Loading...
HomeMy WebLinkAboutNC0024538_NC0024538_Renewal Application_20180125_20180125Water Resources ENVIRONMENTAL QUALITY February 05, 2018 David Hux City of Shelby 824 W Grover St Shelby, NC 28150 Subject: Permit Renewal Application No. NCO024538 First Broad River WWTP Cleveland County Dear Applicant: ROY COOPER Gm-erwr MICHAEL S. REGAN Secretary LLNDA CULPEPPER Interim Director The Water Quality Permitting Section acknowledges the February 5, 2018 receipt of your permit renewal application and supporting documentation. Your application will be assigned to a permit writer within the Section's NPDES WW permitting branch. Per G.S. 150B-3 your current permit does not expire until permit decision on the application is made. Continuation of the current permit is contingent on timely and sufficient application for renewal of the current permit. The permit writer will contact you if additional information is required to complete your permit renewal. Please respond in a timely manner to requests for additional information necessary to allow a complete review of the application and renewal of the permit. Information regarding the status of your renewal application can be found online using the Department of Environmental Quality's Environmental Application Tracker at: https://deg.nc.ciov/permits-regulations/permit-guidance/environmental-application-tracker If you have any additional questions about the permit, please contact the primary reviewer of the application using the links available within the Application Tracker. Sincerely, 3( Wren The ford Administrative Assistant Water Quality Permitting Section cc: Central Files w/application(MRO) ec: WQPS Laserfiche File w/application State of North Carolina I Environmental Quality I Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919-807-6300 NPDES RENEWAL February 2018 CITY OF SHELBY FIRST BROAD RIVER WWTP NPDES NCO024538 Physical: First Broad WWTP 1940 S. Lafayette Street Shelby, NC 28152 Mailing: City of Shelby Utilities Post Office Box 207 Shelby, NC 28151-0207 RECEIVE MEN R/DWR FEB 05 2018 Water Resources Permitting Section Post Office Box 207 January 25, 2018 NCDEQ-DWR NPDES Permitting 1617 Mail Service Center Raleigh, NC 27699-1617 RE: City of Shelby - First Broad WWTP NPDES NCO024538 - Permit Renewal Request On behalf of the City of Shelby, I am requesting the renewal of the National Pollutant Discharge Elimination System Permit #NC0024538 for the First Broad River Wastewater Treatment Plant. The permit application and associated information, including the sludge management plan, are being submitted with this letter. The First Broad River WWTP continues to operate as a 6.0 MGD activated Sludge plant for treating municipal wastewater for the City of Shelby, Town of Fallston and Town of Kingstown. Several improvements have taken place since the last permit renewal to enhance the operations of the treatment plant. All analysis have been conducted by NC Certified laboratories in accordance with 40 CFR Part 136 requirements. This application includes data gathered from January 2014 through December 2017. If you have any questions or need any additional information regarding this permit renewal application please do not hesitate to contact me at david.hux0cityofshelby com Respectfully, I David W. Hux Water Resources Director Please print or type in the unshaded areas only (fill-in areas are spaced for elite type. i.e.. 12 characters/inch). For Approved. OMB No. 2040-0086. Approval expires 5-31-92 FORM U.S. ENVIRONMENTAL PROTECTION AGENCY 1. EPA I.D. NUMBER , GENERAL INFORMATION s NCO024538 T,A C F D P Consolidated Permits Program GENERAL (Read the "General Instructions" before starting.) 1 2 13 14 15 LABEL ITEMS GENERAL INSTRUCTIONS _ If a preprinted label has been provided, I. EPA I.D. NUMBER NPDES# NCO024538 affix it in the designated space. Review the information it is carefully; if any of First Broad Wastewater Treatment Plant incorrect cross through and enter the correct data in the appropriate fill-in area III. FACILITY NAME below, Also, if any of the preprinted data is absent (the area to the I of the label space lists the information that should V. FACILITY 1 1940 S. Lafayette Street appear), please provide it in the proper fill - MAILING LIST in areas) below. If the label is complete Shelby, North Carolina 28152 and correct, you need not complete Items I, III, V, and VI(except VI-B which must be Cleveland County completed regardless). Complete all items VI. FACILITY if no label has been roved. Refer to the LOCATION instructions for detained item descriptions and for the legal authorization under which this data is collected. 11. POLLUTANT CHARACTERISTICS 4 INSTRUCTIONS: Complete A through J to determine whether you need to submit any permit application forms to the EPA. If you answer "yes" to any questions, you must submit this form and the supplemental from listed in the parenthesis following the question. Mark "X" in the box in the third column if the supplemental form is attached. If you answer "no" to each question, you need not submit any of these forms. You may answer "no" if your activity is j excluded from permit requirements; see Section C of the instructions. See also Section D of the instructions for definitions of bold-faced terms. SPECIFIC QUESTIONS MARK"X" SPECIFIC QUESTIONS SPECIFIC MARK "X" FORM FORM YES NO AT YES NO ATTACHED A. is this facility a publicly owned treatment works B. Does or will this facility (either existing or which results in a discharge to waters of the ❑ ❑ ❑ proposed) include a concentrated animal ® ❑ U.S.? (FORM 2A) feeding operation or aquatic animal production facility which results in a discharge to waters of the U.S.? (FORM 213) 16 17 18 19 20 21 C. Is this facility which currently results in ❑ ® [:JD. Is this proposal facility (other than those described ❑ ❑ 11 discharges to waters of the U.S. other than in A or B above) which will result in a discharge 22 23 24 25 26 27 those described in A or B above? FORM 2C to waters of the U.S.? FORM 2D E. Does or will this facility treat, store, or dispose of F. Do you or will you inject at this facility industrial or hazardous wastes? (FORM 3) ❑ ® ❑ municipal effluent below the lowermost stratum ❑ ® ❑ containing, within one quarter mile of the well bore, underground sources of drinking water? 28 29 30 (FORM 4) 31 32 33 G. Do you or will you inject at this facility any H. Do you or will you inject at this facility fluids for produced water other fluids which are brought to the surface in connection with conventional oil or ❑ ® ❑ special processes such as mining of suffer by the Frasch process, solution mining of minerals, in ❑ ® ❑ natural gas production, inject fluids used for situ combustion of fossil fuel, or recovery of enhanced recovery of oil or natural gas, or inject geothermal energy? (FORM 4) fluids for storage of liquid hydrocarbons? 34 35.. 36 37 38 39 (FORM 4 is Is this facility a proposed stationary source J. Is this facility a proposed stationary source which is one of the 28 industrial categories listed which is NOT one of the 28 industrial categories ❑ ® ❑ ❑ ® ❑ in the instructions and which will potentially emit listed in the instructions and which will potentially 100 tons per year of any air pollutant regulated emit 250 tons per year of any air pollutant under the Clean Air Act and may affect or be regulated under the Clean Air Act and may affect located in an attainment area? FORM 5 40 41 42 or be located in an attainment are? (FORM 5) 43 44 45 Ill. NAME OF FACILITY c SKIP First Broad Wastewater Treatment Plant � 1 15 _16-29 30 69- IV. FACILITY CONTACT A. NAME & TITLE (last, first,& title) I B. PHONE (area code & no.) I 2 Hux, David Assistant Utilities Director 704 484 1 6840 15 - 1r9 --_— _—_ ----- ----_— __-----.- 45 46 48 49 51 2 55 1 V. FACILITY MAILING ADDRESS A. STREET OR P.O, BOX _ Post Office Box 207 3 1 15 1e 45 _ B. CITY OR TOWN C. STATE D. ZIP CODE - 4 Shelby NC 28151-0207 15 16 40 41 42 47 51 - VI. FACILITY LOCATION _ A. STREET, ROUTE NO. OR OTHER SPECIFIC IDENTIFIER c 1940 South Lafayette Street 45 «., :... B. COUNTY NAME Cleveland C. CITY OR TOWN D. STATE E. ZIP CODE F. COUNTY CODE Shelby NC 28152 6 15 i 16 40 41 42 47 51 52 54 EPA FORM 3510-1 (8-90) CONTINUED ON REVERSE CONTINUED FROM THE FRONT VII. SIC CODES (4-digit, in order of priority) A. FIRST-. B. SECOND c 4952 (specify) (specify) Sewerage Systems 15 --- 16 17 -- ---- 1A _ C. THIRD D. FOURTH (specify) (specify) 15_ 16 17 1S 16 19 VI11.0PERATOR INFORMATION _ A. NAME B. Is the name listed in Item c City of Shelby VIII-A also the owner? ® YES ❑ NO $ 18 19 55 C. STATUS OF OPERATOR Enter the appropriate letter into the answer box, if "Other."specify.) D. PHONE area code & no. F = FEDERAL M = PUBLIC (other than federal or state) N] I (specify) c 704 484 6857 T A S = STATE O = OTHER (specify) 56 ,G 18 19 21 22 25 P = PRIVATE 15 E. STREET OR PO BOX _ PO Box 207 26 55 F. CITY OR TOWN G. STATE H. ZIP CODE I IX. INDIAN LAND c Shelby NC 42 42 28151-0207 Is the facility located on Indian lands? ❑YES I�:NO B 15� 16 40. 47 51 X. EXISTING ENVIRONMENTAL PERMITS A. NPDES (Discharges to Surface Wafer D PSID Air Emissions from Proposed Sources) ! P a�-- i 15' r 16 17 18 30 T NCO024538 9 ' 15 1 1 17 1 16 -- 30 B. U1C Under round Injection of Fluids E. OTHER (specify) (Specify) NPDES Stormwater c- T I C T 8 NCG110040 9 U 9 15 16 17 18 30 15 16 17 18 30-: C. RCRA Hazardous Wastes E. OTHER (specify) (Specify) c T I c T " WQ0007780 Compost Permit 9 R 9 15 16 17 _-_18------- — 30 1 15 16 1 17 1 18 30 XI. MAP Attach to this application a topographic map of the area extending to at least one mile beyond property boundaries. The map must show the outline of the facility, the location of each of its existing and proposed intake and discharge structures, each of its hazardous waste treatment, storage, or disposal facilities, and each well where it injects fluids underground. Include all springs, rivers and other surface water bodies in the map area. See instructions for precise requirements. XII. NATURE OF BUSINESS(provide a brief description) The First Broad WWTP is a municipal wastewater treatment facility which treats domestic and industrial wastewater collected by a sanitary sewer system. The City of Shelby collects and treats wastewater from the City of Shelby, Town of Kingstown and Town of Fallston. The 6.0 MGD First Broad WWTP provides secondary treatment through physical and biological means. RECEIVEMMENR/DWR FEB 0 5 2018 Water Resources Permitting Section X111. CERTIFICATION (see instructions) 1 certify under penalty of law that I have personally examined and am familiar with the information submitted in"this application and all