Loading...
HomeMy WebLinkAbout20081130 Ver 1_Modifications_20080228North Carolina Wildlife Resources Commission Gordon S. Myers, Executive Director January 28, 2009 N.C. Dept of Environment and Natural Resources Division of Coastal Management N r 1 D 400 Commerce Avenue Morehead City, NC 28557 JAty 2 3 008 Attn: Brad Connell Re: Minor Modification I I to Major Permit No. 170-0$ - -`- -- West Beaufort Boating Access Area Renovation Beaufort, NC Dear Mr. Connell: As YOU are aware work has started on the renovation of the West Beaufort BAA. The work is permitted under CAMA Major Permit No. 170-08. During the coarse of the work it was noticed that additional dredging would be required to prevent tile creation of an area lower than the connecting waters. Asa result, we are requestinga minor modification to the existing major permitto dredge an additional 375 cubic yards. The requested additional dredging will be to a depth of -5.0' NLW and will prevent the creation ofa basin lowerthan the connecting wafters. Please find enclosed 2 information packets. One packet is for you and or3e is for Daniel Govo.ni. Each Packet includes Two (2) Plan Sheets No. 1 of 1, and a brief narrative of the requested modification. An electronic transfer has been completed and proof of the transfer has been forwarded If you have any questions or need additional information please call me at (919) 218-4149. Sincerely, Otl?j Daniel E. Cabe WRC E-agineer Cc: Daniel Govoni Mailing Address: N.C. Wildlife Resources Commission • 1720 Mail Service Center • Raleigh NC 27699-1720 'relephone: (919) 707-0151 Additional Dredging Narrative Revised January 27, 2009 As work progressed on the West Beaufort BAA renovation permitted under LAMA Permit No. 170-08, it was determined that the completion of the project as permitted would create an area at the toe of the ramp lower than. the connecting waters, Additionally, the functionality of the ramp would be reduced. As a result of this discovery, a new hydrographic survey was completed and the additional dredging required was calculated to be 375 cubic yards. The calculation was based on dredging material between the elevation proposed at the ramp toe of -5,0' below NLW and the -5.0' NLW contour shown on the attached Sheet Plan 1 of 1. The proposed additional dredge area includes an area the width of the ramp extending 112.3' on the right side and 71.8' on the left from the toe of the proposed launch ramps to the existing -5.0' contour. The depth of the dredging proposed would be a maximum of 4.0' at the toe of the left hand ramp and 1.5' at the toe of the right hand ramp tapering to nothing at the -5.0' contour. The requested dredging is in addition to the previously permitted dredging required for the installation of the ramp. The requested dredging is required to provide a functional ramp for the loading and unloading of boats and to prevent the creation of an area lower than the connecting eaters. JAN 2 8 2008 ' o Q 4 N O 0 N t ? « O .. r II v BY: ++ ? a z E C = 3 i R _ \ I Qj c 'C CS N ` i 1) C d y > Q C v .o WUm co z L) o a .c o O Q ro'. vu'i m a a 0 z N ^ o m ) co Q \\.' o 0. y 4 LL ' LO N \ a \ o 3 o m , m t y 3 = a0 / Z?fn M q a ° zW y OM U m ?a a z o u o f§ee m8-, dm z x p S p z U o a? aU Ws? ?m vT4 u a a. x =ou > ,? a > Y °: aww°z 5?5-? ; `d ''o a ?PSs ?$o ?o W m A e , ' ?., 'o .d, .r '. ; ate, • '\ ra O o , a??OO a v n r w r' . W N? ?..,. _.. .,, Z W C 0 < x M1 .... Q i7 ....... :... > W N V U Z Q C. J m LLoEO.. cu > U is c Q tn ° m 3 m o r m o 0 o O ? o Q U O m ?N m _ O io 'I _ 1 Co y m d _ W ~ Nio _° ?t ? ? .O a a d ti Z/ Cy) v- Ln lp o B d -- v?o8 . I