From: Kichefski, Steven L CIV USARMY CESAW (US) <Steven.L.Kichefski@usace.army.mil>
Sent: Tuesday, January 23, 2018 10:14 AM
To: Price, Zan (George); Haupt, Mac; Tugwell, Todd J CIV USARMY CESAW (US); Hughes,
Andrea W CIV USARMY CESAW (US); Kim Browning; Leslie, Andrea J; 'Hamstead,
Byron'; bowers.todd@epa.gov
Cc: Jones, M Scott (Scott) CIV USARMY CESAW (US)
Subject: FW: FB05 site visits
Attachments: FB05_RES Sites.pdf
Hello IRT,
Since it looks like I won't be on furlough next week, I wanted to follow up about our site visit on January 30/31 for the
RES French Broad 05 umbrella bank. We previously received a final prospectus for the Carolina Bison site, which was
later put on public notice and accepted. RES decided they would like to resubmit the final prospectus to include 4
additional sites (Commercial Hill/Big Willow/Dead Oak/Puncheon). Each of you should have received the updated final
prospectus a few weeks ago, but if not let me know and I will send you an electronic copy.
In the email below, Brad sent a rough itinerary for the site visits with coordinates of where to meet for each site.
Tuesday's sites (Dead Oak/Puncheon) are larger than Wednesday's, but if we finish early enough we can quickly revisit
the Carolina Bison Site for those who have not seen it yet. We can tweak Wednesday's timing however needed to get
everyone back on the road in time, but I anticipate finishing early afternoon that day. RES is arranging 4wheelers for
one of Tuesday's sites to help get us around faster, so I need to know how many will be attending. As of right now I have
Todd, Mac, Andrea Leslie and myself confirmed from the IRT. If anyone else will be joining us, please let me know by
Friday. I'm told muck boots are fine for all sites as far as gear and there should be opportunities to grab lunch in
between sites.
Attached is an area map of the 5 sites for reference. Let me know if you have any questions.
Regards,
Steve Kichefski
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District, Asheville Field Office
151 Patton Avenue, Suite 208
Asheville, NC 28801
(828)-271-7980 Ext. 4234
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at our website at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 to complete the survey online.
-----Original Message -----
From: Brad Breslow [mailto:bbreslow@res.us]
Sent: Tuesday, January 23, 2018 8:07 AM
To: Kichefski, Steven L CIV USARMY CESAW (US) <Steven.L.Kichefski@usace.army.mil>
Subject: [EXTERNAL] FB05 site visits
Hi Steve,
The itinerary for the visits next week will be as follows. I put 8:00 am as start time each day, but we can start earlier if
you think that is appropriate. Also, I put noon as a placeholder for the afternoon site visits, but we will just head to
those sites as soon as we finish at the first site. I will be sending landowner maps later this afternoon. Let me know if
you need anything else.
Thanks,
Tuesday, January 30
8:00- Dead Oak Site- Meeting coordinates- 35.710944,-82.659112
12:00 -Puncheon Fork- Meeting coordinates- 35.960016,-82.532404
Wednesday, January 31
8:00 - Commercial Hill- Meeting coordinates- 35.368596, -82.461336
12:00 - Big Willow- Meeting coordinates -35.306350, -82.539119
Brad Breslow
Project Manager
RES I res.us <Blockedhttp://www. res. us/>
Direct: 919.209.1062 1 Mobile: 847.774.8404