attachments and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in the application, I believe that the information is true, accurate and complete. I am aware that there are significant penalties for submittingfalse information, including the possibilit of fine and imprisonment. A. NAME & OFFICIAL TITLE (type or print) B. TURE C. DATE SIGNED PII 1 D VJ 140, wa+e� - Fe5wrwS � ZS � $ DIr y- COMMENTS FOR OFFICIAL USE ONLY c C 15 6 55 EPA FORM 3510-1 (8-90) FACILITY NAME AND PERMIT NUMBER: First Broad WWTP, NCO024538 PERMIT ACTION REQUESTED Renewal FORM 2A NPDES FORM 2A APPLICATION OVERVIEW NPDES APPLICATION OVERVIEW RIVER BASIN: Broad Form 2A has been developed in a modular format and consists of a "Basic Application Information" packet and a "Supplemental Application Information" packet. The Basic Application Information packet is divided into two parts. All applicants must complete Parts A and C. Applicants with a design flow greater than or equal to 0.1 mgd must also complete Part B. Some applicants must also complete the Supplemental Application Information packet. The following items explain which parts of Form 2A you must complete. BASIC APPLICATION INFORMATION: A. Basic Application Information for all Applicants. All applicants must complete questions A.1 through A.8. A treatment works that discharges effluent to surface waters of the United States must also answer questions A.9 through A.12. B. Additional Application Information for Applicants with a Design Flow z 0.1 mgd. All treatment works that have design flows greater than or equal to 0.1 million gallons per day must complete questions B.1 through 13.6. C. Certification. All applicants must complete Part C (Certification). SUPPLEMENTAL APPLICATION INFORMATION: D. Expanded Effluent Testing Data. A treatment works that discharges effluent to surface waters of the United States and meets one or more of the following criteria must complete Part D (Expanded Effluent Testing Data): 1. Has a design flow rate greater than or equal to 1 mgd, 2. Is required to have a pretreatment program (or has one in place), or 3. Is otherwise required by the permitting authority to provide the information. E. Toxicity Testing Data. A treatment works that meets one or more of the following criteria must complete Part E (Toxicity Testing Data): 1. Has a design flow rate greater than or equal to 1 mgd, 2. Is required to have a pretreatment program (or has one in place), or 3. Is otherwise required by the permitting authority to submit results of toxicity testing. F. Industrial User Discharges and RCRA/CERCLA Wastes. A treatment works that accepts process wastewater from any significant industrial users (SIUs) or receives RCRA or CERCLA wastes must complete Part F (Industrial User Discharges and RCRA/CERCLA Wastes). SIUs are defined as: 1. All industrial users subject to Categorical Pretreatment Standards under 40 Code of Federal Regulations (CFR) 403.6 and 40 CFR Chapter I, Subchapter N (see instructions); and 2. Any other industrial user that: a. Discharges an average of 25,000 gallons per day or more of process wastewater to the treatment works (with certain exclusions); or b. Contributes a process wastestream that makes up 5 percent or more of the average dry weather hydraulic or organic capacity of the treatment plant; or C. Is designated as an SIU by the control authority. G. Combined Sewer Systems. A treatment works that has a combined sewer system must complete Part G (Combined Sewer Systems). ALL APPLICANTS MUST COMPLETE PART C (CERTIFICATION) EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 1 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad BASIC APPLICATION INFORMATION PART A. BASIC APPLICATION INFORMATION FOR ALL APPLICANTS: All treatment works must complete questions A.1 through A.8 of this Basic Application Information Packet. A.1. Facility Information. Facility Name City of Shelby — First Broad Wastewater Treatment Plant Mailing Address PO Box 207 Shelby NC 28151 Contact Person David Hux Title Water Resources Director Telephone Number (704) 484-6840 Facility Address 1940 S. Lafayette Street (not P.O. Box) Shelby NC 28152 A.2. Applicant Information. If the applicant is different from the above, provide the following: Applicant Name Mailing Address Contact Person Title Telephone Number ( ) Is the applicant the owner or operator (or both) of the treatment works? ® owner ® operator Indicate whether correspondence regarding this permit should be directed to the facility or the applicant. ® facility ❑ applicant A.3. Existing Environmental Permits. Provide the permit number of any existing environmental permits that have been issued to the treatment works (include state -issued permits). NPDES NCO024538 PSD UIC Other Compost WQ0007780 RCRA Other Stormwater NCG110040 A.4. Collection System Information. Provide information on municipalities and areas served by the facility. Provide the name and population of each entity and, if known, provide information on the type of collection system (combined vs. separate) and its ownership (municipal, private, etc.). Name Population Served Type of Collection System Ownership Shelby 21,000 Separate Sanitation City of Shelby Fallston 1,200 Separate Sanitation Town of Fallston Kingstown 680 Separate Sanitation Town of Kingstown Total population served 22,880 EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 2 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad A.5. Indian Country. a. Is the treatment works located in Indian Country? ❑ Yes ® No b. Does the treatment works discharge to a receiving water that is either in Indian Country or that is upstream from (and eventually flows through) Indian Country? ❑ Yes ® No A.6. Flow. Indicate the design flow rate of the treatment plant (i.e., the wastewater flow rate that the plant was built to handle). Also provide the average daily flow rate and maximum daily flow rate for each of the last three years. Each year's data must be based on a 12-month time period with the 12'" month of "this year" occurring no more than three months prior to this application submittal. a. Design flow rate mgd Two Years Ago Last Year This Year b. Annual average daily flow rate 3.37 3.11 3.16 C. Maximum daily flow rate 11.77 7.20 8.52 A.7. Collection System. Indicate the type(s) of collection system(s) used by the treatment plant. Check all that apply. Also estimate the percent contribution (by miles) of each. ® Separate sanitary sewer 100 % ❑ Combined storm and sanitary sewer % A.8. Discharges and Other Disposal Methods. a. Does the treatment works discharge effluent to waters of the U.S.? ® Yes ❑ No If yes, list how many of each of the following types of discharge points the treatment works uses: i. Discharges of treated effluent ii. Discharges of untreated or partially treated effluent III. Combined sewer overflow points iv. Constructed emergency overflows (prior to the headworks) V. Other N/A b. Does the treatment works discharge effluent to basins, ponds, or other surface impoundments that do not have outlets for discharge to waters of the U.S.? ❑ Yes If yes, provide the following for each surface impoundment: Location: Annual average daily volume discharge to surface impoundment(s) Is discharge ❑ continuous or ❑ intermittent? C. Does the treatment works land -apply treated wastewater? If yes, provide the following for each land application site: d Location: Number of acres: Annual average daily volume applied to site: Is land application ❑ continuous or ❑ intermittent? Does the treatment works discharge or transport treated or untreated wastewater to another treatment works? 1 0 0 AM mgd ❑ Yes ® No mgd ❑ Yes ® No EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 3 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VVVVfP, NCO024538 Renewal Broad If yes, describe the mean(s) by which the wastewater from the treatment works is discharged or transported to the other treatment works (e.g., tank truck, pipe). N/A If transport is by a party other than the applicant, provide: Transporter Name N/A Mailing Address N/A Contact Person N/A Title N/A Telephone Number I ) For each treatment works that receives this discharge, provide the following: Name N/A Mailing Address N/A Contact Person N/A Title N/A Telephone Number ( ) If known, provide the NPDES permit number of the treatment works that receives this discharge N/A Provide the average daily flow rate from the treatment works into the receiving facility. N/A mgd e. Does the treatment works discharge or dispose of its wastewater in a manner not included in A.8. through A.8.d above (e.g., underground percolation, well injection): ❑ Yes ® No If yes, provide the following for each disposal method: Description of method (including location and size of site(s) if applicable): N/A Annual daily volume disposed by this method: N/A Is disposal through this method ❑ continuous or ❑ intermittent? EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 4 of 24 [FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad WASTEWATER DISCHARGES: If you answered "Yes" to question A.8.a, complete questions A.9 through A.12 once for each outfall (including bypass points) through which effluent Is discharged. Do not include information on combined sewer overflows in this section. If you answered "No" to question A.8.a, go to Part B, "Additional Application Information for Applicants with a Design Flow Greater than or Equal to 0.1 mgd." A.9. Description of Outfall. a. Outfall number 001 b. Location Shelby 28152 (City or town, if applicable) (Zip Code) Cleveland NC (County) (State) 35 14' 34" 81 34' 28" (Latitude) (Longitude) C. Distance from shore (if applicable) N/A ft. d. Depth below surface (if applicable) N/A ft. e. Average daily flow rate 3.16 mgd f. Does this outfall have either an intermittent or a periodic discharge? ❑ Yes ® No (go to A.9.g.) If yes, provide the following information: Number f times per year discharge occurs: N/A Average duration of each discharge: N/A Average flow per discharge: N/A mgd Months in which discharge occurs: N/A g. Is outfall equipped with a diffuser? ❑ Yes ® No A.10. Description of Receiving Waters. a. Name of receiving water First Broad River b. Name of watershed (if known) Broad River Basin United States Soil Conservation Service 14-digit watershed code (if known): C. Name of State Management/River Basin (if known): Broad River Basin United States Geological Survey 8-digit hydrologic cataloging unit code (if known): 03050105 d. Critical low flow of receiving stream (if applicable) acute ds e. Total hardness of receiving stream at critical low flow (if applicable): chronic cis mg/I of CaCO3 EPA Form 3510-2A (Rev. 1-99). Replaces EPA fortes 7550-6 & 