���
R/W 2
GERALD HERRING
MITIGABLE IMPACTS ZONE 1& 2
(TEMPORARY IMPACTS)
0
WOODS
������'
— —W— —
�—
— —TV FO— —
z
O
�
�
�
,__ �
�
0
RAYNOR\
�
��
�j�.� �,, � � WOOD�
/� � �
_J �
— — _WLB�
L IL �
1�
� �k1Y'-1 i! iE iE 3E
— —BIM— '*���.�—
',Q; _ — _
�
�
SEE DE�'AIL 5 — �
SPECIAL CUT 2 FT BASE
;KIE GILLIAMCHANNEL CHANGE
- - - aZ 1 --SEE—QETAI L 1
� i
� — �
L 'B' RIP RA��r4T EMBANKMENT
SEE DETAIL 5
SPECIAL CUT 'V' DITCH �
SEE DETAI
�oz� z��
CH EL 'CH/4NGE
__ W/ R F�,RAP � 5tt ut�A��
� � S D�TaIL 2 % —
o �o
� o
� /
= ������ ALLOWABLE IMPACTS ZONE 1 ������� ALLOWABLE IMPACTS ZONE 1
- (BRIDGE) (PARALLEL IMPACTS)
�. V
��` / MITIGABLE IMPACTS ZONE 1& 2
�-��� ////// ALLOWABLE IMPACTS ZONE 2
�'�` �� (BRIDGE) (PARALLEL IMPACTS)
�M
�:�
�� � �/ i� �
■ ■ ■ ■ ■
■ ■ ■ ■ ■
.�. �
V
S�� I Te?9 g- gg 4 605
E N G I N E E R I N G 8 Fax�.9'19-789-9591
c o N 5 T R U c T I 0 N License' G2197
BUFFER DRAWING
SHEET 3 OF 7
fo
�RIN s
/ �' �
PROJECT REFERENCE NO. SHEET NO.
8-5656 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
������
�pa WooDs
tir� L�-1 � �k� —��—'
F— _ � _ — �c`� I W = —
--�_�-----
���r�� �-�_���,
2 60�
\
_ �
GERALD HERRING
F— — —TV FO—
MITIGABLE IMPACTS ZONE 1& 2
/ �/ (TEMPORARY IMPACTS)
�
40'
�
O/
GRQPHC SCq�E
EST.S GF
� /
EXISTING R/W
� - � ;,
— W -- �
�—
—�
,
�
lIV G RDo SRo ll2T
�
�E
�E
1
�TB-
�— E
w
40'
C� �— N
m N
ST
PDE�
. W
0' BST Tg � G�-�
�
��
80' 20' ��
��G n
_ , �,
A �i
� �,
����� N S E T -� `�' ' -
�-;� � I I
s L
EXCAV,
�
�
' v ,C ,C
�� : ��
,;-� -; ,� � .��.
�
BR �DGE
#I��
�
_.
S�� I Te?9 g- gg 4 605
E N G I N E E R I N G 8 Fax�.9'19-789-9591
c o N 5 T R U c T I 0 N License' G2197
BUFFER DRAWING
SHEET 4 OF 7
TI�ON
\
PROJECT REFERENCE NO. SHEET NO.
B-5656 4A
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
E 2
EXISTIN
� r�_r �� �
���
, — --
'i � HERRIIV G RDa SR
�� T, , _
„� � _,�,w��,� - - - --
��,,� _ •
�J �
i = - — ���a • � R,
i
s�1�i�'iii�i�C�C�.�"�� i _. !_ ►,,. � •
,.�,_�_'���'►�'�,��►����►��' - ���� � .�; ' 1
�L�����. �.,. � � �_�,��. ,.
���q� - v� .�►�'�.�-�,����� ��rs-�, ,.
�`-�-�����'�•�,������'��.� . � �������� � � . . . � .
�d. � �I �>
' /�/ '`� ` � � � � � � �
� �p� ►, � I�.�. , � �. �
. „
.•
, � .• •
: .��
1 - • I
,
.
� ` • � • ' � � � ` ' � ' : • ' �
, � � �
� � � � � � � �
� ,
� � � � •
� ♦
� • � � � � �
. . � � � • ���������������� `: ' � • :
• . ,�-���-��-�-�
.. �
.
.
�PARALLEL IMPACTS)
RIPARAIN BUFFER IMPACTS SUMMARY
I M PACT
BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
STRUCTURE SIZE / STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
SITE NO. TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ftz) (ftz) (ft2) (ftZ) (ftZ) (ftZ)
1 1 70' 12+47 TO 12+71 -L- LT X 183.0 183.0
24" CORED SLAB
12+g6 TO 13+02 -L- LT X 318.0 318.0
2 1 70' 13+21 TO 13+71 -L- LT X 257.0 257.0
24" CORED SLAB
13+71 TO 13+g1 -L- LT X 114.0 114.0
3 1 70' 13+40 TO 13+72 -L- RT X 325.0 325.0
24" CORED SLAB
13+72 TO 14+37 -L- RT X 419.0 419.0
4 1 70' 10+31 TO 10+g1 -Y- CL X 406.0 150.0 556.0
24" CORED SLAB 10+31 TO 10+82 -Y- RT *X* 541.0 349.0 890.0 541.0 349.0
11+57 TO 11+g6 -L- RT X 189.0 189.0
12+09 TO 12+86 -L- RT *X* 480.0 92.0 572.0 480.0 92.0
12+g6 TO 13+31 -L- RT X 963.0 963.0
12+17 TO 12+86 -L- RT X 1104.0 1104.0
10+32 TO 10+55 -Y- LT "X" 75.0 75.0 75.0
TOTAL: �sss.o 716.0 2579.0 2795.0 591.0 3386.0 1096.0 441.0
NOTES: SITE 4
`X` = TOTAL AREA FOR ZONE 1& 2, TEMPORARY IMPACTS
Rev. SEP 2016
Rev. May 2006