HomeMy WebLinkAboutWQCS00084_NOV2017DV0316 SSO_20160112October 26, 2017
The City of
North Carolina
Mr. G. Landon Davidson, P.G., Regional Office Supervisor
Surface Water Protection Section
North Carolina Division of Water Quality
2090 US Highway 70
Swannanoa, North Carolina 28778
RECEIVED/NCDEWWR
NOV 0 7 2017
Water Quality
Permitting Section
Subject: Environmental Management Commission Settlement Agreement
Quarterly Status Report
City of Brevard Collection System
NPDES Permit NCO025381
Transylvania County
Dear Mr. Davidson,
The City of Brevard offers this quarterly report as requested to document compliance activities
of the Collections System for the period of July, August and September, 2017.
1. As in prior reports the City of Brevard is actively dedicated to fulfilling collection system
management requirements by providing funding for system improvements each fiscal
year and $100,000 is included in the current FY 2017-2018 budget for inflow and
infiltration elimination.
2. Though the Tennessee Valley Authority reported a total of 16.84" of precipitation was
received in the Brevard area during this quarter, there were no sewer discharge events
reported in the city.
3. CDM Smith continued during this reporting period with the following work for the Neely
Road pump station, force main and equalization storage project.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
o Cummings Atlantic performed a generator load test per the
manufacturer's specifications of the new generator. Testing was
successful and the startup and automatic transfer switching of the
generator were performed successfully.
Cummings Atlantic and Instrulogic generator
start up and operational training.
o Electricians installed a 10' section of ground rod outside the building
and beneath the radio antenna for the antenna grounding kit
installed by Instrulogic.
o Installation of fencing, privacy slats, gates and locks were completed
by Seeger's Fence Company to enable the facility to be locked and
secured at the end of each day.
Pump Station fence installation.
New pump station gates.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
818-884-2171, Option 4
o Universal Painting contractors completed the application of the final
coat of paint to the interior walls and pipe of the pump station.
o Training sessions by Wharton -Smith, Inc. and Instrulogic technicians
were provided to City Collections Division personnel, maintenance
staff and on-call employees which included the radio testing unit
interface panel, start-up of the VFD (variable frequency drive) and
starting the station pumps.
o Testing was conducted on the diversion of flow from the Neely Road
Pump Station to the new Equalization Tank during wet weather
conditions.
o Completion of punch list items continued.
o Personnel demobilized from the site and performed site restorations
as necessary.
Pump Station Temporary Start Up
o The city received a period of sustained and heavy rainfall on October
23, 2017 at which time the Gallimore Road Lift Station discharged.
During this time, the existing (old) Neely Road Pump Station reached
a high level and this was deemed a good opportunity to further test
the new pump station.
o With the approval and assistance of Wharton -Smith, Inc. and city
maintenance personnel, the old station pumps were shut down and
the new pump station pumps were placed into service. The new
pumps and technical equipment worked correctly, and as a result,
the Neely Road station did not discharge during this event, though
the rain gauge at the station registered 6.5" of precipitation.
o Heavy rain with flooding conditions occurred again on October 28,
2017 at which time Collections System and maintenance personnel
assisted an inspector with CDM Smith with the start-up of the new
lift station pumps and monitoring flows of the new lift station. This
temporary start-up of the station provided personnel and equipment
experience of the station's ability during high flow events.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
Kings Creek flooding along Neely
Road on October 23, 2017.
o Public Works personnel assisted Wharton -Smith, Inc. with the
following:
■ Video inspection of 280' of 18" sewer main from an unassigned
manhole beside scales to manhole #LO -001 to verify condition
of the pipe following the completion of the new lift station
construction. The pipe was found to be in good condition.
■ Video inspection of an existing 18" VCP (vitrified clay pipe)
feeding the Neely Road Pump Station.
■ Removal of two (2) 3/" water taps temporarily used for the
Neely Road Project construction trailers. The main line was
excavated and two (2) %" water service lines were
disconnected.
Equalization Tank
• Wharton -Smith, Incorporated progressed with the following:
o Two (2) 6" water taps were installed to provide water to newly
installed yard hydrants beside the tank. Three (3) sections of 6" water
line were installed up the exterior wall of the tank for the water
cannons.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
o A ladder was lifted with a crane, placed and bolted to the interior wall
of the tank for future access by personnel.
T
Interior tank ladder placed by crane Ladder placement on interior tank wall.
inside the Equalization Tank.
A new eye wash station was installed at the chlorine building with the
location approved by City maintenance personnel. Plumbing for the
water line to accommodate the station was installed and fully
functional.
Chlorine Building eyewash
station installation.
Interior conduit installation
for eye wash station.
o Personnel began filling the tank with water from the chlorine
chamber on October 5, 2017. The interior floor of the tank was
examined by a CDM Smith inspector for cleanliness prior to the start
of filling the tank with water.