7550-22. Page 5 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad A.11. Description of Treatment a. What level of treatment are provided? Check all that apply. ❑ Primary ® Secondary ❑ Advanced ❑ Other. Describe: b. Indicate the following removal rates (as applicable): Design BOD5 removal or Design CBOD5 removal >85% % Design SS removal >85% % Design P removal % Design N removal % Other % C. What type of disinfection is used for the effluent from this outfall? If disinfection varies by season, please describe: Chlorination If disinfection is by chlorination is dechlorination used for this outfall? ® Yes ❑ No Does the treatment plant have post aeration? ® Yes ❑ No A.12. Effluent Testing Information. All Applicants that discharge to waters of the US must provide effluent testing data for the following parameters. Provide the indicated effluent testing required by the permitting authority for each outfall through which effluent is discharged. Do not include information on combined sewer overflows in this section. All information reported must be based on data collected through analysis conducted using 40 CFR Part 136 methods. In addition, this data must comply with QA/QC requirements of 40 CFR Part 136 and other appropriate QA/QC requirements for standard methods for analytes not addressed by 40 CFR Part 136. At a minimum, effluent testing data must be based on at least three samples and must be no more than four and one-half years apart. Outfall number: 001 MAXIMUM DAILY VALUE AVERAGE DAILY VALUE PARAMETER Value Units Value Units Number of Samples pH (Minimum) 5.7 S.U. pH (Maximum) 7.2 S.U. Flow Rate 11.8 MGD 3.24 MDG 1461 Temperature (Winter) 23.1 'C 16.0 °C 402 Temperature (Summer) 28.5 °C 23.1 'C 596 * For pH please report a minimum and a maximum daily value MAXIMUM DAILY AVERAGE DAILY DISCHARGE POLLUTANT DISCHARGE ANALYTICAL ML/MDL -- -_T --- Number of METHOD Conc. Units Conc. Units Samples CONVENTIONAL AND NON CONVENTIONAL COMPOUNDS BIOCHEMICAL OXYGEN BOD5 36.7 mg/L 5.7 mg/L 1000 SM 5210 B 2.0 DEMAND (Report one) CBOD5 FECAL COLIFORM >6000 #/100ml 2.9 eomean #/100ml 1000 SM 9222 D 1 TOTAL SUSPENDED SOLIDS (TSS) 23 mg/L 5.5 mg/L 1000 SM 2540 D 2.5 END OF PART A. REFER TO THE APPLICATION OVERVIEW (PAGE 1) TO DETERMINE WHICH OTHER PARTS OF FORM 2A YOU MUST COMPLETE EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 6 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad BASIC APPLICATION INFORMATION PART B. ADDITIONAL APPLICATION INFORMATION FOR APPLICANTS WITH A DESIGN FLOW GREATER THAN OR EQUAL TO 0.1 MGD (100,000 gallons per day). All applicants with a design flow rate Z 0.1 mgd must answer questions B.1 through B.6. All others go to Part C (Certification). B.I. Inflow and Infiltration. Estimate the average number of gallons per day that flow into the treatment works from inflow and/or infiltration. 100,000 gpd Briefly explain any steps underway or planned to minimize inflow and infiltration. Continuinq to identify sources through flow monitoring, manhole inspection and videoing of sewer lines. City performs point repairs and continues to identify rehabilitation projects for annual Capital Improvement Projects B.2. Topographic Map. Attach to this application a topographic map of the area extending at least one mile beyond facility property boundaries. This map must show the outline of the facility and the following information. (You may submit more than one map if one map does not show the entire area.) a. The area surrounding the treatment plant, including all unit processes. b. The major pipes or other structures through which wastewater enters the treatment works and the pipes or other structures through which treated wastewater is discharged from the treatment plant. Include outfalls from bypass piping, if applicable. c. Each well where wastewater from the treatment plant is injected underground. d. Wells, springs, other surface water bodies, and drinking water wells that are: 1) within % mile of the property boundaries of the treatment works, and 2) listed in public record or otherwise known to the applicant. e. Any areas where the sewage sludge produced by the treatment works is stored, treated, or disposed. f. If the treatment works receives waste that is classified as hazardous under the Resource Conservation and Recovery Act (RCRA) by truck, rail, or special pipe, show on the map where the hazardous waste enters the treatment works and where it is treated, stored, and/or disposed. B.3. Process Flow Diagram or Schematic. Provide a diagram showing the processes of the treatment plant, including all bypass piping and all backup power sources or redunancy in the system. Also provide a water balance showing all treatment units, including disinfection (e.g., chlorination and dechlorination). The water balance must show daily average flow rates at influent and discharge points and approximate daily flow rates between treatment units. Include a brief narrative description of the diagram. B.4. Operation/Maintenance Performed by Contractor(s). Are any operational or maintenance aspects (related to wastewater treatment and effluent quality) of the treatment works the responsibility of a contractor? ® Yes ❑ No If yes, list the name, address, telephone number, and status of each contractor and describe the contractor's responsibilities (attach additional pages if necessary). Name: Refer to Additional Information Section 13.4 Mailing Address: Telephone Number: ( ) Responsibilities of Contractor: B.5. Scheduled improvements and Schedules of Implementation. Provide information on any uncompleted implementation schedule or uncompleted plans for improvements that will affect the wastewater treatment, effluent quality, or design capacity of the treatment works. If the treatment works has several different implementation schedules or is planning several improvements, submit separate responses to question 13.5 for each. (If none, go to question 13.6.) a. List the outfall number (assigned in question A.9) for each outfall that is covered by this implementation schedule. None b. Indicate whether the planned improvements or implementation schedule are required by local, State, or Federal agencies. ❑ Yes ® No EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 7 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VVVVTP, NCO024538 Renewal Broad C. If the answer to B.5.b is "Yes," briefly describe, including new maximum daily inflow rate (if applicable). N/A d. Provide dates imposed by any compliance schedule or any actual dates of completion for the implementation steps listed below, as applicable. For improvements planned independently of local, State, or Federal agencies, indicate planned or actual completion dates, as applicable. Indicate dates as accurately as possible. Schedule Actual Completion WWTP Upgrades Begin Construction July 2014 July 2014 End Construction January 2016 February 2016 Begin Discharge Attain Operational Level Influent Treatment Upgrades Begin Construction February 2018 End Construction January 2019 Begin Discharge Attain Operational Level Biosolids Handlings Improvements Begin Construction July 2018 End Construction December 2019 Begin Discharge Attain Operational Level e. Have appropriate permits/clearances concerning other Federal/State requirements been obtained? ® Yes ❑ No Describe briefly: Biosolids Handling Improvements came in above project budget. Current evaluating project scope and funding options. B.6. EFFLUENT TESTING DATA (GREATER THAN 0.1 MGD ONLY). Applicants that discharge to waters of the US must provide effluent testing data for the following parameters. Provide the indicated effluent testing required by the permitting authority for each outfall through which effluent is discharged. Do not include information on combine sewer overflows in this section. All information reported must be based on data collected through analysis conducted using 40 CFR Part 136 methods. In addition, this data must comply with QA/QC requirements of 40 CFR Part 136 and other appropriate QA/QC requirements for standard methods for analytes not addressed by 40 CFR Part 136. At a minimum effluent testing data must be based on at least three pollutant scans and must be no more than four and on -half years old. Outfall Number: 001 MAXIMUM DAILY j AVERAGE DAILY DISCHARGE DISCHARGE ANALYTICAL POLLUTANT — — -- ___ ML/MDL r METHOD Number of Cone. Units Cone. Units Samples CONVENTIONAL AND NON CONVENTIONAL COMPOUNDS AMMONIA (as N) 18.8 mg/L 4.5 mg/L 999 SM 4500-NH3 D 0.5 CHLORINE (TOTAL 49 pg/L 16 pg/L 998 SM 4500-CI G 10 RESIDUAL, TRC) DISSOLVED OXYGEN 14.3 mg/L 7.6 mg/L 998 SM 4500-0 G 1.0 TOTAL KJELDAHL 23.0 mg/L 7.7 mg/L 16 351.2 0.5 NITROGEN (TKN) NITRATE PLUS NITRITE 23.9 mg/L 9.4 mg/L 16 353.2 0.02 EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 8 of 24 OIL and GREASE 6.3 mg/L 4.8 mg/L 16 1664B 4 PHOSPHORUS (Total) 7.8 mg/L 2.6 mg/L 16 365.1 0.10 TOTAL DISSOLVED SOLIDS 330 mg/L 260 mg/L 3 SM 254OC-20 10 (TDS) OTHER END OF PART B. REFER TO THE APPLICATION OVERVIEW (PAGE 1) TO DETERMINE WHICH OTHER PARTS OF FORM 2A YOU MUST COMPLETE EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 9 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad BASIC APPLICATION INFORMATION PART C. CERTIFICATION All applicants must complete the Certification Section. Refer to instructions to determine who is an officer for the purposes of this certification. All applicants must complete all applicable sections of Form 2A, as explained in the Application Overview. Indicate below which parts of Form 2A you have completed and are submitting. By signing this certification statement, applicants confirm that they have reviewed Form 2A and have completed all sections that apply to the facility for which this application is submitted. Indicate which parts of Form 2A you have completed and are submitting: ® Basic Application Information packet Supplemental Application Information packet: Z Part D (Expanded Effluent Testing Data) ® Part E (Toxicity Testing: Biomonitoring Data) ® Part F (Industrial User Discharges and RCRA/CERCLA Wastes) Part G (Combined Sewer Systems) ALL APPLICANTS MUST COMPLETE THE FOLLOWING CERTIFICATION. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. ' 1,�, L Name and official title �OL\ l YV . ��� WQTf.(- ZaOUrCa Di fe.Uf DIAA Signature Telephone number () Date signed Upon request of the permitting authority, you must submit any other information necessary to assure wastewater treatment practices at the treatment works or identify appropriate permitting requirements. SEND COMPLETED FORMS TO: NCDENR/ DWQ Attn: NPDES Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22, Page 10 of 24 FACILITY NAME AND PERMIT NUMBER: First Broad WWTP, NCO024538 PERMIT ACTION REQUESTED: Renewal RIVER BASIN: Broad SUPPLEMENTAL APPLICATION INFORMATION PART D. EXPANDED EFFLUENT TESTING DATA 1*01 Refer to the directions on the cover page to determine whether this section applies to the treatment works. Effluent Testing: 1.0 mgd and Pretreatment Works. If the treatment works has a design flow greater than or equal to 1.0 mgd or it has (or is required to have) a pretreatment program, or is otherwise required by the permitting authority to provide the data, then provide effluent testing data for the following pollutants. Provide the indicated effluent testing information and any other information required by the permitting authority for each outfall through which effluent is discharged. Do not include information on combined sewer overflows in this section. All information reported must be based on data collected through analyses conducted using 40 CFR Part 136 methods. In addition, these data must comply with QA/QC requirements of 40 CFR Part 136 and other appropriate QA/QC requirements for standard methods for analytes not addressed by 40 CFR Part 136. Indicate in the blank rows provided below any data you may have on pollutants not specifically listed in this form. At a minimum, effluent testing data must be based on at least three pollutant scans and must be no more than four and one-half years old. Outfall number: 001 (Complete once for each outfall discharging effluent to waters of the United States.) j MAXIMUM DAILY DISCHARGE POLLUTANT Conc. Units Mass Units AVERAGE DAILY DISCHARGE ANALYTICAL METHOD ML/MDL Conc. Units Mass Units Number of Samples METALS (TOTAL RECOVERABLE), CYANIDE, PHENOLS, AND HARDNESS. ANTIMONY 1.0 pg/L 0.027 Ibs 1.0 pg/L 0.026 Ibs 3 200.8 1.0 ARSENIC 2.40 pg/L 0.055 Ibs 1.28 pg/L 0.034 Ibs 16 200.8 1.0 BERYLLIUM 0.4 pg/L 0.011 Ibs 0.4 pg/L 0.010 Ibs 3 200.8 0.40 CADMIUM 0.50 pg/L 0.014 Ibs 0.18 pg/L 0.005 Ibs 16 200.8 0.10 CHROMIUM 5.00 pg/L 0.199 Ibs 5.00 pg/L 0.135 Ibs 16 200.8 5.0 COPPER 19.0 pg/L 0.471 Ibs 7.11 pg/L 0.192 Ibs 19 200.8 1.0 LEAD 9.80 pg/L 0.241 Ibs 1.55 pg/L 0.041 Ibs 16 200.8 1.0 MERCURY 13.75 ng/L 0.0004 Ibs 4.36 ng/L 0.0001 Ibs 16 1631E 0.500 NICKEL 5.00 pg/L 0.198 Ibs 5.00 pg/L 0.135 Ibs 16 200.8 5.0 SELENIUM 8.60 pg/L 0.193 Ibs 2.51 pg/L 0.068 Ibs 16 200.8 1.0 SILVER 1.00 pg/L 0.040 Ibs 1.00 pg/L 0.027 Ibs 16 200.8 1.0 THALLIUM 0.5 pg/L 0.014 Ibs 0.5 pg/L 0.013 Ibs 3 200.8 0.50 ZINC 37 pg/L 1.185 Ibs 25.56 pg/L 0.697 Ibs 16 200.8 10 CYANIDE 0.05 mg/L 1.022 Ibs 0.01 mg/I 0.356 Ibs 52 SM 4500-CN 0.010 TOTAL PHENOLIC COMPOUNDS 0.46 mg/L 12.6 Ibs 0.16 mg/L 4.4 Ibs 3 420.4 0.020 HARDNESS (as CaCO3) 72 mg/L 3200 Ibs 40.1 mg/L 1100 Ibs 25 SM 2340C 10 Use this space (or a separate sheet) to provide information on other metals requested by the permit writer EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 11 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VWVTP, NC0024538 Renewal Broad Outfall number: 001 (Complete once for each outfall discharging effluent to waters of the United States.) MAXIMUM DAILY DISCHARGE AVERAGE DAILY DISCHARGE POLLUTANT Number ANALYTICAL MUMDL Conc. Units Mass Units Conc. Units Mass Units of METHOD Samples VOLATILE ORGANIC COMPOUNDS ACROLEIN 5 pg/L 0.137 lbs 5 pg/L 0.127 lbs 3 624 5 ACRYLONITRILE 5 pg/L 0.137 Lbs 5 pg/L 0.127 lbs 3 624 5 BENZENE 5 pg/L 0.122 lbs 2.6 pg/L 0.062 lbs 5 624 1 BROMOFORM 5.8 pg/L 0.143 lbs 2.6 pg/L 0.065 lbs 3 624 1 CARBON 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 TETRACHLORIDE CHLOROBENZENE 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 CHLORODIBROMO- 8 pg/L 0.197 lbs 3.7 pg/L 0.092 lbs 3 624 1 METHANE CHLOROETHANE 2 pg/L 0.055 lbs 2 pg/L 0.051 lbs 3 624 2 2-CHLOROETHYLVINYL 5 pg/L 0.137 lbs 5 pg/L 0.127 lbs 3 624 5 ETHER CHLOROFORM 2.2 pg/L 0.054 lbs 1.8 pg/L 0.046 lbs 3 624 1 DICHLOROBROMO- 2 pg/L 0.049 lbs 1.3 pg/L 0.034 lbs 3 624 1 METHANE 1,1-DICHLOROETHANE 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 1,2-DICHLOROETHANE 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 TRANS-I,2-DICHLORO- 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 ETHYLENE 1,1-DICHLORO- 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 ETHYLENE 1,2-DICHLOROPROPANE 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 1,3-DICHLORO- 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 PROPYLENE ETHYLBENZENE 5 pg/L 0.122 lbs 2.6 pg/L 0.062 lbs 5 624 1 METHYL BROMIDE 2 pg/L 0.055 lbs 2 pg/L 0.051 lbs 3 624 2 METHYL CHLORIDE 2 pg/L 0.049 lbs 1.33 pg/L 0.034 lbs 3 624 2 METHYLENE CHLORIDE 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 1,1,2,2-TETRA- 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 CHLOROETHANE TETRACHLORO- 1 pg/L 0.027 lbs 1 pg/L 0.026 lbs 3 624 1 ETHYLENE TOLUENE 5 pg/L 0.122 lbs 2.6 pg/L 0.062 lbs 5 624 1 EPA Form 3510-2A(Rev. 1-99). Replaces EPA forms 7550-6&7550-22. Page 12 of 24 FACILITY NAME AND PERMIT NUMBER: First Broad VVVVTP, NCO024538 PERMIT ACTION REQUESTED: Renewal RIVER BASIN: Broad Outfall number: 001 (Complete once for each outfall discharging effluent to waters of the United States.) POLLUTANT MAXIMUM DAILY DISCHARGE AVERAGE DAILY DISCHARGE 1 ANALYTICAL METHOD 624 ML/MDL Con,. Units Mass Units Conc. Units Mass Units Number of Samples TRICHLOROETHANE 1 pg/L 0.027 Ibs 1 Ng/L 0.026 Ibs 3 1 1,1,2- TRICHLOROETHANE 1 Ng/L 0.027 Ibs 1 Ng/L 0.026 Ibs 3 624 1 TRICHLOROETHYLENE 1 Ng/L 0.027 Ibs 1 Ng/L 0.026 Ibs 3 624 1 VINYL CHLORIDE 1 Ng/L 0.027 Ibs 1 Ng/L 0.026 Ibs 3 624 7 Use this space (or a separate sheet) to provide information on other volatile organic compounds requested by the permit writer ACID -EXTRACTABLE COMPOUNDS P-CHLORO-M-CRESOL 4 Ng/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 2-CHLOROPHENOL 4 Ng/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 2,4-DICHLOROPHENOL 4 pg/L 0.097 Ibs 2.5 Ng/L 0.064 Ibs 3 625 2/4/1.6 2,4-DIMETHYLPHENOL 4 Ng/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 4,6-DINITRO-0-CRESOL 20 Ng/L 0.487 Ibs 12.7 Ng/L 0.319 Ibs 3 625 10/20/8 2,4-DINITROPHENOL 20 Ng/L 0.487 Ibs 12.7 Ng/L 0.319 Ibs 3 625 10/20/8 2-NITROPHENOL 8 Ng/L 0.195 Ibs 5.1 Ng/L 0.128 Ibs 3 625 4/8/3.2 4-NITROPHENOL 20 Ng/L 0.487 Ibs 12.7 Ng/L 0.319 Ibs 3 625 10/20/8 PENTACHLOROPHENOL 20 pg/L 0.487 Ibs 12.7 Ng/L 0.319 Ibs 3 625 10/20/8 PHENOL 4 Ng/L 0.097 Ibs 2.5 Ng/L 0.064 Ibs 3 625 2/4/1.6 TRIOHLOROPHENOL RIC 4 Ng/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 Use this space (or a separate sheet) to provide information on other acid -extractable compounds requested by the permit writer � T BASE -NEUTRAL COMPOUNDS ACENAPHTHENE 4 Ng/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/411.6 ACENAPHTHYLENE 4 pg/L 0.097 Ibs 2.5 Ng/L 0.064 Ibs 3 625 2/4/1.6 ANTHRACENE 4 Ng/L 0.097 Ibs 2.5 Ng/L 0.064 Ibs 3 625 2/4/1.6 BENZIDINE 20 pg/L 0.487 Ibs 12.7 pg/L 0.319 Ibs 3 625 10/20/8 BENZO(A)ANTHRACENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 BENZO(A)PYRENE 4 Ng/L 0.097 Ibs 2.5 Ng/L 0.064 Ibs 3 625 2/4/1.6 EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 13 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad Outfall number 001 (Complete once for each outfall discharging effluent to waters of the United States.) MAXIMUM DAILY DISCHARGE AVERAGE DAILY DISCHARGE POLLUTANT ANALYTICAL ML/MDL Number Conc. Units Mass Units Conc. Units Mass Units of METHOD Samples 3,4 BENZO- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 FLUORANTHENE BENZO(GHI)PERYLENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 BENZO(K) 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 FLUORANTHENE BIS (2-CHLOROETHOXY) 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 METHANE BIS (2-CHLOROETHYL)- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 ETHER BIS (2-CHLOROISO- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 PROPYL)ETHER BIS (2-ETHYLHEXYL) 20 pg/L 0.487 Ibs 10.5 pg/L 0.267 Ibs 3 625 10/20/1.6 PHTHALATE 4-BROMOPHENYL 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 PHENYLETHER BUTYL BENZYL 20 pg/L 0.487 Ibs 10.5 pg/L 0.267 Ibs 3 625 10/20/1.6 PHTHALATE 2-CHLORO- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 NAPHTHALENE 4-CHLORPHENYL 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 PHENYLETHER CHRYSENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 DI-N-BUTYL PHTHALATE 20 pg/L 0.487 Ibs 10.5 pg/L 0.267 Ibs 3 625 10/20/1.6 DI-N-OCTYL PHTHALATE 20 pg/L 0.487 Ibs 10.5 pg/L 0.267 Ibs 3 625 10/20/1.6 DIBENZO(A,H) 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 ANTHRACENE 1,2-DICHLOROBENZENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 1,3-DICHLOROBENZENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 1,4-DICHLOROBENZENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 3,3-DICHLORO- 20 pg/L 0.487 Ibs 12.7 pg/L 0.319 Ibs 3 625 10/20/8 BENZIDINE DIETHYL PHTHALATE 20 pg/L 0.487 Ibs 10.5 pg/L 0.267 Ibs 3 625 10/20/1.6 DIMETHYL PHTHALATE 20 pg/L 0.487 Ibs 10.5 pg/L 0.267 Ibs 3 625 10/20/1.6 2,4-DINITROTOLUENE 8 pg/L 0.195 Ibs 5.1 pg/L 0.128 Ibs 3 625 4/8/3.2 2,6-DINITROTOLUENE 8 pg/L 0.195 Ibs 5.1 pg/L 0.128 Ibs 3 625 4/8/3.2 1,2-DIPHENYL- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 HYDRAZINE EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 14 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad Outfall number: 001 (Complete once for each outfall discharging effluent to waters of the United States.) MAXIMUM DAILY DISCHARGE AVERAGE DAILY DISCHARGE T POLLUTANT Number ANALYTICAL METHOD ML/MDL Conc. Units Mass Units Conc. Units Mass Units of � Sample 1 FLUORANTHENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 FLUORENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 HEXACHLOROBENZENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 HEXACHLORO- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 BUTADIENE HEXACHLOROCYCLO- 20 pg/L 0.487 Ibs 12.7 pg/L 0.319 Ibs 3 625 10/20/8 PENTADIENE HEXACHLOROETHANE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 INDENO(1,2,3-CD) 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 PYRENE ISOPHORONE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 NAPHTHALENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 NITROBENZENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 N-NITROSODI-N- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 PROPYLAMINE N-NITROSODI- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 METHYLAMINE N-NITROSODI- 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 PHENYLAMINE PHENANTHRENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 PYRENE 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 1,2,4 4 pg/L 0.097 Ibs 2.5 pg/L 0.064 Ibs 3 625 2/4/1.6 TRICHLOROBENZENE Use this space (or a separate sheet) to provide information on other base -neutral compounds requested by the permit writer Use this space (or a separate sheet) to provide information on other pollutants (e.g., pesticides) requested by the permit writer END OF PART D. REFER TO THE APPLICATION OVERVIEW (PAGE 1) TO DETERMINE WHICH OTHER PARTS OF FORM 2A YOU MUST COMPLETE EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 15 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad 'i 3333( �yyIy'k 0. i�ry� �y.. r - 1',AL APP,' » '�' ! 