■ The top of the tank wall elevation is 2132.20'.
■ The tank reached fill elevation of 2129.20' and leak testing
began the morning of October 21.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
Fs.p
Fill elevation reached on October 21, 2017.
■ After 24 hours of testing, the test was declared a pass with
documentation of a measurement of 1/8" of water loss which
is an allowable loss from evaporation based on specifications
and engineer's calculations.
o Excavators began site restoration and finish grading around the
exterior of the tank. Grading personnel backfilled and compacted soil
around the base of the tank and up to the top of the tank footers
which were not covered until completion of final leak testing.
o Labor and grading crews completed the access road around the tank
utilizing asphalt millings provided by the Public Works Facility.
o Installation of the flow meter in the vault at the plant was completed
and valves were opened to allow the test water into the tank gravity
feed back into the headworks. Gravity worked properly with
measurements of water obtained daily from the tank.
o All materials and equipment no longer in use were removed from the
job site.
o Pre -Con contractors performed the following work:
■ Shot crete was applied prior to the permanent attachment of
the 6" water cannon lines and stairs.
■ Concrete steps were built inside the tank at the 4 man -way
opening.
■ A 3' wide elevated concrete walkway and hand -railing were
installed around the upper perimeter of the tank.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
■ Stairs and hand rails leading to the top of the tank around the
outside wall were completed.
Stair installation leading to the
top of the Equalization Tank.
Hand rail installation atop
the tank perimeter.
■ Cleaning and site demobilization began with the removal of
equipment, supplies and materials no longer needed.
■ The final overcoat and sealant application of Thoroseal, a
waterproof cement -based coating, was completed on the
exterior of the tank.
Q.
Final Thoroseal application on tank wall.
C
o Technicians with Robertson Controls completed the installation of
conduit along the access road, from the exterior of the chlorine
building down to the Draw Down Station. Trench restoration
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
occurred daily as sections of the conduit were completed with the
Transylvania County inspector on site during the installation.
T
Conduit installation at Chlorine Building.
o Required painting of the vault pipe, draw down station pipe and pipe
inside the PRZ (pressure reducer zone) continued by Universal
Painting contractors.
o Survey crews from Ed Holmes and Associates began the lay -out of
the new fence corners around the tank.
Neely Road Force Main Air Release Valve Identification
• Public Works Department personnel assisted the Resident Project
Inspector for CDM Smith with measuring and photographing force main air
release valve plates along the new 20" force main on Old Hendersonville
Highway. Seven (7) air release valve lids were numbered for future
identification along the pipeline.
During a ceremony held in Raleigh, N.C. on November 16, 2017, a 2018 ACEC
(American Council of Engineering Companies) Award of Engineering Excellence
was presented to CDM Smith, Inc. reflecting work completed during the Neely
Road Wastewater Improvements Project in 2017. The award represented the
exceptional ability to overcome small town obstacles brought forth by aging
infrastructure with the use of limited resources.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
ACEC award acceptance by
City of Brevard representatives.
Brown Consultants, PA accomplishments consist of the following items this quarter:
Kines Creek Phase III
• Dillard Excavating, Inc. continued with improvement of sewer main
replacement projects during this quarter and included the following work:
o French Broad Street between N. Broad Street and N. Caldwell Street
■ Replacement of 100' of 8" sewer main.
■ Installation of one (1) manhole.
o French Broad Street at N. Caldwell Street
■ Replacement of 40' of 8" sewer main.
■ Installation of one (1) manhole.
o French Broad Street between N. Caldwell Street and Salem Street
■ Replacement of 230' of 8" sewer main.
■ Installation of one (1) manhole.
■ Replacement of five (5) service taps for existing structures.
o Restoration included filling of trenches with compacted stone.
o A manhole site was restored on Lakeview Avenue with top soil, grass
seed and straw.
o Concrete sidewalks were repaired on Maple Street and N. Country Club
Road.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28711
828-884-2171, Option 4
N. Caldwell Street manhole installation.
Cutting W. French Broad Street for
service line installation.
• Public Works personnel assisted with the following:
o Locate of existing 2" and 4" water mains on W. French Broad Street
prior to proposed sewer main replacement beside French Broad
Place.
o Met with Dillard Excavating, Inc. to discuss proposed slip lining
scheduled for completion in January, 2018, reference the Grove
Street sewer main project.
Kings Creek Phase III
• Dillard Excavating, Inc. completed the following work along Duckworth
Avenue:
o Replacement of 340' of existing 6" sewer line with new 8" pipe.
o Installation of two (2) new manholes.
o Six (6) service line installations.
o Trenches were restored with compacted stone and asphalt.
5. During the reported period, City Collections personnel performed the following inflow
and infiltration improvements:
• Video inspected 4,060' of sewer mains and service lines to determine
condition, verify location or depth and in search of suspected inflow and
infiltration sites or service line blockages.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4