4 5 S 30 . hk ./'�'.'�/♦nn. i{.���yF POTWs meeting one or more of the following criteria must provide the results of whole effluent toxicity tests for acute or chronic toxicity for each of the facility's discharge points: 1) POTWs with a design flow rate greater than or equal to 1.0 mgd; 2) POTWs with a pretreatment program (or those that are required to have one under 40 CFR Part 403); or 3) POTWs required by the permitting authority to submit data for these parameters. • At a minimum, these results must include quarterly testing for a 12-month period within the past 1 year using multiple species (minimum of two species), or the results from four tests performed at least annually in the four and one-half years prior to the application, provided the results show no appreciable toxicity, and testing for acute and/or chronic toxicity, depending on the range of receiving water dilution. Do not include information on combined sewer overflows in this section. All information reported must be based on data collected through analysis conducted using 40 CFR Part 136 methods. In addition, this data must comply with QA/QC requirements of 40 CFR Part 136 and other appropriate QA/QC requirements for standard methods for analytes not addressed by 40 CFR Part 136. • In addition, submit the results of any other whole effluent toxicity tests from the past four and one-half years. If a whole effluent toxicity test conducted during the past four and one-half years revealed toxicity, provide any information on the cause of the toxicity or any results of a toxicity reduction evaluation, if one was conducted. • If you have already submitted any of the information requested in Part E, you need not submit it again. Rather, provide the information requested in question EA for previously submitted information. If EPA methods were not used, report the reasons for using alternate methods. If test summaries are available that contain all of the information requested below, they may be submitted in place of Part E. If no biomonitoring data is required, do not complete Part E. Refer to the Application Overview for directions on which other sections of the form to complete. E.I. Required Tests. Indicate the number of whole effluent toxicity tests conducted in the past four and one-half years. ® chronic ❑ acute E.2. Individual Test Data. Complete the following chart for each whole effluent toxicity test conducted in the last four and one-half years. Allow one column per test (where each species constitutes a test). Copy this page if more than three tests are being reported. Test number: 1 Test number: 1 Test number: a. Test information. Ceriodaphnia Dubia, Test Species & test method number Pimepales promelas, 1000.0 1002.0 Age at initiation of test <48 hours <24 hours Outfall number 001 001 2017, Feb 7, 9, 10 2017, Feb 7, 9 2017, May 9, 11, 12 2017, May 9, 11 Dates sample collected 2017, Aug 8, 10, 11 2017, Aug 8, 10 2017, Nov 14, 16, 17 2017, Nov 14, 16 2017, Feb 7 2017, Feb 8 2017, May 9 2017, May 10 Date test started 2017, Aug 8 2017, Aug 9 2017, Nov 14 2017, Nov 15 Duration 7 days 7 days b. Give toxicity test methods followed. Short-term Methods for Short-term Methods for Estimating the Chronic Toxicity Estimating the Chronic Manual title of Effluents and Receiving Toxicity of Effluents and Waters to Freshwater Receiving Waters to Organisms Freshwater Organisms Edition number and year of publication 4th edition-2002 4th edition-2002 EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 16 of 24 Page number(s) 53-106 141-189 FACILITY NAME AND PERMIT NUMBER: First Broad WWTP, NCO024538 PERMIT ACTION REQUESTED: Renewal RIVER BASIN: Broad c. Give the sample collection method(s) used. For multiple grab samples, indicate the number of grab samples used. 24-Hour composite yes yes Grab d. Indicate where the sample was taken in relation to disinfection. (Check all that apply for each. Before disinfection After disinfection After dechlorination yes yes e. Describe the point in the treatment process at which the sample was collected. Sample was collected: effluent effluent f. For each test, include whether the test was intended to assess chronic toxicity, acute toxicity, or both Chronic toxicity yes yes Acute toxicity no no g. Provide the type of test performed. Static Static -renewal yes yes Flow -through h. Source of dilution water. If laboratory water, specify type; if receiving water, specify source. Laboratory water Reconstituted synthetic water Receiving water Lake Brandt i. Type of dilution water. If salt water, specify "natural' or type of artificial sea salts or brine used. Fresh water yes yes Salt water j. Give the percentage effluent used for all concentrations in the test series. 4.25, 8.5, 17, 34, 68% 17 % k. Parameters measured during the test. (State whether parameter meets test method specifications) pH yes yes Salinity Temperature yes yes Ammonia Dissolved oxygen yes yes EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 17 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VVVVTP, NCO024538 Renewal Broad I. Test Results. Acute: Not Applicable Percent survival in 100% % % % effluent LC5o 95% C.I. % % % Control percent survival % ova Other (describe) Chronic: 2/7/2017 17 % 5/9/2017 68% NOEC 17 % % 8/8/2017 68% 11/14/2017 68% IC25 % % % 2/7/2017 92.5 % 2/8/2017 91.7 % 5/9/2017 100% 5/10/2017 100% Control percent survival % 8/8/2017 92.5% 8l9/2017 100% 11/14/2017 87.5% 11/15/2017 100% 2/7/2017 24 % 2/8/2017 Pass Other (describe) 5/9/2017 >68% 5/10/2017 Pass Chronic Value 8/8/2017 >68% 8/9/2017 Pass 11/14/2017 >68% 11/15/2017 Pass m. Quality Control/Quality Assurance. Is reference toxicant data available? yes yes Was reference toxicant test within yes yes acceptable bounds? 02/07/2017 02101 /2017 05/09/2017 05/17/2017 What date was reference toxicant test run (MM/DD/YYYY)? 08/09/2017 08/02/2017 11 /14/2017 11 /01 /2017 Other (describe) EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 18 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad E.3. Toxicity Reduction Evaluation. Is the treatment works involved in a Toxicity Reduction Evaluation? ❑ Yes ® No If yes, describe: EA. Summary of Submitted Biomonitoring Test Information. If you have submitted biomonitoring test information, or information regarding the cause of toxicity, within the past four and one-half years, provide the dates the information was submitted to the permitting authority and a summary of the results. Date submitted: / / (MM/DD/YYYY) Summary of results: (see instructions) END OF PART E. REFER TO THE APPLICATION OVERVIEW (PAGE 1) TO DETERMINE WHICH OTHER PARTS OF FORM 2A YOU MUST COMPLETE. EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 19 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad SUPPLEMENTALAPPLICATION INFORMATION PART F. INDUSTRIAL USER DISCHARGES AND RCRA/CERCLA WASTES All treatment works receiving discharges from significant industrial users or which receive RCRA,CERCLA, or other remedial wastes must complete part F. GENERAL INFORMATION: F.I. Pretreatment program. Does the treatment works have, or is subject to, an approved pretreatment program? ® Yes ❑ No F.2. Number of Significant Industrial Users (SIUs) and Categorical Industrial Users (CIUs). Provide the number of each of the following types of industrial users that discharge to the treatment works. a. Number of non -categorical SIUs. 2 b. Number of CIUs. 3 SIGNIFICANT INDUSTRIAL USER INFORMATION: Supply the following information for each SIU. If more than one SIU discharges to the treatment works, copy questions F.3 through F.8 and provide the information requested for each SIU. F.3. Significant Industrial User Information. Provide the name and address of each SIU discharging to the treatment works. Submit additional pages as necessary. Name: Please see Addition Information Section F Mailing Address: FA. Industrial Processes. Describe all the industrial processes that affect or contribute to the SIU's discharge. F.5. Principal Product(s) and Raw Material(s). Describe all of the principal processes and raw materials that affect or contribute to the SIU's discharge. Principal product(s): Raw material(s): F.6. Flow Rate. a. Process wastewater flow rate. Indicate the average daily volume of process wastewater discharge into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. gpd ( continuous or intermittent) b. Non -process wastewater flow rate. Indicate the average daily volume of non -process wastewater flow discharged into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. gpd ( continuous or intermittent) F.7. Pretreatment Standards. Indicate whether the SIU is subject to the following: a. Local limits ❑ Yes ❑ No b. Categorical pretreatment standards ❑ Yes ❑ No If subject to categorical pretreatment standards, which category and subcategory? EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 20 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad F.8. Problems at the Treatment Works Attributed to Waste Discharge by the SIU. Has the SIU caused or contributed to any problems (e.g., upsets, interference) at the treatment works in the past three years? ❑ Yes ❑ No If yes, describe each episode. RCRA HAZARDOUS WASTE RECEIVED BY TRUCK, RAIL, OR DEDICATED PIPELINE: F.9. RCRA Waste. Does the treatment works receive or has it in the past three years received RCRA hazardous waste by truck, rail or dedicated pipe? ❑ Yes ® No (go to F.12) F.10. Waste transport Method by which RCRA waste is received (check all that apply): ❑ Truck ❑ Rail ❑ Dedicated Pipe F.11. Waste Description. Give EPA hazardous waste number and amount (volume or mass, specify units). EPA Hazardous Waste Number Amount Units CERCLA (SUPERFUND) WASTEWATER, RCRA REMEDIATION/CORRECTIVE ACTION WASTEWATER, AND OTHER REMEDIAL ACTIVITY WASTEWATER: F.12. Remediation Waste. Does the treatment works currently (or has it been notified that it will) receive waste from remedial activities? ® Yes (complete F.13 through F.15.) ❑ No F.13. Waste Origin. Describe the site and type of facility at which the CERCLA/RCRA/or other remedial waste originates (or is excepted to origniate in the next five years). FASCO Controls manufactured switches and electrical components since 1973. A storage tank of chlorinated VOCs released soil and. groundwater contamination. All soil remediation has been completed. Groundwater remediation has been conducted since 1996. In 2017, the City of Shelby issued a General User Permit for the discharge of groundwater in 3 recovery well on site. F.14. Pollutants. List the hazardous constituents that are received (or are expected to be received). Include data on volume and concentration, if known. (Attach additional sheets if necessary.) 1 4-Dioxane (ND-500 uq/L) 1 1,1-trichloroethane (ND-500 uq/L), Trichloroethene (ND-500 jig/L), 1.1-Dichloroethene (ND-3.000 ug/L), 1 1-Dichloroethane (ND-1,000 ug/L), 1 2-Dichloroethane (ND-500 uq/L), 1,1,2-trichloroethane (ND-500 ug/L) F.15. Waste Treatment. a. Is this waste treated (or will be treated) prior to entering the treatment works? ❑ Yes ® No If yes, describe the treatment (provide information about the removal efficiency): b. Is the discharge (or will the discharge be) continuous or intermittent? ® Continuous ❑ Intermittent If intermittent, describe discharge schedule. Three recovery wells that extract —1.0 qpm from each well. END OF PART F. REFER TO THE APPLICATION OVERVIEW (PAGE 1) TO DETERMINE WHICH OTHER PARTS OF FORM 2A YOU MUST COMPLETE EPA Form 3510-2A (Rev. 1-99). Replaces E FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad SUPPLEMENTAL APPLICATION INFORMATION PART G. COMBINED SEWER SYSTEMS If the treatment works has a combined sewer system, complete Part G. G.I. System Map. Provide a map indicating the following: (may be included with Basic Application Information) a. All CSO discharge points. b. Sensitive use areas potentially affected by CSOs (e.g., beaches, drinking water supplies, shellfish beds, sensitive aquatic ecosystems, and outstanding natural resource waters). C. Waters that support threatened and endangered species potentially affected by CSOs. G.2. System Diagram. Provide a diagram, either in the map provided in G.1 or on a separate drawing, of the combined sewer collection system that includes the following information. a. Location of major sewer trunk lines, both combined and separate sanitary. b. Locations of points where separate sanitary sewers feed into the combined sewer system. C. Locations of in -line and off-line storage structures. d. Locations of flow -regulating devices. e. Locations of pump stations. CSO OUTFALLS: Complete questions G.3 through G.6 once for each CSO discharge point. G.3. Description of Outfall. a. Outfall number b. Location (City or town, if applicable) (Zip Code) (County) (State) (Latitude) (Longitude) C. Distance from shore (if applicable) ft. d. Depth below surface (if applicable) ft. e. Which of the following were monitored during the last year for this CSO? ❑ Rainfall ❑ CSO pollutant concentrations ❑ CSO frequency ❑ CSO flow volume ❑ Receiving water quality f. How many storm events were monitored during the last year? GA. CSO Events. a. Give the number of CSO events in the last year. events (❑ actual or ❑ approx.) b. Give the average duration per CSO event. hours (❑ actual or ❑ approx.) EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 22 of 24 FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad C. Give the average volume per CSO event. million gallons (❑ actual or ❑ approx.) d. Give the minimum rainfall that caused a CSO event in the last year Inches of rainfall G.S. Description of Receiving Waters. a. Name of receiving water: b. Name of watershed/river/stream system: United State Soil Conservation Service 14-digit watershed code (if known): C. Name of State Management/River Basin: United States Geological Survey 8-digit hydrologic cataloging unit code (if known): G.6. CSO Operations. Describe any known water quality impacts on the receiving water caused by this CSO (e.g., permanent or intermittent beach closings, permanent or intermittent shell fish bed closings, fish kills, fish advisories, other recreational loss, or violation of any applicable State water quality standard). ..., END OF PART G. REFER TO THE APPLICATION OVERVIEW (PAGE 1) TO DETERMINE WHICH OTHER PARTS OF FORM 2A YOU MUST COMPLETE. EPA Form 3510-2A (Rev. 1-99). Replaces EPA forms 7550-6 & 7550-22. Page 23 of 24 Additional information, if provided, will appear on the following pages. NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad River Additional Information for NPDES Permit Application Section 13.1. Inflow and Infiltration FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad River The City of Shelby seeks to correct all sources of inflow and infiltration. The City performs flow monitoring to evaluate the flow contributions of various basins within the sewer collection system. The City also utilizes manhole evaluations, video equipment and smoke testing to determine problematic areas. Areas are being prioritized for major repairs and smaller point repairs are being conducted by City Staff. Some of the recent projects conducted to correct I&I are as follows: Sewer Evaluation Protects 2016 Uptown Water and Sewer Evaluation Manhole inspections and video assessment 2017 Sewer Inventory and Assessment Grant Smoke Testing, manhole inspection and video assessment Sewer System Rehabilitation Protects (Since 2014) Year Location Type 23,882 feet (estimated) 38,000 feet Size Length (ft) 2014 Buffalo and Lineberger Sewer Replacement 8" 305 2014 Fallston Rd. N of Wyke Sewer Replacement 8" 416 2014 Mall Liftstation Sewer Replacement 8" / 16" 1,119 2015 Grover Street - KFC Sewer Replacement 8" 260 2015 Arey & S Dale Sewer Replacement 8" 195 2015 Edgewood Rd. R/W Sewer Replacement 8" 165 2015 Fallston Road - Wyke Sewer Replacement 8" 179 2015 Fredrick St and Jefferson Sewer Replacement 8" 647 2015 Hendrick Outfall Sewer Replacement 12" 2,800 2015 Grover (N Laf. to N Washington) Sewer Replacement 8" 830 2015 Outfall Improvements 2014 — Hwy 74 to Mitchell Sewer Replacement 8", 24", 30" 5,416 2015 Outfall Improvements 2014 — Suttle to Marion Sewer Replacement 20" 1,486 2015 Outfall Improvements 2014 — Graham to Gidney Sewer Replacement 20" 3,490 2015 Outfall Improvements 2014 — WWTP Outfall Sewer Replacement 48" 575 2015 Outfall Improvements 2014 — Linton Barnette Sewer Replacement - 288 2015 W. Elm Manhole Replacement - - 2015 Crescent Manhole Replacement - - 2015 E. Grover Street Sewer Point Repairs 8" - 2015 Hawthorne St. Manhole Replacement - - 2015 Bonny Street Sewer Replacement 8" 460 2015 Lineberger and Craig Sewer Replacement 8" 1,180 2016 Campbell Street Sewer Manhole Replacement - - 2016 Elizabeth Ave Sewer Sewer Replacement 8" 285 2016 Washington & Lafayette — Outfall Sewer Replacement/Outfall 8" 650 2016 West Shelby Sewer Improvements Sewer Replacement 8" 2,833 2016 Arey and Trade Sewer Improvements Sewer Replacement 8" 504 2016 Dale, Trade & Morgan Street Sewer Replacement 8" 529 2016 Leander St Sewer Replacement 12" 180 2016 Sumter St. Sewer Replacement 6" 229 2017 Trade, Campbell and Morgan Street Sewer Replacement 8" 1 1,379 Total: 1 26,400 Note -City staff performs point repairs in the collection system to raise/seal manholes within some of the low lying and flood prone areas. These repairs are not included in the above projects. FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad River Additional Information for NPDES Permit Application Section 13.2. Topographical Map First Broad River Wastewater Treatment Plant .,, V 0 0 Ct ° ° ° S 1 �� '° Main Lift ■VIIWiTiP Note: Pipe 001 (Outfall)- Latitude: 35' 14' 34.009" N Longitude: 81 ° 34' 28.353" W S//Oal Legend © Lift Station WWTP Property N.r . Gravty Main 10' Contour Lines Force Main Hydrography 1 inch = 2,000 feet 1 Mile Radius Around WWTP Property FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad River Additional Information for NPDES Permit Application Section 13.3 Process Flow Diagrams and Schematics FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad River Process Flow Description The First Broad WWTP is a 6-mgd facility operated by the City of Shelby which discharges treated effluent to the First Broad River. Influent wastewater enters the plant through a gravity feed sewer line and passes through coarse manual and fine rotary mechanical screens and a grit classifier. Grit slurry is dewatered by an auger type classifier and is deposited into a dumpster for disposal at landfill. Following preliminary treatment, the flow enters the main lift station. Four influent pumps lift the influent flow to a splitter box and the flow is split to two primary clarifiers. Settled solids are removed by positive displacement pumps located in the primary sludge pump station, where they are pumped to the Aerated Sludge holding tank. Wastewater carries over the primary clarifier weirs to a splitter box. Prior to the splitter box Return Activated Sludge (RAS) is pumped back to a manhole where it mixes with primary effluent. The splitter box diverts flow to one of the three aeration basins. The aeration basin system consists of a total volume of 2.25 MG aeration basin and three Turblex blowers. Each aeration basin consists of an anoxic section that has three cells with submersible mixers. Each aeration basin four aerobic zones with fine bubble diffusers. The Turblex blowers can operate between 1,600 -3,550 scfm to provide air to the aeration system. Each of the three basins have an internal recycle pump located in the last aerobic zone of each basin with a rated capacity of 4,166 gpm. These pumps have VFDs that adjust using the incoming flow to the WWTP by the SCADA system. After the aeration basins, flow is split between four (4) final clarifiers. The clarifiers provide separation of the mixed liquor suspended solids (MLSS) generated in the aeration basins. The return activated sludge (RAS) is pumped by two RAS pump stations for return to manhole upstream of the aeration splitter box. Waste Activated Sludge (WAS) is metered and pumped to a 40 ft diameter gravity thickener for thickening. Water is sent back to the primary clarifiers and thickened sludge is pumped to the aerated sludge holding tank. The plant uses chlorine and sulfur dioxide for disinfection/chlorine removal at the effluent. Two compartment contact tank provides detention time for reactions to occur. The sludge management system includes the aerated sludge holding tank, dewatering by belt presses and a composting facility. More details are in the Sludge Management Plan. The plant is equipped with back-up generation of 2000 KW generator which provides back-up generation to the whole plant. In 2012, the City relocated a 175 KW generator to provide more redundancy to the main lift. i c f "N AR �F,11.'E.-�FILTRAI..E.....Vrq. FITA 11 `\ i FROM CITY RS RS OF SHELM COLLECTION SYSTEM INFLUENT GRIT N DRUM SCREEN COLLECTOR LRI '� c INFLUEN PUMF._—_.__..:ING 5 Fi:_ --------------------+, PSL ONIDARY NRIFIER ;.,3 r� SLUDGE TANK FIRST BROAD RIVER H ;TRINE f0'v,.AC'C AMER LEGEND PRIMARY OPERATION (NEW) — — — — SECONDARY OPERATION (NEW) --------- PRIMARY OPERATION (EXISTING) — -- — -- SECONDARY OPERATION (EXISTING) RECORD DRAWINGS THE ORIGINAL DOCUMENTS PREPARED BY HDR, INC. HAVE BEEN MODIFIED TO INCORPORATE FIELD CHANGES MADE BY THE CONTRACTOR BASED ON MARKED UP PRINTS PROVIDED BY THE CONTRACTOR i E Nc.4 AND OTHER DATA ASSOCIATED WITH CHANGES IN THE / WORK AUTHORIZED BY THE OWNER. THE ENGINEER :....._..._................_.........._......__--__......__.._.._.__._....___._.._.._....._...........______._J "„_,..,,,/ REPRESENTS THAT THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF THIS INFORMATION PROVIDED TO THE ENGINEER, BUT MAKES NO REPRESENTATIONS AS TO THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION. DATE: APRIL 2016 This document originally issued and seated by CHRISTOPHER CROTWELL 033566 on MARCH 5, 2014 This document only certified as to revisions. COMPACT J ' � RAS PUMP BUILDING j a'. 4 tIL [. PUM? STATION � �; TWAS -- STATION-- I i COMPOST._. FA ,IlIT_v I ! NDAR'-.' J PROCESS FLOW DIAGRAM 0 1" 2" FILENAME OOG-05.dwg CCCIE NONW D C B A helb`vJ City of Shelby V M7/1 l'Mtli ) al JJJ First Broad WWTP - Schematic JJ Sludge Pumps JaJjJ J yV J�VVJV K�j Amendment Syster It es Belt Pre! Decant Mixer JJ�JpJ J J J J PV O_J�iJJJJVJJJ VJ�JJJVJJJ�JV V V� jJJJJIiJJ �7J��VJJJJJJJVVJ Jii JiiJ�7JJVJJJJV VJVVVJVJVVV�iJV V JiJV V JVJVJVJ� VV JJJ�JJJ��J Compost Bays with Cooling Fans and VVJJJ�J_JaJJVVV Agitators JJJy- / 10 9 8 1 7 6 5 4 3 2 _o _ m IrJv !VJ J�]$J J V JIiJJV �VjJ�JaJJV?V VJJ�VJV�IVJVJ JJJVJJ VJVJH H VJJJJJ . VVJJVJJVVJVVJ JUJVMVJVViiVJV sVVVJJVJ V V o4�7 0JV JTV V VJVJJVJVJVJ VV JJHJ3,JJaJ��J , Covered Storage 1 Aerated Sludge Tank i Filtrate Equalization Under drain System Amy kener Q 3 WAS Sludge <-- from Boiling Springs Chlorine Contact Plant Effluent Basins First Broad River PRIMARY CLARIFIER DISTRIBUTION PRIMARY CLARIFIER SECONDARY CLARIFIER ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ................. ■ ■ ■ ■ ■ ■ ■ ■ SLUDGE SLUDGE ■ HOLDING ■ TANK ■ ■ ■ PRIMARY Trw SLUDGE PUMP STATION .......................... •................. ■.■■■■■■.■.■■. FILTRATE ICOMPOST BUILDING EQ TANK 7 v ■ ■ ■ BFP FEED ° COMPOSTING COMPOST ■ PUMP BFP STORAGE ■ ■ , ■ FILTRATE ■.............................. 0 PUMP STATION WAS c� PUMP STATION GRAVITY THICKENER THICKENED WAS PUMP STATION PUBLIC DISTRIBUTION Existing Biosolids Process Flow Diagram FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VVVVTP, NCO024538 Renewal Broad Additional Information for NPDES Permit Application Section 13.4. Operation/Maintenance Performed by Contractors NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: First Broad WWTP, NCO024538 Operation and Maintenance Performed by Contractors PERMIT ACTION REQUESTED: RIVER BASIN: Renewal Broad River Basin B.4. If yes, list the name, address, telephone number and status of each contractor and describe the contractor's responsibilities. Name: Carolina Catepillar Mailing Address: P.O. Box 1095 Charlotte NC 28201-1095 Phone Number: 704-598-2200 Responsibilities: Preventative and Corrective Maintenance on emergency generators Name: Mailing Address: P.O. Box 33758 Charlotte NC 28233 Phone Number: 704-559-8112 Responsibilities: SCADA System repairs and programming Name: Piedmont Chlorinator Service 7424 Orr Road Charlotte NC 28213 Phone Number: 704-597-7505 Responsibilities: Preventative and corrective maintenance to Chlorine and Sulfur Dioxide system equipment. Name: Charles Underwood 2000 Boone Trail Road Phone Number: 919-775-2463 Responsibilities: NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: First Broad WWTP NCO024538 Operation and Maintenance Performed by Contractors PERMIT ACTION REQUESTED: RIVER BASIN: Renewal Broad River Basin B.4. If yes, list the name, address, telephone number and status of each contractor and describe the contractor's responsibilities. Name: Ken Nash Companv Mailing Address: P.O. Box 252, Lowell, North Carolina Phone Number: 704-354-0499 Responsibilities: Instrumentation Calibration Name: Superior Scales, Inc. Mailing Address: 2118 Carolina Place Fort Mill South Carolina 29708 Phone Number: 803-548-3320 Responsibilities: Preventative Maintenance to Chlorine and Sulfur Dioxide Scales Name: ICR Electric Mailing Address: 934 Thore Road Shelby, North Carolina 28150 Phone Number: 704-482-0329 Responsibilities: Motor Repair Name: Electric Motor Repair Mailing Address: 1143 Airport Road, Shelbv, North Carolina 28150 Phone Number: 704-482-9979 Responsibilities: Motor Repair Name: ACE Industries Inc. Mailing Address: 1851 Scott Futrell Drive Charlotte North Carolina 28208 Phone Number: 704-504-9230 Responsibilities: Hoist Repair NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad Additional Information for NPDES Permit Application Section F. Industrial User Discharges NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VWVFP, NCO024538 Renewal Broad SIGNIFICANT INDUSTRIAL USER INFORMATION: Supply the following information for each SIU. If more than one SIU discharges to the treatment works, copy questions F.3 through F.8 and provide the information requested for each SIU. F.3. Significant Industrial User Information. Provide the name and address of each SIU discharging to the treatment works. Submit additional pages as necessary. Name: Clearwater Paper Corporation Mailing Address: 671 Washburn Switch Road Shelby, NC 28150 F.4. Industrial Processes. Describe all the industrial processes that affect or contribute to the SIU's discharge. Paper manufacturer F.5. Principal Product(s) and Raw Material(s). Describe all of the principal processes and raw materials that affect or contribute to the SIU's discharge. Principal product(s): Consumer household paper towels, bath tissue and napkins Raw material(s): pulp F.6. Flow Rate. a. Process wastewater flow rate. Indicate the average daily volume of process wastewater discharge into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. 405,000 gpd (x continuous or intermittent) b. Non -process wastewater flow rate. Indicate the average daily volume of non -process wastewater flow discharged into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. 1,750 gpd ( continuous or x intermittent) F.7. Pretreatment Standards. Indicate whether the SIU is subject to the following: a. Local limits ® Yes ❑ No b. Categorical pretreatment standards ❑ Yes ® No If subject to categorical pretreatment standards, which category and subcategory? 40 CFR part 430 Pulp, Paper and Paperboard F.8. Problems at the Treatment Works Attributed to Waste Discharge by the SIU. Has the SIU caused or contributed to any problems (e.g., upsets, interference) at the treatment works in the past three years? ❑ Yes ❑ No If yes, describe each episode. NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VVWTP, NCO024538 Renewal Broad SIGNIFICANT INDUSTRIAL USER INFORMATION: Supply the following information for each SIU. If more than one SIU discharges to the treatment works, copy questions F.3 through F.8 and provide the information requested for each SIU. F.3. Significant Industrial User Information. Provide the name and address of each SIU discharging to the treatment works. Submit additional pages as necessary. Name: Dicey Mills, Inc Mailing Address: 430 Neisler Street Shelby, NC 28150 F.4. Industrial Processes. Describe all the industrial processes that affect or contribute to the SIU's discharge. Operations have ceased at the location, permit has been issued to ensure proper wastewater lagoon closure on site. F.5. Principal Product(s) and Raw Material(s). Describe all of the principal processes and raw materials that affect or contribute to the SIU's discharge. Principal product(s): Not Applicable Raw material(s): Not Applicable F.6. Flow Rate. a. Process wastewater flow rate. Indicate the average daily volume of process wastewater discharge into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. 0 gpd ( continuous or X intermittent) b. Non -process wastewater flow rate. Indicate the average daily volume of non -process wastewater flow discharged into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. gpd ( continuous or intermittent) F.7. Pretreatment Standards. Indicate whether the SIU is subject to the following: a. Local limits ® Yes ❑ No b. Categorical pretreatment standards ❑ Yes ® No If subject to categorical pretreatment standards, which category and subcategory? N/A F.B. Problems at the Treatment Works Attributed to Waste Discharge by the SIU. Has the SIU caused or contributed to any problems (e.g., upsets, interference) at the treatment works in the past three years? ❑ Yes ® No If yes, describe each episode. NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VVVVTP, NCO024538 Renewal Broad SIGNIFICANT INDUSTRIAL USER INFORMATION: Supply the following information for each SIU. If more than one SIU discharges to the treatment works, copy questions F.3 through F.8 and provide the information requested for each SIU. F.3. Significant Industrial User Information. Provide the name and address of each SIU discharging to the treatment works. Submit additional pages as necessary. Name: Greenheck Fan Corporation Mailing Address: 2000 Partnership Drive Shelby, NC 28150 FA. Industrial Processes. Describe all the industrial processes that affect or contribute to the SIU's discharge. Paint System rinse water F.5. Principal Product(s) and Raw Material(s). Describe all of the principal processes and raw materials that affect or contribute to the SIU's discharge. Principal product(s): Ventilation products Raw material(s): Aluminum and steel, galvanized and carbon F.6. Flow Rate. a. Process wastewater flow rate. Indicate the average daily volume of process wastewater discharge into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. 1,440 gpd (X continuous or intermittent) b. Non -process wastewater flow rate. Indicate the average daily volume of non -process wastewater flow discharged into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. gpd ( continuous or intermittent) F.7. Pretreatment Standards. Indicate whether the SIU is subject to the following: a. Local limits N Yes ❑ No b. Categorical pretreatment standards N Yes ❑ No If subject to categorical pretreatment standards, which category and subcategory? 40 CFR Part 433- Metal Finisher F.8. Problems at the Treatment Works Attributed to Waste Discharge by the SIU. Has the SIU caused or contributed to any problems (e.g., upsets, interference) at the treatment works in the past three years? ❑ Yes N No If yes, describe each episode. NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP, NCO024538 Renewal Broad SIGNIFICANT INDUSTRIAL USER INFORMATION: Supply the following information for each SIU. If more than one SIU discharges to the treatment works, copy questions F.3 through F.8 and provide the information requested for each SIU. F.3. Significant Industrial User Information. Provide the name and address of each SIU discharging to the treatment works. Submit additional pages as necessary. Name: IMC Metals America Mailing Address: 135 Old Boiling Springs Road Shelby, NC 28150 FA. Industrial Processes. Describe all the industrial processes that affect or contribute to the SIU's discharge. Copper and Tin anodes and rod production by melting and casting F.5. Principal Product(s) and Raw Material(s). Describe all of the principal processes and raw materials that affect or contribute to the SIU's discharge. Principal product(s): Copper and Tin anodes and rods Raw material(s): Copper, Silver copper, Tin F.6. Flow Rate. a. Process wastewater flow rate. Indicate the average daily volume of process wastewater discharge into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. 2,600 gpd ( continuous or X intermittent) b. Non -process wastewater flow rate. Indicate the average daily volume of non -process wastewater flow discharged into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. gpd ( continuous or intermittent) F.7. Pretreatment Standards. Indicate whether the SIU is subject to the following: a. Local limits ® Yes ❑ No b. Categorical pretreatment standards ® Yes ❑ No If subject to categorical pretreatment standards, which category and subcategory? 40 CFR Part 468 Copper Forming F.8. Problems at the Treatment Works Attributed to Waste Discharge by the SIU. Has the SIU caused or contributed to any problems (e.g., upsets, interference) at the treatment works in the past three years? ❑ Yes ® No If yes, describe each episode. NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad VVVVTP, NCO024538 Renewal Broad SIGNIFICANT INDUSTRIAL USER INFORMATION: Supply the following information for each SIU. If more than one SIU discharges to the treatment works, copy questions F.3 through F.8 and provide the information requested for each SIU. F.3. Significant Industrial User Information. Provide the name and address of each SIU discharging to the treatment works. Submit additional pages as necessary. Name: KSM Castings USA Inc. Mailing Address: 120 Blue Brook Drive Shelby, NC 28150 FA. Industrial Processes. Describe all the industrial processes that affect or contribute to the SIU's discharge. Melting, die casting and machining of Aluminum F.5. Principal Product(s) and Raw Material(s). Describe all of the principal processes and raw materials that affect or contribute to the SIU's discharge. Principal product(s): transmission components Raw material(s): Aluminum F.6. Flow Rate. a. Process wastewater flow rate. Indicate the average daily volume of process wastewater discharge into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. 500 gpd (X continuous or intermittent) b. Non -process wastewater flow rate. Indicate the average daily volume of non -process wastewater flow discharged into the collection system in gallons per day (gpd) and whether the discharge is continuous or intermittent. gpd ( continuous or intermittent) F.7. Pretreatment Standards. Indicate whether the SIU is subject to the following: a. Local limits N Yes ❑ No b. Categorical pretreatment standards N Yes ❑ No If subject to categorical pretreatment standards, which category and subcategory? 40 CFR Part 464 Metal Molding and Casting F.8. Problems at the Treatment Works Attributed to Waste Discharge by the SIU. Has the SIU caused or contributed to any problems (e.g., upsets, interference) at the treatment works in the past three years? ❑ Yes N No If yes, describe each episode. NPDES FORM 2A Additional Information FACILITY NAME AND PERMIT NUMBER: PERMIT ACTION REQUESTED: RIVER BASIN: First Broad WWTP NC0024538 Renewal Broad River Additional Information for NPDES Permit Application Sludge Management Plan Sludge Management Plan First Broad Wastewater Treatment Plant NPDES Permit # NCOO24538 Compost Permit # WQOOO778O The First Broad River Wastewater Treatment Plant(WWTP) design for sludge handling consists of sludge dewatering and composting.This plan describes the processes in place for treating and disposing of this material. WASTEWATER PROCESS The First Broad WWTP is a 6.0 MGD Biological Activated Sludge Wastewater Treatment Facility. The process consists of a Barscreen, cylindrical fine screen grit removal, two primary clarifiers, three (3), aeration basins, four secondary clarifiers, gravity sludge thickener, chlorination/dechlorination, sludge holding tank with aeration, and compost facility which includes dewatering and filtrate equalization. The WWTP discharges into the First Broad River, which is a Class C stream in the Broad River Basin. RESIDUALS CHARACTERISTICS The First Broad River WWTP operates a Compost Facility equipped with IPS /Wheelabrator (US Filter) equipment and technology. Primary and secondary residuals produced by the WWTP are processed through the facility with a very small percentage of digested WAS sludge processed for the Town of Boiling Springs. The primary sludge is pumped to the sludge holding tank at a solids concentration of about 3%. WAS sludge is thickened by gravity to about 2% solids prior to being blended in the sludge holding tank with the primary sludge. Quantity Diameter/Size Primary Clarifiers Two (2) 80ft/451,000 gals each Secondary Clarifiers Four(4) (2) @ 70ft/288,000 gals each (2) @ 80ft/451,000 gals each Gravity Thickener One (1) 40ft/110,000 gals Sludge Holding Tank One (1) 50ft/210,000 gals Filtrate Equalization Two (2) 40,000 gals each RESIDUALS DE-WATERING Sludge is stored in the Sludge Holding tank and aerated using a combination of three (3) blowers housed in the blower building adjacent to the sludge holding tank. When operating, the blended sludge is conveyed to one of two (2) meter Roediger Tower Presses by one of three Moyno positive displacement pumps, prior to being deposited on the press the sludge is mixed with polymer through the use of an in-line velocity mixer.The sludge reaches the press at about 3% to 5% solids content. After dewatering through the press, the finished cake is about 20-25%solids content. AMENDMENT PROCESSING The City of Shelby's Public Works Department gathers "Yard Waste" throughout the city; this material is delivered to the Composting Facility. After delivery the yard waste (brush) is feed through a "Diamond Z tub grinder equipped with a set of 3 X 5 screens which produce a ground material from saw dust to pieces roughly as large as 2 to 5 inches in length. This material is transported into a covered area of the compost building where there is room for approximately 2 weeks of storage. COMPOST MIXING After discharge from the press the dewatered sludge travels a conveyor and is deposited into a mixing area where it is mixed with amendment using a skid steer.The compost mix is dependent upon the moisture content Sludge Management Plan First Broad Wastewater Treatment Plant NPDES Permit # NCO024538 Compost Permit # WQ0007780 of the amendment. A "Normal" mix is based on a 1:1 ration by weight (approx. 30% sludge and 70% amendment by volume). From the floor the mix is transported to the "bays" by the use of the skid steer. The "Load Zone" for each bay is an area 6' X 6' X 12', or about 16 cu. yds. The mix enters the bay at about 60% moisture and 40% solids content. COMPOST PROCESS The Compost Process is a 21-Day In -Vessel Aerated Static Pile Process that consists of ten (10) vessels (bay) 6' wide and 180' long. There are two (2) Agitators, one each for five (5) bays. The agitator travels down the length of the bay in an "UP" position, after reaching the far end it "LOWERS" the drum and starts its travel back up the bay. As the agitator travels through the material, the drum pitches the mix back onto a conveyor that discharges about 12' behind the drum. This action moves all the material 12' down the bay. Throwing the first material (finished compost) it comes in contact with out of the bay, moving the rest down and after completing its travel back up the bay, creating an empty "Load Zone" for the next material to go into. After the material is discharge from the bay and prior to distribution as finished compost, it is sampled for Fecal Coliform and is stored inside (covered) for 30 days while awaiting test results. COMPOST STORAGE The finished compost is stored inside (covered) for 30 days. Additional uncovered storage area on a cement pad on site for approximately 90 days storage. LEACHATE COLLECTION Decant from the belt presses and leachate for the collection/piping system on the vessels is collected from the system and drains to a manhole located outside the Compost facility. The manhole is equipped with two pumps that are used to pump the leachate to two 40,000 gallon (each) flow equalization tanks. The filtrate and leachate is then metered back to the primary clarifier splitter box. AERATION AND TEMPERATURE CONTROL In each bay there are 4 zones (A, B, C, D) each zone has a series of perforated pipes underneath a stone plenum that is connected to an air blower. The zones are monitored by thermocouples mounted in the common walls between bays. The blower system monitors on a "TIME —TEMPERATURE" bases. If the temperature in the bay reaches a set point the blower comes on and runs until it reduces the temperature in that zone. If the temperature does not reach the set point within one hour, the blower comes on for one minute to help discharge the moisture from the mix in each zone. DISTRIBUTION Compost generated at the First Broad WWTP is currently distributed to the public (landscapers and homeowners). The City provides the free compost as an unbagged bulk product that is loaded for customers at no charge. Upon distribution the customer is provided Utilization Agreement information. Records of distribution including customer information and quantities are kept on site. ODOR CONTROL The compost building is equipped with five (5) 50 HP exhaust blowers that discharge the air and moisture from inside the building through a series of large perforated pipes to the atmosphere, after passing through a bio- filter. The bio-filter is basically a static compost pile approx. 4 feet deep. The air from the building passes through this organic material prior to escaping to the atmosphere. This material strips the odor from the air as it passes through. The moisture helps with the biological process taking place in the static compost.